Proposal:H.012744.6
Parish:Jefferson
Routes:I-10
Description:I-10 N SERV RD: WILLIAMS-ORLEANS P/L
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$2,054,826.55
Rank | License | Bidder | Construction Bid |
1 | 02179 | Boh Bros. Construction Co., LLC. | $1,780,746.77 |
2 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,610,695.64 |
3 | 06276 | Barriere Construction Co., LLC | $2,974,006.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Barriere Construction Co., LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-02-00010 | Removal of Mailbox and Support Structure | 1 | EACH | 700.00 | 700.00 | 700.00 | 700.00 | 700.00 | 700.00 | 0002 | 202-02-00020 | Removal of Incidental Concrete (4" Thick) | 89.4 | SQYD | 15.00 | 1,341.00 | 50.00 | 4,470.00 | 15.00 | 1,341.00 | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 193 | LNFT | 15.00 | 2,895.00 | 30.00 | 5,790.00 | 15.00 | 2,895.00 | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 401.1 | SQYD | 15.00 | 6,016.50 | 40.00 | 16,044.00 | 15.00 | 6,016.50 | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 2,026 | LNFT | 15.00 | 30,390.00 | 23.00 | 46,598.00 | 15.00 | 30,390.00 | 0006 | 202-02-14500 | Removal of Guard Rail | 895 | LNFT | 9.00 | 8,055.00 | 9.00 | 8,055.00 | 9.00 | 8,055.00 | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" | 28 | LNFT | 110.00 | 3,080.00 | 15.00 | 420.00 | 107.00 | 2,996.00 | 0008 | 202-02-38200 | Removal of Signs | 5 | EACH | 10.00 | 50.00 | 10.00 | 50.00 | 10.00 | 50.00 | 0009 | 202-02-38300 | Removal of Sign and U-Channel Post | 159 | EACH | 25.00 | 3,975.00 | 25.00 | 3,975.00 | 25.00 | 3,975.00 | 0010 | 202-02-38380 | Removal of Sign Truss and Footings | 1 | EACH | 2,800.00 | 2,800.00 | 2,800.00 | 2,800.00 | 2,800.00 | 2,800.00 | 0011 | 202-03-38000 | Relocation of Sign (Type A) | 7 | EACH | 25.00 | 175.00 | 25.00 | 175.00 | 25.00 | 175.00 | 0012 | 202-03-38020 | Relocation of Sign Pole (Type A) | 7 | EACH | 25.00 | 175.00 | 25.00 | 175.00 | 25.00 | 175.00 | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,050 | CUYD | 10.00 | 10,500.00 | 46.00 | 48,300.00 | 25.00 | 26,250.00 | 0014 | 204-06-00100 | Temporary Silt Fencing | 2,700 | LNFT | 2.00 | 5,400.00 | 1.91 | 5,157.00 | 1.00 | 2,700.00 | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 108 | CUYD | 30.00 | 3,240.00 | 46.00 | 4,968.00 | 30.00 | 3,240.00 | 0016 | 502-01-00100 | Asphalt Concrete | 8,349.8 | TON | 80.00 | 667,984.00 | 99.00 | 826,630.20 | 125.00 | 1,043,725.00 | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 884.6 | TON | 120.00 | 106,152.00 | 160.00 | 141,536.00 | 175.00 | 154,805.00 | 0018 | 509-01-00100 | Milling Asphalt Pavement | 78,908 | SQYD | 2.00 | 157,816.00 | 2.20 | 173,597.60 | 5.00 | 394,540.00 | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,381 | CUYD | 1.50 | -6,571.50 | 5.76 | -25,234.56 | 10.00 | -43,810.00 | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 305 | SQYD | 90.00 | 27,450.00 | 150.00 | 45,750.00 | 190.00 | 57,950.00 | 0021 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 932 | LNFT | 2.50 | 2,330.00 | 4.00 | 3,728.00 | 2.25 | 2,097.00 | 0022 | 602-03-00100 | Cleaning and Sealing Random cracks | 100 | LNFT | 4.00 | 400.00 | 6.00 | 600.00 | 3.50 | 350.00 | 0023 | 602-05-01280 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (12" Thick) | 24 | SQYD | 165.00 | 3,960.00 | 450.00 | 10,800.00 | 165.00 | 3,960.00 | 0024 | 602-05-02280 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (12" Thick) | 220 | SQYD | 165.00 | 36,300.00 | 350.00 | 77,000.00 | 165.00 | 36,300.00 | 0025 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 28 | LNFT | 145.00 | 4,060.00 | 160.00 | 4,480.00 | 145.00 | 4,060.00 | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 28 | LNFT | 275.00 | 7,700.00 | 5.00 | 140.00 | 50.00 | 1,400.00 | 0027 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 600.00 | 3,600.00 | 1,200.00 | 7,200.00 | 600.00 | 3,600.00 | 0028 | 702-04-00200 | Adjusting Catch Basins | 19 | EACH | 2,700.00 | 51,300.00 | 2,700.00 | 51,300.00 | 2,700.00 | 51,300.00 | 0029 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 50 | LNFT | 50.00 | 2,500.00 | 50.00 | 2,500.00 | 50.00 | 2,500.00 | 0030 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 270 | LNFT | 67.00 | 18,090.00 | 67.00 | 18,090.00 | 67.00 | 18,090.00 | 0031 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 24.00 | 3,300.00 | 24.00 | 3,300.00 | 24.00 | 3,300.00 | 0032 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | 100 | LNFT | 26.00 | 2,600.00 | 26.00 | 2,600.00 | 26.00 | 2,600.00 | 0033 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 95.00 | 9,500.00 | 95.00 | 9,500.00 | 0034 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 2,600.00 | 10,400.00 | 2,600.00 | 10,400.00 | 2,600.00 | 10,400.00 | 0035 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 | 0036 | 705-09-00100 | Rebuilt Fence | 380 | LNFT | 25.00 | 9,500.00 | 21.57 | 8,196.60 | 13.00 | 4,940.00 | 0037 | 706-01-00100 | Concrete Walk (4" Thick) | 226.6 | SQYD | 70.00 | 15,862.00 | 85.00 | 19,261.00 | 70.00 | 15,862.00 | 0038 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 395 | SQYD | 70.00 | 27,650.00 | 85.00 | 33,575.00 | 70.00 | 27,650.00 | 0039 | 706-04-00100 | Handicapped Curb Ramps TYPE 1 | 8 | EACH | 2,200.00 | 17,600.00 | 2,600.00 | 20,800.00 | 2,200.00 | 17,600.00 | 0040 | 706-04-00100 | Handicapped Curb Ramps TYPE 12 | 1 | EACH | 2,200.00 | 2,200.00 | 4,400.00 | 4,400.00 | 2,200.00 | 2,200.00 | 0041 | 706-04-00100 | Handicapped Curb Ramps TYPE 13 | 3 | EACH | 2,200.00 | 6,600.00 | 2,600.00 | 7,800.00 | 2,200.00 | 6,600.00 | 0042 | 706-04-00100 | Handicapped Curb Ramps TYPE 4 | 46 | EACH | 2,200.00 | 101,200.00 | 1,700.00 | 78,200.00 | 2,200.00 | 101,200.00 | 0043 | 707-01-00100 | Concrete Curb | 1,897 | LNFT | 31.00 | 58,807.00 | 50.00 | 94,850.00 | 31.00 | 58,807.00 | 0044 | 707-03-00100 | Combination Concrete Curb and Gutter | 189 | LNFT | 45.00 | 8,505.00 | 65.00 | 12,285.00 | 45.00 | 8,505.00 | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 305,000.00 | 305,000.00 | 290,000.00 | 290,000.00 | 0046 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,856 | LNFT | 0.10 | 285.60 | 0.35 | 999.60 | 1.00 | 2,856.00 | 0047 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,597 | LNFT | 0.10 | 159.70 | 1.00 | 1,597.00 | 1.00 | 1,597.00 | 0048 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.62 | MILE | 0.10 | 0.76 | 500.00 | 3,810.00 | 1.00 | 7.62 | 0049 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.81 | MILE | 0.10 | 0.38 | 500.00 | 1,905.00 | 10.00 | 38.10 | 0050 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.308 | MILE | 0.10 | 2.73 | 549.84 | 15,015.03 | 10.00 | 273.08 | 0051 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 22 | EACH | 1.00 | 22.00 | 50.00 | 1,100.00 | 1.00 | 22.00 | 0052 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 1.00 | 2.00 | 55.00 | 110.00 | 1.00 | 2.00 | 0053 | 717-01-00100 | Seeding | 19 | LB | 25.00 | 475.00 | 25.92 | 492.48 | 5.00 | 95.00 | 0054 | 718-01-00100 | Fertilizer | 930 | LB | 1.00 | 930.00 | 1.24 | 1,153.20 | 1.00 | 930.00 | 0055 | 726-01-00100 | Bedding Material | 5.1 | CUYD | 90.00 | 459.00 | 95.00 | 484.50 | 40.00 | 204.00 | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 250,000.00 | 250,000.00 | 290,000.00 | 290,000.00 | 0057 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 136 | SQFT | 20.00 | 2,720.00 | 20.00 | 2,720.00 | 20.00 | 2,720.00 | 0058 | 729-16-00300 | Object Marker Assembly (Type 3) | 76 | EACH | 90.00 | 6,840.00 | 90.00 | 6,840.00 | 90.00 | 6,840.00 | 0059 | 729-19-00300 | Dead End Road Installations (Type C) | 12 | EACH | 775.00 | 9,300.00 | 775.00 | 9,300.00 | 775.00 | 9,300.00 | 0060 | 729-19-00400 | Dead End Road Installations (Type D) | 3 | EACH | 775.00 | 2,325.00 | 775.00 | 2,325.00 | 775.00 | 2,325.00 | 0061 | 729-21-00100 | U-Channel Post | 1 | EACH | 150.00 | 150.00 | 95.00 | 95.00 | 95.00 | 95.00 | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,508 | EACH | 5.50 | 8,294.00 | 5.00 | 7,540.00 | 5.00 | 7,540.00 | 0063 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 514 | LNFT | 10.00 | 5,140.00 | 5.00 | 2,570.00 | 5.00 | 2,570.00 | 0064 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,428 | LNFT | 2.50 | 3,570.00 | 2.00 | 2,856.00 | 2.00 | 2,856.00 | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 285 | LNFT | 10.00 | 2,850.00 | 6.00 | 1,710.00 | 6.00 | 1,710.00 | 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.654 | MILE | 2,400.00 | 32,769.60 | 2,499.27 | 34,125.03 | 2,500.00 | 34,135.00 | 0067 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.905 | MILE | 800.00 | 1,524.00 | 847.77 | 1,615.00 | 850.00 | 1,619.25 | 0068 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.02 | MILE | 1,800.00 | 36.00 | 3,000.00 | 60.00 | 3,000.00 | 60.00 | 0069 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 300.00 | 300.00 | 300.00 | 300.00 | 300.00 | 300.00 | 0070 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 200.00 | 2,000.00 | 245.00 | 2,450.00 | 245.00 | 2,450.00 | 0071 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 200.00 | 400.00 | 245.00 | 490.00 | 245.00 | 490.00 | 0072 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 10 | EACH | 250.00 | 2,500.00 | 250.00 | 2,500.00 | 250.00 | 2,500.00 | 0073 | 732-05-00100 | Removal of Existing Markings | 0.092 | MILE | 10,000.00 | 920.00 | 4,891.30 | 450.00 | 5,000.00 | 460.00 | 0074 | 735-01-00100 | Mailboxes | 2 | EACH | 5.00 | 10.00 | 5.00 | 10.00 | 5.00 | 10.00 | 0075 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 115.00 | 230.00 | 115.00 | 230.00 | 115.00 | 230.00 | 0076 | 736-01-00100 | Trenching and Backfilling | 630 | LNFT | 4.00 | 2,520.00 | 7.44 | 4,687.20 | 7.00 | 4,410.00 | 0077 | 736-03-00100 | Jacking or Boring | 330 | LNFT | 36.00 | 11,880.00 | 42.17 | 13,916.10 | 42.00 | 13,860.00 | 0078 | 736-09-00100 | Loop Detector | 1,600 | LNFT | 22.00 | 35,200.00 | 19.88 | 31,808.00 | 20.00 | 32,000.00 | 0079 | 736-10-00300 | Underground Junction Box (Type F) | 9 | EACH | 875.00 | 7,875.00 | 670.95 | 6,038.55 | 670.00 | 6,030.00 | 0080 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 1,500.00 | 1,500.00 | 1,039.21 | 1,039.21 | 1,039.00 | 1,039.00 | 0081 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 70 | LNFT | 4.00 | 280.00 | 2.69 | 188.30 | 3.00 | 210.00 | 0082 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 580 | LNFT | 5.00 | 2,900.00 | 3.40 | 1,972.00 | 4.00 | 2,320.00 | 0083 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 310 | LNFT | 6.00 | 1,860.00 | 4.55 | 1,410.50 | 5.00 | 1,550.00 | 0084 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,310 | LNFT | 2.00 | 8,620.00 | 2.69 | 11,593.90 | 3.00 | 12,930.00 | 0085 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,500.00 | 6,500.00 | 18,000.00 | 18,000.00 | 111,000.00 | 111,000.00 | 0086 | 741-11-00100 | Adjusting Water Valve | 15 | EACH | 200.00 | 3,000.00 | 250.00 | 3,750.00 | 200.00 | 3,000.00 | 0087 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,940 | LNFT | 1.75 | 3,395.00 | 5.10 | 9,894.00 | 2.00 | 3,880.00 | 0088 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,393 | LNFT | 2.00 | 2,786.00 | 5.40 | 7,522.20 | 2.00 | 2,786.00 | 0089 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 3,333 | LNFT | 1.00 | 3,333.00 | 2.00 | 6,666.00 | 0.75 | 2,499.75 | 0090 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,290 | INLF | 0.50 | 1,145.00 | 0.50 | 1,145.00 | 0.75 | 1,717.50 | 0091 | NS-702-00001 | Cleaning Existing Catch Basin | 4 | EACH | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 0092 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 3 | EACH | 1,100.00 | 3,300.00 | 6,000.00 | 18,000.00 | 1,100.00 | 3,300.00 | 0093 | NS-719-00002 | Tree Trimming | 1 | LUMP | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | 3,200.00 | 3,200.00 | 0094 | NS-744-00101 | Flexible Post Traffic Delineators | 10 | EACH | 75.00 | 750.00 | 65.00 | 650.00 | 65.00 | 650.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,780,746.77 | | 2,610,695.64 | | 2,974,006.80 |
|