Proposal:H.013377.6
Parish:Lafourche
Routes:LA 182
Description:LA 182: LA 308 - US 90
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, ASPHALT PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,401,087.17
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,414,779.78 |
| 2 | 62139 | HUEY P. STOCKSTILL, LLC | $1,540,853.35 |
| 3 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,631,058.75 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $1,660,334.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - HUEY P. STOCKSTILL, LLC | - 3 - COASTAL BRIDGE CO., L.L.C. | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 19.3 | SQYD | 40.00 | 772.00 | 40.00 | 772.00 | 45.00 | 868.50 | 50.00 | 965.00 | | 0002 | 202-02-06120 | Removal of Curbs (Asphalt) | 1,020 | LNFT | 2.75 | 2,805.00 | 2.00 | 2,040.00 | 10.00 | 10,200.00 | 5.00 | 5,100.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 338 | LNFT | 16.00 | 5,408.00 | 8.50 | 2,873.00 | 8.50 | 2,873.00 | 10.00 | 3,380.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" Drainage Pipe | 51 | LNFT | 55.00 | 2,805.00 | 48.00 | 2,448.00 | 56.00 | 2,856.00 | 50.00 | 2,550.00 | | 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 6 | EACH | 200.00 | 1,200.00 | 10.00 | 60.00 | 75.00 | 450.00 | 25.00 | 150.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 11,500.00 | 11,500.00 | 10,500.00 | 10,500.00 | 13,500.00 | 13,500.00 | 12,500.00 | 12,500.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 20.00 | 10,000.00 | 50.00 | 25,000.00 | 50.00 | 25,000.00 | 15.00 | 7,500.00 | | 0008 | 401-01-00100 | Aggregate Surface Course (Net Section) | 452.3 | CUYD | 83.00 | 37,540.90 | 50.00 | 22,615.00 | 115.00 | 52,014.50 | 60.00 | 27,138.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 6,770.9 | TON | 87.00 | 589,068.30 | 90.00 | 609,381.00 | 95.00 | 643,235.50 | 80.00 | 541,672.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 296.1 | TON | 162.00 | 47,968.20 | 160.00 | 47,376.00 | 150.00 | 44,415.00 | 120.00 | 35,532.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 57,936 | SQYD | 0.45 | 26,071.20 | 1.50 | 86,904.00 | 1.00 | 57,936.00 | 4.50 | 260,712.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,415 | CUYD | 0.01 | -24.15 | 0.01 | -24.15 | 1.00 | -2,415.00 | 0.40 | -966.00 | | 0013 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,455 | SQYD | 143.00 | 208,065.00 | 130.00 | 189,150.00 | 161.00 | 234,255.00 | 140.00 | 203,700.00 | | 0014 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 102 | LNFT | 410.00 | 41,820.00 | 422.00 | 43,044.00 | 435.00 | 44,370.00 | 425.00 | 43,350.00 | | 0015 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 51 | LNFT | 242.00 | 12,342.00 | 161.00 | 8,211.00 | 130.00 | 6,630.00 | 175.00 | 8,925.00 | | 0016 | 702-04-00200 | Adjusting Catch Basins | 12 | EACH | 3,500.00 | 42,000.00 | 3,300.00 | 39,600.00 | 4,000.00 | 48,000.00 | 2,000.00 | 24,000.00 | | 0017 | 704-03-00100 | Blocked Out Guard rail | 40.6 | LNFT | 20.00 | 812.00 | 25.00 | 1,015.00 | 25.00 | 1,015.00 | 30.00 | 1,218.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 93.8 | LNFT | 22.00 | 2,063.60 | 25.00 | 2,345.00 | 25.00 | 2,345.00 | 30.00 | 2,814.00 | | 0019 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 109.00 | 686.70 | 105.00 | 661.50 | 105.00 | 661.50 | 150.00 | 945.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 97.00 | 7,275.00 | 80.00 | 6,000.00 | 80.00 | 6,000.00 | 100.00 | 7,500.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 2,950.00 | 5,900.00 | 3,000.00 | 6,000.00 | 3,000.00 | 6,000.00 | 3,500.00 | 7,000.00 | | 0022 | 706-04-00100 | Handicapped Curb Ramps Type 2 | 1 | EACH | 2,100.00 | 2,100.00 | 1,900.00 | 1,900.00 | 2,200.00 | 2,200.00 | 2,000.00 | 2,000.00 | | 0023 | 706-04-00100 | Handicapped Curb Ramps Type 3 | 1 | EACH | 2,050.00 | 2,050.00 | 1,800.00 | 1,800.00 | 2,200.00 | 2,200.00 | 2,000.00 | 2,000.00 | | 0024 | 706-04-00100 | Handicapped Curb Ramps Type 4 | 1 | EACH | 2,075.00 | 2,075.00 | 1,850.00 | 1,850.00 | 2,200.00 | 2,200.00 | 2,000.00 | 2,000.00 | | 0025 | 707-01-00300 | Concrete Curb (Mountable) | 1,020 | LNFT | 24.00 | 24,480.00 | 22.00 | 22,440.00 | 28.00 | 28,560.00 | 25.00 | 25,500.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 67,000.00 | 67,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 125,000.00 | 125,000.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,584 | LNFT | 0.15 | 237.60 | 2.50 | 3,960.00 | 1.50 | 2,376.00 | 1.00 | 1,584.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.056 | MILE | 84.00 | 592.70 | 200.00 | 1,411.20 | 350.00 | 2,469.60 | 1.00 | 7.06 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.666 | MILE | 50.00 | 133.30 | 500.00 | 1,333.00 | 375.00 | 999.75 | 1.00 | 2.67 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.322 | MILE | 100.00 | 2,432.20 | 625.00 | 15,201.25 | 500.00 | 12,161.00 | 1.00 | 24.32 | | 0031 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 1.00 | 2.00 | 80.00 | 160.00 | 50.00 | 100.00 | 10.00 | 20.00 | | 0032 | 717-01-00100 | Seeding | 72 | LB | 9.00 | 648.00 | 26.00 | 1,872.00 | 25.00 | 1,800.00 | 25.00 | 1,800.00 | | 0033 | 718-01-00100 | Fertilizer | 2,397 | LB | 0.50 | 1,198.50 | 0.65 | 1,558.05 | 0.70 | 1,677.90 | 1.00 | 2,397.00 | | 0034 | 724-01-00100 | Rumble Strips (Centerline) | 1.375 | MILE | 5,500.00 | 7,562.50 | 1,500.00 | 2,062.50 | 500.00 | 687.50 | 1,000.00 | 1,375.00 | | 0035 | 726-01-00100 | Bedding Material | 42.6 | CUYD | 61.00 | 2,598.60 | 145.00 | 6,177.00 | 140.00 | 5,964.00 | 150.00 | 6,390.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 55,000.00 | 55,000.00 | 154,000.00 | 154,000.00 | 160,000.00 | 160,000.00 | 150,000.00 | 150,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 90.00 | 540.00 | 75.00 | 450.00 | 75.00 | 450.00 | 100.00 | 600.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,510 | EACH | 7.00 | 10,570.00 | 6.50 | 9,815.00 | 5.50 | 8,305.00 | 7.00 | 10,570.00 | | 0039 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 792 | LNFT | 6.75 | 5,346.00 | 6.00 | 4,752.00 | 5.50 | 4,356.00 | 7.00 | 5,544.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.161 | MILE | 2,975.00 | 36,178.98 | 2,950.00 | 35,874.95 | 3,000.00 | 36,483.00 | 3,000.00 | 36,483.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.333 | MILE | 1,050.00 | 1,399.65 | 950.00 | 1,266.35 | 1,000.00 | 1,333.00 | 1,000.00 | 1,333.00 | | 0042 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 550.00 | 1,100.00 | 500.00 | 1,000.00 | 450.00 | 900.00 | 550.00 | 1,100.00 | | 0043 | 735-01-00100 | Mailboxes | 5 | EACH | 1.12 | 5.60 | 10.00 | 50.00 | 25.00 | 125.00 | 50.00 | 250.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 110.00 | 550.00 | 250.00 | 1,250.00 | 150.00 | 750.00 | 150.00 | 750.00 | | 0045 | 736-09-00100 | Loop Detector | 628 | LNFT | 21.25 | 13,345.00 | 20.00 | 12,560.00 | 30.00 | 18,840.00 | 20.00 | 12,560.00 | | 0046 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 390.00 | 780.00 | 460.00 | 920.00 | 1,100.00 | 2,200.00 | 500.00 | 1,000.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 9,000.00 | 9,000.00 | 15,000.00 | 15,000.00 | 17,500.00 | 17,500.00 | | 0048 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 22,750 | LNFT | 1.55 | 35,262.50 | 1.35 | 30,712.50 | 1.50 | 34,125.00 | 0.50 | 11,375.00 | | 0049 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 14,250 | LNFT | 1.55 | 22,087.50 | 1.50 | 21,375.00 | 1.50 | 21,375.00 | 1.00 | 14,250.00 | | 0050 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 37,000 | LNFT | 0.75 | 27,750.00 | 1.25 | 46,250.00 | 0.50 | 18,500.00 | 0.25 | 9,250.00 | | 0051 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 4,000 | INLF | 0.95 | 3,800.00 | 0.01 | 40.00 | 0.50 | 2,000.00 | 0.75 | 3,000.00 | | 0052 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) | 1 | EACH | 23,500.00 | 23,500.00 | 17,700.00 | 17,700.00 | 16,000.00 | 16,000.00 | 17,000.00 | 17,000.00 | | 0053 | 729-01-00101 | Sign (Type A)(Install) | 34.6 | SQFT | 24.00 | 830.40 | 22.00 | 761.20 | 35.00 | 1,211.00 | 40.00 | 1,384.00 | | 0054 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 11.25 | 45.00 | 95.00 | 380.00 | 125.00 | 500.00 | 150.00 | 600.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,414,779.78 | | 1,540,853.35 | | 1,631,058.75 | | 1,660,334.05 |
|