Proposal:H.004634.6
Parish:Livingston
Routes:LA 1026
Description:JUBAN RD WIDENING (I-12 TO US 190)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, ALTERNATE AA1 (P.C.C. PAVEMENT): ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT; ALTERNATE AA2 (ASPHALT CONCRETE): ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT; AND RELATED WORK.
Estimated Construction Cost:$7,218,033.37
| Rank | License | Bidder | Construction Bid |
| 1 | 57931 | KCR CONTRACTORS, LLC | $6,395,407.73 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $6,841,278.04 |
| 3 | 06276 | Barriere Construction Co., LLC | $6,919,271.76 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $6,967,539.64 |
| 5 | 29595 | Boone Services LLC | $7,018,061.06 |
| 6 | 14807 | Richard Price Contracting Co, Llc | $7,109,549.89 |
| 7 | 55950 | Brown Industrial Construction, LLC | $7,162,960.69 |
| 8 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $7,198,213.91 |
| 9 | 55505 | MERRICK, LLC | $7,372,581.43 |
| 10 | 48896 | Command Construction Industries LLC | $7,568,254.20 |
| 11 | 39462 | JB JAMES CONSTRUCTION LLC | $9,655,562.30 |
| 12 | 02179 | Boh Bros. Construction Co., LLC. | $9,736,018.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KCR CONTRACTORS, LLC | - 2 - Byron E. Talbot Contractor, Inc. | - 3 - Barriere Construction Co., LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 9.5 | LUMP | 346,095.81 | 346,095.81 | 62,000.00 | 62,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,250.00 | 5,250.00 | 33,000.00 | 33,000.00 | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 890 | SQYD | 4.19 | 3,729.10 | 14.50 | 12,905.00 | 3.00 | 2,670.00 | 10.00 | 8,900.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 13,012.5 | SQYD | 1.82 | 23,682.75 | 3.30 | 42,941.25 | 3.00 | 39,037.50 | 7.00 | 91,087.50 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 13,012.5 | SQYD | 2.23 | 29,017.88 | 6.00 | 78,075.00 | 4.00 | 52,050.00 | 4.00 | 52,050.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 80 | SQYD | 14.41 | 1,152.80 | 14.50 | 1,160.00 | 25.00 | 2,000.00 | 25.00 | 2,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 1,484 | LNFT | 3.45 | 5,119.80 | 4.00 | 5,936.00 | 7.00 | 10,388.00 | 5.00 | 7,420.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 1,361 | LNFT | 7.19 | 9,785.59 | 4.40 | 5,988.40 | 7.00 | 9,527.00 | 5.00 | 6,805.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 253 | SQYD | 10.67 | 2,699.51 | 14.50 | 3,668.50 | 25.00 | 6,325.00 | 20.00 | 5,060.00 | | 0010 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 172.50 | 172.50 | 2,000.00 | 2,000.00 | 150.00 | 150.00 | 60.00 | 60.00 | | 0011 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 171+50.78, "Louisiana Dental Center" Conc. Sign and Base) | 1 | EACH | 2,530.00 | 2,530.00 | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 | | 0012 | 203-01-00100 | General Excavation | 17,580 | CUYD | 7.57 | 133,080.60 | 17.25 | 303,255.00 | 10.00 | 175,800.00 | 7.50 | 131,850.00 | | 0013 | 203-03-00100 | Embankment | 15,361 | CUYD | 16.46 | 252,842.06 | 15.50 | 238,095.50 | 25.00 | 384,025.00 | 14.00 | 215,054.00 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 130 | LNFT | 6.46 | 839.80 | 8.00 | 1,040.00 | 25.00 | 3,250.00 | 17.00 | 2,210.00 | | 0015 | 204-02-00100 | Temporary Hay Bales | 275 | EACH | 27.50 | 7,562.50 | 22.00 | 6,050.00 | 10.00 | 2,750.00 | 15.00 | 4,125.00 | | 0016 | 204-04-00100 | Temporary Sediment Basins | 8 | EACH | 308.00 | 2,464.00 | 6,700.00 | 53,600.00 | 150.00 | 1,200.00 | 200.00 | 1,600.00 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 165.00 | 990.00 | 143.00 | 858.00 | 150.00 | 900.00 | 250.00 | 1,500.00 | | 0018 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 1,035.00 | 4,140.00 | 2,500.00 | 10,000.00 | 150.00 | 600.00 | 650.00 | 2,600.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 10,583 | LNFT | 3.21 | 33,971.43 | 1.65 | 17,461.95 | 2.00 | 21,166.00 | 1.80 | 19,049.40 | | 0020 | 302-02-04000 | Class II Base Course (4" Thick) | 34,378.6 | SQYD | 13.73 | 472,018.18 | 13.75 | 472,705.75 | 11.00 | 378,164.60 | 10.00 | 343,786.00 | | 0021 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 34,378.6 | SQYD | 13.45 | 462,392.17 | 8.70 | 299,093.82 | 9.00 | 309,407.40 | 7.40 | 254,401.64 | | 0022 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 3,839.4 | SQYD | 17.31 | 66,460.01 | 18.00 | 69,109.20 | 13.00 | 49,912.20 | 10.00 | 38,394.00 | | 0023 | 304-01-00100 | Lime | 541.8 | TON | 200.00 | 108,360.00 | 277.00 | 150,078.60 | 10.00 | 5,418.00 | 250.00 | 135,450.00 | | 0024 | 304-05-00100 | Lime Treatment (Type E) | 38,218 | SQYD | 1.52 | 58,091.36 | 2.65 | 101,277.70 | 0.25 | 9,554.50 | 1.25 | 47,772.50 | | 0025 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5 | CUYD | 115.00 | 575.00 | 105.00 | 525.00 | 250.00 | 1,250.00 | 400.00 | 2,000.00 | | 0026 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 79.44 | 39,720.00 | 97.00 | 48,500.00 | 1.00 | 500.00 | 95.00 | 47,500.00 | | 0027 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (12" Thick) | 1,403.5 | SQYD | 213.78 | 300,040.23 | 131.00 | 183,858.50 | 170.00 | 238,595.00 | 170.00 | 238,595.00 | | 0028 | 701-01-02042 | Cross Drain Pipe (30" RCP/RPVCP or 36" CMP) | 102 | LNFT | 102.53 | 10,458.06 | 133.50 | 13,617.00 | 100.00 | 10,200.00 | 190.00 | 19,380.00 | | 0029 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 906 | LNFT | 58.70 | 53,182.20 | 58.00 | 52,548.00 | 55.00 | 49,830.00 | 100.00 | 90,600.00 | | 0030 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,066 | LNFT | 61.55 | 127,162.30 | 67.00 | 138,422.00 | 45.00 | 92,970.00 | 108.00 | 223,128.00 | | 0031 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,875 | LNFT | 78.42 | 147,037.50 | 84.00 | 157,500.00 | 60.00 | 112,500.00 | 132.00 | 247,500.00 | | 0032 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 680 | LNFT | 95.61 | 65,014.80 | 101.00 | 68,680.00 | 80.00 | 54,400.00 | 162.00 | 110,160.00 | | 0033 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,216 | LNFT | 110.09 | 133,869.44 | 117.00 | 142,272.00 | 95.00 | 115,520.00 | 175.00 | 212,800.00 | | 0034 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 137 | LNFT | 166.75 | 22,844.75 | 175.00 | 23,975.00 | 130.00 | 17,810.00 | 260.00 | 35,620.00 | | 0035 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 4 | LNFT | 97.50 | 390.00 | 100.00 | 400.00 | 55.00 | 220.00 | 680.00 | 2,720.00 | | 0036 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 26 | LNFT | 149.50 | 3,887.00 | 233.00 | 6,058.00 | 170.00 | 4,420.00 | 310.00 | 8,060.00 | | 0037 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 39 | LNFT | 149.50 | 5,830.50 | 240.00 | 9,360.00 | 170.00 | 6,630.00 | 300.00 | 11,700.00 | | 0038 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 85 | LNFT | 74.21 | 6,307.85 | 72.50 | 6,162.50 | 95.00 | 8,075.00 | 130.00 | 11,050.00 | | 0039 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 61 | LNFT | 67.87 | 4,140.07 | 85.00 | 5,185.00 | 110.00 | 6,710.00 | 144.00 | 8,784.00 | | 0040 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 177 | LNFT | 60.65 | 10,735.05 | 62.00 | 10,974.00 | 60.00 | 10,620.00 | 106.00 | 18,762.00 | | 0041 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 153 | LNFT | 73.73 | 11,280.69 | 80.00 | 12,240.00 | 75.00 | 11,475.00 | 122.00 | 18,666.00 | | 0042 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 4,551 | LNFT | 8.90 | 40,503.90 | 5.00 | 22,755.00 | 0.01 | 45.51 | 3.00 | 13,653.00 | | 0043 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 4,242.35 | 4,242.35 | 4,000.00 | 4,000.00 | 15,000.00 | 15,000.00 | 7,000.00 | 7,000.00 | | 0044 | 702-02-00200 | Manholes (R-CB-11) | 33 | EACH | 3,063.60 | 101,098.80 | 3,900.00 | 128,700.00 | 4,000.00 | 132,000.00 | 4,000.00 | 132,000.00 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 47 | EACH | 2,127.50 | 99,992.50 | 2,450.00 | 115,150.00 | 3,000.00 | 141,000.00 | 2,800.00 | 131,600.00 | | 0046 | 702-03-00500 | Catch Basins (CB-06) | 38 | EACH | 3,155.60 | 119,912.80 | 4,250.00 | 161,500.00 | 6,500.00 | 247,000.00 | 3,800.00 | 144,400.00 | | 0047 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 4,830.00 | 48,300.00 | 7,400.00 | 74,000.00 | 12,000.00 | 120,000.00 | 9,000.00 | 90,000.00 | | 0048 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 2,357.50 | 4,715.00 | 2,100.00 | 4,200.00 | 2,000.00 | 4,000.00 | 3,000.00 | 6,000.00 | | 0049 | 702-08-00100 | Side Drain Safety End (Type 1) | 25 | EACH | 2,223.00 | 55,575.00 | 2,200.00 | 55,000.00 | 2,000.00 | 50,000.00 | 2,000.00 | 50,000.00 | | 0050 | 703-01-00100 | Shoulder Underdrain Systems | 8,647 | LNFT | 15.49 | 133,942.03 | 19.00 | 164,293.00 | 7.00 | 60,529.00 | 15.00 | 129,705.00 | | 0051 | 705-09-00100 | Rebuilt Fence | 797 | LNFT | 26.95 | 21,479.15 | 27.50 | 21,917.50 | 30.00 | 23,910.00 | 50.00 | 39,850.00 | | 0052 | 706-01-00100 | Concrete Walk (4" Thick) | 5,784.6 | SQYD | 45.80 | 264,934.68 | 50.00 | 289,230.00 | 50.00 | 289,230.00 | 55.00 | 318,153.00 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 2,311.9 | SQYD | 60.90 | 140,794.71 | 60.00 | 138,714.00 | 75.00 | 173,392.50 | 85.00 | 196,511.50 | | 0054 | 706-02-00400 | Concrete Drive (10" Thick) | 440.2 | SQYD | 71.84 | 31,623.97 | 82.00 | 36,096.40 | 120.00 | 52,824.00 | 125.00 | 55,025.00 | | 0055 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 713.7 | SQYD | 60.76 | 43,364.41 | 30.00 | 21,411.00 | 50.00 | 35,685.00 | 65.00 | 46,390.50 | | 0056 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" Thick) | 533.2 | SQYD | 105.58 | 56,295.26 | 80.00 | 42,656.00 | 100.00 | 53,320.00 | 115.00 | 61,318.00 | | 0057 | 706-04-00100 | Handicapped Curb Ramps | 28 | EACH | 993.45 | 27,816.60 | 725.00 | 20,300.00 | 1,900.00 | 53,200.00 | 1,950.00 | 54,600.00 | | 0058 | 708-01-00100 | Right-of-Way Monument | 58 | EACH | 288.75 | 16,747.50 | 600.00 | 34,800.00 | 250.00 | 14,500.00 | 350.00 | 20,300.00 | | 0059 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 57,500.00 | 57,500.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 110,000.00 | 110,000.00 | | 0060 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 60 | LNFT | 3.00 | 180.00 | 3.30 | 198.00 | 4.00 | 240.00 | 3.00 | 180.00 | | 0061 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 300 | EACH | 5.00 | 1,500.00 | 5.50 | 1,650.00 | 6.00 | 1,800.00 | 5.00 | 1,500.00 | | 0062 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 5,750.00 | 23,000.00 | 27,500.00 | 110,000.00 | 7,000.00 | 28,000.00 | 8,000.00 | 32,000.00 | | 0063 | 716-01-00100 | Mulch (Vegetative) | 14.1 | TON | 715.00 | 10,081.50 | 743.00 | 10,476.30 | 800.00 | 11,280.00 | 700.00 | 9,870.00 | | 0064 | 717-01-00100 | Seeding | 282 | LB | 16.50 | 4,653.00 | 19.80 | 5,583.60 | 22.00 | 6,204.00 | 16.00 | 4,512.00 | | 0065 | 718-01-00100 | Fertilizer | 9,410 | LB | 0.50 | 4,705.00 | 0.67 | 6,304.70 | 1.00 | 9,410.00 | 1.00 | 9,410.00 | | 0066 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 4,213 | SQYD | 1.65 | 6,951.45 | 1.40 | 5,898.20 | 1.25 | 5,266.25 | 1.25 | 5,266.25 | | 0067 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 318 | SQYD | 2.20 | 699.60 | 1.70 | 540.60 | 2.00 | 636.00 | 3.00 | 954.00 | | 0068 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 4,025.00 | 4,025.00 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 | | 0069 | 726-01-00100 | Bedding Material | 879.3 | CUYD | 68.98 | 60,654.11 | 88.00 | 77,378.40 | 110.00 | 96,723.00 | 50.00 | 43,965.00 | | 0070 | 727-01-00100 | Mobilization | 1 | LUMP | 230,945.00 | 230,945.00 | 350,000.00 | 350,000.00 | 650,000.00 | 650,000.00 | 300,000.00 | 300,000.00 | | 0071 | 729-01-00100 | Sign (Type A) | 711.3 | SQFT | 30.23 | 21,502.60 | 30.00 | 21,339.00 | 22.00 | 15,648.60 | 19.00 | 13,514.70 | | 0072 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 32 | EACH | 96.75 | 3,096.00 | 99.00 | 3,168.00 | 100.00 | 3,200.00 | 85.00 | 2,720.00 | | 0073 | 731-02-00100 | Reflectorized Raised Pavement Markers | 272 | EACH | 6.00 | 1,632.00 | 6.60 | 1,795.20 | 7.00 | 1,904.00 | 6.25 | 1,700.00 | | 0074 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 661 | LNFT | 6.00 | 3,966.00 | 6.60 | 4,362.60 | 7.00 | 4,627.00 | 6.25 | 4,131.25 | | 0075 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.91 | MILE | 2,800.00 | 13,748.00 | 3,080.00 | 15,122.80 | 3,300.00 | 16,203.00 | 3,000.00 | 14,730.00 | | 0076 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 6,000.00 | 1,416.00 | 6,600.00 | 1,557.60 | 7,000.00 | 1,652.00 | 6,000.00 | 1,416.00 | | 0077 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 17,000.00 | 1,173.00 | 18,700.00 | 1,290.30 | 21,000.00 | 1,449.00 | 15,000.00 | 1,035.00 | | 0078 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.067 | MILE | 33,000.00 | 2,211.00 | 36,300.00 | 2,432.10 | 40,000.00 | 2,680.00 | 32,000.00 | 2,144.00 | | 0079 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.15 | MILE | 1,350.00 | 202.50 | 1,500.00 | 225.00 | 1,600.00 | 240.00 | 1,400.00 | 210.00 | | 0080 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 200.00 | 800.00 | 220.00 | 880.00 | 250.00 | 1,000.00 | 210.00 | 840.00 | | 0081 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 8 | EACH | 300.00 | 2,400.00 | 330.00 | 2,640.00 | 350.00 | 2,800.00 | 325.00 | 2,600.00 | | 0082 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 20.00 | 40.00 | 220.00 | 440.00 | 250.00 | 500.00 | 210.00 | 420.00 | | 0083 | 732-04-01134 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type T) | 2 | EACH | 750.00 | 1,500.00 | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 800.00 | 1,600.00 | | 0084 | 732-04-01136 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TR) | 2 | EACH | 825.00 | 1,650.00 | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 800.00 | 1,600.00 | | 0085 | 732-04-01137 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTUC) | 2 | EACH | 825.00 | 1,650.00 | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 800.00 | 1,600.00 | | 0086 | 732-04-01138 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TUC) | 2 | EACH | 825.00 | 1,650.00 | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 800.00 | 1,600.00 | | 0087 | 735-01-00100 | Mailboxes | 40 | EACH | 16.13 | 645.20 | 127.50 | 5,100.00 | 20.00 | 800.00 | 10.00 | 400.00 | | 0088 | 735-02-00100 | Mailbox Supports (Single) | 40 | EACH | 123.63 | 4,945.20 | 16.50 | 660.00 | 150.00 | 6,000.00 | 150.00 | 6,000.00 | | 0089 | 740-01-00100 | Construction Layout | 1 | LUMP | 93,555.00 | 93,555.00 | 80,000.00 | 80,000.00 | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | | 0090 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 5,600.00 | 5,600.00 | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0091 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,969 | INLF | 1.12 | 3,325.28 | 1.50 | 4,453.50 | 1.00 | 2,969.00 | 1.00 | 2,969.00 | | 0092 | NS-702-00100 | Paved Gutter Drain | 8 | EACH | 3,126.56 | 25,012.48 | 1,800.00 | 14,400.00 | 5,000.00 | 40,000.00 | 4,000.00 | 32,000.00 | | 0093 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 36 | EACH | 403.13 | 14,512.68 | 412.50 | 14,850.00 | 700.00 | 25,200.00 | 625.00 | 22,500.00 | | 0094 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 23 | EACH | 483.75 | 11,126.25 | 495.00 | 11,385.00 | 150.00 | 3,450.00 | 150.00 | 3,450.00 | | 0095 | NS-MSC-00120 | Drainage Structure (Catch Basin)(CB-SD08) | 1 | EACH | 1,700.00 | 1,700.00 | 8,100.00 | 8,100.00 | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | | 0096 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Lt. of Sta. 180+87, 5'-6" x 37'-6") | 1 | EACH | 1,097.50 | 1,097.50 | 12,500.00 | 12,500.00 | 35,000.00 | 35,000.00 | 16,000.00 | 16,000.00 | | 0115 | 725-01-00100 | Temporary Detour Roads | 707.5 | SQYD | 59.24 | 41,912.30 | 94.50 | 66,858.75 | 50.00 | 35,375.00 | 98.00 | 69,335.00 | | | | SUBTOTAL GENERAL | | | | 4,853,226 | | 5,263,489 | | 5,105,113 | | 5,185,878 | | | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Asphalt Concrete) | | | | | | | | | | | | | | | | | | | | | | | | | | 0106 | 502-01-00100 | Asphalt Concrete | 13,626.9 | TON | 85.18 | 1,160,739.34 | 90.00 | 1,226,421.00 | 100.00 | 1,362,690.00 | 95.00 | 1,294,555.50 | | 0107 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 447 | SQYD | 79.20 | 35,402.40 | 78.00 | 34,866.00 | 95.00 | 42,465.00 | 88.00 | 39,336.00 | | 0108 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 500.00 | 500.00 | 925.00 | 925.00 | 500.00 | 500.00 | 250.00 | 250.00 | | 0109 | 707-01-00200 | Concrete Curb (Barrier) (6") | 439.8 | LNFT | 12.39 | 5,449.12 | 9.50 | 4,178.10 | 35.00 | 15,393.00 | 20.00 | 8,796.00 | | 0110 | 707-03-00100 | Combination Concrete Curb and Gutter (Barrier)(6") | 4,226 | LNFT | 19.58 | 82,745.08 | 17.50 | 73,955.00 | 25.00 | 105,650.00 | 28.00 | 118,328.00 | | 0111 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(3") | 2,632.9 | LNFT | 27.69 | 72,905.00 | 21.50 | 56,607.35 | 25.00 | 65,822.50 | 28.00 | 73,721.20 | | 0112 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(4") | 8,619.6 | LNFT | 20.78 | 179,115.29 | 20.30 | 174,977.88 | 25.00 | 215,490.00 | 28.00 | 241,348.80 | | 0113 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.916 | MILE | 600.00 | 4,149.60 | 660.00 | 4,564.56 | 700.00 | 4,841.20 | 600.00 | 4,149.60 | | 0114 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.307 | MILE | 900.00 | 1,176.30 | 990.00 | 1,293.93 | 1,000.00 | 1,307.00 | 900.00 | 1,176.30 | | | | SUBTOTAL ALT AA2 | | | | 1,542,182.13 | | 1,577,788.82 | | 1,814,158.70 | | 1,781,661.40 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,395,407.73 | | 6,841,278.04 | | 6,919,271.76 | | 6,967,539.64 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Boone Services LLC | - 6 - Richard Price Contracting Co, Llc | - 7 - Brown Industrial Construction, LLC | - 8 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 9.5 | LUMP | 193,740.00 | 193,740.00 | 200,000.00 | 200,000.00 | 550,000.00 | 550,000.00 | 350,000.00 | 350,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,750.00 | 35,750.00 | 50,000.00 | 50,000.00 | 64,000.00 | 64,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 890 | SQYD | 6.89 | 6,132.10 | 8.50 | 7,565.00 | 10.50 | 9,345.00 | 10.00 | 8,900.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 13,012.5 | SQYD | 1.10 | 14,313.75 | 2.50 | 32,531.25 | 3.00 | 39,037.50 | 3.75 | 48,796.88 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 13,012.5 | SQYD | 8.70 | 113,208.75 | 8.50 | 110,606.25 | 4.50 | 58,556.25 | 9.50 | 123,618.75 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 80 | SQYD | 19.65 | 1,572.00 | 8.50 | 680.00 | 17.00 | 1,360.00 | 10.00 | 800.00 | | 0007 | 202-02-12000 | Removal of Fence | 1,484 | LNFT | 5.15 | 7,642.60 | 8.50 | 12,614.00 | 6.50 | 9,646.00 | 3.00 | 4,452.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 1,361 | LNFT | 4.08 | 5,552.88 | 8.50 | 11,568.50 | 4.50 | 6,124.50 | 3.00 | 4,083.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 253 | SQYD | 18.52 | 4,685.56 | 9.00 | 2,277.00 | 13.00 | 3,289.00 | 20.00 | 5,060.00 | | 0010 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 55.00 | 55.00 | 180.00 | 180.00 | 300.00 | 300.00 | 65.00 | 65.00 | | 0011 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 171+50.78, "Louisiana Dental Center" Conc. Sign and Base) | 1 | EACH | 8,500.00 | 8,500.00 | 3,000.00 | 3,000.00 | 1,500.00 | 1,500.00 | 15,000.00 | 15,000.00 | | 0012 | 203-01-00100 | General Excavation | 17,580 | CUYD | 18.87 | 331,734.60 | 9.50 | 167,010.00 | 7.00 | 123,060.00 | 15.00 | 263,700.00 | | 0013 | 203-03-00100 | Embankment | 15,361 | CUYD | 22.64 | 347,773.04 | 19.00 | 291,859.00 | 26.00 | 399,386.00 | 25.00 | 384,025.00 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 130 | LNFT | 3.04 | 395.20 | 16.00 | 2,080.00 | 25.00 | 3,250.00 | 7.00 | 910.00 | | 0015 | 204-02-00100 | Temporary Hay Bales | 275 | EACH | 20.42 | 5,615.50 | 25.00 | 6,875.00 | 15.00 | 4,125.00 | 16.00 | 4,400.00 | | 0016 | 204-04-00100 | Temporary Sediment Basins | 8 | EACH | 625.00 | 5,000.00 | 1,500.00 | 12,000.00 | 250.00 | 2,000.00 | 275.00 | 2,200.00 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 146.00 | 876.00 | 250.00 | 1,500.00 | 130.00 | 780.00 | 140.00 | 840.00 | | 0018 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 471.00 | 1,884.00 | 950.00 | 3,800.00 | 500.00 | 2,000.00 | 550.00 | 2,200.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 10,583 | LNFT | 2.75 | 29,103.25 | 2.75 | 29,103.25 | 1.75 | 18,520.25 | 1.75 | 18,520.25 | | 0020 | 302-02-04000 | Class II Base Course (4" Thick) | 34,378.6 | SQYD | 15.00 | 515,679.00 | 12.50 | 429,732.50 | 11.50 | 395,353.90 | 12.00 | 412,543.20 | | 0021 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 34,378.6 | SQYD | 6.70 | 230,336.62 | 11.25 | 386,759.25 | 10.50 | 360,975.30 | 7.00 | 240,650.20 | | 0022 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 3,839.4 | SQYD | 11.87 | 45,573.68 | 11.00 | 42,233.40 | 9.50 | 36,474.30 | 18.00 | 69,109.20 | | 0023 | 304-01-00100 | Lime | 541.8 | TON | 248.42 | 134,593.96 | 245.00 | 132,741.00 | 217.00 | 117,570.60 | 200.00 | 108,360.00 | | 0024 | 304-05-00100 | Lime Treatment (Type E) | 38,218 | SQYD | 2.29 | 87,519.22 | 2.75 | 105,099.50 | 2.00 | 76,436.00 | 1.00 | 38,218.00 | | 0025 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5 | CUYD | 130.00 | 650.00 | 195.00 | 975.00 | 125.00 | 625.00 | 100.00 | 500.00 | | 0026 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 110.00 | 55,000.00 | 78.75 | 39,375.00 | 82.00 | 41,000.00 | 85.00 | 42,500.00 | | 0027 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (12" Thick) | 1,403.5 | SQYD | 154.53 | 216,882.86 | 143.50 | 201,402.25 | 106.00 | 148,771.00 | 140.00 | 196,490.00 | | 0028 | 701-01-02042 | Cross Drain Pipe (30" RCP/RPVCP or 36" CMP) | 102 | LNFT | 102.26 | 10,430.52 | 228.00 | 23,256.00 | 129.00 | 13,158.00 | 155.00 | 15,810.00 | | 0029 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 906 | LNFT | 55.16 | 49,974.96 | 59.50 | 53,907.00 | 78.00 | 70,668.00 | 75.00 | 67,950.00 | | 0030 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,066 | LNFT | 59.91 | 123,774.06 | 63.25 | 130,674.50 | 69.00 | 142,554.00 | 90.00 | 185,940.00 | | 0031 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,875 | LNFT | 75.34 | 141,262.50 | 75.75 | 142,031.25 | 88.00 | 165,000.00 | 110.00 | 206,250.00 | | 0032 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 680 | LNFT | 100.47 | 68,319.60 | 93.50 | 63,580.00 | 112.00 | 76,160.00 | 120.00 | 81,600.00 | | 0033 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,216 | LNFT | 117.64 | 143,050.24 | 117.00 | 142,272.00 | 136.00 | 165,376.00 | 150.00 | 182,400.00 | | 0034 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 137 | LNFT | 182.96 | 25,065.52 | 159.00 | 21,783.00 | 182.00 | 24,934.00 | 195.00 | 26,715.00 | | 0035 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 4 | LNFT | 213.26 | 853.04 | 168.00 | 672.00 | 450.00 | 1,800.00 | 211.00 | 844.00 | | 0036 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 26 | LNFT | 202.76 | 5,271.76 | 163.00 | 4,238.00 | 270.00 | 7,020.00 | 202.00 | 5,252.00 | | 0037 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 39 | LNFT | 305.34 | 11,908.26 | 166.00 | 6,474.00 | 240.00 | 9,360.00 | 172.00 | 6,708.00 | | 0038 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 85 | LNFT | 61.51 | 5,228.35 | 66.50 | 5,652.50 | 96.00 | 8,160.00 | 93.00 | 7,905.00 | | 0039 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 61 | LNFT | 76.29 | 4,653.69 | 82.50 | 5,032.50 | 116.00 | 7,076.00 | 170.00 | 10,370.00 | | 0040 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 177 | LNFT | 74.02 | 13,101.54 | 63.25 | 11,195.25 | 90.00 | 15,930.00 | 90.00 | 15,930.00 | | 0041 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 153 | LNFT | 89.97 | 13,765.41 | 75.50 | 11,551.50 | 110.00 | 16,830.00 | 110.00 | 16,830.00 | | 0042 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 4,551 | LNFT | 1.00 | 4,551.00 | 1.25 | 5,688.75 | 3.00 | 13,653.00 | 2.00 | 9,102.00 | | 0043 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 6,660.00 | 6,660.00 | 3,775.00 | 3,775.00 | 3,800.00 | 3,800.00 | 5,300.00 | 5,300.00 | | 0044 | 702-02-00200 | Manholes (R-CB-11) | 33 | EACH | 3,470.00 | 114,510.00 | 3,400.00 | 112,200.00 | 3,200.00 | 105,600.00 | 5,000.00 | 165,000.00 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 47 | EACH | 3,245.00 | 152,515.00 | 2,500.00 | 117,500.00 | 2,500.00 | 117,500.00 | 2,300.00 | 108,100.00 | | 0046 | 702-03-00500 | Catch Basins (CB-06) | 38 | EACH | 4,110.00 | 156,180.00 | 5,100.00 | 193,800.00 | 3,800.00 | 144,400.00 | 5,800.00 | 220,400.00 | | 0047 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 7,725.00 | 77,250.00 | 8,950.00 | 89,500.00 | 7,000.00 | 70,000.00 | 9,300.00 | 93,000.00 | | 0048 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 1,870.00 | 3,740.00 | 1,625.00 | 3,250.00 | 1,500.00 | 3,000.00 | 1,700.00 | 3,400.00 | | 0049 | 702-08-00100 | Side Drain Safety End (Type 1) | 25 | EACH | 1,870.00 | 46,750.00 | 1,441.00 | 36,025.00 | 1,250.00 | 31,250.00 | 1,700.00 | 42,500.00 | | 0050 | 703-01-00100 | Shoulder Underdrain Systems | 8,647 | LNFT | 16.97 | 146,739.59 | 16.50 | 142,675.50 | 14.50 | 125,381.50 | 12.00 | 103,764.00 | | 0051 | 705-09-00100 | Rebuilt Fence | 797 | LNFT | 27.23 | 21,702.31 | 59.50 | 47,421.50 | 24.50 | 19,526.50 | 30.00 | 23,910.00 | | 0052 | 706-01-00100 | Concrete Walk (4" Thick) | 5,784.6 | SQYD | 48.45 | 280,263.87 | 42.00 | 242,953.20 | 39.00 | 225,599.40 | 45.00 | 260,307.00 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 2,311.9 | SQYD | 55.59 | 128,518.52 | 51.00 | 117,906.90 | 51.50 | 119,062.85 | 70.00 | 161,833.00 | | 0054 | 706-02-00400 | Concrete Drive (10" Thick) | 440.2 | SQYD | 112.35 | 49,456.47 | 67.50 | 29,713.50 | 76.00 | 33,455.20 | 85.00 | 37,417.00 | | 0055 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 713.7 | SQYD | 45.94 | 32,787.38 | 50.79 | 36,248.82 | 48.50 | 34,614.45 | 60.00 | 42,822.00 | | 0056 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" Thick) | 533.2 | SQYD | 88.18 | 47,017.58 | 77.00 | 41,056.40 | 74.00 | 39,456.80 | 80.00 | 42,656.00 | | 0057 | 706-04-00100 | Handicapped Curb Ramps | 28 | EACH | 520.00 | 14,560.00 | 600.00 | 16,800.00 | 1,200.00 | 33,600.00 | 1,000.00 | 28,000.00 | | 0058 | 708-01-00100 | Right-of-Way Monument | 58 | EACH | 250.00 | 14,500.00 | 278.00 | 16,124.00 | 250.00 | 14,500.00 | 300.00 | 17,400.00 | | 0059 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 122,300.00 | 122,300.00 | 125,000.00 | 125,000.00 | 180,000.00 | 180,000.00 | 140,000.00 | 140,000.00 | | 0060 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 60 | LNFT | 3.30 | 198.00 | 3.50 | 210.00 | 3.00 | 180.00 | 1.25 | 75.00 | | 0061 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 300 | EACH | 5.50 | 1,650.00 | 6.00 | 1,800.00 | 5.00 | 1,500.00 | 8.00 | 2,400.00 | | 0062 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 17,000.00 | 68,000.00 | 14,000.00 | 56,000.00 | 6,570.00 | 26,280.00 | 15,000.00 | 60,000.00 | | 0063 | 716-01-00100 | Mulch (Vegetative) | 14.1 | TON | 759.00 | 10,701.90 | 800.00 | 11,280.00 | 675.00 | 9,517.50 | 830.00 | 11,703.00 | | 0064 | 717-01-00100 | Seeding | 282 | LB | 20.90 | 5,893.80 | 21.50 | 6,063.00 | 18.00 | 5,076.00 | 22.00 | 6,204.00 | | 0065 | 718-01-00100 | Fertilizer | 9,410 | LB | 0.67 | 6,304.70 | 0.75 | 7,057.50 | 0.50 | 4,705.00 | 0.80 | 7,528.00 | | 0066 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 4,213 | SQYD | 1.43 | 6,024.59 | 3.75 | 15,798.75 | 1.00 | 4,213.00 | 1.55 | 6,530.15 | | 0067 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 318 | SQYD | 1.87 | 594.66 | 6.50 | 2,067.00 | 1.50 | 477.00 | 2.00 | 636.00 | | 0068 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | 21,300.00 | 21,300.00 | 10,000.00 | 10,000.00 | | 0069 | 726-01-00100 | Bedding Material | 879.3 | CUYD | 40.00 | 35,172.00 | 49.50 | 43,525.35 | 70.00 | 61,551.00 | 65.00 | 57,154.50 | | 0070 | 727-01-00100 | Mobilization | 1 | LUMP | 309,545.00 | 309,545.00 | 290,000.00 | 290,000.00 | 700,000.00 | 700,000.00 | 510,000.00 | 510,000.00 | | 0071 | 729-01-00100 | Sign (Type A) | 711.3 | SQFT | 19.80 | 14,083.74 | 33.00 | 23,472.90 | 12.00 | 8,535.60 | 19.00 | 13,514.70 | | 0072 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 32 | EACH | 88.00 | 2,816.00 | 110.00 | 3,520.00 | 70.00 | 2,240.00 | 92.00 | 2,944.00 | | 0073 | 731-02-00100 | Reflectorized Raised Pavement Markers | 272 | EACH | 6.60 | 1,795.20 | 7.15 | 1,944.80 | 6.00 | 1,632.00 | 8.00 | 2,176.00 | | 0074 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 661 | LNFT | 9.90 | 6,543.90 | 7.15 | 4,726.15 | 9.00 | 5,949.00 | 12.30 | 8,130.30 | | 0075 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.91 | MILE | 3,410.00 | 16,743.10 | 3,500.00 | 17,185.00 | 3,100.00 | 15,221.00 | 4,300.00 | 21,113.00 | | 0076 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 6,600.00 | 1,557.60 | 7,000.00 | 1,652.00 | 5,190.00 | 1,224.84 | 9,000.00 | 2,124.00 | | 0077 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 18,700.00 | 1,290.30 | 20,500.00 | 1,414.50 | 7,200.00 | 496.80 | 26,700.00 | 1,842.30 | | 0078 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.067 | MILE | 44,000.00 | 2,948.00 | 41,000.00 | 2,747.00 | 41,800.00 | 2,800.60 | 60,500.00 | 4,053.50 | | 0079 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.15 | MILE | 2,310.00 | 346.50 | 1,600.00 | 240.00 | 2,240.00 | 336.00 | 3,690.00 | 553.50 | | 0080 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 275.00 | 1,100.00 | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 370.00 | 1,480.00 | | 0081 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 8 | EACH | 330.00 | 2,640.00 | 350.00 | 2,800.00 | 250.00 | 2,000.00 | 490.00 | 3,920.00 | | 0082 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 275.00 | 550.00 | 250.00 | 500.00 | 250.00 | 500.00 | 370.00 | 740.00 | | 0083 | 732-04-01134 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type T) | 2 | EACH | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 750.00 | 1,500.00 | 925.00 | 1,850.00 | | 0084 | 732-04-01136 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TR) | 2 | EACH | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 750.00 | 1,500.00 | 925.00 | 1,850.00 | | 0085 | 732-04-01137 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTUC) | 2 | EACH | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 750.00 | 1,500.00 | 925.00 | 1,850.00 | | 0086 | 732-04-01138 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TUC) | 2 | EACH | 825.00 | 1,650.00 | 900.00 | 1,800.00 | 750.00 | 1,500.00 | 925.00 | 1,850.00 | | 0087 | 735-01-00100 | Mailboxes | 40 | EACH | 11.00 | 440.00 | 18.00 | 720.00 | 25.00 | 1,000.00 | 10.00 | 400.00 | | 0088 | 735-02-00100 | Mailbox Supports (Single) | 40 | EACH | 165.00 | 6,600.00 | 137.00 | 5,480.00 | 120.00 | 4,800.00 | 185.00 | 7,400.00 | | 0089 | 740-01-00100 | Construction Layout | 1 | LUMP | 99,000.00 | 99,000.00 | 101,500.00 | 101,500.00 | 73,100.00 | 73,100.00 | 35,000.00 | 35,000.00 | | 0090 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 27,720.00 | 27,720.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 7,500.00 | 7,500.00 | | 0091 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,969 | INLF | 1.65 | 4,898.85 | 1.00 | 2,969.00 | 1.50 | 4,453.50 | 1.25 | 3,711.25 | | 0092 | NS-702-00100 | Paved Gutter Drain | 8 | EACH | 1,775.00 | 14,200.00 | 1,200.00 | 9,600.00 | 3,950.00 | 31,600.00 | 3,200.00 | 25,600.00 | | 0093 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 36 | EACH | 660.00 | 23,760.00 | 450.00 | 16,200.00 | 645.00 | 23,220.00 | 670.00 | 24,120.00 | | 0094 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 23 | EACH | 138.00 | 3,174.00 | 535.00 | 12,305.00 | 275.00 | 6,325.00 | 130.00 | 2,990.00 | | 0095 | NS-MSC-00120 | Drainage Structure (Catch Basin)(CB-SD08) | 1 | EACH | 9,730.00 | 9,730.00 | 9,600.00 | 9,600.00 | 7,500.00 | 7,500.00 | 5,300.00 | 5,300.00 | | 0096 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Lt. of Sta. 180+87, 5'-6" x 37'-6") | 1 | EACH | 27,400.00 | 27,400.00 | 13,000.00 | 13,000.00 | 21,350.00 | 21,350.00 | 16,500.00 | 16,500.00 | | 0115 | 725-01-00100 | Temporary Detour Roads | 707.5 | SQYD | 63.27 | 44,763.53 | 59.50 | 42,096.25 | 59.00 | 41,742.50 | 70.00 | 49,525.00 | | | | SUBTOTAL GENERAL | | | | 5,206,216 | | 5,029,199 | | 5,624,738 | | 5,631,625 | | | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Asphalt Concrete) | | | | | | | | | | | | | | | | | | | | | | | | | | 0106 | 502-01-00100 | Asphalt Concrete | 13,626.9 | TON | 100.10 | 1,364,052.69 | 123.50 | 1,682,922.15 | 83.00 | 1,131,032.70 | 85.00 | 1,158,286.50 | | 0107 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 447 | SQYD | 87.26 | 39,005.22 | 76.00 | 33,972.00 | 102.00 | 45,594.00 | 90.00 | 40,230.00 | | 0108 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 825.00 | 825.00 | 100.00 | 100.00 | 300.00 | 300.00 | 925.00 | 925.00 | | 0109 | 707-01-00200 | Concrete Curb (Barrier) (6") | 439.8 | LNFT | 14.68 | 6,456.26 | 11.00 | 4,837.80 | 12.00 | 5,277.60 | 11.00 | 4,837.80 | | 0110 | 707-03-00100 | Combination Concrete Curb and Gutter (Barrier)(6") | 4,226 | LNFT | 24.46 | 103,367.96 | 22.75 | 96,141.50 | 19.00 | 80,294.00 | 23.00 | 97,198.00 | | 0111 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(3") | 2,632.9 | LNFT | 27.56 | 72,562.72 | 22.75 | 59,898.48 | 36.50 | 96,100.85 | 23.00 | 60,556.70 | | 0112 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(4") | 8,619.6 | LNFT | 25.26 | 217,731.10 | 22.75 | 196,095.90 | 20.00 | 172,392.00 | 23.00 | 198,250.80 | | 0113 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.916 | MILE | 880.00 | 6,086.08 | 715.00 | 4,944.94 | 800.00 | 5,532.80 | 767.00 | 5,304.57 | | 0114 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.307 | MILE | 1,345.00 | 1,757.92 | 1,100.00 | 1,437.70 | 1,300.00 | 1,699.10 | 765.00 | 999.86 | | | | SUBTOTAL ALT AA2 | | | | 1,811,844.95 | | 2,080,350.47 | | 1,538,223.05 | | 1,566,589.23 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,018,061.06 | | 7,109,549.89 | | 7,162,960.69 | | 7,198,213.91 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - MERRICK, LLC | - 10 - Command Construction Industries LLC | - 11 - JB JAMES CONSTRUCTION LLC | - 12 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 9.5 | LUMP | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 250,000.00 | 250,000.00 | 67,000.00 | 67,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 890 | SQYD | 4.50 | 4,005.00 | 10.00 | 8,900.00 | 15.00 | 13,350.00 | 13.00 | 11,570.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 13,012.5 | SQYD | 2.80 | 36,435.00 | 10.00 | 130,125.00 | 4.00 | 52,050.00 | 8.00 | 104,100.00 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 13,012.5 | SQYD | 4.25 | 55,303.13 | 10.00 | 130,125.00 | 6.00 | 78,075.00 | 11.00 | 143,137.50 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 80 | SQYD | 20.00 | 1,600.00 | 10.00 | 800.00 | 15.00 | 1,200.00 | 15.00 | 1,200.00 | | 0007 | 202-02-12000 | Removal of Fence | 1,484 | LNFT | 4.00 | 5,936.00 | 3.00 | 4,452.00 | 8.00 | 11,872.00 | 5.00 | 7,420.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 1,361 | LNFT | 4.00 | 5,444.00 | 3.00 | 4,083.00 | 8.00 | 10,888.00 | 7.00 | 9,527.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 253 | SQYD | 12.00 | 3,036.00 | 25.00 | 6,325.00 | 15.00 | 3,795.00 | 13.00 | 3,289.00 | | 0010 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 100.00 | 100.00 | 500.00 | 500.00 | 350.00 | 350.00 | 112.00 | 112.00 | | 0011 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 171+50.78, "Louisiana Dental Center" Conc. Sign and Base) | 1 | EACH | 12,000.00 | 12,000.00 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | 168.00 | 168.00 | | 0012 | 203-01-00100 | General Excavation | 17,580 | CUYD | 6.00 | 105,480.00 | 10.00 | 175,800.00 | 18.00 | 316,440.00 | 26.00 | 457,080.00 | | 0013 | 203-03-00100 | Embankment | 15,361 | CUYD | 19.00 | 291,859.00 | 10.00 | 153,610.00 | 37.00 | 568,357.00 | 41.00 | 629,801.00 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 130 | LNFT | 15.00 | 1,950.00 | 30.00 | 3,900.00 | 10.00 | 1,300.00 | 18.00 | 2,340.00 | | 0015 | 204-02-00100 | Temporary Hay Bales | 275 | EACH | 14.00 | 3,850.00 | 10.00 | 2,750.00 | 25.00 | 6,875.00 | 45.00 | 12,375.00 | | 0016 | 204-04-00100 | Temporary Sediment Basins | 8 | EACH | 200.00 | 1,600.00 | 150.00 | 1,200.00 | 2,160.00 | 17,280.00 | 335.00 | 2,680.00 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 185.00 | 1,110.00 | 150.00 | 900.00 | 150.00 | 900.00 | 223.00 | 1,338.00 | | 0018 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 750.00 | 3,000.00 | 250.00 | 1,000.00 | 500.00 | 2,000.00 | 2,150.00 | 8,600.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 10,583 | LNFT | 1.80 | 19,049.40 | 3.00 | 31,749.00 | 2.50 | 26,457.50 | 3.00 | 31,749.00 | | 0020 | 302-02-04000 | Class II Base Course (4" Thick) | 34,378.6 | SQYD | 12.00 | 412,543.20 | 12.00 | 412,543.20 | 14.00 | 481,300.40 | 19.00 | 653,193.40 | | 0021 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 34,378.6 | SQYD | 13.00 | 446,921.80 | 12.00 | 412,543.20 | 12.00 | 412,543.20 | 10.00 | 343,786.00 | | 0022 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 3,839.4 | SQYD | 9.30 | 35,706.42 | 12.00 | 46,072.80 | 13.00 | 49,912.20 | 11.00 | 42,233.40 | | 0023 | 304-01-00100 | Lime | 541.8 | TON | 225.00 | 121,905.00 | 250.00 | 135,450.00 | 280.00 | 151,704.00 | 281.00 | 152,245.80 | | 0024 | 304-05-00100 | Lime Treatment (Type E) | 38,218 | SQYD | 1.40 | 53,505.20 | 4.00 | 152,872.00 | 6.00 | 229,308.00 | 3.00 | 114,654.00 | | 0025 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5 | CUYD | 200.00 | 1,000.00 | 250.00 | 1,250.00 | 200.00 | 1,000.00 | 174.00 | 870.00 | | 0026 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 100.00 | 50,000.00 | 75.00 | 37,500.00 | 102.00 | 51,000.00 | 174.00 | 87,000.00 | | 0027 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (12" Thick) | 1,403.5 | SQYD | 150.00 | 210,525.00 | 120.00 | 168,420.00 | 145.00 | 203,507.50 | 150.00 | 210,525.00 | | 0028 | 701-01-02042 | Cross Drain Pipe (30" RCP/RPVCP or 36" CMP) | 102 | LNFT | 130.00 | 13,260.00 | 125.00 | 12,750.00 | 175.00 | 17,850.00 | 147.00 | 14,994.00 | | 0029 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 906 | LNFT | 55.00 | 49,830.00 | 65.00 | 58,890.00 | 145.00 | 131,370.00 | 108.00 | 97,848.00 | | 0030 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,066 | LNFT | 65.00 | 134,290.00 | 70.00 | 144,620.00 | 150.00 | 309,900.00 | 114.00 | 235,524.00 | | 0031 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,875 | LNFT | 75.00 | 140,625.00 | 80.00 | 150,000.00 | 175.00 | 328,125.00 | 140.00 | 262,500.00 | | 0032 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 680 | LNFT | 115.00 | 78,200.00 | 100.00 | 68,000.00 | 215.00 | 146,200.00 | 149.00 | 101,320.00 | | 0033 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 1,216 | LNFT | 140.00 | 170,240.00 | 120.00 | 145,920.00 | 240.00 | 291,840.00 | 181.00 | 220,096.00 | | 0034 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 137 | LNFT | 165.00 | 22,605.00 | 180.00 | 24,660.00 | 295.00 | 40,415.00 | 220.00 | 30,140.00 | | 0035 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 4 | LNFT | 200.00 | 800.00 | 250.00 | 1,000.00 | 1,600.00 | 6,400.00 | 148.00 | 592.00 | | 0036 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | 26 | LNFT | 170.00 | 4,420.00 | 225.00 | 5,850.00 | 395.00 | 10,270.00 | 285.00 | 7,410.00 | | 0037 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 39 | LNFT | 170.00 | 6,630.00 | 230.00 | 8,970.00 | 965.00 | 37,635.00 | 285.00 | 11,115.00 | | 0038 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 85 | LNFT | 85.00 | 7,225.00 | 75.00 | 6,375.00 | 155.00 | 13,175.00 | 129.00 | 10,965.00 | | 0039 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 61 | LNFT | 87.00 | 5,307.00 | 85.00 | 5,185.00 | 155.00 | 9,455.00 | 151.00 | 9,211.00 | | 0040 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 177 | LNFT | 65.00 | 11,505.00 | 70.00 | 12,390.00 | 110.00 | 19,470.00 | 108.00 | 19,116.00 | | 0041 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 153 | LNFT | 75.00 | 11,475.00 | 80.00 | 12,240.00 | 155.00 | 23,715.00 | 130.00 | 19,890.00 | | 0042 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 4,551 | LNFT | 1.00 | 4,551.00 | 1.00 | 4,551.00 | 4.30 | 19,569.30 | 1.30 | 5,916.30 | | 0043 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 7,450.00 | 7,450.00 | | 0044 | 702-02-00200 | Manholes (R-CB-11) | 33 | EACH | 4,400.00 | 145,200.00 | 5,000.00 | 165,000.00 | 6,000.00 | 198,000.00 | 5,120.00 | 168,960.00 | | 0045 | 702-03-00100 | Catch Basins (CB-01) | 47 | EACH | 2,000.00 | 94,000.00 | 3,000.00 | 141,000.00 | 4,500.00 | 211,500.00 | 5,100.00 | 239,700.00 | | 0046 | 702-03-00500 | Catch Basins (CB-06) | 38 | EACH | 4,400.00 | 167,200.00 | 4,000.00 | 152,000.00 | 6,200.00 | 235,600.00 | 13,400.00 | 509,200.00 | | 0047 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 5,600.00 | 56,000.00 | 10,000.00 | 100,000.00 | 8,000.00 | 80,000.00 | 27,500.00 | 275,000.00 | | 0048 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 5,000.00 | 10,000.00 | 3,000.00 | 6,000.00 | 3,000.00 | 6,000.00 | 5,600.00 | 11,200.00 | | 0049 | 702-08-00100 | Side Drain Safety End (Type 1) | 25 | EACH | 2,400.00 | 60,000.00 | 3,000.00 | 75,000.00 | 3,000.00 | 75,000.00 | 1,700.00 | 42,500.00 | | 0050 | 703-01-00100 | Shoulder Underdrain Systems | 8,647 | LNFT | 10.00 | 86,470.00 | 15.00 | 129,705.00 | 15.00 | 129,705.00 | 29.00 | 250,763.00 | | 0051 | 705-09-00100 | Rebuilt Fence | 797 | LNFT | 12.00 | 9,564.00 | 10.00 | 7,970.00 | 24.50 | 19,526.50 | 27.00 | 21,519.00 | | 0052 | 706-01-00100 | Concrete Walk (4" Thick) | 5,784.6 | SQYD | 35.00 | 202,461.00 | 50.00 | 289,230.00 | 50.00 | 289,230.00 | 91.00 | 526,398.60 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 2,311.9 | SQYD | 70.00 | 161,833.00 | 60.00 | 138,714.00 | 60.00 | 138,714.00 | 112.00 | 258,932.80 | | 0054 | 706-02-00400 | Concrete Drive (10" Thick) | 440.2 | SQYD | 95.00 | 41,819.00 | 85.00 | 37,417.00 | 85.00 | 37,417.00 | 142.00 | 62,508.40 | | 0055 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 713.7 | SQYD | 75.00 | 53,527.50 | 55.00 | 39,253.50 | 78.00 | 55,668.60 | 108.00 | 77,079.60 | | 0056 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" Thick) | 533.2 | SQYD | 115.00 | 61,318.00 | 75.00 | 39,990.00 | 80.00 | 42,656.00 | 183.00 | 97,575.60 | | 0057 | 706-04-00100 | Handicapped Curb Ramps | 28 | EACH | 750.00 | 21,000.00 | 1,500.00 | 42,000.00 | 1,400.00 | 39,200.00 | 2,600.00 | 72,800.00 | | 0058 | 708-01-00100 | Right-of-Way Monument | 58 | EACH | 250.00 | 14,500.00 | 300.00 | 17,400.00 | 250.00 | 14,500.00 | 335.00 | 19,430.00 | | 0059 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 195,000.00 | 195,000.00 | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | 99,000.00 | 99,000.00 | | 0060 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 60 | LNFT | 1.00 | 60.00 | 5.00 | 300.00 | 3.00 | 180.00 | 3.35 | 201.00 | | 0061 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 300 | EACH | 4.70 | 1,410.00 | 5.00 | 1,500.00 | 5.00 | 1,500.00 | 5.60 | 1,680.00 | | 0062 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 20,000.00 | 80,000.00 | 10,000.00 | 40,000.00 | 11,500.00 | 46,000.00 | 1,100.00 | 4,400.00 | | 0063 | 716-01-00100 | Mulch (Vegetative) | 14.1 | TON | 750.00 | 10,575.00 | 750.00 | 10,575.00 | 650.00 | 9,165.00 | 750.00 | 10,575.00 | | 0064 | 717-01-00100 | Seeding | 282 | LB | 17.00 | 4,794.00 | 20.00 | 5,640.00 | 15.00 | 4,230.00 | 20.00 | 5,640.00 | | 0065 | 718-01-00100 | Fertilizer | 9,410 | LB | 0.50 | 4,705.00 | 0.75 | 7,057.50 | 0.45 | 4,234.50 | 0.70 | 6,587.00 | | 0066 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 4,213 | SQYD | 1.80 | 7,583.40 | 2.00 | 8,426.00 | 1.50 | 6,319.50 | 1.40 | 5,898.20 | | 0067 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 318 | SQYD | 2.40 | 763.20 | 2.00 | 636.00 | 2.00 | 636.00 | 1.80 | 572.40 | | 0068 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 | 132,000.00 | 132,000.00 | | 0069 | 726-01-00100 | Bedding Material | 879.3 | CUYD | 100.00 | 87,930.00 | 50.00 | 43,965.00 | 100.00 | 87,930.00 | 70.00 | 61,551.00 | | 0070 | 727-01-00100 | Mobilization | 1 | LUMP | 730,000.00 | 730,000.00 | 900,000.00 | 900,000.00 | 950,000.00 | 950,000.00 | 172,700.00 | 172,700.00 | | 0071 | 729-01-00100 | Sign (Type A) | 711.3 | SQFT | 20.00 | 14,226.00 | 30.00 | 21,339.00 | 18.00 | 12,803.40 | 39.00 | 27,740.70 | | 0072 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 32 | EACH | 95.14 | 3,044.48 | 125.00 | 4,000.00 | 80.00 | 2,560.00 | 123.00 | 3,936.00 | | 0073 | 731-02-00100 | Reflectorized Raised Pavement Markers | 272 | EACH | 5.50 | 1,496.00 | 6.00 | 1,632.00 | 6.00 | 1,632.00 | 6.70 | 1,822.40 | | 0074 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 661 | LNFT | 10.00 | 6,610.00 | 10.00 | 6,610.00 | 6.00 | 3,966.00 | 10.00 | 6,610.00 | | 0075 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.91 | MILE | 4,600.00 | 22,586.00 | 4,200.00 | 20,622.00 | 2,800.00 | 13,748.00 | 3,460.00 | 16,988.60 | | 0076 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 11,000.00 | 2,596.00 | 10,000.00 | 2,360.00 | 6,000.00 | 1,416.00 | 5,800.00 | 1,368.80 | | 0077 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 15,000.00 | 1,035.00 | 15,000.00 | 1,035.00 | 17,000.00 | 1,173.00 | 8,000.00 | 552.00 | | 0078 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.067 | MILE | 50,000.00 | 3,350.00 | 50,000.00 | 3,350.00 | 34,000.00 | 2,278.00 | 46,700.00 | 3,128.90 | | 0079 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.15 | MILE | 6,000.00 | 900.00 | 6,000.00 | 900.00 | 1,350.00 | 202.50 | 2,350.00 | 352.50 | | 0080 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 325.00 | 1,300.00 | 300.00 | 1,200.00 | 200.00 | 800.00 | 279.00 | 1,116.00 | | 0081 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 8 | EACH | 325.00 | 2,600.00 | 325.00 | 2,600.00 | 300.00 | 2,400.00 | 279.00 | 2,232.00 | | 0082 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 325.00 | 650.00 | 300.00 | 600.00 | 200.00 | 400.00 | 279.00 | 558.00 | | 0083 | 732-04-01134 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type T) | 2 | EACH | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 | 750.00 | 1,500.00 | 1,100.00 | 2,200.00 | | 0084 | 732-04-01136 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TR) | 2 | EACH | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 | 750.00 | 1,500.00 | 840.00 | 1,680.00 | | 0085 | 732-04-01137 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTUC) | 2 | EACH | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 | 750.00 | 1,500.00 | 840.00 | 1,680.00 | | 0086 | 732-04-01138 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TUC) | 2 | EACH | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 | 750.00 | 1,500.00 | 840.00 | 1,680.00 | | 0087 | 735-01-00100 | Mailboxes | 40 | EACH | 10.00 | 400.00 | 10.00 | 400.00 | 15.00 | 600.00 | 175.00 | 7,000.00 | | 0088 | 735-02-00100 | Mailbox Supports (Single) | 40 | EACH | 150.00 | 6,000.00 | 150.00 | 6,000.00 | 115.00 | 4,600.00 | 175.00 | 7,000.00 | | 0089 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 150,000.00 | 150,000.00 | 105,000.00 | 105,000.00 | 300,000.00 | 300,000.00 | | 0090 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 200,000.00 | 200,000.00 | 1,000.00 | 1,000.00 | 20,000.00 | 20,000.00 | 3,000.00 | 3,000.00 | | 0091 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,969 | INLF | 2.40 | 7,125.60 | 1.00 | 2,969.00 | 0.90 | 2,672.10 | 1.00 | 2,969.00 | | 0092 | NS-702-00100 | Paved Gutter Drain | 8 | EACH | 3,200.00 | 25,600.00 | 3,500.00 | 28,000.00 | 5,000.00 | 40,000.00 | 3,400.00 | 27,200.00 | | 0093 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 36 | EACH | 625.00 | 22,500.00 | 500.00 | 18,000.00 | 600.00 | 21,600.00 | 670.00 | 24,120.00 | | 0094 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 23 | EACH | 145.00 | 3,335.00 | 500.00 | 11,500.00 | 125.00 | 2,875.00 | 530.00 | 12,190.00 | | 0095 | NS-MSC-00120 | Drainage Structure (Catch Basin)(CB-SD08) | 1 | EACH | 9,000.00 | 9,000.00 | 25,000.00 | 25,000.00 | 13,000.00 | 13,000.00 | 30,000.00 | 30,000.00 | | 0096 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Lt. of Sta. 180+87, 5'-6" x 37'-6") | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 41,000.00 | 41,000.00 | | 0115 | 725-01-00100 | Temporary Detour Roads | 707.5 | SQYD | 80.00 | 56,600.00 | 50.00 | 35,375.00 | 110.00 | 77,825.00 | 52.00 | 36,790.00 | | | | SUBTOTAL GENERAL | | | | 5,458,894 | | 5,975,442 | | 7,702,817 | | 7,886,368 | | | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Asphalt Concrete) | | | | | | | | | | | | | | | | | | | | | | | | | | 0106 | 502-01-00100 | Asphalt Concrete | 13,626.9 | TON | 115.00 | 1,567,093.50 | 90.00 | 1,226,421.00 | 100.00 | 1,362,690.00 | 92.00 | 1,253,674.80 | | 0107 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 447 | SQYD | 105.00 | 46,935.00 | 85.00 | 37,995.00 | 80.00 | 35,760.00 | 96.00 | 42,912.00 | | 0108 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 100.00 | 100.00 | 500.00 | 500.00 | 125.00 | 125.00 | 335.00 | 335.00 | | 0109 | 707-01-00200 | Concrete Curb (Barrier) (6") | 439.8 | LNFT | 24.00 | 10,555.20 | 20.00 | 8,796.00 | 45.00 | 19,791.00 | 29.00 | 12,754.20 | | 0110 | 707-03-00100 | Combination Concrete Curb and Gutter (Barrier)(6") | 4,226 | LNFT | 18.00 | 76,068.00 | 20.00 | 84,520.00 | 35.00 | 147,910.00 | 38.00 | 160,588.00 | | 0111 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(3") | 2,632.9 | LNFT | 18.00 | 47,392.20 | 20.00 | 52,658.00 | 40.00 | 105,316.00 | 33.00 | 86,885.70 | | 0112 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(4") | 8,619.6 | LNFT | 18.00 | 155,152.80 | 20.00 | 172,392.00 | 32.00 | 275,827.20 | 33.00 | 284,446.80 | | 0113 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.916 | MILE | 1,200.00 | 8,299.20 | 1,000.00 | 6,916.00 | 600.00 | 4,149.60 | 900.00 | 6,224.40 | | 0114 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.307 | MILE | 1,600.00 | 2,091.20 | 2,000.00 | 2,614.00 | 900.00 | 1,176.30 | 1,400.00 | 1,829.80 | | | | SUBTOTAL ALT AA2 | | | | 1,913,687.10 | | 1,592,812.00 | | 1,952,745.10 | | 1,849,650.70 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,372,581.43 | | 7,568,254.20 | | 9,655,562.30 | | 9,736,018.60 |
|