Proposal:H.001679.6
Parish:Lincoln
Routes:LA 146
Description:LA 146 BRIDGES NEAR VIENNA
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE (TIMBER), GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS (PRECAST), CONCRETE SLAB SPAN BRIDGE, CLASS II BASE COURSE, ALTERNATE AA1 (18” PILE): PRECAST CONCRETE PILES (18”); ALTERNATE AA2 (24” PILE): PRECAST CONCRETE PILES (24”) AND RELATED WORK.
Estimated Construction Cost:$2,998,877.02
| Rank | License | Bidder | Construction Bid |
| 1 | 14788 | Louisiana Bridge, Inc. | $2,542,524.92 |
| 2 | 63897 | TL Hawk, LLC | $2,703,733.75 |
| 3 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $2,825,634.17 |
| 4 | 23112 | BEN ALLEN, INC. | $2,996,834.12 |
| 5 | 49239 | WL Bass Construction Inc. | $3,142,235.00 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $4,007,333.14 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Louisiana Bridge, Inc. | - 2 - TL Hawk, LLC | - 3 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 4 - BEN ALLEN, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5.504 | LUMP | 74,000.00 | 74,000.00 | 50,000.00 | 50,000.00 | 36,000.00 | 36,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 8,332.00 | 8,332.00 | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 5,373.4 | SQYD | 5.00 | 26,867.00 | 2.00 | 10,746.80 | 4.00 | 21,493.60 | 3.00 | 16,120.20 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 5,373.4 | SQYD | 3.00 | 16,120.20 | 1.75 | 9,403.45 | 4.00 | 21,493.60 | 7.00 | 37,613.80 | | 0005 | 202-02-04501 | Removal of Bridge Str. No. 05310850912091, Sta. 110+50.00, 24.0'x39.0' TTRES Bridge | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | | 0006 | 202-02-04501 | Removal of Bridge Str. No. 05310850914151, Sta. 212+00, 24.0'x19.0' TTRES Bridge | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 8,500.00 | 8,500.00 | | 0007 | 202-02-04501 | Removal of Bridge Str. No. 05310850914371, Sta. 310+00.00, 24.0'x117.0' TTRES Bridge | 1 | LUMP | 12,000.00 | 12,000.00 | 29,000.00 | 29,000.00 | 66,000.00 | 66,000.00 | 10,000.00 | 10,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 304 | LNFT | 4.00 | 1,216.00 | 7.00 | 2,128.00 | 4.50 | 1,368.00 | 4.00 | 1,216.00 | | 0009 | 202-02-14500 | Removal of Guard Rail Total of all three sites | 953.5 | LNFT | 6.00 | 5,721.00 | 7.00 | 6,674.50 | 6.00 | 5,721.00 | 8.00 | 7,628.00 | | 0010 | 203-01-00100 | General Excavation | 1,856 | CUYD | 7.00 | 12,992.00 | 6.00 | 11,136.00 | 13.00 | 24,128.00 | 10.00 | 18,560.00 | | 0011 | 203-02-00100 | Drainage Excavation | 1,536 | CUYD | 5.00 | 7,680.00 | 9.00 | 13,824.00 | 9.50 | 14,592.00 | 10.00 | 15,360.00 | | 0012 | 203-03-00100 | Embankment | 9,943 | CUYD | 10.00 | 99,430.00 | 20.00 | 198,860.00 | 16.00 | 159,088.00 | 13.00 | 129,259.00 | | 0013 | 203-04-00300 | Nonplastic Embankment (Stone) | 12 | CUYD | 100.00 | 1,200.00 | 125.00 | 1,500.00 | 115.00 | 1,380.00 | 120.00 | 1,440.00 | | 0014 | 203-08-00100 | Geotextile Fabric | 55 | SQYD | 3.00 | 165.00 | 4.00 | 220.00 | 1.50 | 82.50 | 3.00 | 165.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 130.00 | 2,080.00 | 175.00 | 2,800.00 | 150.00 | 2,400.00 | 30.00 | 480.00 | | 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 450.00 | 900.00 | 325.00 | 650.00 | 550.00 | 1,100.00 | 500.00 | 1,000.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 4,536 | LNFT | 4.00 | 18,144.00 | 2.05 | 9,298.80 | 2.25 | 10,206.00 | 2.50 | 11,340.00 | | 0018 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 6,370.9 | SQYD | 27.00 | 172,014.30 | 30.00 | 191,127.00 | 29.50 | 187,941.55 | 30.00 | 191,127.00 | | 0019 | 304-01-00100 | Lime | 90.31 | TON | 205.00 | 18,513.55 | 245.00 | 22,125.95 | 210.00 | 18,965.10 | 250.00 | 22,577.50 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 6,371 | SQYD | 4.00 | 25,484.00 | 2.25 | 14,334.75 | 3.50 | 22,298.50 | 6.00 | 38,226.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 7 | CUYD | 120.00 | 840.00 | 65.00 | 455.00 | 370.00 | 2,590.00 | 110.00 | 770.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 1,489.8 | TON | 138.00 | 205,592.40 | 130.00 | 193,674.00 | 150.00 | 223,470.00 | 163.00 | 242,837.40 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 353 | TON | 138.00 | 48,714.00 | 150.00 | 52,950.00 | 165.00 | 58,245.00 | 163.00 | 57,539.00 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 1,390 | SQYD | 12.00 | 16,680.00 | 12.50 | 17,375.00 | 11.00 | 15,290.00 | 15.00 | 20,850.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -77 | CUYD | 0.01 | -0.77 | 0.01 | -0.77 | 0.10 | -7.70 | 1.00 | -77.00 | | 0026 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 81.78 | SQYD | 105.00 | 8,586.90 | 200.00 | 16,356.00 | 200.00 | 16,356.00 | 100.00 | 8,178.00 | | 0027 | 701-05-01082 | Side Drain Pipe (30" RCP/RPVCP/CMP) | 24 | LNFT | 70.00 | 1,680.00 | 50.00 | 1,200.00 | 125.00 | 3,000.00 | 120.00 | 2,880.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,169.16 | LNFT | 29.00 | 33,905.64 | 25.43 | 29,731.74 | 32.00 | 37,413.12 | 27.00 | 31,567.32 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 102.00 | 10,200.00 | 91.77 | 9,177.00 | 75.00 | 7,500.00 | 95.00 | 9,500.00 | | 0030 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 12 | EACH | 3,300.00 | 39,600.00 | 2,661.10 | 31,933.20 | 3,000.00 | 36,000.00 | 3,000.00 | 36,000.00 | | 0031 | 705-01-00100 | Barbed Wire Fence | 304 | LNFT | 10.00 | 3,040.00 | 14.59 | 4,435.36 | 8.00 | 2,432.00 | 15.00 | 4,560.00 | | 0032 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 800.00 | 800.00 | 1,561.36 | 1,561.36 | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 250.00 | 3,000.00 | 200.00 | 2,400.00 | 150.00 | 1,800.00 | 150.00 | 1,800.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 250.00 | 3,000.00 | 100.00 | 1,200.00 | 150.00 | 1,800.00 | 150.00 | 1,800.00 | | 0035 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,141 | SQYD | 72.00 | 82,152.00 | 80.00 | 91,280.00 | 70.00 | 79,870.00 | 70.00 | 79,870.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 1,141 | SQYD | 3.00 | 3,423.00 | 4.00 | 4,564.00 | 1.50 | 1,711.50 | 3.00 | 3,423.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,000.00 | 23,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | | 0038 | 717-01-00100 | Seeding | 120 | LB | 22.00 | 2,640.00 | 28.65 | 3,438.00 | 20.00 | 2,400.00 | 10.00 | 1,200.00 | | 0039 | 718-01-00100 | Fertilizer | 4,000 | LB | 0.55 | 2,200.00 | 0.83 | 3,320.00 | 0.75 | 3,000.00 | 2.00 | 8,000.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,525 | SQYD | 1.70 | 4,292.50 | 1.41 | 3,560.25 | 2.40 | 6,060.00 | 2.00 | 5,050.00 | | 0041 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 705 | SQYD | 2.00 | 1,410.00 | 1.63 | 1,149.15 | 3.00 | 2,115.00 | 4.00 | 2,820.00 | | 0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.94 | MILE | 6,000.00 | 5,640.00 | 300.00 | 282.00 | 3,000.00 | 2,820.00 | 330.00 | 310.20 | | 0044 | 726-01-00100 | Bedding Material | 190.36 | CUYD | 95.00 | 18,084.20 | 115.00 | 21,891.40 | 100.00 | 19,036.00 | 110.00 | 20,939.60 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 188,000.00 | 188,000.00 | 202,250.00 | 202,250.00 | 260,000.00 | 260,000.00 | 290,000.00 | 290,000.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 120.00 | 1,440.00 | 75.00 | 900.00 | 100.00 | 1,200.00 | 115.00 | 1,380.00 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 102 | EACH | 12.00 | 1,224.00 | 9.00 | 918.00 | 10.00 | 1,020.00 | 14.00 | 1,428.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.539 | MILE | 9,000.00 | 13,851.00 | 3,525.02 | 5,425.01 | 5,000.00 | 7,695.00 | 7,800.00 | 12,004.20 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.303 | MILE | 4,000.00 | 1,212.00 | 1,531.35 | 464.00 | 2,000.00 | 606.00 | 3,600.00 | 1,090.80 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 38,000.00 | 38,000.00 | 38,000.00 | 38,000.00 | | 0051 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 750.00 | 5,250.00 | 1,800.00 | 12,600.00 | 100.00 | 700.00 | 1,500.00 | 10,500.00 | | 0052 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 850.00 | 190,340.50 | 950.00 | 212,733.50 | 1,000.00 | 223,930.00 | 1,300.00 | 291,109.00 | | 0053 | 805-15-01300 | Reinforced Concrete Box Culverts (Precast) (7' x 6') | 240 | LNFT | 470.00 | 112,800.00 | 550.00 | 132,000.00 | 625.00 | 150,000.00 | 616.00 | 147,840.00 | | 0054 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 216 | LNFT | 545.00 | 117,720.00 | 625.00 | 135,000.00 | 700.00 | 151,200.00 | 714.00 | 154,224.00 | | 0055 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 1 Box culvert | 2 | EACH | 48,000.00 | 96,000.00 | 32,000.00 | 64,000.00 | 40,000.00 | 80,000.00 | 30,000.00 | 60,000.00 | | 0056 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 2 Box culvert | 2 | EACH | 48,000.00 | 96,000.00 | 46,000.00 | 92,000.00 | 35,000.00 | 70,000.00 | 44,000.00 | 88,000.00 | | 0057 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,679.2 | SQFT | 2.00 | 3,358.40 | 1.50 | 2,518.80 | 3.00 | 5,037.60 | 1.50 | 2,518.80 | | 0058 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,679.2 | SQFT | 2.00 | 3,358.40 | 1.50 | 2,518.80 | 3.00 | 5,037.60 | 1.50 | 2,518.80 | | 0059 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 120.00 | 9,600.00 | 140.00 | 11,200.00 | 165.00 | 13,200.00 | 100.00 | 8,000.00 | | 0060 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 200 | LNFT | 135.00 | 27,000.00 | 145.00 | 29,000.00 | 130.00 | 26,000.00 | 120.00 | 24,000.00 | | 0061 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 82.00 | 209,920.00 | 77.00 | 197,120.00 | 75.00 | 192,000.00 | 90.00 | 230,400.00 | | 0062 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 168 | SFIN | 115.00 | 19,320.00 | 25.00 | 4,200.00 | 100.00 | 16,800.00 | 60.00 | 10,080.00 | | 0063 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 18.00 | 4,608.00 | 20.00 | 5,120.00 | 19.00 | 4,864.00 | 50.00 | 12,800.00 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 3.00 | 576.00 | 10.00 | 1,920.00 | 20.00 | 3,840.00 | 10.00 | 1,920.00 | | 0065 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 4.00 | 1,280.00 | 2.50 | 800.00 | 2.25 | 720.00 | 10.00 | 3,200.00 | | 0066 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 917 | INLF | 5.00 | 4,585.00 | 2.00 | 1,834.00 | 1.50 | 1,375.50 | 10.00 | 9,170.00 | | | | SUBTOTAL GENERAL | | | | 2,181,450 | | 2,278,616 | | 2,420,884 | | 2,573,614 | | | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA1 (18" Pile) | | | | | | | | | | | | | | | | | | | | | | | | | | 0067 | 804-01-00400 | Precast Concrete Piles (18") | 1,920 | LNFT | 96.00 | 184,320.00 | 100.00 | 192,000.00 | 88.00 | 168,960.00 | 100.00 | 192,000.00 | | 0068 | 804-05-00400 | Precast Concrete Test Piles (18") | 1 | EACH | 1.00 | 1.00 | 63,500.00 | 63,500.00 | 14,500.00 | 14,500.00 | 35,000.00 | 35,000.00 | | 0069 | 804-09-00400 | Static Load Test (Precast Concrete Piles (18")) | 1 | EACH | 45,000.00 | 45,000.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0070 | 805-01-00300 | Class A1 Concrete (Bent Cap) 18" Pile Alternate | 61.92 | CUYD | 1,200.00 | 74,304.00 | 1,650.00 | 102,168.00 | 2,000.00 | 123,840.00 | 1,500.00 | 92,880.00 | | 0071 | 806-01-00100 | Deformed Reinforcing Steel | 52,227 | LB | 1.10 | 57,449.70 | 1.10 | 57,449.70 | 1.10 | 57,449.70 | 1.50 | 78,340.50 | | | | SUBTOTAL ALT AA2 | | | | 361,074.70 | | 425,117.70 | | 404,749.70 | | 423,220.50 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,542,524.92 | | 2,703,733.75 | | 2,825,634.17 | | 2,996,834.12 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | - 6 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5.504 | LUMP | 145,000.00 | 145,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 16,500.00 | 16,500.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 5,373.4 | SQYD | 2.00 | 10,746.80 | 10.00 | 53,734.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 5,373.4 | SQYD | 3.50 | 18,806.90 | 12.00 | 64,480.80 | | 0005 | 202-02-04501 | Removal of Bridge Str. No. 05310850912091, Sta. 110+50.00, 24.0'x39.0' TTRES Bridge | 1 | LUMP | 10,000.00 | 10,000.00 | 60,000.00 | 60,000.00 | | 0006 | 202-02-04501 | Removal of Bridge Str. No. 05310850914151, Sta. 212+00, 24.0'x19.0' TTRES Bridge | 1 | LUMP | 12,000.00 | 12,000.00 | 60,000.00 | 60,000.00 | | 0007 | 202-02-04501 | Removal of Bridge Str. No. 05310850914371, Sta. 310+00.00, 24.0'x117.0' TTRES Bridge | 1 | LUMP | 20,000.00 | 20,000.00 | 65,000.00 | 65,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 304 | LNFT | 2.00 | 608.00 | 10.00 | 3,040.00 | | 0009 | 202-02-14500 | Removal of Guard Rail Total of all three sites | 953.5 | LNFT | 3.00 | 2,860.50 | 10.00 | 9,535.00 | | 0010 | 203-01-00100 | General Excavation | 1,856 | CUYD | 17.50 | 32,480.00 | 25.00 | 46,400.00 | | 0011 | 203-02-00100 | Drainage Excavation | 1,536 | CUYD | 12.00 | 18,432.00 | 20.00 | 30,720.00 | | 0012 | 203-03-00100 | Embankment | 9,943 | CUYD | 18.00 | 178,974.00 | 33.00 | 328,119.00 | | 0013 | 203-04-00300 | Nonplastic Embankment (Stone) | 12 | CUYD | 175.00 | 2,100.00 | 350.00 | 4,200.00 | | 0014 | 203-08-00100 | Geotextile Fabric | 55 | SQYD | 2.25 | 123.75 | 15.00 | 825.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 155.00 | 2,480.00 | 150.00 | 2,400.00 | | 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 350.00 | 700.00 | 500.00 | 1,000.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 4,536 | LNFT | 2.00 | 9,072.00 | 3.00 | 13,608.00 | | 0018 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 6,370.9 | SQYD | 45.00 | 286,690.50 | 38.00 | 242,094.20 | | 0019 | 304-01-00100 | Lime | 90.31 | TON | 200.00 | 18,062.00 | 235.00 | 21,222.85 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 6,371 | SQYD | 5.00 | 31,855.00 | 5.00 | 31,855.00 | | 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 7 | CUYD | 90.00 | 630.00 | 150.00 | 1,050.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 1,489.8 | TON | 135.00 | 201,123.00 | 130.00 | 193,674.00 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 353 | TON | 150.00 | 52,950.00 | 150.00 | 52,950.00 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 1,390 | SQYD | 25.00 | 34,750.00 | 12.50 | 17,375.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -77 | CUYD | 0.01 | -0.77 | 0.01 | -0.77 | | 0026 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 81.78 | SQYD | 290.00 | 23,716.20 | 200.00 | 16,356.00 | | 0027 | 701-05-01082 | Side Drain Pipe (30" RCP/RPVCP/CMP) | 24 | LNFT | 88.00 | 2,112.00 | 190.00 | 4,560.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,169.16 | LNFT | 30.00 | 35,074.80 | 25.50 | 29,813.58 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 115.00 | 11,500.00 | 90.00 | 9,000.00 | | 0030 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 12 | EACH | 2,900.00 | 34,800.00 | 2,850.00 | 34,200.00 | | 0031 | 705-01-00100 | Barbed Wire Fence | 304 | LNFT | 14.60 | 4,438.40 | 10.00 | 3,040.00 | | 0032 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 1,570.00 | 1,570.00 | 750.00 | 750.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 155.00 | 1,860.00 | 250.00 | 3,000.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 155.00 | 1,860.00 | 250.00 | 3,000.00 | | 0035 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,141 | SQYD | 83.00 | 94,703.00 | 73.74 | 84,137.34 | | 0036 | 711-04-00100 | Geotextile Fabric | 1,141 | SQYD | 2.25 | 2,567.25 | 2.98 | 3,400.18 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0038 | 717-01-00100 | Seeding | 120 | LB | 29.00 | 3,480.00 | 20.00 | 2,400.00 | | 0039 | 718-01-00100 | Fertilizer | 4,000 | LB | 1.00 | 4,000.00 | 0.50 | 2,000.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,525 | SQYD | 1.45 | 3,661.25 | 2.50 | 6,312.50 | | 0041 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 705 | SQYD | 1.65 | 1,163.25 | 3.00 | 2,115.00 | | 0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 14,100.00 | 14,100.00 | 30,000.00 | 30,000.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.94 | MILE | 3,000.00 | 2,820.00 | 300.00 | 282.00 | | 0044 | 726-01-00100 | Bedding Material | 190.36 | CUYD | 115.00 | 21,891.40 | 140.00 | 26,650.40 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 314,200.00 | 314,200.00 | 375,000.00 | 375,000.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 105.00 | 1,260.00 | 105.00 | 1,260.00 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 102 | EACH | 10.00 | 1,020.00 | 9.00 | 918.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.539 | MILE | 5,000.00 | 7,695.00 | 3,500.00 | 5,386.50 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.303 | MILE | 2,000.00 | 606.00 | 1,800.00 | 545.40 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 60,000.00 | 60,000.00 | | 0051 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 500.00 | 3,500.00 | 2,500.00 | 17,500.00 | | 0052 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 350.00 | 78,375.50 | 950.00 | 212,733.50 | | 0053 | 805-15-01300 | Reinforced Concrete Box Culverts (Precast) (7' x 6') | 240 | LNFT | 800.00 | 192,000.00 | 755.00 | 181,200.00 | | 0054 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 216 | LNFT | 870.00 | 187,920.00 | 935.00 | 201,960.00 | | 0055 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 1 Box culvert | 2 | EACH | 55,000.00 | 110,000.00 | 50,000.00 | 100,000.00 | | 0056 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 2 Box culvert | 2 | EACH | 37,000.00 | 74,000.00 | 35,000.00 | 70,000.00 | | 0057 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,679.2 | SQFT | 1.35 | 2,266.92 | 1.00 | 1,679.20 | | 0058 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,679.2 | SQFT | 2.50 | 4,198.00 | 1.17 | 1,964.66 | | 0059 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 150.00 | 12,000.00 | 140.00 | 11,200.00 | | 0060 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 200 | LNFT | 170.00 | 34,000.00 | 145.00 | 29,000.00 | | 0061 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 95.00 | 243,200.00 | 85.00 | 217,600.00 | | 0062 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 168 | SFIN | 250.00 | 42,000.00 | 60.00 | 10,080.00 | | 0063 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 10.00 | 2,560.00 | 20.00 | 5,120.00 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 12.00 | 2,304.00 | 10.00 | 1,920.00 | | 0065 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 2.50 | 800.00 | 10.00 | 3,200.00 | | 0066 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 917 | INLF | 1.60 | 1,467.20 | 1.00 | 917.00 | | | | SUBTOTAL GENERAL | | | | 2,818,634 | | 3,389,983 | | | | | | | | | | | | | Alternate AA2 | Alternate AA1 (18" Pile) | | | | | | | | | | | | | | | | | | 0067 | 804-01-00400 | Precast Concrete Piles (18") | 1,920 | LNFT | 110.00 | 211,200.00 | 104.00 | 199,680.00 | | 0068 | 804-05-00400 | Precast Concrete Test Piles (18") | 1 | EACH | 5,000.00 | 5,000.00 | 80,000.00 | 80,000.00 | | 0069 | 804-09-00400 | Static Load Test (Precast Concrete Piles (18")) | 1 | EACH | 10,000.00 | 10,000.00 | 150,000.00 | 150,000.00 | | 0070 | 805-01-00300 | Class A1 Concrete (Bent Cap) 18" Pile Alternate | 61.92 | CUYD | 350.00 | 21,672.00 | 1,850.00 | 114,552.00 | | 0071 | 806-01-00100 | Deformed Reinforcing Steel | 52,227 | LB | 1.45 | 75,729.15 | 1.40 | 73,117.80 | | | | SUBTOTAL ALT AA2 | | | | 323,601.15 | | 617,349.80 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,142,235.00 | | 4,007,333.14 |
|