Proposal:H.012739.6-R1
Parish:Madison
Routes:I-20
Description:I-20 MRB AT VICKSBURG OVERLAY AND REHAB
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE DECK (HYDRODEMOLITION), TRAFFIC SIGNALIZATION, DRILLED SHAFT FOUNDATIONS, STRUCTURAL METALWORK, ELECTRICAL SYSTEMS, BRIDGE REPAIRS, LATEX MODIFIED CONCRETE OVERLAY, INTELLIGENT TRANSPORTATION SYSTEMS, AND RELATED WORK.
Estimated Construction Cost:$47,639,500.44
Maximum Number of Days Allowed for Construction:450
Calculated Daily User Cost:$12,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 47488 | OCCI INC of Missouri | $27,711,842.51 | 300.00 | $31,311,842.51 |
| 2 | 26435 | C.E.C., Inc. | $29,646,173.86 | 450.00 | $35,046,173.86 |
| 3 | 44133 | Gibson & Associates Inc. | $31,113,258.47 | 450.00 | $36,513,258.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - OCCI INC of Missouri | - 2 - C.E.C., Inc. | - 3 - Gibson & Associates Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.079 | LUMP | 3,356.00 | 3,356.00 | 10,000.00 | 10,000.00 | 111,000.00 | 111,000.00 | | 0002 | 202-02-00010 | Removal of Concrete Slab | 1 | EACH | 4,502.00 | 4,502.00 | 4,440.00 | 4,440.00 | 8,700.00 | 8,700.00 | | 0003 | 202-02-00010 | Removal of Existing Aerial Beacon Access | 2 | EACH | 41,310.00 | 82,620.00 | 50,000.00 | 100,000.00 | 65,000.00 | 130,000.00 | | 0004 | 202-02-00010 | Removal of Piertop Concrete | 2 | EACH | 1,433.00 | 2,866.00 | 20,000.00 | 40,000.00 | 500.00 | 1,000.00 | | 0005 | 202-02-00010 | Removal of Pullbox and Structure Mount | 22 | EACH | 126.00 | 2,772.00 | 197.00 | 4,334.00 | 179.80 | 3,955.60 | | 0006 | 202-02-00010 | Removal of Removal and Reinstallation of Road Surface Sensor | 1 | EACH | 4,596.00 | 4,596.00 | 1,887.00 | 1,887.00 | 1,886.50 | 1,886.50 | | 0007 | 202-02-00030 | Removal of Existing ITS Conduit | 23,550 | LNFT | 5.00 | 117,750.00 | 3.85 | 90,667.50 | 3.82 | 89,961.00 | | 0008 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) 1.5" DECK HYDROBLASTING | 885,780 | SFIN | 7.00 | 6,200,460.00 | 4.60 | 4,074,588.00 | 4.05 | 3,587,409.00 | | 0009 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment RVD (RDS) Unit | 1 | LUMP | 2,020.00 | 2,020.00 | 3,100.00 | 3,100.00 | 3,096.50 | 3,096.50 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 2,247.00 | 2,247.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 32,500.00 | 32,500.00 | 1,600,000.00 | 1,600,000.00 | 850,000.00 | 850,000.00 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.372 | MILE | 375.00 | 3,139.50 | 1,200.00 | 10,046.40 | 770.00 | 6,446.44 | | 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.372 | MILE | 400.00 | 3,348.80 | 1,200.00 | 10,046.40 | 770.00 | 6,446.44 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.744 | MILE | 650.00 | 10,883.60 | 2,040.00 | 34,157.76 | 1,650.00 | 27,627.60 | | 0015 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 65 | MILE | 7,000.00 | 455,000.00 | 12,000.00 | 780,000.00 | 11,000.00 | 715,000.00 | | 0016 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 230 | EACH | 993.00 | 228,390.00 | 435.00 | 100,050.00 | 1,000.00 | 230,000.00 | | 0017 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 11,500 | EACH | 65.00 | 747,500.00 | 55.00 | 632,500.00 | 38.00 | 437,000.00 | | 0018 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 15,000.00 | 60,000.00 | 25,000.00 | 100,000.00 | 30,000.00 | 120,000.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 2,706,541.00 | 2,706,541.00 | 2,900,000.00 | 2,900,000.00 | 3,100,000.00 | 3,100,000.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,309 | EACH | 5.00 | 16,545.00 | 8.40 | 27,795.60 | 7.15 | 23,659.35 | | 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.356 | MILE | 3,100.00 | 25,903.60 | 4,200.00 | 35,095.20 | 4,180.00 | 34,928.08 | | 0022 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 4.178 | MILE | 5,700.00 | 23,814.60 | 7,200.00 | 30,081.60 | 8,250.00 | 34,468.50 | | 0023 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 14,140.00 | 14,140.00 | 10,373.00 | 10,373.00 | 12,622.50 | 12,622.50 | | 0024 | 736-12-01006 | Conductor (1c, #6 awg) | 1,815 | LNFT | 1.40 | 2,541.00 | 1.44 | 2,613.60 | 1.44 | 2,613.60 | | 0025 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 1 | EACH | 5,818.00 | 5,818.00 | 12,625.00 | 12,625.00 | 12,622.50 | 12,622.50 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | 29,160.00 | 29,160.00 | 280,000.00 | 280,000.00 | | 0027 | 805-01-00900 | Class A1 Concrete Pier E3 | 4.5 | CUYD | 4,625.00 | 20,812.50 | 3,150.00 | 14,175.00 | 2,350.00 | 10,575.00 | | 0028 | 806-01-00100 | Deformed Reinforcing Steel | 1,257 | LB | 4.60 | 5,782.20 | 3.00 | 3,771.00 | 1.00 | 1,257.00 | | 0029 | 807-01-00200 | Structural Metalwork (Grade 50) Anchor Bolts, Nuts, & Washers | 120 | LUMP | 33,651.00 | 33,651.00 | 75,000.00 | 75,000.00 | 38,000.00 | 38,000.00 | | 0030 | 807-01-00200 | Structural Metalwork (Grade 50) Electrical Access | 30,000 | LUMP | 450,126.00 | 450,126.00 | 700,000.00 | 700,000.00 | 497,000.00 | 497,000.00 | | 0031 | 807-01-00200 | Structural Metalwork (Grade 50) Inspection Walkway Modifications | 187,000 | LUMP | 1,200,000.00 | 1,200,000.00 | 950,000.00 | 950,000.00 | 1,127,000.00 | 1,127,000.00 | | 0032 | 807-01-00200 | Structural Metalwork (Grade 50) Outboard Truss Walkway | 528,350 | LUMP | 3,359,506.00 | 3,359,506.00 | 2,800,000.00 | 2,800,000.00 | 5,304,000.00 | 5,304,000.00 | | 0033 | 807-01-00200 | Structural Metalwork (Grade 50) Stairs Pier E3 | 18,690 | LUMP | 600,157.00 | 600,157.00 | 400,000.00 | 400,000.00 | 338,000.00 | 338,000.00 | | 0034 | 811-01-00100 | Cleaning and Painting Area where existing electrical components attached to structure are removed. | 1 | LUMP | 174,265.00 | 174,265.00 | 280,000.00 | 280,000.00 | 1,885,000.00 | 1,885,000.00 | | 0035 | 822-01-00100 | Trenching and Backfilling | 740 | LNFT | 8.00 | 5,920.00 | 19.00 | 14,060.00 | 17.39 | 12,868.60 | | 0036 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") PVC/HDPE | 1,020 | LNFT | 22.00 | 22,440.00 | 15.00 | 15,300.00 | 14.77 | 15,065.40 | | 0037 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (2#10, 1#10 GREEN INSULATED GROUND) | 4,940 | LNFT | 38.00 | 187,720.00 | 10.50 | 51,870.00 | 10.49 | 51,820.60 | | 0039 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (2#12, 1#12 Green Insulated Ground) | 85 | LNFT | 21.00 | 1,785.00 | 25.15 | 2,137.75 | 25.14 | 2,136.90 | | 0040 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (2#8, 1#8 Green Insulated Ground) | 5 | LNFT | 26.00 | 130.00 | 75.00 | 375.00 | 75.02 | 375.10 | | 0041 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (4#10, 2#10 Green Insulated Ground) | 70 | LNFT | 26.00 | 1,820.00 | 15.55 | 1,088.50 | 15.52 | 1,086.40 | | 0042 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (4#12, 2#12 Green Insulated Ground) | 10 | LNFT | 26.00 | 260.00 | 61.00 | 610.00 | 60.50 | 605.00 | | 0043 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (2#12, 1#12 Green Insulated Ground) | 40 | LNFT | 26.00 | 1,040.00 | 60.00 | 2,400.00 | 59.73 | 2,389.20 | | 0044 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (2#8, 1#8 Green Insulated Ground) | 8,350 | LNFT | 29.00 | 242,150.00 | 24.05 | 200,817.50 | 24.05 | 200,817.50 | | 0045 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (2#8, 3#10, 1#8 & 1#10 Green Insulated Ground) | 15 | LNFT | 32.00 | 480.00 | 45.00 | 675.00 | 44.22 | 663.30 | | 0046 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (4#10, 1#2 Green Insulated Ground) | 7,800 | LNFT | 31.00 | 241,800.00 | 16.80 | 131,040.00 | 16.78 | 130,884.00 | | 0047 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (4#10, 2#10 Green Insulated Ground) | 135 | LNFT | 26.00 | 3,510.00 | 38.00 | 5,130.00 | 37.58 | 5,073.30 | | 0048 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (4#10, 2#12, 2#10 & 1#12 Green Insulated Ground) | 15 | LNFT | 27.00 | 405.00 | 35.00 | 525.00 | 34.02 | 510.30 | | 0050 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (6#10, 3#10 Green Insulated Ground) | 10 | LNFT | 32.00 | 320.00 | 204.00 | 2,040.00 | 203.94 | 2,039.40 | | 0051 | 822-02-01200 | Conduit w Conductors (Rigid Alum) (1") (6#12, 3#12 Green Insulated Ground) | 15 | LNFT | 32.00 | 480.00 | 83.00 | 1,245.00 | 82.64 | 1,239.60 | | 0052 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#10, 8#12, 1#10 & 4#12 Green Insulated Ground) | 5 | LNFT | 37.00 | 185.00 | 122.00 | 610.00 | 121.66 | 608.30 | | 0053 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#8, 2#10, 2#12, 1#8 & 1#10 & 1#12 Green Insulated Ground) | 5 | LNFT | 37.00 | 185.00 | 130.00 | 650.00 | 127.16 | 635.80 | | 0054 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#8, 2#10, 4#12, 1#8, 1#10 & 2#12 Green Insulated Ground) | 10 | LNFT | 37.00 | 370.00 | 80.00 | 800.00 | 78.10 | 781.00 | | 0055 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#8, 2#10, 6#12, 1#8 & 1#10, & 3#12 Green Insulated Ground) | 15 | LNFT | 38.00 | 570.00 | 65.00 | 975.00 | 62.92 | 943.80 | | 0056 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#8, 2#10, 8#12, 1#8, 1#10 & 4#12 Green Insulated Ground) | 5 | LNFT | 39.00 | 195.00 | 155.00 | 775.00 | 152.90 | 764.50 | | 0057 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#8, 4#10, 1#8 & 2#10 Green Insulated Ground) | 20 | LNFT | 36.00 | 720.00 | 72.00 | 1,440.00 | 70.95 | 1,419.00 | | 0058 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (2#8, 4#10, 2#12, 1#8 & 2#10 & 1#12 Green Insulated Ground) | 15 | LNFT | 37.00 | 555.00 | 58.00 | 870.00 | 57.72 | 865.80 | | 0059 | 822-02-01300 | Conduit w Conductors (Rigid Alum) (1-1/4") (4#12, 2#12 Green Insulated Ground) | 5 | LNFT | 32.00 | 160.00 | 88.00 | 440.00 | 87.56 | 437.80 | | 0060 | 822-02-01400 | Conduit w Conductors (Rigid Alum) (1-1/2") (2#2, 1#8 White Insulated Neutral 1#2 Green Insulated Ground) | 10 | LNFT | 38.00 | 380.00 | 153.00 | 1,530.00 | 152.90 | 1,529.00 | | 0061 | 822-02-01400 | Conduit w Conductors (Rigid Alum) (1-1/2") (2#2, 2#10, 1#2 Green Insulated Ground) | 7,400 | LNFT | 42.00 | 310,800.00 | 26.00 | 192,400.00 | 25.44 | 188,256.00 | | 0062 | 822-02-01400 | Conduit w Conductors (Rigid Alum) (1-1/2") (2#8, 4#10, 4#12, 1#8 & 2#10 & 2#12 Green Insulated Ground) | 5 | LNFT | 37.00 | 185.00 | 160.00 | 800.00 | 159.06 | 795.30 | | 0063 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (1-2Pair) | 1,070 | LNFT | 33.00 | 35,310.00 | 25.00 | 26,750.00 | 24.12 | 25,808.40 | | 0064 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (1-2Pair, 2-3Pair) | 290 | LNFT | 34.00 | 9,860.00 | 32.00 | 9,280.00 | 31.69 | 9,190.10 | | 0065 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2-2Pair) | 5 | LNFT | 34.00 | 170.00 | 188.00 | 940.00 | 187.88 | 939.40 | | 0066 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2-2Pair, 2-3Pair) | 885 | LNFT | 36.00 | 31,860.00 | 33.00 | 29,205.00 | 32.19 | 28,488.15 | | 0067 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2-2Pair, 2-3Pair, Existing Cable) | 20 | LNFT | 37.00 | 740.00 | 99.00 | 1,980.00 | 98.89 | 1,977.80 | | 0068 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2-3Pair) | 45 | LNFT | 36.00 | 1,620.00 | 120.00 | 5,400.00 | 119.02 | 5,355.90 | | 0069 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (3-2Pair) | 5 | LNFT | 37.00 | 185.00 | 200.00 | 1,000.00 | 199.98 | 999.90 | | 0070 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (3-2Pair, 2-3Pair) | 265 | LNFT | 37.00 | 9,805.00 | 35.00 | 9,275.00 | 34.96 | 9,264.40 | | 0071 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (Existing Cable) | 55 | LNFT | 28.00 | 1,540.00 | 82.00 | 4,510.00 | 81.94 | 4,506.70 | | 0072 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#2, 1#2 Green Insulated Ground) | 25 | LNFT | 57.00 | 1,425.00 | 80.00 | 2,000.00 | 78.14 | 1,953.50 | | 0073 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#2/0, 1#2/0 Green Insulated Ground) | 850 | LNFT | 63.00 | 53,550.00 | 44.00 | 37,400.00 | 43.62 | 37,077.00 | | 0074 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#2/0, 2#2, 1#2/0 & 1#2 Green Insulated Ground) | 425 | LNFT | 69.00 | 29,325.00 | 54.00 | 22,950.00 | 53.17 | 22,597.25 | | 0075 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#2/0, 2#2, 2#6, 1#2/0 & 1#2 & 1#6 Green Insulated Ground) | 450 | LNFT | 75.00 | 33,750.00 | 58.00 | 26,100.00 | 68.79 | 30,955.50 | | 0076 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#2/0, 2#2, 2#6, 2#8, 1#2/0 & 1#2 & 1#6 & 1#8 Green Insulated Ground) | 250 | LNFT | 77.00 | 19,250.00 | 69.00 | 17,250.00 | 68.79 | 17,197.50 | | 0077 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#6, 1#6 Green Insulated Ground) | 25 | LNFT | 54.00 | 1,350.00 | 72.00 | 1,800.00 | 71.37 | 1,784.25 | | 0078 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#8, 1#8 Green Insulated Ground) | 25 | LNFT | 53.00 | 1,325.00 | 69.00 | 1,725.00 | 68.33 | 1,708.25 | | 0079 | 822-02-02500 | Conduit w Conductors (Rigid Galv Steel) (2") (3#2) | 60 | LNFT | 50.00 | 3,000.00 | 42.00 | 2,520.00 | 41.77 | 2,506.20 | | 0080 | 822-02-02700 | Conduit w Conductors (Rigid Galv Steel) (3") (2#3/0, 1#3/0 Green Insulated Ground) | 25 | LNFT | 78.00 | 1,950.00 | 102.00 | 2,550.00 | 101.73 | 2,543.25 | | 0081 | 822-02-04100 | Conduit w Conductors (Fiberglass) (3/4") (1#8 Bare Solid Ground) | 10 | LNFT | 33.00 | 330.00 | 60.00 | 600.00 | 59.07 | 590.70 | | 0082 | 822-02-04200 | Conduit w Conductors (Fiberglass) (1") (4#10, 1#2 Bare Standard Ground) | 150 | LNFT | 36.00 | 5,400.00 | 77.00 | 11,550.00 | 75.41 | 11,311.50 | | 0083 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (3#2) | 50 | LNFT | 48.00 | 2,400.00 | 100.00 | 5,000.00 | 99.66 | 4,983.00 | | 0084 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (4#2, 4#10, 1#2 Bare Stranded Ground) | 80 | LNFT | 49.00 | 3,920.00 | 90.00 | 7,200.00 | 90.23 | 7,218.40 | | 0085 | 822-02-04700 | Conduit w Conductors (Fiberglass) (3") (2#2/0, 2#2, 2#6, 2#8, 1#2/0 & 1#2 & 1#6 & 1#8 Green Insulated Ground) | 150 | LNFT | 84.00 | 12,600.00 | 166.00 | 24,900.00 | 165.72 | 24,858.00 | | 0086 | 822-02-04700 | Conduit w Conductors (Fiberglass) (3") (2#3/0, & 1#3/0 Green Insulated Ground) | 30 | LNFT | 82.00 | 2,460.00 | 163.00 | 4,890.00 | 162.58 | 4,877.40 | | 0087 | 822-02-06500 | Conduit w Conductors (Flexible Metal) (2") 2" Liq Tight Flexible Metal | 725 | LNFT | 52.00 | 37,700.00 | 60.00 | 43,500.00 | 59.98 | 43,485.50 | | 0088 | 822-05-00700 | Light Pole (40') (Alum) (Single Arm) (10' Single Arm) | 91 | EACH | 3,114.00 | 283,374.00 | 3,610.00 | 328,510.00 | 3,610.72 | 328,575.52 | | 0089 | 822-05-00700 | Light Pole (40') (Alum) (Single Arm) (6' Single Arm) | 7 | EACH | 2,843.00 | 19,901.00 | 3,355.00 | 23,485.00 | 3,355.00 | 23,485.00 | | 0090 | 822-05-02100 | Light Pole (Structure Mounted Arm) | 39 | EACH | 775.00 | 30,225.00 | 1,387.00 | 54,093.00 | 1,386.03 | 54,055.17 | | 0091 | 822-07-02800 | Luminaire (82 Watt) (LED) | 137 | EACH | 679.00 | 93,023.00 | 594.00 | 81,378.00 | 593.30 | 81,282.10 | | 0092 | 822-08-00200 | Electrical Service Point (Structure) | 3 | EACH | 19,091.00 | 57,273.00 | 13,730.00 | 41,190.00 | 12,729.94 | 38,189.82 | | 0093 | 822-09-00100 | Electrical System (Aerial Light) | 1 | LUMP | 21,669.00 | 21,669.00 | 46,520.00 | 46,520.00 | 46,512.40 | 46,512.40 | | 0094 | 822-09-00100 | Electrical System (Monitoring System) | 1 | LUMP | 4,928.00 | 4,928.00 | 26,800.00 | 26,800.00 | 26,781.70 | 26,781.70 | | 0095 | 822-09-00100 | Electrical System (Navigation Light) | 1 | LUMP | 91,217.00 | 91,217.00 | 66,600.00 | 66,600.00 | 65,565.50 | 65,565.50 | | 0096 | 822-09-00100 | Electrical System (Pier Power) | 1 | LUMP | 28,903.00 | 28,903.00 | 36,500.00 | 36,500.00 | 36,460.60 | 36,460.60 | | 0097 | 822-09-00100 | Electrical System (Temporary Aviation Lighting) | 1 | LUMP | 3,182.00 | 3,182.00 | 22,300.00 | 22,300.00 | 22,291.50 | 22,291.50 | | 0098 | 822-09-00100 | Electrical System (Temporary Navigation Lighting) | 1 | LUMP | 14,743.00 | 14,743.00 | 54,900.00 | 54,900.00 | 54,884.50 | 54,884.50 | | 0099 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Louisiana) | 1 | LUMP | 97,315.00 | 97,315.00 | 64,300.00 | 64,300.00 | 64,303.80 | 64,303.80 | | 0100 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Main Bridge) | 1 | LUMP | 76,369.00 | 76,369.00 | 15,730.00 | 15,730.00 | 15,728.90 | 15,728.90 | | 0101 | 822-11-00100 | Removal and Disposal of Electrical Equipment (Mississippi) | 1 | LUMP | 5,479.00 | 5,479.00 | 2,590.00 | 2,590.00 | 2,590.50 | 2,590.50 | | 0102 | 822-16-00300 | Underground Junction Box (13" x 24") | 2 | EACH | 1,061.00 | 2,122.00 | 1,240.00 | 2,480.00 | 1,236.40 | 2,472.80 | | 0104 | 822-20-00100 | Disconnect (Service) (Stainless Steel, Non-Fused, 3P, 200A, 600V) | 3 | EACH | 3,230.00 | 9,690.00 | 3,080.00 | 9,240.00 | 3,078.54 | 9,235.62 | | 0105 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 440 | LNFT | 0.80 | 352.00 | 1.40 | 616.00 | 1.39 | 611.60 | | 0106 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 300 | LNFT | 1.10 | 330.00 | 3.10 | 930.00 | 3.10 | 930.00 | | 0107 | 829-03-00100 | Evaluation Identification of floor beam cracks | 1 | LUMP | 137,561.00 | 137,561.00 | 325,000.00 | 325,000.00 | 215,000.00 | 215,000.00 | | 0108 | 830-01-00100 | Bridge Superstructure Repair Debris Closure Plates PP L15' | 1 | EACH | 195,843.00 | 195,843.00 | 45,000.00 | 45,000.00 | 257,500.00 | 257,500.00 | | 0109 | 830-01-00100 | Bridge Superstructure Repair Expansion Dam Repairs Pier E2 | 1 | EACH | 26,767.00 | 26,767.00 | 22,000.00 | 22,000.00 | 10,000.00 | 10,000.00 | | 0110 | 830-01-00100 | Bridge Superstructure Repair Floor Beam Crack Repairs | 18 | EACH | 7,601.00 | 136,818.00 | 8,500.00 | 153,000.00 | 7,000.00 | 126,000.00 | | 0111 | 830-01-00100 | Bridge Superstructure Repair Inspection Walk Repairs | 3 | EACH | 4,531.00 | 13,593.00 | 6,300.00 | 18,900.00 | 2,500.00 | 7,500.00 | | 0112 | 830-01-00100 | Bridge Superstructure Repair Ladder Repairs | 2 | EACH | 4,813.00 | 9,626.00 | 4,500.00 | 9,000.00 | 500.00 | 1,000.00 | | 0113 | 830-01-00100 | Bridge Superstructure Repair Stringer Connection to Floor Beam Modification | 20 | EACH | 4,552.00 | 91,040.00 | 7,100.00 | 142,000.00 | 3,200.00 | 64,000.00 | | 0114 | 830-02-00100 | Bridge Substructure Repair Horizontal Jacking Beam Modifications Pier E2 | 2 | EACH | 49,542.00 | 99,084.00 | 107,000.00 | 214,000.00 | 117,000.00 | 234,000.00 | | 0115 | 830-02-00100 | Bridge Substructure Repair Horizontal Jacks and Jacking of Pier E2 | 2 | EACH | 42,181.00 | 84,362.00 | 100,000.00 | 200,000.00 | 67,000.00 | 134,000.00 | | 0116 | 830-02-00100 | Bridge Substructure Repair PTFE Bearing Sandwich Beneath Bearings Pier E2 | 2 | EACH | 54,969.00 | 109,938.00 | 30,000.00 | 60,000.00 | 58,000.00 | 116,000.00 | | 0117 | 830-02-00100 | Bridge Substructure Repair Stainless Steel Anchor Bolts, Nuts, and Washers Pier E2 | 2 | EACH | 62,279.00 | 124,558.00 | 35,000.00 | 70,000.00 | 13,000.00 | 26,000.00 | | 0118 | 830-02-00100 | Bridge Substructure Repair Transverse Restraint Angle Modifications Pier E2 | 2 | EACH | 80,711.00 | 161,422.00 | 40,000.00 | 80,000.00 | 76,000.00 | 152,000.00 | | 0119 | 830-02-00100 | Bridge Substructure Repair Vertical Jacks and Jacking Pier E2 | 2 | EACH | 198,990.00 | 397,980.00 | 45,000.00 | 90,000.00 | 105,000.00 | 210,000.00 | | 0120 | 830-07-00100 | Structural Concrete Patching | 27,575 | SQFT | 5.00 | 137,875.00 | 31.00 | 854,825.00 | 15.00 | 413,625.00 | | 0121 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 16,500.00 | 33,000.00 | 15,000.00 | 30,000.00 | 24,000.00 | 48,000.00 | | 0122 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 52 | EACH | 8,635.00 | 449,020.00 | 1,000.00 | 52,000.00 | 500.00 | 26,000.00 | | 0123 | NS-736-00100 | Radar Traffic Sensor and Recorder System | 1 | EACH | 15,958.00 | 15,958.00 | 25,200.00 | 25,200.00 | 25,153.70 | 25,153.70 | | 0124 | NS-830-00800 | Latex Modified Concrete Overlay 1.5" LATEX OVERLAY | 885,780 | SFIN | 5.00 | 4,428,900.00 | 8.60 | 7,617,708.00 | 7.22 | 6,395,331.60 | | 0125 | NS-830-01800 | Methyl Methacrylate Concrete Sealer | 197,192 | SQFT | 1.70 | 335,226.40 | 2.00 | 394,384.00 | 1.49 | 293,816.08 | | 0126 | NS-ITS-01121 | CCTV Camera Assembly, Furnish and Install with PTZ, Digital | 3 | EACH | 12,670.00 | 38,010.00 | 11,200.00 | 33,600.00 | 11,777.34 | 35,332.02 | | 0127 | NS-ITS-03501 | CCTV Camera Site, Remove | 1 | EACH | 3,871.00 | 3,871.00 | 3,800.00 | 3,800.00 | 3,792.80 | 3,792.80 | | 0128 | NS-ITS-04010 | Pulling Fiber Optic Cable Through Existing Conduit | 90 | LNFT | 6.90 | 621.00 | 3.50 | 315.00 | 3.32 | 298.80 | | 0129 | NS-ITS-04100 | Fiber Optic Cable, SM, Furnish & Install, 49-96 Fibers | 11,685 | LNFT | 4.40 | 51,414.00 | 6.25 | 73,031.25 | 6.25 | 73,031.25 | | 0130 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 112 | EACH | 80.00 | 8,960.00 | 50.00 | 5,600.00 | 47.01 | 5,265.12 | | 0131 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 108 | EACH | 73.00 | 7,884.00 | 60.00 | 6,480.00 | 58.61 | 6,329.88 | | 0132 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 75 | LNFT | 4.80 | 360.00 | 9.00 | 675.00 | 7.73 | 579.75 | | 0133 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 4 | EACH | 72.00 | 288.00 | 40.00 | 160.00 | 33.00 | 132.00 | | 0134 | NS-ITS-04360 | Fiber Optic Connection Splice Tray, Furnish & Install | 2 | EACH | 96.00 | 192.00 | 120.00 | 240.00 | 110.00 | 220.00 | | 0135 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 2 | EACH | 1,251.00 | 2,502.00 | 2,800.00 | 5,600.00 | 2,486.00 | 4,972.00 | | 0136 | NS-ITS-06120 | Pullbox, Structure Mount, Furnish & Install - New | 22 | EACH | 2,455.00 | 54,010.00 | 2,550.00 | 56,100.00 | 2,335.50 | 51,381.00 | | 0137 | NS-ITS-08180 | Lowering Tool, Electric Hoist Assembly & Clutch Adapter, Furnish | 1 | EACH | 3,712.00 | 3,712.00 | 4,940.00 | 4,940.00 | 4,521.00 | 4,521.00 | | 0138 | NS-ITS-08220 | Lowering Device, Furnish & Install | 1 | EACH | 7,585.00 | 7,585.00 | 11,370.00 | 11,370.00 | 10,422.50 | 10,422.50 | | 0139 | NS-ITS-10060 | Electrical Service | 1 | EACH | 4,507.00 | 4,507.00 | 10,700.00 | 10,700.00 | 9,801.00 | 9,801.00 | | 0140 | NS-ITS-10280 | Video Surge Suppressor, Furnish & Install | 3 | EACH | 239.00 | 717.00 | 142.00 | 426.00 | 130.16 | 390.48 | | 0141 | NS-ITS-10340 | Data Surge Suppressor, Furnish & Install | 1 | EACH | 207.00 | 207.00 | 162.00 | 162.00 | 148.50 | 148.50 | | 0142 | NS-ITS-10362 | Power Surge Suppressor (ITS Cabinet), Furnish & Install | 2 | EACH | 738.00 | 1,476.00 | 3,960.00 | 7,920.00 | 2,711.50 | 5,423.00 | | 0143 | NS-ITS-12000 | Communications System Integration | 1 | LUMP | 4,985.00 | 4,985.00 | 25,500.00 | 25,500.00 | 23,303.50 | 23,303.50 | | 0144 | NS-ITS-12020 | TMC Integration | 1 | LUMP | 4,985.00 | 4,985.00 | 33,000.00 | 33,000.00 | 30,244.50 | 30,244.50 | | 0145 | NS-ITS-13000 | Training Documents | 1 | LUMP | 1,591.00 | 1,591.00 | 1,520.00 | 1,520.00 | 1,391.50 | 1,391.50 | | 0146 | NS-ITS-13060 | Operator's Manuals | 1 | LUMP | 1,061.00 | 1,061.00 | 1,400.00 | 1,400.00 | 1,391.50 | 1,391.50 | | 0147 | NS-ITS-13080 | Maintenance Procedures Manuals | 1 | LUMP | 1,061.00 | 1,061.00 | 1,400.00 | 1,400.00 | 1,391.50 | 1,391.50 | | 0148 | NS-ITS-13100 | Wiring Diagrams | 1 | LUMP | 1,061.00 | 1,061.00 | 1,400.00 | 1,400.00 | 1,391.50 | 1,391.50 | | 0149 | NS-ITS-13120 | Equipment Assembly Drawings | 1 | LUMP | 1,591.00 | 1,591.00 | 1,400.00 | 1,400.00 | 2,084.50 | 2,084.50 | | 0150 | NS-ITS-13140 | Cabinet & Rack Wiring Diagrams | 1 | LUMP | 1,061.00 | 1,061.00 | 2,090.00 | 2,090.00 | 2,777.50 | 2,777.50 | | 0151 | NS-ITS-13160 | Electrical Schematic, Wiring, & Logic Diagrams | 1 | LUMP | 1,061.00 | 1,061.00 | 2,800.00 | 2,800.00 | 2,084.50 | 2,084.50 | | 0152 | NS-ITS-13180 | ITS Connection Diagrams | 1 | LUMP | 1,061.00 | 1,061.00 | 2,085.00 | 2,085.00 | 2,084.50 | 2,084.50 | | 0153 | NS-ITS-13200 | As-Builts | 1 | LUMP | 4,242.00 | 4,242.00 | 2,085.00 | 2,085.00 | 2,084.50 | 2,084.50 | | 0154 | NS-ITS-15320 | 2" Rigid Galvanized Steel Conduit | 180 | LNFT | 32.00 | 5,760.00 | 27.10 | 4,878.00 | 27.10 | 4,878.00 | | 0155 | NS-ITS-15620 | 2" FRE Conduit | 21,690 | LNFT | 57.00 | 1,236,330.00 | 44.72 | 969,976.80 | 44.72 | 969,976.80 | | 0156 | 822-17-00400 | Structure Junction Box (Stainless Steel) (24"x 24" 6") | 51 | EACH | 2,248.55 | 114,676.05 | 2,535.00 | 129,285.00 | 2,534.64 | 129,266.64 | | 0157 | 822-17-00400 | Structure Junction Box (Stainless Steel) (12" x 12" x 6") | 98 | EACH | 912.17 | 89,392.66 | 1,215.00 | 119,070.00 | 1,211.72 | 118,748.56 | | 0158 | 732-05-00100 | Removal of Existing Markings | 4.2 | MILE | 11,428.00 | 47,997.60 | 8,000.00 | 33,600.00 | 3,850.00 | 16,170.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 27,711,842.51 | | 29,646,173.86 | | 31,113,258.47 |
|