Proposal:H.011825.6
Parish:Livingston
Description:BUDDY ELLIS ROAD IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, PERMANENT SHEETING (STEEL), PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$3,723,840.75
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $4,024,541.80 |
| 2 | 14807 | Richard Price Contracting Co, Llc | $4,153,261.84 |
| 3 | 63897 | TL Hawk, LLC | $4,189,925.35 |
| 4 | 00481 | COASTAL BRIDGE CO., L.L.C. | $4,207,132.60 |
| 5 | 57931 | KCR CONTRACTORS, LLC | $4,219,048.58 |
| 6 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $4,572,336.95 |
| 7 | 12487 | Diamond B Construction Co., L.L.C. | $4,925,371.80 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $5,397,420.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Richard Price Contracting Co, Llc | - 3 - TL Hawk, LLC | - 4 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 60,000.00 | 60,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-00010 | Removal of Timber Bridge (STA. 277+31 to STA. 278+11)(25' Wide x 34' Long Timber Bridge) | 1 | EACH | 35,000.00 | 35,000.00 | 23,580.95 | 23,580.95 | 35,000.00 | 35,000.00 | 27,000.00 | 27,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 160 | SQYD | 1.00 | 160.00 | 2.99 | 478.40 | 12.00 | 1,920.00 | 20.00 | 3,200.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 914 | SQYD | 1.00 | 914.00 | 5.99 | 5,474.86 | 7.50 | 6,855.00 | 10.00 | 9,140.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,052 | SQYD | 1.00 | 1,052.00 | 5.99 | 6,301.48 | 7.50 | 7,890.00 | 10.00 | 10,520.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (15", 24", 30". 36" & 60") | 487 | LNFT | 1.00 | 487.00 | 29.94 | 14,580.78 | 21.00 | 10,227.00 | 10.00 | 4,870.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (8", 12", 18", 24" & 30") | 3,480 | LNFT | 1.00 | 3,480.00 | 5.99 | 20,845.20 | 19.00 | 66,120.00 | 10.00 | 34,800.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 36 | EACH | 17.00 | 612.00 | 41.27 | 1,485.72 | 10.00 | 360.00 | 10.00 | 360.00 | | 0009 | 203-02-00100 | Drainage Excavation | 476 | CUYD | 40.00 | 19,040.00 | 23.58 | 11,224.08 | 10.00 | 4,760.00 | 5.00 | 2,380.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 90,000.00 | 90,000.00 | 95,081.06 | 95,081.06 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | | 0011 | 203-10-00100 | Cleaning Existing Ditches | 7,561 | LNFT | 10.00 | 75,610.00 | 5.95 | 44,987.95 | 7.50 | 56,707.50 | 7.00 | 52,927.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 119 | EACH | 10.00 | 1,190.00 | 28.23 | 3,359.37 | 26.00 | 3,094.00 | 1.00 | 119.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 32,271 | LNFT | 1.50 | 48,406.50 | 3.04 | 98,103.84 | 2.50 | 80,677.50 | 1.00 | 32,271.00 | | 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 822.6 | CUYD | 140.00 | 115,164.00 | 91.10 | 74,938.86 | 100.00 | 82,260.00 | 60.00 | 49,356.00 | | 0015 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 320 | SQYD | 75.00 | 24,000.00 | 40.04 | 12,812.80 | 175.00 | 56,000.00 | 60.00 | 19,200.00 | | 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 80 | CUYD | 100.00 | 8,000.00 | 92.23 | 7,378.40 | 80.00 | 6,400.00 | 60.00 | 4,800.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 7,889.9 | TON | 87.50 | 690,366.25 | 87.00 | 686,421.30 | 87.50 | 690,366.25 | 98.00 | 773,210.20 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 913 | TON | 170.00 | 155,210.00 | 168.00 | 153,384.00 | 170.00 | 155,210.00 | 150.00 | 136,950.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 39,213 | SQYD | 1.85 | 72,544.05 | 2.00 | 78,426.00 | 1.85 | 72,544.05 | 1.50 | 58,819.50 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,429.2 | SQYD | 84.00 | 204,052.80 | 113.64 | 276,054.29 | 84.00 | 204,052.80 | 85.00 | 206,482.00 | | 0021 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 2,768.8 | SQYD | 80.00 | 221,504.00 | 95.52 | 264,475.78 | 116.00 | 321,180.80 | 85.00 | 235,348.00 | | 0022 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 152 | LNFT | 150.00 | 22,800.00 | 114.76 | 17,443.52 | 180.00 | 27,360.00 | 200.00 | 30,400.00 | | 0023 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 38 | LNFT | 175.00 | 6,650.00 | 124.85 | 4,744.30 | 187.00 | 7,106.00 | 200.00 | 7,600.00 | | 0024 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 236 | LNFT | 200.00 | 47,200.00 | 153.02 | 36,112.72 | 217.00 | 51,212.00 | 250.00 | 59,000.00 | | 0025 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 80 | LNFT | 220.00 | 17,600.00 | 177.47 | 14,197.60 | 262.00 | 20,960.00 | 300.00 | 24,000.00 | | 0026 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 120 | LNFT | 400.00 | 48,000.00 | 297.05 | 35,646.00 | 441.00 | 52,920.00 | 525.00 | 63,000.00 | | 0027 | 701-02-01140 | Cross Drain Pipe Arch (72" Equiv. RCPA) | 92 | LNFT | 500.00 | 46,000.00 | 391.02 | 35,973.84 | 553.00 | 50,876.00 | 650.00 | 59,800.00 | | 0028 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 570 | LNFT | 60.00 | 34,200.00 | 55.42 | 31,589.40 | 50.00 | 28,500.00 | 55.00 | 31,350.00 | | 0029 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 384 | LNFT | 75.00 | 28,800.00 | 68.87 | 26,446.08 | 100.00 | 38,400.00 | 105.00 | 40,320.00 | | 0030 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 148 | LNFT | 95.00 | 14,060.00 | 85.81 | 12,699.88 | 115.00 | 17,020.00 | 120.00 | 17,760.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 480 | LNFT | 120.00 | 57,600.00 | 113.46 | 54,460.80 | 145.00 | 69,600.00 | 150.00 | 72,000.00 | | 0032 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 132 | LNFT | 175.00 | 23,100.00 | 138.39 | 18,267.48 | 205.00 | 27,060.00 | 189.00 | 24,948.00 | | 0033 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 128 | LNFT | 190.00 | 24,320.00 | 166.40 | 21,299.20 | 235.00 | 30,080.00 | 230.00 | 29,440.00 | | 0034 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 170 | LNFT | 55.00 | 9,350.00 | 41.56 | 7,065.20 | 70.00 | 11,900.00 | 75.00 | 12,750.00 | | 0035 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 312 | LNFT | 75.00 | 23,400.00 | 55.17 | 17,213.04 | 115.00 | 35,880.00 | 110.00 | 34,320.00 | | 0036 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 70 | LNFT | 225.00 | 15,750.00 | 151.90 | 10,633.00 | 255.00 | 17,850.00 | 280.00 | 19,600.00 | | 0037 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 148 | LNFT | 55.00 | 8,140.00 | 54.92 | 8,128.16 | 55.00 | 8,140.00 | 65.00 | 9,620.00 | | 0038 | 701-05-01062 | Side Drain Pipe (24" RCP/RPVCP/CMP) | 28 | LNFT | 75.00 | 2,100.00 | 69.03 | 1,932.84 | 105.00 | 2,940.00 | 130.00 | 3,640.00 | | 0039 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 370 | LNFT | 75.00 | 27,750.00 | 55.17 | 20,412.90 | 70.00 | 25,900.00 | 80.00 | 29,600.00 | | 0040 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 2,298 | LNFT | 70.00 | 160,860.00 | 66.43 | 152,656.14 | 75.00 | 172,350.00 | 80.00 | 183,840.00 | | 0041 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 502 | LNFT | 80.00 | 40,160.00 | 81.83 | 41,078.66 | 90.00 | 45,180.00 | 100.00 | 50,200.00 | | 0042 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 32 | LNFT | 100.00 | 3,200.00 | 93.48 | 2,991.36 | 120.00 | 3,840.00 | 170.00 | 5,440.00 | | 0043 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 380 | LNFT | 0.01 | 3.80 | 1.57 | 596.60 | 28.00 | 10,640.00 | 25.00 | 9,500.00 | | 0044 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 2,500.00 | 32,500.00 | 3,368.14 | 43,785.82 | 3,500.00 | 45,500.00 | 4,000.00 | 52,000.00 | | 0045 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 3,500.00 | 14,000.00 | 4,524.71 | 18,098.84 | 5,495.00 | 21,980.00 | 4,500.00 | 18,000.00 | | 0046 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.3 | LNFT | 30.00 | 2,439.00 | 30.95 | 2,516.24 | 26.25 | 2,134.13 | 25.00 | 2,032.50 | | 0047 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 9.9 | LNFT | 125.00 | 1,237.50 | 141.49 | 1,400.75 | 120.00 | 1,188.00 | 0.01 | 0.10 | | 0048 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 168.8 | LNFT | 95.00 | 16,036.00 | 107.59 | 18,161.19 | 91.25 | 15,403.00 | 100.00 | 16,880.00 | | 0049 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 2,500.00 | 2,500.00 | 2,888.66 | 2,888.66 | 2,450.00 | 2,450.00 | 2,500.00 | 2,500.00 | | 0050 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 1 | EACH | 2,600.00 | 2,600.00 | 3,047.84 | 3,047.84 | 2,585.00 | 2,585.00 | 2,500.00 | 2,500.00 | | 0051 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 6 | EACH | 2,700.00 | 16,200.00 | 3,059.63 | 18,357.78 | 2,595.00 | 15,570.00 | 2,400.00 | 14,400.00 | | 0052 | 706-01-00100 | Concrete Walk (4" Thick) | 3.9 | SQYD | 100.00 | 390.00 | 70.85 | 276.32 | 151.00 | 588.90 | 1,000.00 | 3,900.00 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 927.5 | SQYD | 65.00 | 60,287.50 | 78.53 | 72,836.58 | 90.00 | 83,475.00 | 50.00 | 46,375.00 | | 0054 | 710-01-00100 | Flowable Fill | 6 | CUYD | 250.00 | 1,500.00 | 107.95 | 647.70 | 400.00 | 2,400.00 | 250.00 | 1,500.00 | | 0055 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 607 | SQYD | 125.00 | 75,875.00 | 88.43 | 53,677.01 | 90.00 | 54,630.00 | 100.00 | 60,700.00 | | 0056 | 711-04-00100 | Geotextile Fabric | 607 | SQYD | 5.00 | 3,035.00 | 5.90 | 3,581.30 | 4.50 | 2,731.50 | 3.90 | 2,367.30 | | 0057 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 273,472.85 | 273,472.85 | 75,000.00 | 75,000.00 | 245,000.00 | 245,000.00 | | 0058 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 6.661 | MILE | 200.00 | 1,332.20 | 2,357.74 | 15,704.91 | 2,000.00 | 13,322.00 | 2,000.00 | 13,322.00 | | 0059 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,226 | SQYD | 1.50 | 7,839.00 | 2.33 | 12,176.58 | 1.25 | 6,532.50 | 1.25 | 6,532.50 | | 0060 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 154 | SQYD | 2.00 | 308.00 | 5.29 | 814.66 | 3.76 | 579.04 | 3.75 | 577.50 | | 0061 | 726-01-00100 | Bedding Material | 863.9 | CUYD | 50.00 | 43,195.00 | 34.20 | 29,545.38 | 115.00 | 99,348.50 | 120.00 | 103,668.00 | | 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 205,000.00 | 205,000.00 | 355,334.50 | 355,334.50 | 400,000.00 | 400,000.00 | | 0063 | 729-01-00100 | Sign (Type A) | 272.3 | SQFT | 22.00 | 5,990.60 | 29.48 | 8,027.40 | 20.00 | 5,446.00 | 20.00 | 5,446.00 | | 0064 | 729-02-00100 | Sign (Type B) | 24.3 | SQFT | 22.00 | 534.60 | 41.27 | 1,002.86 | 20.00 | 486.00 | 20.00 | 486.00 | | 0065 | 729-08-00100 | Mounting (2 1/2" Size Post) | 1 | EACH | 1,000.00 | 1,000.00 | 1,473.81 | 1,473.81 | 1,350.00 | 1,350.00 | 1,500.00 | 1,500.00 | | 0066 | 729-16-00300 | Object Marker Assembly (Type 3) | 28 | EACH | 95.00 | 2,660.00 | 94.32 | 2,640.96 | 80.00 | 2,240.00 | 70.00 | 1,960.00 | | 0067 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 52 | EACH | 90.00 | 4,680.00 | 147.38 | 7,663.76 | 75.00 | 3,900.00 | 70.00 | 3,640.00 | | 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | 886 | EACH | 7.00 | 6,202.00 | 6.48 | 5,741.28 | 5.00 | 4,430.00 | 5.00 | 4,430.00 | | 0069 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 157 | LNFT | 13.00 | 2,041.00 | 7.66 | 1,202.62 | 8.00 | 1,256.00 | 8.00 | 1,256.00 | | 0070 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.712 | MILE | 4,000.00 | 26,848.00 | 3,418.22 | 22,943.09 | 3,000.00 | 20,136.00 | 3,000.00 | 20,136.00 | | 0071 | 735-01-00100 | Mailboxes | 114 | EACH | 2.00 | 228.00 | 23.58 | 2,688.12 | 20.00 | 2,280.00 | 20.00 | 2,280.00 | | 0072 | 735-02-00100 | Mailbox Supports (Single) | 114 | EACH | 130.00 | 14,820.00 | 141.49 | 16,129.86 | 120.00 | 13,680.00 | 100.00 | 11,400.00 | | 0073 | 739-01-00100 | Hydro-Seeding | 8.14 | ACRE | 2,000.00 | 16,280.00 | 2,077.55 | 16,911.26 | 1,282.97 | 10,443.38 | 2,000.00 | 16,280.00 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 55,000.00 | 55,000.00 | 75,000.00 | 75,000.00 | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 | | 0075 | 802-02-00100 | Permanent Sheeting (Steel) | 3,520 | SQFT | 60.00 | 211,200.00 | 58.95 | 207,504.00 | 35.00 | 123,200.00 | 60.00 | 211,200.00 | | 0076 | 804-01-00300 | Precast Concrete Piles (16") | 800 | LNFT | 115.00 | 92,000.00 | 94.32 | 75,456.00 | 135.00 | 108,000.00 | 90.00 | 72,000.00 | | 0077 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 15,000.00 | 15,000.00 | 23,367.49 | 23,367.49 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0078 | 804-18-00100 | Vibration Monitoring (Including Initial Site Survey) | 10 | DAY | 2,250.00 | 22,500.00 | 1,414.86 | 14,148.60 | 450.00 | 4,500.00 | 1,500.00 | 15,000.00 | | 0079 | 805-12-00500 | Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) | 1,680 | SQFT | 110.00 | 184,800.00 | 141.49 | 237,703.20 | 122.00 | 204,960.00 | 100.00 | 168,000.00 | | 0080 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 717 | SQFT | 7.00 | 5,019.00 | 3.54 | 2,538.18 | 0.75 | 537.75 | 2.50 | 1,792.50 | | 0081 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 717 | SQFT | 5.00 | 3,585.00 | 3.54 | 2,538.18 | 0.25 | 179.25 | 3.50 | 2,509.50 | | 0082 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway, 90 Deg. Crossing, w/Asphalt) | 580 | SQFT | 60.00 | 34,800.00 | 88.43 | 51,289.40 | 50.00 | 29,000.00 | 70.00 | 40,600.00 | | 0083 | NS-300-00060 | Geogrid | 81 | SQYD | 3.00 | 243.00 | 3.92 | 317.52 | 10.00 | 810.00 | 1.00 | 81.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,024,541.80 | | 4,153,261.84 | | 4,189,925.35 | | 4,207,132.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - KCR CONTRACTORS, LLC | - 6 - KORT's CONSTRUCTION SERVICES, INC. | - 7 - Diamond B Construction Co., L.L.C. | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 300,000.00 | 300,000.00 | 65,000.00 | 65,000.00 | 325,000.00 | 325,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-02-00010 | Removal of Timber Bridge (STA. 277+31 to STA. 278+11)(25' Wide x 34' Long Timber Bridge) | 1 | EACH | 14,777.74 | 14,777.74 | 22,000.00 | 22,000.00 | 25,000.00 | 25,000.00 | 125,000.00 | 125,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 160 | SQYD | 10.35 | 1,656.00 | 8.00 | 1,280.00 | 25.00 | 4,000.00 | 10.00 | 1,600.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 914 | SQYD | 6.93 | 6,334.02 | 9.00 | 8,226.00 | 15.00 | 13,710.00 | 13.00 | 11,882.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,052 | SQYD | 2.94 | 3,092.88 | 10.00 | 10,520.00 | 15.00 | 15,780.00 | 22.00 | 23,144.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (15", 24", 30". 36" & 60") | 487 | LNFT | 43.06 | 20,970.22 | 8.00 | 3,896.00 | 37.50 | 18,262.50 | 50.00 | 24,350.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (8", 12", 18", 24" & 30") | 3,480 | LNFT | 36.15 | 125,802.00 | 5.00 | 17,400.00 | 12.50 | 43,500.00 | 30.00 | 104,400.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 36 | EACH | 40.25 | 1,449.00 | 16.00 | 576.00 | 10.00 | 360.00 | 150.00 | 5,400.00 | | 0009 | 203-02-00100 | Drainage Excavation | 476 | CUYD | 6.14 | 2,922.64 | 21.00 | 9,996.00 | 45.00 | 21,420.00 | 30.00 | 14,280.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 268,239.66 | 268,239.66 | 245,000.00 | 245,000.00 | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | | 0011 | 203-10-00100 | Cleaning Existing Ditches | 7,561 | LNFT | 11.57 | 87,480.77 | 8.00 | 60,488.00 | 15.00 | 113,415.00 | 13.00 | 98,293.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 119 | EACH | 21.50 | 2,558.50 | 16.00 | 1,904.00 | 20.00 | 2,380.00 | 20.00 | 2,380.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 32,271 | LNFT | 1.61 | 51,956.31 | 1.45 | 46,792.95 | 2.00 | 64,542.00 | 2.50 | 80,677.50 | | 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 822.6 | CUYD | 118.02 | 97,083.25 | 145.00 | 119,277.00 | 44.00 | 36,194.40 | 130.00 | 106,938.00 | | 0015 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 320 | SQYD | 30.72 | 9,830.40 | 53.00 | 16,960.00 | 110.00 | 35,200.00 | 50.00 | 16,000.00 | | 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 80 | CUYD | 273.75 | 21,900.00 | 95.00 | 7,600.00 | 65.00 | 5,200.00 | 200.00 | 16,000.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 7,889.9 | TON | 94.06 | 742,123.99 | 90.00 | 710,091.00 | 85.00 | 670,641.50 | 88.38 | 697,309.36 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 913 | TON | 182.75 | 166,850.75 | 172.00 | 157,036.00 | 190.00 | 173,470.00 | 171.72 | 156,780.36 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 39,213 | SQYD | 1.99 | 78,033.87 | 2.00 | 78,426.00 | 1.00 | 39,213.00 | 1.87 | 73,328.31 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,429.2 | SQYD | 90.31 | 219,381.05 | 90.00 | 218,628.00 | 88.00 | 213,769.60 | 84.85 | 206,117.62 | | 0021 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 2,768.8 | SQYD | 86.00 | 238,116.80 | 170.00 | 470,696.00 | 180.00 | 498,384.00 | 80.81 | 223,746.73 | | 0022 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 152 | LNFT | 114.98 | 17,476.96 | 140.00 | 21,280.00 | 155.00 | 23,560.00 | 185.00 | 28,120.00 | | 0023 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 38 | LNFT | 173.65 | 6,598.70 | 210.00 | 7,980.00 | 250.00 | 9,500.00 | 200.00 | 7,600.00 | | 0024 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 236 | LNFT | 157.08 | 37,070.88 | 220.00 | 51,920.00 | 335.00 | 79,060.00 | 180.00 | 42,480.00 | | 0025 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 80 | LNFT | 176.44 | 14,115.20 | 270.00 | 21,600.00 | 600.00 | 48,000.00 | 200.00 | 16,000.00 | | 0026 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 120 | LNFT | 300.12 | 36,014.40 | 375.00 | 45,000.00 | 645.00 | 77,400.00 | 350.00 | 42,000.00 | | 0027 | 701-02-01140 | Cross Drain Pipe Arch (72" Equiv. RCPA) | 92 | LNFT | 381.69 | 35,115.48 | 490.00 | 45,080.00 | 670.00 | 61,640.00 | 460.00 | 42,320.00 | | 0028 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 570 | LNFT | 75.13 | 42,824.10 | 63.00 | 35,910.00 | 85.00 | 48,450.00 | 110.00 | 62,700.00 | | 0029 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 384 | LNFT | 85.12 | 32,686.08 | 80.00 | 30,720.00 | 100.00 | 38,400.00 | 145.00 | 55,680.00 | | 0030 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 148 | LNFT | 102.02 | 15,098.96 | 98.00 | 14,504.00 | 125.00 | 18,500.00 | 182.00 | 26,936.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 480 | LNFT | 113.76 | 54,604.80 | 118.00 | 56,640.00 | 160.00 | 76,800.00 | 195.00 | 93,600.00 | | 0032 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 132 | LNFT | 147.90 | 19,522.80 | 150.00 | 19,800.00 | 200.00 | 26,400.00 | 220.00 | 29,040.00 | | 0033 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 128 | LNFT | 180.13 | 23,056.64 | 165.00 | 21,120.00 | 275.00 | 35,200.00 | 245.00 | 31,360.00 | | 0034 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 170 | LNFT | 80.50 | 13,685.00 | 78.00 | 13,260.00 | 95.00 | 16,150.00 | 120.00 | 20,400.00 | | 0035 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 312 | LNFT | 97.27 | 30,348.24 | 90.00 | 28,080.00 | 130.00 | 40,560.00 | 125.00 | 39,000.00 | | 0036 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 70 | LNFT | 143.75 | 10,062.50 | 160.00 | 11,200.00 | 300.00 | 21,000.00 | 230.00 | 16,100.00 | | 0037 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 148 | LNFT | 54.63 | 8,085.24 | 72.00 | 10,656.00 | 90.00 | 13,320.00 | 115.00 | 17,020.00 | | 0038 | 701-05-01062 | Side Drain Pipe (24" RCP/RPVCP/CMP) | 28 | LNFT | 80.50 | 2,254.00 | 92.00 | 2,576.00 | 75.00 | 2,100.00 | 145.00 | 4,060.00 | | 0039 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 370 | LNFT | 80.50 | 29,785.00 | 83.00 | 30,710.00 | 100.00 | 37,000.00 | 105.00 | 38,850.00 | | 0040 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 2,298 | LNFT | 80.20 | 184,299.60 | 73.00 | 167,754.00 | 94.00 | 216,012.00 | 120.00 | 275,760.00 | | 0041 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 502 | LNFT | 87.52 | 43,935.04 | 85.00 | 42,670.00 | 93.00 | 46,686.00 | 140.00 | 70,280.00 | | 0042 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 32 | LNFT | 140.30 | 4,489.60 | 102.00 | 3,264.00 | 145.00 | 4,640.00 | 150.00 | 4,800.00 | | 0043 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 380 | LNFT | 7.20 | 2,736.00 | 3.00 | 1,140.00 | 5.00 | 1,900.00 | 4.50 | 1,710.00 | | 0044 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 2,817.50 | 36,627.50 | 2,500.00 | 32,500.00 | 2,500.00 | 32,500.00 | 5,000.00 | 65,000.00 | | 0045 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 4,312.50 | 17,250.00 | 4,000.00 | 16,000.00 | 6,000.00 | 24,000.00 | 7,000.00 | 28,000.00 | | 0046 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.3 | LNFT | 28.88 | 2,347.94 | 25.00 | 2,032.50 | 25.00 | 2,032.50 | 25.00 | 2,032.50 | | 0047 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 9.9 | LNFT | 132.00 | 1,306.80 | 100.00 | 990.00 | 100.00 | 990.00 | 140.00 | 1,386.00 | | 0048 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 168.8 | LNFT | 100.38 | 16,944.14 | 100.00 | 16,880.00 | 100.00 | 16,880.00 | 85.00 | 14,348.00 | | 0049 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 2,695.00 | 2,695.00 | 2,250.00 | 2,250.00 | 2,300.00 | 2,300.00 | 4,000.00 | 4,000.00 | | 0050 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 1 | EACH | 2,843.50 | 2,843.50 | 2,500.00 | 2,500.00 | 2,600.00 | 2,600.00 | 2,250.00 | 2,250.00 | | 0051 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 6 | EACH | 2,854.50 | 17,127.00 | 2,750.00 | 16,500.00 | 2,900.00 | 17,400.00 | 2,850.00 | 17,100.00 | | 0052 | 706-01-00100 | Concrete Walk (4" Thick) | 3.9 | SQYD | 54.55 | 212.75 | 80.00 | 312.00 | 230.00 | 897.00 | 500.00 | 1,950.00 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 927.5 | SQYD | 89.56 | 83,066.90 | 88.00 | 81,620.00 | 95.00 | 88,112.50 | 78.00 | 72,345.00 | | 0054 | 710-01-00100 | Flowable Fill | 6 | CUYD | 195.00 | 1,170.00 | 120.00 | 720.00 | 550.00 | 3,300.00 | 2,000.00 | 12,000.00 | | 0055 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 607 | SQYD | 66.97 | 40,650.79 | 80.00 | 48,560.00 | 140.00 | 84,980.00 | 85.00 | 51,595.00 | | 0056 | 711-04-00100 | Geotextile Fabric | 607 | SQYD | 1.15 | 698.05 | 5.00 | 3,035.00 | 2.50 | 1,517.50 | 3.50 | 2,124.50 | | 0057 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 31,025.85 | 31,025.85 | 160,000.00 | 160,000.00 | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | | 0058 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 6.661 | MILE | 4,600.00 | 30,640.60 | 4,100.00 | 27,310.10 | 2,500.00 | 16,652.50 | 3,999.40 | 26,640.00 | | 0059 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,226 | SQYD | 1.34 | 7,002.84 | 1.50 | 7,839.00 | 1.35 | 7,055.10 | 1.25 | 6,532.50 | | 0060 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 154 | SQYD | 2.15 | 331.10 | 4.00 | 616.00 | 2.00 | 308.00 | 2.00 | 308.00 | | 0061 | 726-01-00100 | Bedding Material | 863.9 | CUYD | 78.72 | 68,006.21 | 65.00 | 56,153.50 | 115.00 | 99,348.50 | 110.00 | 95,029.00 | | 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 152,098.00 | 152,098.00 | 420,000.00 | 420,000.00 | 250,000.00 | 250,000.00 | 525,000.00 | 525,000.00 | | 0063 | 729-01-00100 | Sign (Type A) | 272.3 | SQFT | 27.50 | 7,488.25 | 22.00 | 5,990.60 | 20.00 | 5,446.00 | 25.00 | 6,807.50 | | 0064 | 729-02-00100 | Sign (Type B) | 24.3 | SQFT | 40.23 | 977.59 | 22.00 | 534.60 | 20.00 | 486.00 | 35.00 | 850.50 | | 0065 | 729-08-00100 | Mounting (2 1/2" Size Post) | 1 | EACH | 1,343.75 | 1,343.75 | 850.00 | 850.00 | 1,700.00 | 1,700.00 | 1,250.00 | 1,250.00 | | 0066 | 729-16-00300 | Object Marker Assembly (Type 3) | 28 | EACH | 88.00 | 2,464.00 | 95.00 | 2,660.00 | 100.00 | 2,800.00 | 100.00 | 2,800.00 | | 0067 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 52 | EACH | 143.75 | 7,475.00 | 95.00 | 4,940.00 | 200.00 | 10,400.00 | 125.00 | 6,500.00 | | 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | 886 | EACH | 5.18 | 4,589.48 | 7.00 | 6,202.00 | 7.00 | 6,202.00 | 6.50 | 5,759.00 | | 0069 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 157 | LNFT | 9.90 | 1,554.30 | 13.00 | 2,041.00 | 13.00 | 2,041.00 | 12.00 | 1,884.00 | | 0070 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.712 | MILE | 3,117.50 | 20,924.66 | 3,600.00 | 24,163.20 | 3,600.00 | 24,163.20 | 3,498.96 | 23,485.02 | | 0071 | 735-01-00100 | Mailboxes | 114 | EACH | 23.00 | 2,622.00 | 5.00 | 570.00 | 1.00 | 114.00 | 15.00 | 1,710.00 | | 0072 | 735-02-00100 | Mailbox Supports (Single) | 114 | EACH | 138.00 | 15,732.00 | 175.00 | 19,950.00 | 135.00 | 15,390.00 | 115.00 | 13,110.00 | | 0073 | 739-01-00100 | Hydro-Seeding | 8.14 | ACRE | 1,988.75 | 16,188.43 | 1,400.00 | 11,396.00 | 2,000.00 | 16,280.00 | 1,850.00 | 15,059.00 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,750.00 | 13,750.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | | 0075 | 802-02-00100 | Permanent Sheeting (Steel) | 3,520 | SQFT | 50.30 | 177,056.00 | 60.00 | 211,200.00 | 60.00 | 211,200.00 | 50.00 | 176,000.00 | | 0076 | 804-01-00300 | Precast Concrete Piles (16") | 800 | LNFT | 89.18 | 71,344.00 | 85.00 | 68,000.00 | 140.00 | 112,000.00 | 135.00 | 108,000.00 | | 0077 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 13,750.00 | 13,750.00 | 22,000.00 | 22,000.00 | 3,000.00 | 3,000.00 | 12,500.00 | 12,500.00 | | 0078 | 804-18-00100 | Vibration Monitoring (Including Initial Site Survey) | 10 | DAY | 605.00 | 6,050.00 | 1,250.00 | 12,500.00 | 1,000.00 | 10,000.00 | 1,750.00 | 17,500.00 | | 0079 | 805-12-00500 | Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) | 1,680 | SQFT | 108.66 | 182,548.80 | 150.00 | 252,000.00 | 125.00 | 210,000.00 | 120.00 | 201,600.00 | | 0080 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 717 | SQFT | 1.25 | 896.25 | 3.50 | 2,509.50 | 1.50 | 1,075.50 | 3.00 | 2,151.00 | | 0081 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 717 | SQFT | 2.30 | 1,649.10 | 3.50 | 2,509.50 | 1.50 | 1,075.50 | 3.00 | 2,151.00 | | 0082 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway, 90 Deg. Crossing, w/Asphalt) | 580 | SQFT | 57.34 | 33,257.20 | 80.00 | 46,400.00 | 50.00 | 29,000.00 | 70.00 | 40,600.00 | | 0083 | NS-300-00060 | Geogrid | 81 | SQYD | 11.33 | 917.73 | 5.50 | 445.50 | 5.00 | 405.00 | 20.00 | 1,620.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,219,048.58 | | 4,572,336.95 | | 4,925,371.80 | | 5,397,420.40 |
|