Proposal:H.011827.6
Parish:Livingston
Description:DUNN ROAD IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, ASPHALT PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, LIME TREATMENT, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, CONCRETE DRIVES, AND RELATED WORK.
Estimated Construction Cost:$3,668,509.60
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $3,727,717.07 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $4,067,275.75 |
| 3 | 00481 | COASTAL BRIDGE CO., L.L.C. | $4,184,527.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - KCR CONTRACTORS, LLC | - 3 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 10 | LUMP | 57,000.00 | 57,000.00 | 384,590.07 | 384,590.07 | 50,000.00 | 50,000.00 | | 0002 | 202-02-00030 | Removal of Bulkhead | 106 | LNFT | 15.00 | 1,590.00 | 16.49 | 1,747.94 | 10.00 | 1,060.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 816.2 | SQYD | 5.05 | 4,121.81 | 2.92 | 2,383.30 | 15.00 | 12,243.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS 9.5" Soil Cement | 816.2 | SQYD | 6.31 | 5,150.22 | 3.57 | 2,913.83 | 15.00 | 12,243.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,662 | SQYD | 9.12 | 15,157.44 | 3.48 | 5,783.76 | 14.00 | 23,268.00 | | 0006 | 202-02-12020 | Removal of Fence (Chain Link) | 26 | LNFT | 6.12 | 159.12 | 11.00 | 286.00 | 50.00 | 1,300.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) (24", 30", 36", 48" and 84") | 377 | LNFT | 4.42 | 1,666.34 | 15.35 | 5,786.95 | 25.00 | 9,425.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (8", 12", 15", 18", 24" and 30") | 3,410 | LNFT | 3.67 | 12,514.70 | 7.90 | 26,939.00 | 25.00 | 85,250.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 36 | EACH | 20.00 | 720.00 | 23.00 | 828.00 | 75.00 | 2,700.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 185,000.00 | 185,000.00 | 124,677.94 | 124,677.94 | 40,000.00 | 40,000.00 | | 0011 | 203-10-00100 | Cleaning Existing Ditches | 2,125 | LNFT | 4.50 | 9,562.50 | 8.84 | 18,785.00 | 25.00 | 53,125.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 546 | EACH | 10.00 | 5,460.00 | 21.09 | 11,515.14 | 5.00 | 2,730.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 26,035 | LNFT | 1.75 | 45,561.25 | 1.61 | 41,916.35 | 2.00 | 52,070.00 | | 0014 | 303-01-00150 | In-Place Cement Stabilized Base Course (8" Thick) | 27,565 | SQYD | 7.50 | 206,737.50 | 11.56 | 318,651.40 | 12.00 | 330,780.00 | | 0015 | 304-01-00100 | Lime | 390 | TON | 20.00 | 7,800.00 | 29.79 | 11,618.10 | 50.00 | 19,500.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 27,565 | SQYD | 0.50 | 13,782.50 | 0.01 | 275.65 | 0.25 | 6,891.25 | | 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 678.1 | CUYD | 95.00 | 64,419.50 | 102.45 | 69,471.35 | 175.00 | 118,667.50 | | 0018 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 229 | SQYD | 20.00 | 4,580.00 | 139.30 | 31,899.70 | 45.00 | 10,305.00 | | 0019 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 400 | CUYD | 1.00 | 400.00 | 94.88 | 37,952.00 | 100.00 | 40,000.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 8,828.3 | TON | 91.50 | 807,789.45 | 95.61 | 844,073.76 | 92.00 | 812,203.60 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,238.9 | TON | 175.00 | 216,807.50 | 139.86 | 173,272.55 | 135.00 | 167,251.50 | | 0022 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 18,856 | GAL | 3.25 | 61,282.00 | 2.97 | 56,002.32 | 3.30 | 62,224.80 | | 0023 | 507-02-00200 | Aggregate (S2) | 27,730 | SQYD | 1.20 | 33,276.00 | 1.57 | 43,536.10 | 1.40 | 38,822.00 | | 0024 | 507-02-00300 | Aggregate (S3) | 27,730 | SQYD | 1.00 | 27,730.00 | 1.30 | 36,049.00 | 1.20 | 33,276.00 | | 0025 | 509-01-00100 | Milling Asphalt Pavement | 34,130 | SQYD | 2.00 | 68,260.00 | 2.33 | 79,522.90 | 4.00 | 136,520.00 | | 0026 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 374 | SQYD | 65.00 | 24,310.00 | 94.22 | 35,238.28 | 110.00 | 41,140.00 | | 0027 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 540.4 | SQYD | 105.00 | 56,742.00 | 113.11 | 61,124.64 | 80.00 | 43,232.00 | | 0028 | 701-01-01180 | Cross Drain Pipe (96" RCP) | 96 | LNFT | 850.00 | 81,600.00 | 1,417.15 | 136,046.40 | 1,000.00 | 96,000.00 | | 0029 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 220 | LNFT | 140.00 | 30,800.00 | 162.97 | 35,853.40 | 125.00 | 27,500.00 | | 0030 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 40 | LNFT | 135.00 | 5,400.00 | 266.10 | 10,644.00 | 155.00 | 6,200.00 | | 0031 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 35 | LNFT | 165.00 | 5,775.00 | 322.55 | 11,289.25 | 200.00 | 7,000.00 | | 0032 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 100 | LNFT | 350.00 | 35,000.00 | 424.97 | 42,497.00 | 400.00 | 40,000.00 | | 0033 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 442 | LNFT | 34.00 | 15,028.00 | 33.65 | 14,873.30 | 55.00 | 24,310.00 | | 0034 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 1,807 | LNFT | 35.00 | 63,245.00 | 34.94 | 63,136.58 | 55.00 | 99,385.00 | | 0035 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,006 | LNFT | 38.00 | 76,228.00 | 39.39 | 79,016.34 | 80.00 | 160,480.00 | | 0036 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 232 | LNFT | 70.00 | 16,240.00 | 58.17 | 13,495.44 | 125.00 | 29,000.00 | | 0037 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 642 | LNFT | 76.00 | 48,792.00 | 58.33 | 37,447.86 | 135.00 | 86,670.00 | | 0038 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 163 | LNFT | 42.00 | 6,846.00 | 84.99 | 13,853.37 | 65.00 | 10,595.00 | | 0039 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 673 | LNFT | 44.00 | 29,612.00 | 86.39 | 58,140.47 | 85.00 | 57,205.00 | | 0040 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 132 | LNFT | 80.00 | 10,560.00 | 92.66 | 12,231.12 | 100.00 | 13,200.00 | | 0041 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 58 | LNFT | 90.00 | 5,220.00 | 112.85 | 6,545.30 | 175.00 | 10,150.00 | | 0042 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 84 | LNFT | 55.00 | 4,620.00 | 66.55 | 5,590.20 | 100.00 | 8,400.00 | | 0043 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 181 | LNFT | 75.00 | 13,575.00 | 90.08 | 16,304.48 | 105.00 | 19,005.00 | | 0044 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 663 | LNFT | 80.00 | 53,040.00 | 101.68 | 67,413.84 | 110.00 | 72,930.00 | | 0045 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 238 | LNFT | 85.00 | 20,230.00 | 106.00 | 25,228.00 | 115.00 | 27,370.00 | | 0046 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 1,472 | LNFT | 55.00 | 80,960.00 | 42.85 | 63,075.20 | 65.00 | 95,680.00 | | 0047 | 701-05-01062 | Side Drain Pipe (24" RCP/RPVCP/CMP) | 78 | LNFT | 65.00 | 5,070.00 | 56.51 | 4,407.78 | 85.00 | 6,630.00 | | 0048 | 701-05-02042 | Side Drain Pipe (Erosion) (18" RPVCP/CMP) | 146 | LNFT | 42.00 | 6,132.00 | 42.85 | 6,256.10 | 65.00 | 9,490.00 | | 0049 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 86 | LNFT | 85.00 | 7,310.00 | 103.84 | 8,930.24 | 70.00 | 6,020.00 | | 0050 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 68 | LNFT | 86.00 | 5,848.00 | 110.01 | 7,480.68 | 95.00 | 6,460.00 | | 0051 | 701-07-00300 | Yard Drain Pipe (8") | 56 | LNFT | 28.00 | 1,568.00 | 56.98 | 3,190.88 | 55.00 | 3,080.00 | | 0052 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 358 | LNFT | 0.01 | 3.58 | 7.68 | 2,749.44 | 40.00 | 14,320.00 | | 0053 | 702-03-00100 | Catch Basins (CB-01) | 73 | EACH | 2,600.00 | 189,800.00 | 2,646.15 | 193,168.95 | 3,000.00 | 219,000.00 | | 0054 | 702-03-00200 | Catch Basins (CB-02) | 5 | EACH | 2,800.00 | 14,000.00 | 3,806.50 | 19,032.50 | 4,500.00 | 22,500.00 | | 0055 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 2,000.02 | 2,000.02 | 1,815.30 | 1,815.30 | 1,500.00 | 1,500.00 | | 0056 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 80 | LNFT | 60.00 | 4,800.00 | 130.43 | 10,434.40 | 175.00 | 14,000.00 | | 0059 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 26 | LNFT | 35.00 | 910.00 | 99.52 | 2,587.52 | 150.00 | 3,900.00 | | 0060 | 706-01-00100 | Concrete Walk (4" Thick) | 17.2 | SQYD | 80.00 | 1,376.00 | 60.00 | 1,032.00 | 125.00 | 2,150.00 | | 0061 | 706-02-00200 | Concrete Drive (6" Thick) | 1,595.7 | SQYD | 56.00 | 89,359.20 | 103.34 | 164,899.64 | 75.00 | 119,677.50 | | 0062 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 55 | SQYD | 100.00 | 5,500.00 | 69.00 | 3,795.00 | 125.00 | 6,875.00 | | 0063 | 711-04-00100 | Geotextile Fabric | 55 | SQYD | 5.00 | 275.00 | 1.46 | 80.30 | 8.00 | 440.00 | | 0064 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 53,475.13 | 53,475.13 | 50,000.00 | 50,000.00 | | 0065 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 29,431 | LNFT | 0.05 | 1,471.55 | 0.14 | 4,120.34 | 0.30 | 8,829.30 | | 0066 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 154 | LNFT | 1.00 | 154.00 | 1.15 | 177.10 | 1.10 | 169.40 | | 0067 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 6,000.00 | 24,000.00 | 3,450.00 | 13,800.00 | 15,000.00 | 60,000.00 | | 0068 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,814 | SQYD | 3.00 | 5,442.00 | 1.60 | 2,902.40 | 3.00 | 5,442.00 | | 0069 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 40 | SQYD | 3.00 | 120.00 | 16.27 | 650.80 | 25.00 | 1,000.00 | | 0070 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 174 | SQYD | 3.00 | 522.00 | 6.04 | 1,050.96 | 25.00 | 4,350.00 | | 0071 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 33 | SQYD | 11.00 | 363.00 | 19.65 | 648.45 | 25.00 | 825.00 | | 0072 | 726-01-00100 | Bedding Material | 956.2 | CUYD | 90.00 | 86,058.00 | 96.50 | 92,273.30 | 25.00 | 23,905.00 | | 0073 | 727-01-00100 | Mobilization | 1 | LUMP | 370,000.00 | 370,000.00 | 226,593.12 | 226,593.12 | 375,000.00 | 375,000.00 | | 0074 | 729-01-00100 | Sign (Type A) | 134.2 | SQFT | 29.31 | 3,933.40 | 28.75 | 3,858.25 | 25.00 | 3,355.00 | | 0075 | 729-01-00103 | Sign (Type A)(Relocate) | 12 | SQFT | 129.64 | 1,555.68 | 63.25 | 759.00 | 55.00 | 660.00 | | 0076 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 29 | EACH | 197.28 | 5,721.12 | 97.75 | 2,834.75 | 85.00 | 2,465.00 | | 0077 | 731-02-00100 | Reflectorized Raised Pavement Markers | 368 | EACH | 6.76 | 2,487.68 | 5.75 | 2,116.00 | 6.50 | 2,392.00 | | 0078 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 300 | LNFT | 10.50 | 3,150.00 | 11.50 | 3,450.00 | 12.00 | 3,600.00 | | 0079 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.574 | MILE | 3,200.00 | 17,836.80 | 3,450.00 | 19,230.30 | 3,500.00 | 19,509.00 | | 0080 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 310.01 | 620.02 | 316.25 | 632.50 | 245.00 | 490.00 | | 0081 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 310.01 | 620.02 | 316.25 | 632.50 | 245.00 | 490.00 | | 0082 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 563.66 | 2,254.64 | 402.50 | 1,610.00 | 250.00 | 1,000.00 | | 0083 | 735-01-00100 | Mailboxes | 117 | EACH | 15.00 | 1,755.00 | 17.25 | 2,018.25 | 15.00 | 1,755.00 | | 0084 | 735-02-00100 | Mailbox Supports (Single) | 117 | EACH | 120.00 | 14,040.00 | 132.25 | 15,473.25 | 115.00 | 13,455.00 | | 0085 | 739-01-00100 | Hydro-Seeding | 9.9 | ACRE | 1,803.71 | 17,856.73 | 1,582.61 | 15,667.84 | 1,500.00 | 14,850.00 | | 0086 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 | 40,000.00 | 40,000.00 | | 0087 | NS-300-00060 | Geogrid | 212 | SQYD | 2.00 | 424.00 | 10.50 | 2,226.00 | 5.00 | 1,060.00 | | 0088 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 104 | SQYD | 14.00 | 1,456.00 | 17.25 | 1,794.00 | 22.00 | 2,288.00 | | 0089 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 4,288 | INLF | 0.60 | 2,572.80 | 1.32 | 5,660.16 | 1.00 | 4,288.00 | | 0090 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 4 | EACH | 3,500.00 | 14,000.00 | 3,059.51 | 12,238.04 | 2,500.00 | 10,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,727,717.07 | | 4,067,275.75 | | 4,184,527.85 |
|