Proposal:H.006531.6-R1
Parish:Lafayette
Description:ROUNDABOUT AT GIRARD PK AND HOSPITAL DR
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, DRILLED SHAFT FOUNDATIONS, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$742,665.75
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $978,637.55 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $993,232.32 |
| 3 | 51821 | Elliott Construction, LLC | $1,105,335.90 |
| 4 | 33663 | Glenn Lege Construction LLC | $1,114,174.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Elliott Construction, LLC | - 4 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.2 | LUMP | 30,000.00 | 30,000.00 | 21,461.69 | 21,461.69 | 25,000.00 | 25,000.00 | 12,475.00 | 12,475.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 9,860.51 | 9,860.51 | 15,000.00 | 15,000.00 | 14,155.00 | 14,155.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,359.8 | SQYD | 3.00 | 7,079.40 | 5.75 | 13,568.85 | 12.00 | 28,317.60 | 6.50 | 15,338.70 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 364.2 | SQYD | 7.00 | 2,549.40 | 5.20 | 1,893.84 | 12.00 | 4,370.40 | 11.00 | 4,006.20 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 278.5 | LNFT | 6.00 | 1,671.00 | 4.30 | 1,197.55 | 10.00 | 2,785.00 | 15.00 | 4,177.50 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 529 | SQYD | 8.50 | 4,496.50 | 11.30 | 5,977.70 | 20.00 | 10,580.00 | 14.50 | 7,670.50 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 849.7 | LNFT | 8.50 | 7,222.45 | 3.30 | 2,804.01 | 7.00 | 5,947.90 | 4.75 | 4,036.08 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 319 | LNFT | 6.00 | 1,914.00 | 3.55 | 1,132.45 | 8.00 | 2,552.00 | 5.66 | 1,805.54 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,245.6 | SQYD | 15.00 | 18,684.00 | 6.32 | 7,872.19 | 16.00 | 19,929.60 | 15.70 | 19,555.92 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 28,000.00 | 28,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 37,185.00 | 37,185.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 25.00 | 12,500.00 | 15.00 | 7,500.00 | 25.00 | 12,500.00 | 30.85 | 15,425.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 48 | EACH | 30.00 | 1,440.00 | 25.00 | 1,200.00 | 30.00 | 1,440.00 | 18.50 | 888.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 812 | LNFT | 1.50 | 1,218.00 | 3.00 | 2,436.00 | 2.75 | 2,233.00 | 2.00 | 1,624.00 | | 0014 | 302-02-04000 | Class II Base Course (4" Thick) Crushed Stone | 2,778.8 | SQYD | 17.00 | 47,239.60 | 20.00 | 55,576.00 | 22.00 | 61,133.60 | 15.00 | 41,682.00 | | 0015 | 303-01-00300 | In-Place Cement Stabilized Base Course (10" Thick) | 2,778.8 | SQYD | 14.00 | 38,903.20 | 12.00 | 33,345.60 | 15.75 | 43,766.10 | 9.10 | 25,287.08 | | 0016 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) 9% Cement by Volume | 250 | SQYD | 19.00 | 4,750.00 | 43.00 | 10,750.00 | 45.00 | 11,250.00 | 12.50 | 3,125.00 | | 0017 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 1,423.2 | SQYD | 78.00 | 111,009.60 | 90.00 | 128,088.00 | 107.00 | 152,282.40 | 110.00 | 156,552.00 | | 0018 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 935.8 | SQYD | 88.00 | 82,350.40 | 100.00 | 93,580.00 | 120.00 | 112,296.00 | 117.00 | 109,488.60 | | 0019 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (13" Thick) | 298.4 | SQYD | 135.00 | 40,284.00 | 192.00 | 57,292.80 | 200.00 | 59,680.00 | 197.00 | 58,784.80 | | 0020 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 134 | LNFT | 90.00 | 12,060.00 | 83.00 | 11,122.00 | 72.50 | 9,715.00 | 77.00 | 10,318.00 | | 0021 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 160 | LNFT | 100.00 | 16,000.00 | 95.00 | 15,200.00 | 95.00 | 15,200.00 | 238.00 | 38,080.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 198 | LNFT | 3.00 | 594.00 | 11.50 | 2,277.00 | 15.00 | 2,970.00 | 28.00 | 5,544.00 | | 0023 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 3,300.00 | 3,300.00 | 5,000.00 | 5,000.00 | 5,875.00 | 5,875.00 | 3,560.00 | 3,560.00 | | 0024 | 702-02-00200 | Manholes (R-CB-11) (Conflict) | 1 | EACH | 9,000.00 | 9,000.00 | 12,305.00 | 12,305.00 | 6,650.00 | 6,650.00 | 5,550.00 | 5,550.00 | | 0025 | 702-03-00600 | Catch Basins (CB-07) | 3 | EACH | 4,500.00 | 13,500.00 | 6,725.00 | 20,175.00 | 7,450.00 | 22,350.00 | 6,180.00 | 18,540.00 | | 0026 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 4,200.00 | 4,200.00 | 3,800.00 | 3,800.00 | 6,225.00 | 6,225.00 | 4,305.00 | 4,305.00 | | 0027 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 2,000.00 | 4,000.00 | 2,155.00 | 4,310.00 | 3,500.00 | 7,000.00 | 2,050.00 | 4,100.00 | | 0028 | 703-06-00100 | Underdrain Video Inspection | 294 | LNFT | 3.50 | 1,029.00 | 6.40 | 1,881.60 | 3.00 | 882.00 | 3.10 | 911.40 | | 0029 | 705-06-00500 | Chain Link Fence (8 Foot Height) (Privacy Color Slates) | 280 | LNFT | 105.00 | 29,400.00 | 30.60 | 8,568.00 | 33.00 | 9,240.00 | 35.00 | 9,800.00 | | 0030 | 705-09-00100 | Rebuilt Fence | 116 | LNFT | 72.00 | 8,352.00 | 33.00 | 3,828.00 | 35.00 | 4,060.00 | 37.25 | 4,321.00 | | 0031 | 706-01-00100 | Concrete Walk (4" Thick) | 263.2 | SQYD | 43.00 | 11,317.60 | 40.00 | 10,528.00 | 74.00 | 19,476.80 | 69.86 | 18,387.15 | | 0032 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" Thick) | 211.6 | SQYD | 80.00 | 16,928.00 | 120.00 | 25,392.00 | 120.00 | 25,392.00 | 93.15 | 19,710.54 | | 0033 | 706-04-00100 | Handicapped Curb Ramps | 12 | EACH | 1,200.00 | 14,400.00 | 1,400.00 | 16,800.00 | 2,200.00 | 26,400.00 | 2,095.88 | 25,150.56 | | 0034 | 707-01-00200 | Concrete Curb (Barrier) | 1,100.7 | LNFT | 8.00 | 8,805.60 | 12.00 | 13,208.40 | 16.50 | 18,161.55 | 29.11 | 32,041.38 | | 0035 | 707-01-00300 | Concrete Curb (Mountable) | 349 | LNFT | 11.00 | 3,839.00 | 13.00 | 4,537.00 | 19.00 | 6,631.00 | 29.11 | 10,159.39 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 32,000.00 | 32,000.00 | 15,000.00 | 15,000.00 | 23,775.00 | 23,775.00 | | 0037 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,318 | SQYD | 9.50 | 12,521.00 | 11.00 | 14,498.00 | 9.50 | 12,521.00 | 12.00 | 15,816.00 | | 0038 | 715-01-00100 | Topsoil | 146 | CUYD | 30.00 | 4,380.00 | 67.80 | 9,898.80 | 50.00 | 7,300.00 | 28.50 | 4,161.00 | | 0039 | 726-01-00100 | Bedding Material | 35.5 | CUYD | 125.00 | 4,437.50 | 80.00 | 2,840.00 | 100.00 | 3,550.00 | 76.50 | 2,715.75 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 96,000.00 | 96,000.00 | 80,000.00 | 80,000.00 | 75,000.00 | 75,000.00 | 57,100.00 | 57,100.00 | | 0041 | 729-01-00100 | Sign (Type A) | 71.5 | SQFT | 26.00 | 1,859.00 | 61.25 | 4,379.38 | 55.00 | 3,932.50 | 27.95 | 1,998.43 | | 0042 | 729-02-00100 | Sign (Type B) | 159.8 | SQFT | 27.00 | 4,314.60 | 61.25 | 9,787.75 | 55.00 | 8,789.00 | 44.25 | 7,071.15 | | 0043 | 729-08-00100 | Mounting (2 1/2" Size Post) | 32 | EACH | 1,200.00 | 38,400.00 | 1,325.00 | 42,400.00 | 1,265.00 | 40,480.00 | 1,280.81 | 40,985.92 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 431 | EACH | 6.00 | 2,586.00 | 6.20 | 2,672.20 | 8.00 | 3,448.00 | 7.57 | 3,262.67 | | 0045 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 194 | LNFT | 7.00 | 1,358.00 | 7.30 | 1,416.20 | 7.00 | 1,358.00 | 6.99 | 1,356.06 | | 0046 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 192 | LNFT | 7.00 | 1,344.00 | 7.30 | 1,401.60 | 8.00 | 1,536.00 | 8.15 | 1,564.80 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.343 | MILE | 3,100.00 | 1,063.30 | 3,160.00 | 1,083.88 | 4,400.00 | 1,509.20 | 4,657.50 | 1,597.52 | | 0048 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.086 | MILE | 9,000.00 | 774.00 | 9,880.00 | 849.68 | 8,250.00 | 709.50 | 8,732.81 | 751.02 | | 0049 | 732-03-02050 | Plastic Pavement Striping (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 7,200.00 | 194.40 | 9,880.00 | 266.76 | 5,500.00 | 148.50 | 5,821.88 | 157.19 | | 0050 | 736-11-00400 | Conduit (4" HDPE, Schedule 80) | 300 | LNFT | 9.00 | 2,700.00 | 9.20 | 2,760.00 | 9.90 | 2,970.00 | 10.48 | 3,144.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 17,500.00 | 17,500.00 | 8,500.00 | 8,500.00 | 29,400.00 | 29,400.00 | | 0052 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 15,000.00 | 15,000.00 | 6,450.00 | 6,450.00 | 5,500.00 | 5,500.00 | 2,910.94 | 2,910.94 | | 0053 | 741-01-01080 | Water Main (6" PVC) | 38 | LNFT | 90.00 | 3,420.00 | 102.00 | 3,876.00 | 80.00 | 3,040.00 | 116.44 | 4,424.72 | | 0054 | 741-02-00300 | Gate Valve (6") | 1 | EACH | 3,500.00 | 3,500.00 | 3,060.00 | 3,060.00 | 2,500.00 | 2,500.00 | 3,493.13 | 3,493.13 | | 0055 | 741-04-00100 | Fire Hydrant | 1 | EACH | 6,000.00 | 6,000.00 | 10,200.00 | 10,200.00 | 3,500.00 | 3,500.00 | 1,164.38 | 1,164.38 | | 0056 | 741-12-00100 | Remove Water Valve Including Box | 1 | EACH | 1,500.00 | 1,500.00 | 2,550.00 | 2,550.00 | 1,000.00 | 1,000.00 | 2,910.94 | 2,910.94 | | 0057 | 741-13-00100 | Removing Fire Hydrant | 1 | EACH | 1,500.00 | 1,500.00 | 2,550.00 | 2,550.00 | 1,500.00 | 1,500.00 | 2,910.94 | 2,910.94 | | 0058 | 741-14-00100 | Concrete Blocking | 0.8 | CUYD | 500.00 | 400.00 | 1,020.00 | 816.00 | 2,000.00 | 1,600.00 | 1,164.38 | 931.50 | | 0059 | 742-01-00400 | Sanitary Sewer Pipe (8") (Ductile Iron Pipe) | 16 | LNFT | 200.00 | 3,200.00 | 410.00 | 6,560.00 | 200.00 | 3,200.00 | 465.75 | 7,452.00 | | 0060 | 803-01-00200 | Drilled Shaft (24" Diameter) | 36 | LNFT | 160.00 | 5,760.00 | 159.00 | 5,724.00 | 175.00 | 6,300.00 | 1,822.25 | 65,601.00 | | 0061 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 30.53 | CUYD | 850.00 | 25,950.50 | 1,276.00 | 38,956.28 | 1,775.00 | 54,190.75 | 1,085.00 | 33,125.05 | | 0062 | 822-01-00100 | Trenching and Backfilling | 225 | LNFT | 5.00 | 1,125.00 | 7.35 | 1,653.75 | 8.00 | 1,800.00 | 8.38 | 1,885.50 | | 0063 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2#6, 2#8) | 225 | LNFT | 6.50 | 1,462.50 | 6.30 | 1,417.50 | 7.00 | 1,575.00 | 7.16 | 1,611.00 | | 0064 | 822-03-00100 | Conductors (2#6, 2#8) | 320 | LNFT | 4.00 | 1,280.00 | 4.10 | 1,312.00 | 4.50 | 1,440.00 | 4.66 | 1,491.20 | | 0065 | 822-03-00100 | Conductors (2#6, 2#8, 3#10) | 55 | LNFT | 5.00 | 275.00 | 5.10 | 280.50 | 5.50 | 302.50 | 5.82 | 320.10 | | 0066 | 822-04-00400 | Jacked or Bored Casing 2" Dia (HDPE) | 375 | LNFT | 9.00 | 3,375.00 | 9.15 | 3,431.25 | 10.00 | 3,750.00 | 10.42 | 3,907.50 | | 0067 | 822-05-02100 | Light Pole (30')(Aluminum)(Single Arm)(LUSSLA30-1-8) | 6 | EACH | 3,100.00 | 18,600.00 | 2,550.00 | 15,300.00 | 2,750.00 | 16,500.00 | 2,910.94 | 17,465.64 | | 0068 | 822-07-01600 | Luminaire (250 Watt) (High Pressure Sodium) | 6 | EACH | 425.00 | 2,550.00 | 408.00 | 2,448.00 | 440.00 | 2,640.00 | 465.75 | 2,794.50 | | 0069 | 822-08-00200 | Electrical Service Point (Structure) (LUS SLA-7) | 1 | EACH | 5,000.00 | 5,000.00 | 4,528.00 | 4,528.00 | 4,884.00 | 4,884.00 | 5,169.83 | 5,169.83 | | 0070 | 822-16-00400 | Underground Junction Box (24.5"x24.5")(LUS SLA-8)(A&B) | 2 | EACH | 1,400.00 | 2,800.00 | 1,325.00 | 2,650.00 | 1,430.00 | 2,860.00 | 1,513.69 | 3,027.38 | | 0071 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 508 | INLF | 1.25 | 635.00 | 1.00 | 508.00 | 1.50 | 762.00 | 1.75 | 889.00 | | 0072 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 224 | INLF | 1.50 | 336.00 | 2.40 | 537.60 | 2.00 | 448.00 | 2.00 | 448.00 | | 0073 | NS-741-00100 | Insertion of Valve Assembly | 1 | EACH | 15,000.00 | 15,000.00 | 10,200.00 | 10,200.00 | 7,000.00 | 7,000.00 | 11,643.75 | 11,643.75 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 978,637.55 | | 993,232.32 | | 1,105,335.90 | | 1,114,174.85 |
|