Bid Tabulations for the Letting of 6/26/2019 LA DOTD Headquarters

Proposal:H.010366.6
Parish:Sabine
Routes:LA 175
Description:LA 175: 300' S OF SHIRWILLIS DR - LA 120
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, IN-PLACE CEMENT STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,784,701.58
Rank License BidderConstruction Bid
108584Madden Contracting Co., LLC$4,061,592.74
212312GILCHRIST CONSTRUCTION CO. LLC$4,525,394.30
363897TL Hawk, LLC$5,391,321.79


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Madden Contracting Co., LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
TL Hawk, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-02020Removal of Asphalt Pavement 173.3   SQYD20.003,466.0023.003,985.9014.002,426.20
0002202-02-06100Removal of Concrete Walks and Drives 36     SQYD45.001,620.0050.001,800.0016.25585.00
0003202-02-14500Removal of Guard Rail 404     LNFT12.505,050.0026.0010,504.0012.505,050.00
0004202-02-32100Removal of Pipe (Cross Drain) (18")265     LNFT12.003,180.0050.0013,250.0015.003,975.00
0005202-02-32100Removal of Pipe (Cross Drain) (24")51     LNFT12.00612.00100.005,100.0015.00765.00
0006203-05-00100Excavation and Embankment 1     LUMP7,500.007,500.0015,000.0015,000.0050,000.0050,000.00
0007203-07-00100Borrow (Vehicular Measurement) 7,879     CUYD19.00149,701.0021.00165,459.0030.00236,370.00
0008203-10-00100Cleaning Existing Ditches 20     LNFT9.00180.00115.002,300.0028.00560.00
0009204-05-00100Temporary Sediment Check Dams (Hay) 30     EACH200.006,000.00130.003,900.00145.004,350.00
0010303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 78,581     SQYD6.90542,208.907.25569,712.2512.00942,972.00
0011303-02-00100Removal of Existing Patches 300     SQYD1.00300.001.00300.0025.007,500.00
0012309-01-12000In-Place Cement Treated Subgrade (12" Thick) 66,558     SQYD7.20479,217.607.50499,185.008.00532,464.00
0013401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 964     CUYD53.2551,333.0030.0028,920.0085.0081,940.00
0014502-01-00100Asphalt Concrete 14,767.1   TON95.001,402,874.50100.001,476,710.00111.001,639,148.10
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,966.5   TON65.00127,822.50100.00196,650.00127.00249,745.50
0016507-01-00100Asphalt Material (CRS-2P Emulsion) 53,441     GAL2.43129,861.632.60138,946.602.71144,825.11
0017507-02-00200Aggregate (S2) 78,581     SQYD1.32103,726.921.50117,871.501.1691,153.96
0018507-02-00300Aggregate (S3) 78,581     SQYD1.0784,081.671.30102,155.300.9373,080.33
0019509-01-00100Milling Asphalt Pavement 68,402     SQYD3.00205,206.002.50171,005.004.00273,608.00
0020509-02-00100Contractor Retained Reclaimed Asphalt Pavement -6,898     CUYD0.01-68.981.00-6,898.000.01-68.98
0021602-02-00300Cleaning and Resealing Existing Transverse Pavements Joints 170     LNFT30.005,100.0015.002,550.0015.002,550.00
0022701-01-02002Cross Drain Pipe (24" RCP/RPVCP/CPEPDW or 30" CMP) 328     LNFT120.0039,360.00350.00114,800.00120.0039,360.00
0023701-10-01040Reinforced Concrete Pipe (Extension) (18") 32     LNFT90.002,880.00325.0010,400.00200.006,400.00
0024701-10-01060Reinforced Concrete Pipe (Extension) (24") 40     LNFT105.004,200.00325.0013,000.00200.008,000.00
0025701-12-01100Corrugated Metal Pipe (Extension) (36") 8     LNFT150.001,200.00150.001,200.00250.002,000.00
0026701-14-00100Cleaning Existing Pipes 54     LNFT20.001,080.0050.002,700.0060.003,240.00
0027701-15-00100Concrete Collar 11     EACH650.007,150.001,500.0016,500.001,500.0016,500.00
0028701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 278     LNFT1.00278.0010.002,780.003.00834.00
0029704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 139     LNFT85.0011,815.0090.0012,510.0085.0011,815.00
0030704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 325     LNFT24.007,800.0026.008,450.0024.007,800.00
0031704-05-00100Guard Rail Anchor Sections (Trailing End) 6.3   LNFT125.00787.50130.00819.00125.00787.50
0032704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) 50     LNFT50.002,500.0053.002,650.0050.002,500.00
0033704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT85.008,500.0087.008,700.0085.008,500.00
0034704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 7     EACH2,750.0019,250.002,850.0019,950.002,750.0019,250.00
0035707-04-00100Asphalt Curb 54     LNFT20.001,080.0050.002,700.0030.001,620.00
0036711-01-04000Riprap (55 lb, 18" Thick) 55     SQYD72.003,960.00140.007,700.00100.005,500.00
0037711-04-00100Geotextile Fabric 55     SQYD2.00110.0010.00550.007.05387.75
0038712-02-00100Sacked Concrete Revetment 5     SQYD175.00875.001,000.005,000.00150.00750.00
0039713-01-00100Temporary Signs and Barricades 1     LUMP167,500.00167,500.0050,000.0050,000.0020,000.0020,000.00
0040713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 16.604 MILE350.005,811.40200.003,320.80649.8410,789.94
0041713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 13.837 MILE450.006,226.65600.008,302.20450.106,228.03
0042713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 59.967 MILE650.0038,978.55800.0047,973.60650.0338,980.35
0043713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 2,922     EACH1.554,529.101.002,922.002.005,844.00
0044716-01-00100Mulch (Vegetative) 7.4   TON1,500.0011,100.00800.005,920.00697.005,157.80
0045717-01-00100Seeding 111     LB20.002,220.0016.001,776.0010.301,143.30
0046718-01-00100Fertilizer 3,700     LB1.003,700.000.501,850.000.451,665.00
0047722-02-00100Project Site Laboratory (Equipped) 1     EACH3,000.003,000.003,500.003,500.0030,000.0030,000.00
0048724-01-00100Rumble Strips (Centerline) 5.535 MILE1,500.008,302.50650.003,597.75280.001,549.80
0049724-02-00100Rumble Strips (Shoulder/Edge) 11.07  MILE1,500.0016,605.00650.007,195.50280.003,099.60
0050726-01-00100Bedding Material 129.7   CUYD91.0011,802.70130.0016,861.00120.0015,564.00
0051727-01-00100Mobilization 1     LUMP167,500.00167,500.00375,000.00375,000.00525,000.00525,000.00
0052729-16-00200Object Marker Assembly (Type 2) 27     EACH50.001,350.00140.003,780.0085.002,295.00
0053729-16-00300Object Marker Assembly (Type 3) 8     EACH100.00800.00110.00880.00100.00800.00
0054731-02-00100Reflectorized Raised Pavement Markers 1,011     EACH4.004,044.006.006,066.004.004,044.00
0055732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 15     LNFT10.00150.006.0090.0010.00150.00
0056732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.85  MILE2,600.0046,410.002,400.0042,840.002,600.0046,410.00
0057732-02-02020Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) 17.85  MILE3,200.0057,120.003,500.0062,475.003,200.0057,120.00
0058732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.459 MILE900.003,113.101,100.003,804.90900.263,114.00
0059732-05-00100Removal of Existing Markings 0.023 MILE5,500.00126.5042,000.00966.005,500.00126.50
0060735-01-00100Mailboxes 52     EACH1.0052.001.0052.001.0052.00
0061735-02-00100Mailbox Supports (Single) 37     EACH140.005,180.00150.005,550.00140.005,180.00
0062735-03-00100Mailbox Supports (Double) 7     EACH155.001,085.00160.001,120.00155.001,085.00
0063740-01-00100Construction Layout 1     LUMP25,000.0025,000.0025,000.0025,000.0045,000.0045,000.00
0064805-16-00100Reinforced Concrete Box Culverts (Extension) (4' x 4') 24     LNFT650.0015,600.001,300.0031,200.001,050.0025,200.00
0065805-16-01200Reinforced Concrete Box Culverts (Extension) (6' x 6') 24     LNFT800.0019,200.001,500.0036,000.001,325.0031,800.00
0066805-16-02700Reinforced Concrete Box Culverts (Extension) (3' X 3')8     LNFT550.004,400.001,500.0012,000.001,150.009,200.00
0067805-16-02700Reinforced Concrete Box Culverts (Extension) (3' X 4')8     LNFT625.005,000.001,500.0012,000.001,250.0010,000.00
0068NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,296     INLF3.003,888.003.504,536.005.006,480.00
           
  CONTRACTOR TOTAL   4,061,592.74 4,525,394.30 5,391,321.79