Proposal:H.012934.6
Parish:Ascension
Routes:LA 936
Description:LA 936: W JCT LA 22 - E JCT LA 22
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,185,404.18
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,325,873.80 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,413,835.88 |
| 3 | 06276 | Barriere Construction Co., LLC | $1,423,571.10 |
| 4 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,520,125.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - Barriere Construction Co., LLC | - 4 - R.J. Daigle & Sons Contractors, Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 375 | LNFT | 7.00 | 2,625.00 | 8.50 | 3,187.50 | 6.00 | 2,250.00 | 6.70 | 2,512.50 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 4 | LNFT | 30.00 | 120.00 | 1.00 | 4.00 | 8.00 | 32.00 | 1.00 | 4.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 254 | CUYD | 22.00 | 5,588.00 | 5.00 | 1,270.00 | 40.00 | 10,160.00 | 73.36 | 18,633.44 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) (Superelevation Correction) | 54 | CUYD | 28.00 | 1,512.00 | 5.00 | 270.00 | 20.00 | 1,080.00 | 184.62 | 9,969.48 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 800 | LNFT | 5.50 | 4,400.00 | 10.00 | 8,000.00 | 10.00 | 8,000.00 | 6.34 | 5,072.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 40 | EACH | 85.00 | 3,400.00 | 3.00 | 120.00 | 85.00 | 3,400.00 | 135.96 | 5,438.40 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 511 | LNFT | 1.25 | 638.75 | 1.00 | 511.00 | 2.25 | 1,149.75 | 3.18 | 1,624.98 | | 0008 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 14,197 | SQYD | 7.50 | 106,477.50 | 10.00 | 141,970.00 | 8.30 | 117,835.10 | 9.36 | 132,883.92 | | 0009 | 304-01-00100 | Lime | 70.44 | TON | 225.00 | 15,849.00 | 1.00 | 70.44 | 275.00 | 19,371.00 | 211.00 | 14,862.84 | | 0010 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 4,969 | SQYD | 1.00 | 4,969.00 | 1.00 | 4,969.00 | 5.50 | 27,329.50 | 2.16 | 10,733.04 | | 0011 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 2,130 | SQYD | 10.25 | 21,832.50 | 5.00 | 10,650.00 | 11.00 | 23,430.00 | 28.55 | 60,811.50 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 195 | CUYD | 45.00 | 8,775.00 | 75.00 | 14,625.00 | 100.00 | 19,500.00 | 29.65 | 5,781.75 | | 0013 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 18 | CUYD | 100.00 | 1,800.00 | 1.00 | 18.00 | 150.00 | 2,700.00 | 173.33 | 3,119.94 | | 0014 | 502-01-00100 | Asphalt Concrete | 7,434 | TON | 84.00 | 624,456.00 | 91.50 | 680,211.00 | 83.75 | 622,597.50 | 86.19 | 640,736.46 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 352.4 | TON | 122.00 | 42,992.80 | 91.50 | 32,244.60 | 190.00 | 66,956.00 | 135.34 | 47,693.82 | | 0016 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 9,268 | GAL | 2.75 | 25,487.00 | 2.75 | 25,487.00 | 2.75 | 25,487.00 | 3.32 | 30,769.76 | | 0017 | 507-02-00200 | Aggregate (S2) | 13,629 | SQYD | 1.90 | 25,895.10 | 2.07 | 28,212.03 | 1.90 | 25,895.10 | 2.28 | 31,074.12 | | 0018 | 507-02-00300 | Aggregate (S3) | 13,629 | SQYD | 1.70 | 23,169.30 | 1.70 | 23,169.30 | 1.70 | 23,169.30 | 2.02 | 27,530.58 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 53,021 | SQYD | 1.95 | 103,390.95 | 1.00 | 53,021.00 | 1.85 | 98,088.85 | 2.16 | 114,525.36 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,209 | CUYD | 0.00 | 0.00 | 0.01 | -22.09 | 30.00 | -66,270.00 | 0.01 | -22.09 | | 0021 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 597 | SQYD | 110.00 | 65,670.00 | 100.00 | 59,700.00 | 95.00 | 56,715.00 | 159.62 | 95,293.14 | | 0022 | 701-08-00100 | Relaying Pipe | 24 | LNFT | 170.00 | 4,080.00 | 250.00 | 6,000.00 | 150.00 | 3,600.00 | 219.10 | 5,258.40 | | 0023 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 150.00 | 2,400.00 | 500.00 | 8,000.00 | 150.00 | 2,400.00 | 338.39 | 5,414.24 | | 0024 | 701-15-00100 | Concrete Collar | 5 | EACH | 1,400.00 | 7,000.00 | 1,500.00 | 7,500.00 | 2,500.00 | 12,500.00 | 1,087.20 | 5,436.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 12 | LNFT | 5.00 | 60.00 | 200.00 | 2,400.00 | 1.00 | 12.00 | 60.00 | 720.00 | | 0026 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 120 | LNFT | 42.00 | 5,040.00 | 30.00 | 3,600.00 | 41.00 | 4,920.00 | 44.88 | 5,385.60 | | 0027 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 32.00 | 1,001.60 | 24.00 | 751.20 | 31.00 | 970.30 | 34.07 | 1,066.39 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 23.00 | 862.50 | 24.00 | 900.00 | 22.00 | 825.00 | 24.53 | 919.88 | | 0029 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 160.00 | 1,008.00 | 115.00 | 724.50 | 150.00 | 945.00 | 166.72 | 1,050.34 | | 0030 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 88.00 | 8,800.00 | 80.00 | 8,000.00 | 85.00 | 8,500.00 | 91.63 | 9,163.00 | | 0031 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,000.00 | 9,000.00 | 3,200.00 | 9,600.00 | 3,000.00 | 9,000.00 | 3,237.40 | 9,712.20 | | 0032 | 711-03-00300 | Riprap (30 lb) | 10 | TON | 155.00 | 1,550.00 | 145.00 | 1,450.00 | 270.00 | 2,700.00 | 301.80 | 3,018.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 8 | SQYD | 3.00 | 24.00 | 16.00 | 128.00 | 1.00 | 8.00 | 1.98 | 15.84 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 95,000.00 | 95,000.00 | 24,600.00 | 24,600.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.331 | MILE | 200.00 | 2,266.20 | 300.00 | 3,399.30 | 100.00 | 1,133.10 | 146.83 | 1,663.73 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.444 | MILE | 300.00 | 1,033.20 | 325.00 | 1,119.30 | 300.00 | 1,033.20 | 303.03 | 1,043.64 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.44 | MILE | 100.00 | 4,044.00 | 500.00 | 20,220.00 | 600.00 | 24,264.00 | 660.00 | 26,690.40 | | 0038 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 516 | EACH | 3.00 | 1,548.00 | 3.50 | 1,806.00 | 2.00 | 1,032.00 | 3.30 | 1,702.80 | | 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | 1,500.00 | 1,500.00 | | 0040 | 726-01-00100 | Bedding Material | 14.2 | CUYD | 65.00 | 923.00 | 5.00 | 71.00 | 85.00 | 1,207.00 | 60.30 | 856.26 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 59,000.00 | 59,000.00 | 138,000.00 | 138,000.00 | 85,000.00 | 85,000.00 | 70,000.00 | 70,000.00 | | 0042 | 729-16-00200 | Object Marker Assembly (Type 2) | 18 | EACH | 72.00 | 1,296.00 | 45.00 | 810.00 | 80.00 | 1,440.00 | 77.00 | 1,386.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 84.00 | 336.00 | 75.00 | 300.00 | 85.00 | 340.00 | 88.00 | 352.00 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 571 | EACH | 5.00 | 2,855.00 | 6.00 | 3,426.00 | 5.00 | 2,855.00 | 6.33 | 3,614.43 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 12.50 | 450.00 | 9.00 | 324.00 | 12.00 | 432.00 | 16.50 | 594.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.48 | MILE | 3,000.00 | 40,440.00 | 2,950.00 | 39,766.00 | 2,900.00 | 39,092.00 | 3,190.00 | 43,001.20 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.148 | MILE | 800.00 | 918.40 | 1,100.00 | 1,262.80 | 800.00 | 918.40 | 1,101.92 | 1,265.00 | | 0048 | 735-01-00100 | Mailboxes | 106 | EACH | 15.00 | 1,590.00 | 20.00 | 2,120.00 | 1.00 | 106.00 | 18.15 | 1,923.90 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 106 | EACH | 125.00 | 13,250.00 | 120.00 | 12,720.00 | 127.00 | 13,462.00 | 145.20 | 15,391.20 | | 0050 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 1,500.00 | 750.00 | 3,500.00 | 1,750.00 | 3,000.00 | 1,500.00 | 4,264.11 | 2,132.06 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,800.00 | 12,800.00 | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 16,200.00 | 16,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,325,873.80 | | 1,413,835.88 | | 1,423,571.10 | | 1,520,125.45 |
|