Proposal:H.012561.6
Parish:Claiborne
Routes:LA 520
Description:LA 520: US 79 TO LA 2 ALT (NORTH SECTION)
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,066,983.55
Rank | License | Bidder | Construction Bid |
1 | 08584 | Madden Contracting Co., LLC | $1,159,704.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | Unit Price | Total Amount | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" & 30" RCP | 8 | LNFT | 15.00 | 120.00 | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,517 | CUYD | 29.50 | 44,751.50 | 0003 | 502-01-00100 | Asphalt Concrete | 6,708 | TON | 105.00 | 704,340.00 | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 367.8 | TON | 70.00 | 25,746.00 | 0005 | 509-01-00100 | Milling Asphalt Pavement | 976 | SQYD | 8.75 | 8,540.00 | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 1.00 | -28.00 | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 844 | SQYD | 96.00 | 81,024.00 | 0008 | 701-08-00100 | Relaying Pipe 30" RCP | 4 | LNFT | 150.00 | 600.00 | 0009 | 701-15-00100 | Concrete Collar | 1 | EACH | 900.00 | 900.00 | 0010 | 702-07-00100 | Cross Drain Safety End (Type 1) Sta 72+50 Rt | 2 | EACH | 4,000.00 | 8,000.00 | 0011 | 711-01-02000 | Riprap (10 lb, 10" Thick) | 50 | SQYD | 91.00 | 4,550.00 | 0012 | 711-04-00100 | Geotextile Fabric | 50 | SQYD | 2.50 | 125.00 | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,500.00 | 80,500.00 | 0014 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 33 | LNFT | 0.20 | 6.60 | 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.674 | MILE | 450.00 | 2,103.30 | 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.326 | MILE | 300.00 | 397.80 | 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.355 | MILE | 450.00 | 3,759.75 | 0018 | 716-01-00100 | Mulch (Vegetative) | 23 | TON | 700.00 | 16,100.00 | 0019 | 717-01-00100 | Seeding | 720 | LB | 15.00 | 10,800.00 | 0020 | 718-01-00100 | Fertilizer | 12,000 | LB | 0.50 | 6,000.00 | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 80,500.00 | 80,500.00 | 0022 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 54 | SQFT | 35.00 | 1,890.00 | 0023 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 9 | EACH | 125.00 | 1,125.00 | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,059 | EACH | 4.00 | 4,236.00 | 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 33 | LNFT | 6.00 | 198.00 | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.647 | MILE | 2,100.00 | 41,258.70 | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.554 | MILE | 1,000.00 | 1,554.00 | 0028 | 732-05-00100 | Removal of Existing Markings | 2.168 | MILE | 4,000.00 | 8,672.00 | 0029 | 735-01-00100 | Mailboxes | 15 | EACH | 5.00 | 75.00 | 0030 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 130.00 | 1,690.00 | 0031 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 170.00 | 170.00 | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,159,704.65 |
|