Proposal:H.013253.6
Parish:Caddo
Routes:US 79, US 80
Description:US 79 / US 80: TEXAS STATE LINE - JCT US 80
Type Construction:PAVEMENT PATCHING, IN-PLACE CEMENT TREATED BASE COURSE, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,390,270.03
| Rank | License | Bidder | Construction Bid |
| 1 | 36374 | Best-Yet Builders, Llc | $8,213,794.15 |
| 2 | 08584 | Madden Contracting Co., LLC | $8,696,579.68 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Best-Yet Builders, Llc | - 2 - Madden Contracting Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | | 0002 | 202-02-00030 | Removal of TIMBER RETAINING WALL | 168 | LNFT | 178.58 | 30,001.44 | 40.00 | 6,720.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 656 | LNFT | 4.00 | 2,624.00 | 12.00 | 7,872.00 | | 0004 | 203-01-00100 | General Excavation | 340 | CUYD | 30.00 | 10,200.00 | 7.10 | 2,414.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,380 | CUYD | 20.00 | 67,600.00 | 40.75 | 137,735.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 40 | EACH | 10.00 | 400.00 | 25.00 | 1,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 250.00 | 1,500.00 | 150.00 | 900.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,000 | LNFT | 2.00 | 2,000.00 | 2.50 | 2,500.00 | | 0009 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 66,821 | SQYD | 12.00 | 801,852.00 | 8.05 | 537,909.05 | | 0010 | 502-01-00100 | Asphalt Concrete | 34,953.5 | TON | 106.35 | 3,717,304.73 | 123.00 | 4,299,280.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 826.5 | TON | 111.35 | 92,030.78 | 192.50 | 159,101.25 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 158,506 | SQYD | 3.00 | 475,518.00 | 3.55 | 562,696.30 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -9,190 | CUYD | 0.10 | -919.00 | 0.01 | -91.90 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 5,941 | SQYD | 150.00 | 891,150.00 | 100.00 | 594,100.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 590.6 | LNFT | 32.00 | 18,899.20 | 24.00 | 14,174.40 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,000.00 | 12,000.00 | 3,200.00 | 12,800.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 450,000.00 | 450,000.00 | | 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 812 | LNFT | 1.00 | 812.00 | 0.25 | 203.00 | | 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 420 | LNFT | 3.00 | 1,260.00 | 0.75 | 315.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 20.553 | MILE | 500.00 | 10,276.50 | 375.00 | 7,707.38 | | 0021 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.508 | MILE | 10,000.00 | 15,080.00 | 1,100.00 | 1,658.80 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.702 | MILE | 500.00 | 6,851.00 | 275.00 | 3,768.05 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 47.692 | MILE | 700.00 | 33,384.40 | 650.00 | 30,999.80 | | 0024 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 16 | EACH | 100.00 | 1,600.00 | 25.00 | 400.00 | | 0025 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 16 | EACH | 150.00 | 2,400.00 | 25.00 | 400.00 | | 0026 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 3,000.00 | 12,000.00 | 9,000.00 | 36,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 30.11 | TON | 850.00 | 25,593.50 | 700.00 | 21,077.00 | | 0028 | 717-01-00100 | Seeding | 910.6 | LB | 12.50 | 11,382.50 | 15.00 | 13,659.00 | | 0029 | 718-01-00100 | Fertilizer | 15,220 | LB | 0.65 | 9,893.00 | 0.50 | 7,610.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | 100.00 | 100.00 | | 0031 | 724-01-00100 | Rumble Strips (Centerline) | 6.111 | MILE | 1,500.00 | 9,166.50 | 1,650.00 | 10,083.15 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 12.222 | MILE | 1,500.00 | 18,333.00 | 1,650.00 | 20,166.30 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 450,000.00 | 450,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 100.00 | 800.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,473 | EACH | 7.00 | 10,311.00 | 5.00 | 7,365.00 | | 0036 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 406 | LNFT | 2.00 | 812.00 | 2.00 | 812.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 210 | LNFT | 7.00 | 1,470.00 | 9.00 | 1,890.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.662 | MILE | 2,800.00 | 66,253.60 | 2,650.00 | 62,704.30 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.447 | MILE | 2,000.00 | 4,894.00 | 900.00 | 2,202.30 | | 0040 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.163 | MILE | 10,000.00 | 1,630.00 | 10,000.00 | 1,630.00 | | 0041 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 1.199 | MILE | 5,000.00 | 5,995.00 | 3,000.00 | 3,597.00 | | 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 300.00 | 1,200.00 | 300.00 | 1,200.00 | | 0043 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 300.00 | 600.00 | | 0044 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 300.00 | 2,400.00 | 300.00 | 2,400.00 | | 0045 | 732-05-00100 | Removal of Existing Markings | 0.29 | MILE | 10,000.00 | 2,900.00 | 4,000.00 | 1,160.00 | | 0046 | 735-01-00100 | Mailboxes | 46 | EACH | 75.00 | 3,450.00 | 1.00 | 46.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 46 | EACH | 100.00 | 4,600.00 | 130.00 | 5,980.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | | 0049 | 802-02-00100 | Permanent Sheeting (Steel) | 4,760 | SQFT | 78.75 | 374,850.00 | 45.00 | 214,200.00 | | 0050 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 51 | EACH | 2,700.00 | 137,700.00 | 5,000.00 | 255,000.00 | | 0051 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 25 | EACH | 3,800.00 | 95,000.00 | 5,000.00 | 125,000.00 | | 0052 | NS-600-00400 | Ultra-Thin Whitetopping (4 inch Thick) | 11,174.7 | SQYD | 50.00 | 558,735.00 | 50.00 | 558,735.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,213,794.15 | | 8,696,579.68 |
|