Proposal:H.012609.6
Parish:Terrebonne
Routes:LA 182
Description:LA 182: RIGHT TURN LANE AT LA 24
Type Construction:GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$183,117.02
Rank | License | Bidder | Construction Bid |
1 | 06276 | Barriere Construction Co., LLC | $293,333.00 |
2 | 62139 | HUEY P. STOCKSTILL, LLC | $293,911.75 |
3 | 34263 | La Contracting Enterprise LLC | $315,173.26 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - HUEY P. STOCKSTILL, LLC | - 3 - La Contracting Enterprise LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-02-00020 | Removal of Composite Pavement | 79.3 | SQYD | 45.00 | 3,568.50 | 60.00 | 4,758.00 | 80.00 | 6,344.00 | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 604 | LNFT | 10.00 | 6,040.00 | 12.00 | 7,248.00 | 16.00 | 9,664.00 | 0003 | 202-02-14500 | Removal of Guard Rail | 348 | LNFT | 6.00 | 2,088.00 | 6.00 | 2,088.00 | 7.50 | 2,610.00 | 0004 | 202-03-38000 | Relocation of Sign City of Houma Historic District directional sign | 1 | EACH | 5,000.00 | 5,000.00 | 100.00 | 100.00 | 5,500.00 | 5,500.00 | 0005 | 202-03-38000 | Relocation of Sign Type A signs | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 460.00 | 1,840.00 | 0006 | 202-03-38000 | Relocation of Sign Type B signs | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 460.00 | 1,840.00 | 0007 | 202-03-38000 | Relocation of Sign Type D signs | 2 | EACH | 100.00 | 200.00 | 100.00 | 200.00 | 900.00 | 1,800.00 | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 14,894.91 | 14,894.91 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 50 | CUYD | 120.00 | 6,000.00 | 100.00 | 5,000.00 | 40.00 | 2,000.00 | 0010 | 502-01-00100 | Asphalt Concrete | 526.2 | TON | 155.00 | 81,561.00 | 110.00 | 57,882.00 | 137.00 | 72,089.40 | 0011 | 509-01-00100 | Milling Asphalt Pavement | 2,173 | SQYD | 8.00 | 17,384.00 | 5.00 | 10,865.00 | 7.00 | 15,211.00 | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -120.7 | CUYD | 0.01 | -1.21 | 0.00 | 0.00 | 0.01 | -1.21 | 0013 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 1,860 | LNFT | 2.50 | 4,650.00 | 3.00 | 5,580.00 | 2.60 | 4,836.00 | 0014 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 800.00 | 800.00 | 1,500.00 | 1,500.00 | 1,700.00 | 1,700.00 | 0015 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 3 | EACH | 100.00 | 300.00 | 1,500.00 | 4,500.00 | 1,900.00 | 5,700.00 | 0016 | 702-04-00200 | Adjusting Catch Basins Convert existing Catch Basins from CB-06 to CB-01 | 1 | EACH | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 | 6,300.00 | 6,300.00 | 0017 | 702-04-00200 | Adjusting Catch Basins Convert existing Catch Basins from CB-06 to CB-07 | 1 | EACH | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | 6,600.00 | 6,600.00 | 0018 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,800.00 | 2,800.00 | 0019 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 65.00 | 6,500.00 | 50.00 | 5,000.00 | 65.00 | 6,500.00 | 0020 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 175 | LNFT | 65.00 | 11,375.00 | 76.00 | 13,300.00 | 96.00 | 16,800.00 | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25.1 | LNFT | 24.00 | 602.40 | 24.00 | 602.40 | 30.00 | 753.00 | 0022 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 10 | LNFT | 30.00 | 300.00 | 30.00 | 300.00 | 37.00 | 370.00 | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 2,500.00 | 2,500.00 | 2,600.00 | 2,600.00 | 3,200.00 | 3,200.00 | 0024 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 1 | EACH | 7,000.00 | 7,000.00 | 6,500.00 | 6,500.00 | 8,000.00 | 8,000.00 | 0025 | 707-03-00100 | Combination Concrete Curb and Gutter Barrier | 567 | LNFT | 30.00 | 17,010.00 | 26.00 | 14,742.00 | 24.00 | 13,608.00 | 0026 | 707-03-00100 | Combination Concrete Curb and Gutter Mountable | 37 | LNFT | 30.00 | 1,110.00 | 31.00 | 1,147.00 | 24.00 | 888.00 | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 0028 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 300 | LNFT | 0.01 | 3.00 | 0.35 | 105.00 | 0.40 | 120.00 | 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 73 | LNFT | 2.00 | 146.00 | 1.00 | 73.00 | 1.25 | 91.25 | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.22 | MILE | 10.00 | 2.20 | 200.00 | 44.00 | 125.00 | 27.50 | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.22 | MILE | 10.00 | 2.20 | 500.00 | 110.00 | 125.00 | 27.50 | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.44 | MILE | 10.00 | 4.40 | 625.00 | 275.00 | 310.00 | 136.40 | 0033 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 25.00 | 100.00 | 50.00 | 200.00 | 25.00 | 100.00 | 0034 | 717-01-00100 | Seeding | 1.27 | LB | 400.00 | 508.00 | 325.00 | 412.75 | 400.00 | 508.00 | 0035 | 718-01-00100 | Fertilizer | 42.36 | LB | 10.00 | 423.60 | 10.00 | 423.60 | 12.00 | 508.32 | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 29,000.00 | 29,000.00 | 29,000.00 | 29,000.00 | 30,000.00 | 30,000.00 | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 90.00 | 180.00 | 170.00 | 340.00 | 105.00 | 210.00 | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 39 | EACH | 6.50 | 253.50 | 6.50 | 253.50 | 10.00 | 390.00 | 0039 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 150 | LNFT | 2.00 | 300.00 | 2.00 | 300.00 | 5.00 | 750.00 | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36.5 | LNFT | 7.00 | 255.50 | 7.00 | 255.50 | 15.00 | 547.50 | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.22 | MILE | 4,000.00 | 880.00 | 4,000.00 | 880.00 | 9,900.00 | 2,178.00 | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.11 | MILE | 1,000.00 | 110.00 | 1,000.00 | 110.00 | 5,000.00 | 550.00 | 0043 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.02 | MILE | 3,000.00 | 60.00 | 3,000.00 | 60.00 | 9,900.00 | 198.00 | 0044 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 250.00 | 500.00 | 245.00 | 490.00 | 370.00 | 740.00 | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 0046 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 300.00 | 300.00 | 785.00 | 785.00 | 750.00 | 750.00 | 0047 | NS-201-00005 | Arborist Services | 1 | LUMP | 18,000.00 | 18,000.00 | 3,000.00 | 3,000.00 | 5,500.00 | 5,500.00 | 0048 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,746 | LNFT | 2.25 | 3,928.50 | 3.25 | 5,674.50 | 2.70 | 4,714.20 | 0049 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 950 | LNFT | 2.25 | 2,137.50 | 3.25 | 3,087.50 | 3.40 | 3,230.00 | 0050 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 2,696 | LNFT | 1.00 | 2,696.00 | 1.25 | 3,370.00 | 2.15 | 5,796.40 | 0051 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 6,360 | INLF | 1.00 | 6,360.00 | 1.25 | 7,950.00 | 1.80 | 11,448.00 | 0052 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 18,000.00 | 18,000.00 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 293,333.00 | | 293,911.75 | | 315,173.26 |
|