Type Construction:CLEARING AND GRUBBING, EARTHWORK, REMOVAL OF TIMBER BRIDGES, DRAINAGE STRUCTURES, RIPRAP, CLASS II BASE COURSE (CRUSHED STONE), ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, CONCRETE APPROACH SLABS, AND RELATED WORK.
Estimated Construction Cost:$1,362,985.75
Rank License BidderConstruction Bid
112487Diamond B Construction Co., L.L.C.$1,556,661.06
255505MERRICK, LLC$1,610,888.54
363897TL Hawk, LLC$1,661,887.43
455950Brown Industrial Construction, LLC$1,806,616.30
500044GUINN CONSTRUCTION, LLC$1,813,298.90
600009Coastal Contractors, Inc.$1,947,100.80
736827Shavers-Whittle Construction LLC$2,044,883.95


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
MERRICK, LLC
- 3 -
TL Hawk, LLC
- 4 -
Brown Industrial Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP45,000.0045,000.0020,000.0020,000.0060,000.0060,000.00250,000.00250,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP5,000.005,000.0010,000.0010,000.0030,000.0030,000.0010,000.0010,000.00
0003202-02-00010Removal of BRIDGE (STA. 100+00, 18.3' x 58.3' TIMBER BRIDGE)1     EACH25,000.0025,000.0030,000.0030,000.0020,000.0020,000.0035,000.0035,000.00
0004202-02-00010Removal of BRIDGE(STA. 300+00, 18' x 51.9', TIMBER BRIDGE)1     EACH25,000.0025,000.0030,000.0030,000.0020,000.0020,000.0035,000.0035,000.00
0005202-02-02020Removal of Asphalt Pavement 1,780     SQYD6.0010,680.003.506,230.0012.0021,360.007.0012,460.00
0006202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,780     SQYD1.001,780.005.509,790.006.0010,680.007.0012,460.00
0007203-05-00100Excavation and Embankment 1     LUMP85,000.0085,000.00105,000.00105,000.0049,585.0049,585.0090,000.0090,000.00
0008204-02-00100Temporary Hay Bales 24     EACH20.00480.0025.00600.0020.00480.0015.00360.00
0009204-03-00100Temporary Slope Drains 200     LNFT8.501,700.0013.002,600.001.00200.0012.002,400.00
0010204-05-00100Temporary Sediment Check Dams (Hay) 6     EACH140.00840.00200.001,200.00155.00930.00128.00768.00
0011204-06-00100Temporary Silt Fencing 2,105     LNFT3.006,315.001.703,578.504.008,420.003.006,315.00
0012302-01-00300Class II Base Course (Crushed Stone) 497     CUYD105.0052,185.00115.0057,155.00110.0054,670.00150.0074,550.00
0013401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 93     CUYD80.007,440.00105.009,765.00185.0017,205.00130.0012,090.00
0014402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 200     CUYD40.008,000.0070.0014,000.00100.0020,000.00100.0020,000.00
0015502-01-00100Asphalt Concrete 431.3   TON160.0069,008.00250.00107,825.00225.0097,042.50160.0069,008.00
0016701-05-01061Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) 262     LNFT127.0033,274.0075.0019,650.0090.0023,580.00100.0026,200.00
0017701-05-02061Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) 709     LNFT95.0067,355.0065.0046,085.0090.0063,810.00105.0074,445.00
0018701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 503     LNFT0.1050.303.501,760.508.004,024.008.004,024.00
0019702-03-00100Catch Basins (CB-01) 3     EACH5,500.0016,500.003,500.0010,500.003,850.0011,550.004,000.0012,000.00
0020704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 75     LNFT24.001,800.0025.001,875.0022.001,650.0022.001,650.00
0021704-07-00200Guard Rail Transitions (Double Thrie Beam) 150     LNFT95.0014,250.00105.0015,750.0090.0013,500.0090.0013,500.00
0022704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) 4     EACH2,000.008,000.002,100.008,400.001,800.007,200.001,800.007,200.00
0023704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 2     EACH2,500.005,000.002,800.005,600.002,400.004,800.004,125.008,250.00
0024705-01-00100Barbed Wire Fence 115     LNFT30.003,450.0015.001,725.0025.612,945.1526.002,990.00
0025705-05-00100Double Swinging Driveway Gates 1     DBGT850.00850.002,200.002,200.001,250.001,250.001,750.001,750.00
0026711-01-04000Riprap (55 lb, 18" Thick) 1,284     SQYD70.0089,880.0050.0064,200.0080.00102,720.0076.0097,584.00
0027711-04-00100Geotextile Fabric 1,284     SQYD1.251,605.001.501,926.008.0010,272.002.002,568.00
0028713-01-00100Temporary Signs and Barricades 1     LUMP25,000.0025,000.0050,000.0050,000.0015,000.0015,000.0010,000.0010,000.00
0029716-01-00100Mulch (Vegetative) 0.9   TON2,000.001,800.001,400.001,260.001,953.661,758.291,954.001,758.60
0030717-01-00100Seeding 21     LB30.00630.0045.00945.0030.57641.9740.00840.00
0031718-01-00100Fertilizer 482     LB1.00482.002.00964.000.81390.421.00482.00
0032726-01-00100Bedding Material 9.9   CUYD200.001,980.00110.001,089.00135.001,336.50300.002,970.00
0033727-01-00100Mobilization 1     LUMP155,000.00155,000.00160,000.00160,000.00165,000.00165,000.00180,000.00180,000.00
0034729-16-00300Object Marker Assembly (Type 3) 8     EACH90.00720.00100.00800.0085.00680.0085.00680.00
0035740-01-00100Construction Layout 1     LUMP22,000.0022,000.0035,000.0035,000.0030,000.0030,000.0034,000.0034,000.00
0036804-01-00300Precast Concrete Piles (16") 2,575     LNFT85.50220,162.50105.00270,375.0085.00218,875.0073.00187,975.00
0037804-10-00300Precast Concrete Indicator Piles (16") 2     EACH9,500.0019,000.008,000.0016,000.0025,000.0050,000.009,000.0018,000.00
0038804-14-00100Dynamic Monitoring Assistance 14     EACH3,000.0042,000.00300.004,200.001,000.0014,000.001,500.0021,000.00
0039804-17-00100Construction Site Survey 1     LUMP22,000.0022,000.0015,000.0015,000.0011,500.0011,500.004,000.004,000.00
0040804-18-00100Vibration Monitoring 45     DAY800.0036,000.00515.0023,175.00300.0013,500.00300.0013,500.00
0041805-12-00300Bridge Superstructure and Substructure (24' Roadway, 60 Degree Crossing) (Cast in Place)1,920     SQFT96.00184,320.00100.00192,000.0098.00188,160.00100.00192,000.00
0042805-12-00700Bridge Superstructure and Substructure (28' Roadway, 60 Degree Crossing) (Cast-In-Place)2,240     SQFT86.00192,640.0088.00197,120.0098.00219,520.0090.00201,600.00
0043805-18-00100Concrete Finish (Class 2 Rubbed Finish) 1,972.9   SQFT1.252,466.131.001,972.902.003,945.801.502,959.35
0044805-18-00200Concrete Finish (Class 3 Special Finish) 1,972.9   SQFT1.252,466.131.603,156.642.003,945.801.502,959.35
0045813-01-00100Concrete Approach Slabs (Cast-in-Place) (24' Clear Roadway, 60 Degree Crossing, w/o Asphalt)(10' Long)500     SQFT41.0020,500.0046.0023,000.0060.0030,000.0045.0022,500.00
0046813-01-00100Concrete Approach Slabs (Cast-in-Place) (28' Clear Rdwy., 60 Degree Crossing, w/o Asphalt)(10' Long)(Tapered Barrier Rail - One Side)596     SQFT37.0022,052.0046.0027,416.0060.0035,760.0045.0026,820.00
             
  CONTRACTOR TOTAL   1,556,661.06 1,610,888.54 1,661,887.43 1,806,616.30



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
GUINN CONSTRUCTION, LLC
- 6 -
Coastal Contractors, Inc.
- 7 -
Shavers-Whittle Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP45,000.0045,000.0080,000.0080,000.0040,000.0040,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP10,000.0010,000.0020,000.0020,000.0025,000.0025,000.00
0003202-02-00010Removal of BRIDGE (STA. 100+00, 18.3' x 58.3' TIMBER BRIDGE)1     EACH12,000.0012,000.0095,000.0095,000.0040,000.0040,000.00
0004202-02-00010Removal of BRIDGE(STA. 300+00, 18' x 51.9', TIMBER BRIDGE)1     EACH12,500.0012,500.0090,000.0090,000.0040,000.0040,000.00
0005202-02-02020Removal of Asphalt Pavement 1,780     SQYD2.003,560.0010.0017,800.006.5011,570.00
0006202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,780     SQYD4.007,120.0015.0026,700.006.5011,570.00
0007203-05-00100Excavation and Embankment 1     LUMP55,000.0055,000.0080,000.0080,000.00125,000.00125,000.00
0008204-02-00100Temporary Hay Bales 24     EACH10.00240.0020.00480.0011.00264.00
0009204-03-00100Temporary Slope Drains 200     LNFT0.000.0010.002,000.0011.002,200.00
0010204-05-00100Temporary Sediment Check Dams (Hay) 6     EACH250.001,500.00125.00750.0075.00450.00
0011204-06-00100Temporary Silt Fencing 2,105     LNFT4.008,420.001.503,157.503.256,841.25
0012302-01-00300Class II Base Course (Crushed Stone) 497     CUYD135.0067,095.00125.0062,125.00135.0067,095.00
0013401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 93     CUYD145.0013,485.00100.009,300.0065.006,045.00
0014402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 200     CUYD50.0010,000.0040.008,000.0060.0012,000.00
0015502-01-00100Asphalt Concrete 431.3   TON225.0097,042.50140.0060,382.00185.0079,790.50
0016701-05-01061Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) 262     LNFT90.0023,580.0095.0024,890.0070.0018,340.00
0017701-05-02061Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) 709     LNFT90.0063,810.0090.0063,810.0090.0063,810.00
0018701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 503     LNFT10.005,030.0010.005,030.006.753,395.25
0019702-03-00100Catch Basins (CB-01) 3     EACH4,500.0013,500.005,000.0015,000.004,200.0012,600.00
0020704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 75     LNFT26.001,950.0025.001,875.0025.001,875.00
0021704-07-00200Guard Rail Transitions (Double Thrie Beam) 150     LNFT80.0012,000.0080.0012,000.00100.0015,000.00
0022704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) 4     EACH5,500.0022,000.002,700.0010,800.002,000.008,000.00
0023704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 2     EACH3,000.006,000.002,800.005,600.002,800.005,600.00
0024705-01-00100Barbed Wire Fence 115     LNFT25.002,875.0012.001,380.0015.001,725.00
0025705-05-00100Double Swinging Driveway Gates 1     DBGT2,500.002,500.002,500.002,500.001,750.001,750.00
0026711-01-04000Riprap (55 lb, 18" Thick) 1,284     SQYD75.0096,300.0080.00102,720.00110.00141,240.00
0027711-04-00100Geotextile Fabric 1,284     SQYD5.006,420.003.504,494.005.006,420.00
0028713-01-00100Temporary Signs and Barricades 1     LUMP22,500.0022,500.0022,000.0022,000.0050,000.0050,000.00
0029716-01-00100Mulch (Vegetative) 0.9   TON4,500.004,050.002,000.001,800.002,000.001,800.00
0030717-01-00100Seeding 21     LB40.00840.0020.00420.0035.00735.00
0031718-01-00100Fertilizer 482     LB2.00964.001.00482.001.00482.00
0032726-01-00100Bedding Material 9.9   CUYD250.002,475.00355.003,514.5050.00495.00
0033727-01-00100Mobilization 1     LUMP170,000.00170,000.00190,000.00190,000.00125,000.00125,000.00
0034729-16-00300Object Marker Assembly (Type 3) 8     EACH150.001,200.0085.00680.00100.00800.00
0035740-01-00100Construction Layout 1     LUMP16,000.0016,000.0026,000.0026,000.0050,000.0050,000.00
0036804-01-00300Precast Concrete Piles (16") 2,575     LNFT108.00278,100.0075.00193,125.00110.00283,250.00
0037804-10-00300Precast Concrete Indicator Piles (16") 2     EACH15,000.0030,000.0045,000.0090,000.004,500.009,000.00
0038804-14-00100Dynamic Monitoring Assistance 14     EACH500.007,000.00800.0011,200.001,650.0023,100.00
0039804-17-00100Construction Site Survey 1     LUMP42,000.0042,000.0026,000.0026,000.0015,000.0015,000.00
0040804-18-00100Vibration Monitoring 45     DAY1.0045.00400.0018,000.00450.0020,250.00
0041805-12-00300Bridge Superstructure and Substructure (24' Roadway, 60 Degree Crossing) (Cast in Place)1,920     SQFT135.00259,200.00125.00240,000.00145.00278,400.00
0042805-12-00700Bridge Superstructure and Substructure (28' Roadway, 60 Degree Crossing) (Cast-In-Place)2,240     SQFT135.00302,400.00112.00250,880.00160.00358,400.00
0043805-18-00100Concrete Finish (Class 2 Rubbed Finish) 1,972.9   SQFT2.003,945.801.001,972.902.504,932.25
0044805-18-00200Concrete Finish (Class 3 Special Finish) 1,972.9   SQFT4.007,891.601.001,972.903.005,918.70
0045813-01-00100Concrete Approach Slabs (Cast-in-Place) (24' Clear Roadway, 60 Degree Crossing, w/o Asphalt)(10' Long)500     SQFT60.0030,000.0055.0027,500.0062.0031,000.00
0046813-01-00100Concrete Approach Slabs (Cast-in-Place) (28' Clear Rdwy., 60 Degree Crossing, w/o Asphalt)(10' Long)(Tapered Barrier Rail - One Side)596     SQFT60.0035,760.0060.0035,760.0065.0038,740.00
           
  CONTRACTOR TOTAL   1,813,298.90 1,947,100.80 2,044,883.95