Bid Tabulations for the Letting of 5/8/2019 LA DOTD Headquarters

Proposal:H.012236.6
Parish:Jefferson
Description:NORTH KENNER PEDESTRIAN SAFETY IMPR
Type Construction:CLEARING AND GRUBBING, GRADING, PORTLAND CEMENT CONCRETE WALKS, HANDICAPPED CURB RAMPS, TRENCH DRAINS, AND RELATED WORK.
Estimated Construction Cost:$324,162.00
Rank License BidderConstruction Bid
157835Roubion Roads & Streets LLC$278,190.99
257931KCR CONTRACTORS, LLC$286,847.05
349356KORT's CONSTRUCTION SERVICES, INC.$289,349.90
448896Command Construction Industries LLC$316,792.44
5C0002Dragon Limited, Inc.$319,469.64
634263La Contracting Enterprise LLC$341,868.50
714914Kass Bros. Inc.$348,438.10
865305McCoy Group, LLC$385,876.45
939001JD's Rebar & Construction Inc.$600,472.38


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Roubion Roads & Streets LLC
- 2 -
KCR CONTRACTORS, LLC
- 3 -
KORT's CONSTRUCTION SERVICES, INC.
- 4 -
Command Construction Industries LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.979 LUMP2,206.052,206.055,750.005,750.0020,000.0020,000.0030,000.0030,000.00
0002202-02-06100Removal of Concrete Walks and Drives 136     SQYD8.111,102.967.29991.4410.001,360.0010.001,360.00
0003202-02-06140Removal of Curbs (Concrete) 114     LNFT6.13698.822.30262.205.00570.0010.001,140.00
0004202-02-38200Removal of Signs 1     EACH196.41196.4153.7553.7522.0022.0050.0050.00
0005203-05-00100Excavation and Embankment 1     LUMP7,649.467,649.4616,808.0716,808.0716,000.0016,000.0030,000.0030,000.00
0006204-06-00100Temporary Silt Fencing 7,394     LNFT2.7520,333.501.7312,791.622.0014,788.000.0173.94
0007702-04-00100Adjusting Manholes 2     EACH489.91979.821,380.002,760.001,600.003,200.001,000.002,000.00
0008702-04-00200Adjusting Catch Basins 1     EACH489.91489.911,725.001,725.001,800.001,800.001,000.001,000.00
0009706-01-00100Concrete Walk (4" Thick) 2,074.3   SQYD49.75103,196.4347.6398,798.9148.0099,566.4050.00103,715.00
0010706-02-00200Concrete Drive (6" Thick) 96     SQYD59.925,752.32116.9411,226.2475.007,200.0060.005,760.00
0011706-02-00300Concrete Drive (8" Thick) 137.1   SQYD85.7211,752.21148.7720,396.3785.0011,653.5075.0010,282.50
0012706-03-00300Incidental Concrete Paving (6" Thick) 12.9   SQYD70.14904.8151.40663.0665.00838.5060.00774.00
0013706-04-00100Handicapped Curb Ramps 27     EACH960.6725,938.09363.249,807.481,200.0032,400.001,000.0027,000.00
0014707-01-00200Concrete Curb (Barrier) 150     LNFT14.192,128.5014.762,214.0019.002,850.0020.003,000.00
0015713-01-00100Temporary Signs and Barricades 1     LUMP14,426.9114,426.9111,787.5011,787.5010,000.0010,000.0030,000.0030,000.00
0016714-01-00600Slab Sodding (St. Augustine) 1,807     SQYD9.4217,021.947.6313,787.417.5013,552.508.0014,456.00
0017727-01-00100Mobilization 1     LUMP19,485.8619,485.8618,250.0018,250.0020,000.0020,000.0030,000.0030,000.00
0018729-01-00100Sign (Type A) 6     SQFT58.85353.1037.63225.7855.00330.00100.00600.00
0019729-01-00103Sign (Type A)(Relocate) 20     SQFT100.042,000.8091.381,827.6050.001,000.00100.002,000.00
0020732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 759     LNFT14.1210,717.0813.8010,474.2011.008,349.0010.007,590.00
0021732-05-00100Removal of Existing Markings 0.011 MILE17,654.08194.1917,250.00189.7530,000.00330.0030,000.00330.00
0022739-01-00100Hydro-Seeding 0.7   ACRE4,472.373,130.663,148.632,204.043,200.002,240.003,800.002,660.00
0023740-01-00100Construction Layout 1     LUMP9,714.399,714.3914,950.0014,950.005,000.005,000.001,000.001,000.00
0024741-11-00200Adjusting Water Valve and Meter Box 2     EACH98.20196.40718.751,437.50300.00600.00500.001,000.00
0025NS-719-00001Tree Protection Fencing 1     LUMP5,948.445,948.448,465.638,465.632,500.002,500.001,000.001,000.00
0026NS-719-00002Tree Trimming 1     LUMP4,119.284,119.283,440.003,440.004,200.004,200.001.001.00
0027TS-700-00100Trench Drains cast in place concrete5     EACH1,510.537,552.653,111.9015,559.501,800.009,000.002,000.0010,000.00
             
  CONTRACTOR TOTAL   278,190.99 286,847.05 289,349.90 316,792.44



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Dragon Limited, Inc.
- 6 -
La Contracting Enterprise LLC
- 7 -
Kass Bros. Inc.
- 8 -
McCoy Group, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.979 LUMP16,407.9716,407.973,500.003,500.0016,500.0016,500.005,011.075,011.07
0002202-02-06100Removal of Concrete Walks and Drives 136     SQYD15.982,173.2827.003,672.0022.002,992.0042.295,751.44
0003202-02-06140Removal of Curbs (Concrete) 114     LNFT15.681,787.5216.001,824.005.00570.0026.012,965.14
0004202-02-38200Removal of Signs 1     EACH62.5062.50630.00630.00262.00262.00803.51803.51
0005203-05-00100Excavation and Embankment 1     LUMP10,000.0010,000.0050,000.0050,000.0010,700.0010,700.0017,253.2017,253.20
0006204-06-00100Temporary Silt Fencing 7,394     LNFT1.4610,795.242.5018,485.002.0014,788.000.755,545.50
0007702-04-00100Adjusting Manholes 2     EACH377.81755.62700.001,400.00900.001,800.002,132.624,265.24
0008702-04-00200Adjusting Catch Basins 1     EACH625.13625.131,200.001,200.001,080.001,080.003,835.383,835.38
0009706-01-00100Concrete Walk (4" Thick) 2,074.3   SQYD68.75142,608.1344.0091,269.2060.00124,458.0060.97126,470.07
0010706-02-00200Concrete Drive (6" Thick) 96     SQYD75.007,200.0046.004,416.0084.008,064.0084.558,116.80
0011706-02-00300Concrete Drive (8" Thick) 137.1   SQYD75.0010,282.5058.007,951.8099.0013,572.9079.4710,895.34
0012706-03-00300Incidental Concrete Paving (6" Thick) 12.9   SQYD117.371,514.0745.00580.50148.001,909.20317.054,089.95
0013706-04-00100Handicapped Curb Ramps 27     EACH1,500.0040,500.002,000.0054,000.002,050.0055,350.001,428.9738,582.19
0014707-01-00200Concrete Curb (Barrier) 150     LNFT13.982,097.009.001,350.0017.002,550.0076.1711,425.50
0015713-01-00100Temporary Signs and Barricades 1     LUMP10,375.0010,375.0019,000.0019,000.0010,000.0010,000.0027,391.8427,391.84
0016714-01-00600Slab Sodding (St. Augustine) 1,807     SQYD11.2520,328.7510.0018,070.0010.0018,070.007.7313,968.11
0017727-01-00100Mobilization 1     LUMP14,300.0014,300.0015,000.0015,000.0020,000.0020,000.0037,649.7037,649.70
0018729-01-00100Sign (Type A) 6     SQFT43.75262.5061.00366.0070.00420.00279.201,675.20
0019729-01-00103Sign (Type A)(Relocate) 20     SQFT106.252,125.0055.001,100.0028.00560.0083.761,675.20
0020732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 759     LNFT12.509,487.5012.009,108.0017.0012,903.0010.888,257.92
0021732-05-00100Removal of Existing Markings 0.011 MILE37,500.00412.5036,000.00396.0022,000.00242.0032,646.84359.12
0022739-01-00100Hydro-Seeding 0.7   ACRE2,250.001,575.003,500.002,450.003,750.002,625.003,187.372,231.16
0023740-01-00100Construction Layout 1     LUMP2,500.002,500.0015,000.0015,000.001,750.001,750.0033,500.0033,500.00
0024741-11-00200Adjusting Water Valve and Meter Box 2     EACH560.091,120.18550.001,100.00336.00672.00837.621,675.24
0025NS-719-00001Tree Protection Fencing 1     LUMP2,500.002,500.004,500.004,500.0010,000.0010,000.002,176.462,176.46
0026NS-719-00002Tree Trimming 1     LUMP1,330.501,330.503,000.003,000.004,100.004,100.002,720.572,720.57
0027TS-700-00100Trench Drains cast in place concrete5     EACH1,268.756,343.752,500.0012,500.002,500.0012,500.001,517.127,585.60
             
  CONTRACTOR TOTAL   319,469.64 341,868.50 348,438.10 385,876.45



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 9 -
JD's Rebar & Construction Inc.
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.979 LUMP7,721.537,721.53
0002202-02-06100Removal of Concrete Walks and Drives 136     SQYD18.742,548.64
0003202-02-06140Removal of Curbs (Concrete) 114     LNFT20.662,355.24
0004202-02-38200Removal of Signs 1     EACH1,308.731,308.73
0005203-05-00100Excavation and Embankment 1     LUMP17,071.1817,071.18
0006204-06-00100Temporary Silt Fencing 7,394     LNFT1.7913,235.26
0007702-04-00100Adjusting Manholes 2     EACH4,575.589,151.16
0008702-04-00200Adjusting Catch Basins 1     EACH5,719.485,719.48
0009706-01-00100Concrete Walk (4" Thick) 2,074.3   SQYD61.02126,573.79
0010706-02-00200Concrete Drive (6" Thick) 96     SQYD93.889,012.48
0011706-02-00300Concrete Drive (8" Thick) 137.1   SQYD86.7111,887.94
0012706-03-00300Incidental Concrete Paving (6" Thick) 12.9   SQYD196.572,535.75
0013706-04-00100Handicapped Curb Ramps 27     EACH2,048.5455,310.58
0014707-01-00200Concrete Curb (Barrier) 150     LNFT65.079,760.50
0015713-01-00100Temporary Signs and Barricades 1     LUMP29,590.0429,590.04
0016714-01-00600Slab Sodding (St. Augustine) 1,807     SQYD17.0730,845.49
0017727-01-00100Mobilization 1     LUMP159,330.99159,330.99
0018729-01-00100Sign (Type A) 6     SQFT189.781,138.68
0019729-01-00103Sign (Type A)(Relocate) 20     SQFT39.83796.60
0020732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 759     LNFT36.4227,642.78
0021732-05-00100Removal of Existing Markings 0.011 MILE103,460.911,138.07
0022739-01-00100Hydro-Seeding 0.7   ACRE9,673.676,771.57
0023740-01-00100Construction Layout 1     LUMP15,933.1015,933.10
0024741-11-00200Adjusting Water Valve and Meter Box 2     EACH2,077.714,155.42
0025NS-719-00001Tree Protection Fencing 1     LUMP17,071.1817,071.18
0026NS-719-00002Tree Trimming 1     LUMP13,656.9513,656.95
0027TS-700-00100Trench Drains cast in place concrete5     EACH3,641.8518,209.25
       
  CONTRACTOR TOTAL   600,472.38