Proposal:H.013329.6
Parish:East Baton Rouge
Routes:LA 42
Description:LA 42: LA 427 - LA 3246 (RT II)
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED ITEMS.
Estimated Construction Cost:$1,562,199.21
Rank | License | Bidder | Construction Bid |
1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,705,561.94 |
2 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,893,742.00 |
3 | 06276 | Barriere Construction Co., LLC | $1,897,677.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Barriere Construction Co., LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 6,781.25 | 6,781.25 | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | 0002 | 202-02-00020 | Removal of INCIDENTAL CONCRETE | 194 | SQYD | 37.55 | 7,284.70 | 15.00 | 2,910.00 | 30.00 | 5,820.00 | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 87.8 | LNFT | 34.63 | 3,040.51 | 12.00 | 1,053.60 | 9.75 | 856.05 | 0004 | 202-02-14500 | Removal of Guard Rail | 165 | LNFT | 9.60 | 1,584.00 | 10.00 | 1,650.00 | 9.75 | 1,608.75 | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMP x 50' & 48" CMPA x 10' | 60 | LNFT | 17.25 | 1,035.00 | 20.00 | 1,200.00 | 30.00 | 1,800.00 | 0006 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 1,092.50 | 1,092.50 | 3,500.00 | 3,500.00 | 2,200.00 | 2,200.00 | 0007 | 203-01-00100 | General Excavation | 17 | CUYD | 15.24 | 259.08 | 200.00 | 3,400.00 | 160.00 | 2,720.00 | 0008 | 203-03-00100 | Embankment | 17 | CUYD | 66.13 | 1,124.21 | 300.00 | 5,100.00 | 160.00 | 2,720.00 | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 469 | CUYD | 116.26 | 54,525.94 | 80.00 | 37,520.00 | 70.00 | 32,830.00 | 0010 | 203-10-00100 | Cleaning Existing Ditches | 610 | LNFT | 5.75 | 3,507.50 | 13.00 | 7,930.00 | 10.00 | 6,100.00 | 0011 | 204-06-00100 | Temporary Silt Fencing | 865 | LNFT | 2.89 | 2,499.85 | 2.00 | 1,730.00 | 2.00 | 1,730.00 | 0012 | 502-01-00100 | Asphalt Concrete | 10,334.2 | TON | 97.67 | 1,009,341.31 | 97.00 | 1,002,417.40 | 105.00 | 1,085,091.00 | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 237.7 | TON | 134.33 | 31,930.24 | 160.00 | 38,032.00 | 275.00 | 65,367.50 | 0014 | 509-01-00100 | Milling Asphalt Pavement | 53,694 | SQYD | 4.49 | 241,086.06 | 3.60 | 193,298.40 | 3.75 | 201,352.50 | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,284 | CUYD | 0.01 | -32.84 | 0.10 | -328.40 | 25.00 | -82,100.00 | 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 378 | SQYD | 128.31 | 48,501.18 | 100.00 | 37,800.00 | 200.00 | 75,600.00 | 0017 | 701-01-01063 | Cross Drain Pipe (42" RCP/RPVCP) | 50 | LNFT | 215.63 | 10,781.50 | 400.00 | 20,000.00 | 400.00 | 20,000.00 | 0018 | 701-13-01120 | Corrugated Metal Pipe Arch (Extension) (48" Equiv.) | 10 | LNFT | 258.75 | 2,587.50 | 400.00 | 4,000.00 | 450.00 | 4,500.00 | 0019 | 701-14-00100 | Cleaning Existing Pipes | 210 | LNFT | 23.00 | 4,830.00 | 13.00 | 2,730.00 | 20.00 | 4,200.00 | 0020 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,092.50 | 1,092.50 | 3,000.00 | 3,000.00 | 2,200.00 | 2,200.00 | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 50 | LNFT | 13.80 | 690.00 | 1.00 | 50.00 | 11.00 | 550.00 | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 29.84 | 4,103.00 | 26.00 | 3,575.00 | 24.00 | 3,300.00 | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,852.50 | 7,705.00 | 3,500.00 | 7,000.00 | 3,100.00 | 6,200.00 | 0024 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 368 | SQYD | 48.94 | 18,009.92 | 170.00 | 62,560.00 | 80.00 | 29,440.00 | 0025 | 707-01-00300 | Concrete Curb (Mountable) | 87.8 | LNFT | 71.01 | 6,234.68 | 30.00 | 2,634.00 | 35.00 | 3,073.00 | 0026 | 710-01-00100 | Flowable Fill | 10 | CUYD | 287.50 | 2,875.00 | 150.00 | 1,500.00 | 275.00 | 2,750.00 | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | 165,000.00 | 165,000.00 | 0028 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,506 | LNFT | 0.40 | 602.40 | 0.40 | 602.40 | 0.10 | 150.60 | 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 1.15 | 82.80 | 1.10 | 79.20 | 1.00 | 72.00 | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.012 | MILE | 117.91 | 1,062.60 | 325.00 | 2,928.90 | 150.00 | 1,351.80 | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.3 | MILE | 575.00 | 172.50 | 600.00 | 180.00 | 600.00 | 180.00 | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.261 | MILE | 718.73 | 28,936.79 | 500.00 | 20,130.50 | 600.00 | 24,156.60 | 0033 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 5 | EACH | 57.50 | 287.50 | 55.00 | 275.00 | 50.00 | 250.00 | 0034 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 51.75 | 103.50 | 50.00 | 100.00 | 45.00 | 90.00 | 0035 | 726-01-00100 | Bedding Material | 22.2 | CUYD | 111.11 | 2,466.64 | 75.00 | 1,665.00 | 135.00 | 2,997.00 | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 185,000.00 | 185,000.00 | 125,000.00 | 125,000.00 | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 92.00 | 184.00 | 100.00 | 200.00 | 90.00 | 180.00 | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,271 | EACH | 7.48 | 9,507.08 | 6.00 | 7,626.00 | 6.50 | 8,261.50 | 0039 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 502 | LNFT | 2.30 | 1,154.60 | 2.00 | 1,004.00 | 2.70 | 1,355.40 | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 359 | LNFT | 8.05 | 2,889.95 | 7.00 | 2,513.00 | 7.50 | 2,692.50 | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.42 | MILE | 2,990.00 | 40,125.80 | 2,800.00 | 37,576.00 | 2,800.00 | 37,576.00 | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.1 | MILE | 1,150.00 | 115.00 | 1,200.00 | 120.00 | 1,050.00 | 105.00 | 0043 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) MERGE | 1 | EACH | 287.50 | 287.50 | 400.00 | 400.00 | 250.00 | 250.00 | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 281.75 | 845.25 | 280.00 | 840.00 | 250.00 | 750.00 | 0045 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 373.75 | 747.50 | 350.00 | 700.00 | 350.00 | 700.00 | 0046 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 287.50 | 575.00 | 300.00 | 600.00 | 250.00 | 500.00 | 0047 | 736-09-00100 | Loop Detector | 70 | LNFT | 39.00 | 2,730.00 | 35.00 | 2,450.00 | 35.00 | 2,450.00 | 0048 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 622.48 | 622.48 | 750.00 | 750.00 | 600.00 | 600.00 | 0049 | 739-01-00100 | Hydro-Seeding | 4.1 | ACRE | 1,608.16 | 6,593.46 | 1,400.00 | 5,740.00 | 1,000.00 | 4,100.00 | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,705,561.94 | | 1,893,742.00 | | 1,897,677.20 |
|