Proposal:H.010184.6
Parish:St. Tammany
Routes:LA 59
Description:LA 59: CURVE REALIGN AND TUNNEL AT TRACE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CONCRETE TUNNEL AND APPROACHES, MILLING, ASPHALT PAVEMENT, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,933,894.50
Rank | License | Bidder | Construction Bid |
1 | 24901 | Hard Rock Construction LLC | $3,502,082.99 |
2 | 54896 | Magee Excavation & Development LLC | $3,554,600.00 |
3 | 57931 | KCR CONTRACTORS, LLC | $3,644,738.78 |
4 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $4,371,664.33 |
5 | 06276 | Barriere Construction Co., LLC | $4,372,118.58 |
6 | 12069 | B & K Construction Co. LLC | $4,483,912.57 |
7 | 63897 | TL Hawk, LLC | $4,781,851.75 |
8 | 48896 | Command Construction Industries LLC | $4,966,666.00 |
9 | 39462 | JB JAMES CONSTRUCTION LLC | $5,450,511.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - Magee Excavation & Development LLC | - 3 - KCR CONTRACTORS, LLC | - 4 - KORT's CONSTRUCTION SERVICES, INC. | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 104,728.97 | 104,728.97 | 83,600.00 | 83,600.00 | 80,000.00 | 80,000.00 | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,000.00 | 9,000.00 | 5,600.00 | 5,600.00 | 9,229.54 | 9,229.54 | 15,000.00 | 15,000.00 | 0003 | 202-02-02000 | Removal of Asphalt Drives | 211 | SQYD | 18.00 | 3,798.00 | 8.00 | 1,688.00 | 5.75 | 1,213.25 | 15.00 | 3,165.00 | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 6,694.6 | SQYD | 10.00 | 66,946.00 | 5.50 | 36,820.30 | 3.51 | 23,498.05 | 11.00 | 73,640.60 | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 391 | SQYD | 15.00 | 5,865.00 | 8.00 | 3,128.00 | 9.27 | 3,624.57 | 15.00 | 5,865.00 | 0006 | 202-02-32180 | Removal of Pipe Headwalls | 8 | EACH | 350.00 | 2,800.00 | 70.00 | 560.00 | 575.00 | 4,600.00 | 1,000.00 | 8,000.00 | 0007 | 202-02-38240 | Removal of Signs and Supports (Solar Beacons, Ground Mounted) | 4 | EACH | 625.00 | 2,500.00 | 642.00 | 2,568.00 | 575.00 | 2,300.00 | 600.00 | 2,400.00 | 0008 | 202-03-38000 | Relocation of Sign (Solar Beacons) | 4 | EACH | 869.00 | 3,476.00 | 890.00 | 3,560.00 | 575.00 | 2,300.00 | 1,500.00 | 6,000.00 | 0009 | 203-01-00100 | General Excavation | 9,330 | CUYD | 14.00 | 130,620.00 | 20.00 | 186,600.00 | 0.03 | 279.90 | 23.00 | 214,590.00 | 0010 | 203-03-00100 | Embankment | 7,850 | CUYD | 5.00 | 39,250.00 | 22.00 | 172,700.00 | 17.44 | 136,904.00 | 30.00 | 235,500.00 | 0011 | 204-02-00100 | Temporary Hay Bales | 45 | EACH | 27.00 | 1,215.00 | 10.00 | 450.00 | 25.00 | 1,125.00 | 16.00 | 720.00 | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 161 | EACH | 100.00 | 16,100.00 | 8.00 | 1,288.00 | 100.00 | 16,100.00 | 125.00 | 20,125.00 | 0013 | 204-06-00100 | Temporary Silt Fencing | 5,370 | LNFT | 2.00 | 10,740.00 | 1.00 | 5,370.00 | 1.85 | 9,934.50 | 1.75 | 9,397.50 | 0014 | 302-02-08000 | Class II Base Course (8" Thick) | 983.3 | SQYD | 28.00 | 27,532.40 | 22.00 | 21,632.60 | 27.97 | 27,502.90 | 26.00 | 25,565.80 | 0015 | 302-02-12000 | Class II Base Course (12" Thick) | 6,432.6 | SQYD | 36.00 | 231,573.60 | 25.00 | 160,815.00 | 37.35 | 240,257.61 | 28.00 | 180,112.80 | 0016 | 304-01-00100 | Lime | 36.21 | TON | 293.00 | 10,609.53 | 370.00 | 13,397.70 | 200.00 | 7,242.00 | 200.00 | 7,242.00 | 0017 | 304-05-00100 | Lime Treatment (Type E) | 2,555.1 | SQYD | 3.25 | 8,304.08 | 7.25 | 18,524.48 | 2.67 | 6,822.12 | 3.00 | 7,665.30 | 0018 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 62.00 | 15,500.00 | 52.00 | 13,000.00 | 40.00 | 10,000.00 | 65.00 | 16,250.00 | 0019 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 60 | SQYD | 82.00 | 4,920.00 | 312.00 | 18,720.00 | 125.00 | 7,500.00 | 85.00 | 5,100.00 | 0020 | 502-01-00100 | Asphalt Concrete | 3,361 | TON | 135.00 | 453,735.00 | 128.00 | 430,208.00 | 125.00 | 420,125.00 | 110.00 | 369,710.00 | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 469.8 | TON | 163.00 | 76,577.40 | 224.00 | 105,235.20 | 150.00 | 70,470.00 | 130.00 | 61,074.00 | 0022 | 509-01-00100 | Milling Asphalt Pavement | 3,025 | SQYD | 7.00 | 21,175.00 | 2.25 | 6,806.25 | 6.70 | 20,267.50 | 8.00 | 24,200.00 | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -127 | CUYD | 0.01 | -1.27 | 1.00 | -127.00 | 0.10 | -12.70 | 0.01 | -1.27 | 0024 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 28 | LNFT | 187.00 | 5,236.00 | 75.00 | 2,100.00 | 50.84 | 1,423.52 | 75.00 | 2,100.00 | 0025 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 98 | LNFT | 116.00 | 11,368.00 | 85.00 | 8,330.00 | 56.87 | 5,573.26 | 80.00 | 7,840.00 | 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 10 | LNFT | 275.00 | 2,750.00 | 115.00 | 1,150.00 | 68.90 | 689.00 | 95.00 | 950.00 | 0027 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 522 | LNFT | 85.00 | 44,370.00 | 95.00 | 49,590.00 | 59.54 | 31,079.88 | 90.00 | 46,980.00 | 0028 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 292 | LNFT | 138.00 | 40,296.00 | 105.00 | 30,660.00 | 73.59 | 21,488.28 | 110.00 | 32,120.00 | 0029 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 368 | LNFT | 126.00 | 46,368.00 | 115.00 | 42,320.00 | 78.52 | 28,895.36 | 125.00 | 46,000.00 | 0030 | 701-04-02040 | Storm Drain Pipe Arch (Outfall) (24" Equiv. CMPA) | 100 | LNFT | 84.00 | 8,400.00 | 115.00 | 11,500.00 | 92.16 | 9,216.00 | 100.00 | 10,000.00 | 0031 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 64 | LNFT | 89.00 | 5,696.00 | 40.00 | 2,560.00 | 57.57 | 3,684.48 | 55.00 | 3,520.00 | 0032 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 76 | LNFT | 93.00 | 7,068.00 | 70.00 | 5,320.00 | 80.90 | 6,148.40 | 80.00 | 6,080.00 | 0033 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 24 | LNFT | 155.00 | 3,720.00 | 90.00 | 2,160.00 | 115.86 | 2,780.64 | 75.00 | 1,800.00 | 0034 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 180 | LNFT | 122.00 | 21,960.00 | 115.00 | 20,700.00 | 111.94 | 20,149.20 | 110.00 | 19,800.00 | 0035 | 701-07-00300 | Yard Drain Pipe (8") | 216 | LNFT | 55.00 | 11,880.00 | 14.00 | 3,024.00 | 66.18 | 14,294.88 | 75.00 | 16,200.00 | 0036 | 701-14-00100 | Cleaning Existing Pipes | 280 | LNFT | 9.00 | 2,520.00 | 14.00 | 3,920.00 | 14.38 | 4,026.40 | 15.00 | 4,200.00 | 0037 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 216 | LNFT | 10.00 | 2,160.00 | 30.00 | 6,480.00 | 100.00 | 21,600.00 | 10.00 | 2,160.00 | 0038 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 10,000.00 | 10,000.00 | 4,700.00 | 4,700.00 | 7,065.60 | 7,065.60 | 6,500.00 | 6,500.00 | 0039 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 3,600.00 | 39,600.00 | 2,440.00 | 26,840.00 | 2,166.05 | 23,826.55 | 3,000.00 | 33,000.00 | 0040 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 4,000.00 | 44,000.00 | 2,575.00 | 28,325.00 | 2,589.27 | 28,481.97 | 3,500.00 | 38,500.00 | 0041 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,500.00 | 5,000.00 | 1,130.00 | 2,260.00 | 2,493.20 | 4,986.40 | 2,000.00 | 4,000.00 | 0042 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 4,800.00 | 19,200.00 | 3,830.00 | 15,320.00 | 5,248.03 | 20,992.12 | 5,500.00 | 22,000.00 | 0043 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 988 | LNFT | 26.00 | 25,688.00 | 18.00 | 17,784.00 | 35.22 | 34,797.36 | 17.00 | 16,796.00 | 0044 | 706-02-00200 | Concrete Drive (6" Thick) | 417.6 | SQYD | 82.00 | 34,243.20 | 60.00 | 25,056.00 | 73.60 | 30,735.36 | 60.00 | 25,056.00 | 0045 | 708-01-00100 | Right-of-Way Monument | 33 | EACH | 285.00 | 9,405.00 | 14.00 | 462.00 | 287.50 | 9,487.50 | 700.00 | 23,100.00 | 0046 | 711-02-00200 | Riprap (10 lb) | 1 | CUYD | 275.00 | 275.00 | 450.00 | 450.00 | 311.25 | 311.25 | 85.00 | 85.00 | 0047 | 711-04-00100 | Geotextile Fabric | 3,850 | SQYD | 1.25 | 4,812.50 | 2.00 | 7,700.00 | 1.32 | 5,082.00 | 1.00 | 3,850.00 | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 27,000.00 | 27,000.00 | 16,500.00 | 16,500.00 | 13,258.96 | 13,258.96 | 35,000.00 | 35,000.00 | 0049 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 275 | LNFT | 1.00 | 275.00 | 1.12 | 308.00 | 1.10 | 302.50 | 1.10 | 302.50 | 0050 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.1 | MILE | 1,100.00 | 110.00 | 5,000.00 | 500.00 | 1,100.00 | 110.00 | 520.00 | 52.00 | 0051 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.1 | MILE | 1,100.00 | 110.00 | 1,116.50 | 111.65 | 1,100.00 | 110.00 | 520.00 | 52.00 | 0052 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.2 | MILE | 1,100.00 | 220.00 | 1,116.50 | 223.30 | 1,100.00 | 220.00 | 1,100.00 | 220.00 | 0053 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 55.00 | 220.00 | 56.00 | 224.00 | 55.00 | 220.00 | 55.00 | 220.00 | 0054 | 716-01-00100 | Mulch (Vegetative) | 6.6 | TON | 598.00 | 3,946.80 | 780.00 | 5,148.00 | 770.00 | 5,082.00 | 575.00 | 3,795.00 | 0055 | 717-01-00100 | Seeding | 114 | LB | 22.00 | 2,508.00 | 17.00 | 1,938.00 | 13.20 | 1,504.80 | 28.00 | 3,192.00 | 0056 | 718-01-00100 | Fertilizer | 3,785 | LB | 2.00 | 7,570.00 | 1.00 | 3,785.00 | 0.55 | 2,081.75 | 1.00 | 3,785.00 | 0057 | 725-01-00100 | Temporary Detour Roads | 775.8 | SQYD | 65.00 | 50,427.00 | 64.00 | 49,651.20 | 67.71 | 52,529.42 | 75.00 | 58,185.00 | 0058 | 726-01-00100 | Bedding Material | 893.3 | CUYD | 76.00 | 67,890.80 | 55.00 | 49,131.50 | 92.52 | 82,648.12 | 70.00 | 62,531.00 | 0059 | 727-01-00100 | Mobilization | 1 | LUMP | 159,000.00 | 159,000.00 | 150,000.00 | 150,000.00 | 106,825.00 | 106,825.00 | 130,000.00 | 130,000.00 | 0060 | 729-01-00100 | Sign (Type A) | 31.3 | SQFT | 23.00 | 719.90 | 25.00 | 782.50 | 33.00 | 1,032.90 | 31.00 | 970.30 | 0061 | 729-01-00103 | Sign (Type A)(Relocate) | 12.5 | SQFT | 10.00 | 125.00 | 11.00 | 137.50 | 82.50 | 1,031.25 | 76.00 | 950.00 | 0062 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 164.00 | 820.00 | 170.00 | 850.00 | 99.00 | 495.00 | 92.00 | 460.00 | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 107 | EACH | 7.00 | 749.00 | 7.00 | 749.00 | 7.15 | 765.05 | 6.50 | 695.50 | 0064 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 85 | LNFT | 7.00 | 595.00 | 8.00 | 680.00 | 7.70 | 654.50 | 7.50 | 637.50 | 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.597 | MILE | 3,200.00 | 5,110.40 | 3,300.00 | 5,270.10 | 3,245.00 | 5,182.27 | 2,700.00 | 4,311.90 | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.778 | MILE | 925.00 | 719.65 | 950.00 | 739.10 | 935.00 | 727.43 | 800.00 | 622.40 | 0067 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 266.00 | 2,128.00 | 275.00 | 2,200.00 | 269.50 | 2,156.00 | 210.00 | 1,680.00 | 0068 | 732-05-00100 | Removal of Existing Markings | 0.122 | MILE | 5,300.00 | 646.60 | 5,582.00 | 681.00 | 5,500.00 | 671.00 | 7,400.00 | 902.80 | 0069 | 735-01-00100 | Mailboxes | 2 | EACH | 5.50 | 11.00 | 6.00 | 12.00 | 33.00 | 66.00 | 32.00 | 64.00 | 0070 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 228.00 | 456.00 | 230.00 | 460.00 | 220.00 | 440.00 | 180.00 | 360.00 | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 23,000.00 | 23,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 0072 | 742-05-00200 | Pipe Extensions (Sewage Effluent Gravity Discharge) (4") | 94 | LNFT | 55.00 | 5,170.00 | 7.00 | 658.00 | 67.29 | 6,325.26 | 45.00 | 4,230.00 | 0073 | 805-02-00900 | Class A2 Concrete (Tunnel and Approaches) | 1,226.43 | CUYD | 780.00 | 956,615.40 | 725.00 | 889,161.75 | 749.81 | 919,589.48 | 1,250.00 | 1,533,037.50 | 0074 | 806-01-00100 | Deformed Reinforcing Steel | 211,616 | LB | 0.75 | 158,712.00 | 0.90 | 190,454.40 | 1.12 | 237,009.92 | 1.00 | 211,616.00 | 0075 | 807-01-00100 | Structural Metalwork (Grade 36) | 5,000 | LUMP | 3,500.00 | 3,500.00 | 15,000.00 | 15,000.00 | 3,850.00 | 3,850.00 | 6,000.00 | 6,000.00 | 0076 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#10C, 1#10 Ground) | 540 | LNFT | 12.00 | 6,480.00 | 8.00 | 4,320.00 | 8.02 | 4,330.80 | 7.50 | 4,050.00 | 0077 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#12C, 1#12 Ground) | 1,055 | LNFT | 12.00 | 12,660.00 | 8.00 | 8,440.00 | 7.93 | 8,366.15 | 7.00 | 7,385.00 | 0078 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#8C, 1#10 Ground) | 80 | LNFT | 20.00 | 1,600.00 | 8.00 | 640.00 | 8.40 | 672.00 | 7.50 | 600.00 | 0079 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#8C, 1#8 Ground) | 690 | LNFT | 10.25 | 7,072.50 | 9.00 | 6,210.00 | 8.80 | 6,072.00 | 8.50 | 5,865.00 | 0080 | 822-05-02100 | Light Pole (Straight Square Steel)(Single Arm) | 17 | EACH | 2,098.00 | 35,666.00 | 1,900.00 | 32,300.00 | 1,881.00 | 31,977.00 | 5,500.00 | 93,500.00 | 0081 | 822-07-02800 | Luminaire (213W LED, Type C) | 19 | EACH | 1,660.00 | 31,540.00 | 2,333.00 | 44,327.00 | 2,299.00 | 43,681.00 | 2,500.00 | 47,500.00 | 0082 | 822-07-02800 | Luminaire (36W LED, Type A) | 10 | EACH | 1,000.00 | 10,000.00 | 1,500.00 | 15,000.00 | 1,474.00 | 14,740.00 | 1,500.00 | 15,000.00 | 0083 | 822-07-02800 | Luminaire (53W LED, Type B) | 27 | EACH | 1,140.00 | 30,780.00 | 1,550.00 | 41,850.00 | 1,527.90 | 41,253.30 | 1,300.00 | 35,100.00 | 0084 | 822-08-00200 | Electrical Service Point (Structure) (Meter, Lighting, Controller Panel, and Photocell) | 1 | EACH | 22,400.00 | 22,400.00 | 39,500.00 | 39,500.00 | 38,782.70 | 38,782.70 | 18,000.00 | 18,000.00 | 0085 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 19,094 | INLF | 1.00 | 19,094.00 | 1.00 | 19,094.00 | 1.20 | 22,912.80 | 0.80 | 15,275.20 | 0086 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,235 | INLF | 1.50 | 1,852.50 | 1.00 | 1,235.00 | 1.20 | 1,482.00 | 1.00 | 1,235.00 | 0087 | NS-700-00011 | Bollard | 3 | EACH | 800.00 | 2,400.00 | 400.00 | 1,200.00 | 2,300.00 | 6,900.00 | 600.00 | 1,800.00 | 0088 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 5,800.00 | 11,600.00 | 8,850.00 | 17,700.00 | 2,750.00 | 5,500.00 | 10,000.00 | 20,000.00 | 0089 | NS-P52-00039 | Sump Pump Station and Sump Control Panel | 1 | LUMP | 121,000.00 | 121,000.00 | 40,000.00 | 40,000.00 | 154,365.95 | 154,365.95 | 105,000.00 | 105,000.00 | 0090 | NS-P52-00040 | Pre-Applied Sheet Membrane Waterproofing | 1,821 | SQYD | 45.00 | 81,945.00 | 78.50 | 142,948.50 | 137.40 | 250,205.40 | 63.00 | 114,723.00 | 0091 | NS-P52-00041 | Self-Adhering Sheet Waterproofing | 1,830 | SQYD | 22.00 | 40,260.00 | 43.00 | 78,690.00 | 50.85 | 93,055.50 | 25.00 | 45,750.00 | 0092 | NS-P52-00042 | Sanitary Sewer Clean-out | 3 | EACH | 826.00 | 2,478.00 | 55.00 | 165.00 | 575.00 | 1,725.00 | 350.00 | 1,050.00 | 0093 | TS-700-00200 | Trench Drains | 28 | LF | 416.00 | 11,648.00 | 130.00 | 3,640.00 | 254.64 | 7,129.92 | 250.00 | 7,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,502,082.99 | | 3,554,600.00 | | 3,644,738.78 | | 4,371,664.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barriere Construction Co., LLC | - 6 - B & K Construction Co. LLC | - 7 - TL Hawk, LLC | - 8 - Command Construction Industries LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 70,000.00 | 70,000.00 | 14,400.00 | 14,400.00 | 80,800.00 | 80,800.00 | 100,000.00 | 100,000.00 | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 19,204.00 | 19,204.00 | 60,000.00 | 60,000.00 | 1,291.00 | 1,291.00 | 0003 | 202-02-02000 | Removal of Asphalt Drives | 211 | SQYD | 10.00 | 2,110.00 | 7.00 | 1,477.00 | 15.00 | 3,165.00 | 15.00 | 3,165.00 | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 6,694.6 | SQYD | 10.00 | 66,946.00 | 7.00 | 46,862.20 | 7.25 | 48,535.85 | 15.00 | 100,419.00 | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 391 | SQYD | 10.00 | 3,910.00 | 13.00 | 5,083.00 | 12.00 | 4,692.00 | 15.00 | 5,865.00 | 0006 | 202-02-32180 | Removal of Pipe Headwalls | 8 | EACH | 200.00 | 1,600.00 | 514.00 | 4,112.00 | 800.00 | 6,400.00 | 1,000.00 | 8,000.00 | 0007 | 202-02-38240 | Removal of Signs and Supports (Solar Beacons, Ground Mounted) | 4 | EACH | 600.00 | 2,400.00 | 690.00 | 2,760.00 | 575.00 | 2,300.00 | 2,500.00 | 10,000.00 | 0008 | 202-03-38000 | Relocation of Sign (Solar Beacons) | 4 | EACH | 900.00 | 3,600.00 | 960.00 | 3,840.00 | 800.00 | 3,200.00 | 5,000.00 | 20,000.00 | 0009 | 203-01-00100 | General Excavation | 9,330 | CUYD | 17.00 | 158,610.00 | 24.00 | 223,920.00 | 18.00 | 167,940.00 | 20.00 | 186,600.00 | 0010 | 203-03-00100 | Embankment | 7,850 | CUYD | 17.00 | 133,450.00 | 29.50 | 231,575.00 | 33.00 | 259,050.00 | 20.00 | 157,000.00 | 0011 | 204-02-00100 | Temporary Hay Bales | 45 | EACH | 15.00 | 675.00 | 19.00 | 855.00 | 30.00 | 1,350.00 | 15.00 | 675.00 | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 161 | EACH | 20.00 | 3,220.00 | 144.00 | 23,184.00 | 200.00 | 32,200.00 | 125.00 | 20,125.00 | 0013 | 204-06-00100 | Temporary Silt Fencing | 5,370 | LNFT | 1.50 | 8,055.00 | 1.90 | 10,203.00 | 3.50 | 18,795.00 | 3.00 | 16,110.00 | 0014 | 302-02-08000 | Class II Base Course (8" Thick) | 983.3 | SQYD | 26.00 | 25,565.80 | 22.00 | 21,632.60 | 25.00 | 24,582.50 | 30.00 | 29,499.00 | 0015 | 302-02-12000 | Class II Base Course (12" Thick) | 6,432.6 | SQYD | 28.00 | 180,112.80 | 33.00 | 212,275.80 | 35.00 | 225,141.00 | 35.00 | 225,141.00 | 0016 | 304-01-00100 | Lime | 36.21 | TON | 330.00 | 11,949.30 | 432.00 | 15,642.72 | 250.00 | 9,052.50 | 250.00 | 9,052.50 | 0017 | 304-05-00100 | Lime Treatment (Type E) | 2,555.1 | SQYD | 6.50 | 16,608.15 | 7.80 | 19,929.78 | 10.00 | 25,551.00 | 5.00 | 12,775.50 | 0018 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 10.00 | 2,500.00 | 75.00 | 18,750.00 | 90.00 | 22,500.00 | 50.00 | 12,500.00 | 0019 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 60 | SQYD | 80.00 | 4,800.00 | 346.00 | 20,760.00 | 70.00 | 4,200.00 | 300.00 | 18,000.00 | 0020 | 502-01-00100 | Asphalt Concrete | 3,361 | TON | 115.00 | 386,515.00 | 138.00 | 463,818.00 | 115.00 | 386,515.00 | 110.00 | 369,710.00 | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 469.8 | TON | 200.00 | 93,960.00 | 240.00 | 112,752.00 | 200.00 | 93,960.00 | 150.00 | 70,470.00 | 0022 | 509-01-00100 | Milling Asphalt Pavement | 3,025 | SQYD | 2.00 | 6,050.00 | 2.40 | 7,260.00 | 2.00 | 6,050.00 | 7.00 | 21,175.00 | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -127 | CUYD | 0.01 | -1.27 | 5.00 | -635.00 | 0.01 | -1.27 | 1.00 | -127.00 | 0024 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 28 | LNFT | 90.00 | 2,520.00 | 91.00 | 2,548.00 | 135.00 | 3,780.00 | 110.00 | 3,080.00 | 0025 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 98 | LNFT | 100.00 | 9,800.00 | 109.00 | 10,682.00 | 100.00 | 9,800.00 | 125.00 | 12,250.00 | 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 10 | LNFT | 90.00 | 900.00 | 125.00 | 1,250.00 | 135.00 | 1,350.00 | 125.00 | 1,250.00 | 0027 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 522 | LNFT | 100.00 | 52,200.00 | 117.00 | 61,074.00 | 100.00 | 52,200.00 | 150.00 | 78,300.00 | 0028 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 292 | LNFT | 110.00 | 32,120.00 | 129.50 | 37,814.00 | 110.00 | 32,120.00 | 175.00 | 51,100.00 | 0029 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 368 | LNFT | 120.00 | 44,160.00 | 152.50 | 56,120.00 | 130.00 | 47,840.00 | 200.00 | 73,600.00 | 0030 | 701-04-02040 | Storm Drain Pipe Arch (Outfall) (24" Equiv. CMPA) | 100 | LNFT | 96.07 | 9,607.00 | 131.00 | 13,100.00 | 100.00 | 10,000.00 | 150.00 | 15,000.00 | 0031 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 64 | LNFT | 60.00 | 3,840.00 | 82.00 | 5,248.00 | 30.00 | 1,920.00 | 100.00 | 6,400.00 | 0032 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 76 | LNFT | 70.00 | 5,320.00 | 107.00 | 8,132.00 | 75.00 | 5,700.00 | 125.00 | 9,500.00 | 0033 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 24 | LNFT | 70.00 | 1,680.00 | 110.50 | 2,652.00 | 125.00 | 3,000.00 | 125.00 | 3,000.00 | 0034 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 180 | LNFT | 90.00 | 16,200.00 | 137.50 | 24,750.00 | 140.00 | 25,200.00 | 175.00 | 31,500.00 | 0035 | 701-07-00300 | Yard Drain Pipe (8") | 216 | LNFT | 100.00 | 21,600.00 | 270.00 | 58,320.00 | 22.00 | 4,752.00 | 15.00 | 3,240.00 | 0036 | 701-14-00100 | Cleaning Existing Pipes | 280 | LNFT | 10.00 | 2,800.00 | 10.00 | 2,800.00 | 25.00 | 7,000.00 | 25.00 | 7,000.00 | 0037 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 216 | LNFT | 1.00 | 216.00 | 43.00 | 9,288.00 | 5.00 | 1,080.00 | 0.00 | 0.00 | 0038 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 15,000.00 | 15,000.00 | 9,900.00 | 9,900.00 | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 | 0039 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 3,000.00 | 33,000.00 | 1,923.00 | 21,153.00 | 3,500.00 | 38,500.00 | 4,000.00 | 44,000.00 | 0040 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 4,000.00 | 44,000.00 | 2,610.00 | 28,710.00 | 5,500.00 | 60,500.00 | 5,000.00 | 55,000.00 | 0041 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,500.00 | 5,000.00 | 1,620.00 | 3,240.00 | 3,000.00 | 6,000.00 | 4,000.00 | 8,000.00 | 0042 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 5,000.00 | 20,000.00 | 4,550.00 | 18,200.00 | 5,000.00 | 20,000.00 | 5,000.00 | 20,000.00 | 0043 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 988 | LNFT | 40.00 | 39,520.00 | 43.50 | 42,978.00 | 49.40 | 48,807.20 | 40.00 | 39,520.00 | 0044 | 706-02-00200 | Concrete Drive (6" Thick) | 417.6 | SQYD | 80.00 | 33,408.00 | 80.00 | 33,408.00 | 75.00 | 31,320.00 | 60.00 | 25,056.00 | 0045 | 708-01-00100 | Right-of-Way Monument | 33 | EACH | 250.00 | 8,250.00 | 72.00 | 2,376.00 | 9.00 | 297.00 | 300.00 | 9,900.00 | 0046 | 711-02-00200 | Riprap (10 lb) | 1 | CUYD | 500.00 | 500.00 | 478.00 | 478.00 | 130.00 | 130.00 | 500.00 | 500.00 | 0047 | 711-04-00100 | Geotextile Fabric | 3,850 | SQYD | 2.25 | 8,662.50 | 1.50 | 5,775.00 | 7.00 | 26,950.00 | 2.00 | 7,700.00 | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 11,000.00 | 11,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 0049 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 275 | LNFT | 1.00 | 275.00 | 1.20 | 330.00 | 1.00 | 275.00 | 1.00 | 275.00 | 0050 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.1 | MILE | 300.00 | 30.00 | 600.00 | 60.00 | 500.00 | 50.00 | 1,200.00 | 120.00 | 0051 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.1 | MILE | 1,200.00 | 120.00 | 600.00 | 60.00 | 500.00 | 50.00 | 1,200.00 | 120.00 | 0052 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.2 | MILE | 1,500.00 | 300.00 | 1,200.00 | 240.00 | 1,000.00 | 200.00 | 50.00 | 10.00 | 0053 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 100.00 | 400.00 | 60.00 | 240.00 | 50.00 | 200.00 | 100.00 | 400.00 | 0054 | 716-01-00100 | Mulch (Vegetative) | 6.6 | TON | 550.00 | 3,630.00 | 657.60 | 4,340.16 | 700.00 | 4,620.00 | 750.00 | 4,950.00 | 0055 | 717-01-00100 | Seeding | 114 | LB | 25.00 | 2,850.00 | 29.50 | 3,363.00 | 14.50 | 1,653.00 | 25.00 | 2,850.00 | 0056 | 718-01-00100 | Fertilizer | 3,785 | LB | 0.80 | 3,028.00 | 0.90 | 3,406.50 | 0.95 | 3,595.75 | 1.00 | 3,785.00 | 0057 | 725-01-00100 | Temporary Detour Roads | 775.8 | SQYD | 60.00 | 46,548.00 | 65.00 | 50,427.00 | 84.00 | 65,167.20 | 200.00 | 155,160.00 | 0058 | 726-01-00100 | Bedding Material | 893.3 | CUYD | 80.00 | 71,464.00 | 92.00 | 82,183.60 | 100.00 | 89,330.00 | 100.00 | 89,330.00 | 0059 | 727-01-00100 | Mobilization | 1 | LUMP | 428,000.00 | 428,000.00 | 381,883.00 | 381,883.00 | 444,000.00 | 444,000.00 | 500,000.00 | 500,000.00 | 0060 | 729-01-00100 | Sign (Type A) | 31.3 | SQFT | 24.00 | 751.20 | 26.50 | 829.45 | 22.00 | 688.60 | 20.00 | 626.00 | 0061 | 729-01-00103 | Sign (Type A)(Relocate) | 12.5 | SQFT | 11.00 | 137.50 | 12.00 | 150.00 | 10.00 | 125.00 | 20.00 | 250.00 | 0062 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 160.00 | 800.00 | 180.00 | 900.00 | 150.00 | 750.00 | 100.00 | 500.00 | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 107 | EACH | 8.00 | 856.00 | 7.50 | 802.50 | 6.00 | 642.00 | 10.00 | 1,070.00 | 0064 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 85 | LNFT | 10.00 | 850.00 | 8.50 | 722.50 | 7.00 | 595.00 | 10.00 | 850.00 | 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.597 | MILE | 3,200.00 | 5,110.40 | 3,240.00 | 5,174.28 | 2,706.00 | 4,321.48 | 3,000.00 | 4,791.00 | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.778 | MILE | 850.00 | 661.30 | 960.00 | 746.88 | 803.00 | 624.73 | 900.00 | 700.20 | 0067 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 300.00 | 2,400.00 | 240.00 | 1,920.00 | 200.00 | 1,600.00 | 300.00 | 2,400.00 | 0068 | 732-05-00100 | Removal of Existing Markings | 0.122 | MILE | 5,500.00 | 671.00 | 9,000.00 | 1,098.00 | 7,378.00 | 900.12 | 5,000.00 | 610.00 | 0069 | 735-01-00100 | Mailboxes | 2 | EACH | 5.00 | 10.00 | 6.00 | 12.00 | 5.00 | 10.00 | 15.00 | 30.00 | 0070 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 230.00 | 460.00 | 180.00 | 360.00 | 210.00 | 420.00 | 150.00 | 300.00 | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 25,200.00 | 25,200.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 0072 | 742-05-00200 | Pipe Extensions (Sewage Effluent Gravity Discharge) (4") | 94 | LNFT | 40.00 | 3,760.00 | 47.00 | 4,418.00 | 30.00 | 2,820.00 | 20.00 | 1,880.00 | 0073 | 805-02-00900 | Class A2 Concrete (Tunnel and Approaches) | 1,226.43 | CUYD | 1,100.00 | 1,349,073.00 | 997.17 | 1,222,959.20 | 1,150.00 | 1,410,394.50 | 1,260.00 | 1,545,301.80 | 0074 | 806-01-00100 | Deformed Reinforcing Steel | 211,616 | LB | 1.20 | 253,939.20 | 0.90 | 190,454.40 | 1.39 | 294,146.24 | 1.00 | 211,616.00 | 0075 | 807-01-00100 | Structural Metalwork (Grade 36) | 5,000 | LUMP | 10.00 | 10.00 | 9,500.00 | 9,500.00 | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 0076 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#10C, 1#10 Ground) | 540 | LNFT | 8.00 | 4,320.00 | 8.50 | 4,590.00 | 7.29 | 3,936.60 | 12.00 | 6,480.00 | 0077 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#12C, 1#12 Ground) | 1,055 | LNFT | 8.00 | 8,440.00 | 8.00 | 8,440.00 | 7.21 | 7,606.55 | 12.00 | 12,660.00 | 0078 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#8C, 1#10 Ground) | 80 | LNFT | 8.50 | 680.00 | 8.50 | 680.00 | 7.64 | 611.20 | 20.00 | 1,600.00 | 0079 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#8C, 1#8 Ground) | 690 | LNFT | 9.00 | 6,210.00 | 9.50 | 6,555.00 | 8.00 | 5,520.00 | 12.00 | 8,280.00 | 0080 | 822-05-02100 | Light Pole (Straight Square Steel)(Single Arm) | 17 | EACH | 1,900.00 | 32,300.00 | 6,234.00 | 105,978.00 | 1,710.00 | 29,070.00 | 2,000.00 | 34,000.00 | 0081 | 822-07-02800 | Luminaire (213W LED, Type C) | 19 | EACH | 2,300.00 | 43,700.00 | 2,460.00 | 46,740.00 | 2,090.00 | 39,710.00 | 1,500.00 | 28,500.00 | 0082 | 822-07-02800 | Luminaire (36W LED, Type A) | 10 | EACH | 1,500.00 | 15,000.00 | 1,614.00 | 16,140.00 | 1,340.00 | 13,400.00 | 1,000.00 | 10,000.00 | 0083 | 822-07-02800 | Luminaire (53W LED, Type B) | 27 | EACH | 1,550.00 | 41,850.00 | 1,464.00 | 39,528.00 | 1,389.00 | 37,503.00 | 1,000.00 | 27,000.00 | 0084 | 822-08-00200 | Electrical Service Point (Structure) (Meter, Lighting, Controller Panel, and Photocell) | 1 | EACH | 40,000.00 | 40,000.00 | 21,000.00 | 21,000.00 | 35,257.00 | 35,257.00 | 15,000.00 | 15,000.00 | 0085 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 19,094 | INLF | 0.55 | 10,501.70 | 1.25 | 23,867.50 | 1.00 | 19,094.00 | 1.00 | 19,094.00 | 0086 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,235 | INLF | 0.80 | 988.00 | 1.50 | 1,852.50 | 1.00 | 1,235.00 | 1.00 | 1,235.00 | 0087 | NS-700-00011 | Bollard | 3 | EACH | 1,000.00 | 3,000.00 | 1,000.00 | 3,000.00 | 825.00 | 2,475.00 | 1,250.00 | 3,750.00 | 0088 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 5,000.00 | 10,000.00 | 7,425.00 | 14,850.00 | 9,000.00 | 18,000.00 | 10,000.00 | 20,000.00 | 0089 | NS-P52-00039 | Sump Pump Station and Sump Control Panel | 1 | LUMP | 100,000.00 | 100,000.00 | 90,000.00 | 90,000.00 | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 0090 | NS-P52-00040 | Pre-Applied Sheet Membrane Waterproofing | 1,821 | SQYD | 55.00 | 100,155.00 | 48.00 | 87,408.00 | 80.00 | 145,680.00 | 50.00 | 91,050.00 | 0091 | NS-P52-00041 | Self-Adhering Sheet Waterproofing | 1,830 | SQYD | 40.00 | 73,200.00 | 36.00 | 65,880.00 | 25.00 | 45,750.00 | 50.00 | 91,500.00 | 0092 | NS-P52-00042 | Sanitary Sewer Clean-out | 3 | EACH | 700.00 | 2,100.00 | 190.00 | 570.00 | 300.00 | 900.00 | 250.00 | 750.00 | 0093 | TS-700-00200 | Trench Drains | 28 | LF | 200.00 | 5,600.00 | 157.00 | 4,396.00 | 275.00 | 7,700.00 | 250.00 | 7,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,372,118.58 | | 4,483,912.57 | | 4,781,851.75 | | 4,966,666.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - JB JAMES CONSTRUCTION LLC | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 200,000.00 | 200,000.00 | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 0003 | 202-02-02000 | Removal of Asphalt Drives | 211 | SQYD | 17.00 | 3,587.00 | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 6,694.6 | SQYD | 6.00 | 40,167.60 | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 391 | SQYD | 20.00 | 7,820.00 | 0006 | 202-02-32180 | Removal of Pipe Headwalls | 8 | EACH | 1,000.00 | 8,000.00 | 0007 | 202-02-38240 | Removal of Signs and Supports (Solar Beacons, Ground Mounted) | 4 | EACH | 575.00 | 2,300.00 | 0008 | 202-03-38000 | Relocation of Sign (Solar Beacons) | 4 | EACH | 800.00 | 3,200.00 | 0009 | 203-01-00100 | General Excavation | 9,330 | CUYD | 23.00 | 214,590.00 | 0010 | 203-03-00100 | Embankment | 7,850 | CUYD | 25.00 | 196,250.00 | 0011 | 204-02-00100 | Temporary Hay Bales | 45 | EACH | 25.00 | 1,125.00 | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 161 | EACH | 100.00 | 16,100.00 | 0013 | 204-06-00100 | Temporary Silt Fencing | 5,370 | LNFT | 3.00 | 16,110.00 | 0014 | 302-02-08000 | Class II Base Course (8" Thick) | 983.3 | SQYD | 30.00 | 29,499.00 | 0015 | 302-02-12000 | Class II Base Course (12" Thick) | 6,432.6 | SQYD | 40.00 | 257,304.00 | 0016 | 304-01-00100 | Lime | 36.21 | TON | 300.00 | 10,863.00 | 0017 | 304-05-00100 | Lime Treatment (Type E) | 2,555.1 | SQYD | 6.00 | 15,330.60 | 0018 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 300.00 | 75,000.00 | 0019 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 60 | SQYD | 280.00 | 16,800.00 | 0020 | 502-01-00100 | Asphalt Concrete | 3,361 | TON | 116.00 | 389,876.00 | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 469.8 | TON | 200.00 | 93,960.00 | 0022 | 509-01-00100 | Milling Asphalt Pavement | 3,025 | SQYD | 2.00 | 6,050.00 | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -127 | CUYD | 1.00 | -127.00 | 0024 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 28 | LNFT | 110.00 | 3,080.00 | 0025 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 98 | LNFT | 120.00 | 11,760.00 | 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 10 | LNFT | 300.00 | 3,000.00 | 0027 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 522 | LNFT | 135.00 | 70,470.00 | 0028 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 292 | LNFT | 145.00 | 42,340.00 | 0029 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 368 | LNFT | 165.00 | 60,720.00 | 0030 | 701-04-02040 | Storm Drain Pipe Arch (Outfall) (24" Equiv. CMPA) | 100 | LNFT | 100.00 | 10,000.00 | 0031 | 701-05-01001 | Side Drain Pipe (12" RCP/RPVCP/CPEPDW/CMP) | 64 | LNFT | 95.00 | 6,080.00 | 0032 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 76 | LNFT | 120.00 | 9,120.00 | 0033 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 24 | LNFT | 110.00 | 2,640.00 | 0034 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 180 | LNFT | 145.00 | 26,100.00 | 0035 | 701-07-00300 | Yard Drain Pipe (8") | 216 | LNFT | 100.00 | 21,600.00 | 0036 | 701-14-00100 | Cleaning Existing Pipes | 280 | LNFT | 20.00 | 5,600.00 | 0037 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 216 | LNFT | 3.50 | 756.00 | 0038 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 10,000.00 | 10,000.00 | 0039 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 4,500.00 | 49,500.00 | 0040 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 5,000.00 | 55,000.00 | 0041 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 3,500.00 | 7,000.00 | 0042 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 6,000.00 | 24,000.00 | 0043 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 988 | LNFT | 16.00 | 15,808.00 | 0044 | 706-02-00200 | Concrete Drive (6" Thick) | 417.6 | SQYD | 80.00 | 33,408.00 | 0045 | 708-01-00100 | Right-of-Way Monument | 33 | EACH | 250.00 | 8,250.00 | 0046 | 711-02-00200 | Riprap (10 lb) | 1 | CUYD | 425.00 | 425.00 | 0047 | 711-04-00100 | Geotextile Fabric | 3,850 | SQYD | 3.00 | 11,550.00 | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 185,000.00 | 185,000.00 | 0049 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 275 | LNFT | 1.00 | 275.00 | 0050 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.1 | MILE | 500.00 | 50.00 | 0051 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.1 | MILE | 5,000.00 | 500.00 | 0052 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.2 | MILE | 1,000.00 | 200.00 | 0053 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 50.00 | 200.00 | 0054 | 716-01-00100 | Mulch (Vegetative) | 6.6 | TON | 700.00 | 4,620.00 | 0055 | 717-01-00100 | Seeding | 114 | LB | 12.00 | 1,368.00 | 0056 | 718-01-00100 | Fertilizer | 3,785 | LB | 0.50 | 1,892.50 | 0057 | 725-01-00100 | Temporary Detour Roads | 775.8 | SQYD | 85.00 | 65,943.00 | 0058 | 726-01-00100 | Bedding Material | 893.3 | CUYD | 150.00 | 133,995.00 | 0059 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 0060 | 729-01-00100 | Sign (Type A) | 31.3 | SQFT | 22.00 | 688.60 | 0061 | 729-01-00103 | Sign (Type A)(Relocate) | 12.5 | SQFT | 10.00 | 125.00 | 0062 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 150.00 | 750.00 | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 107 | EACH | 6.00 | 642.00 | 0064 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 85 | LNFT | 7.00 | 595.00 | 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.597 | MILE | 2,700.00 | 4,311.90 | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.778 | MILE | 790.00 | 614.62 | 0067 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 200.00 | 1,600.00 | 0068 | 732-05-00100 | Removal of Existing Markings | 0.122 | MILE | 7,377.05 | 900.00 | 0069 | 735-01-00100 | Mailboxes | 2 | EACH | 5.00 | 10.00 | 0070 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 210.00 | 420.00 | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | 0072 | 742-05-00200 | Pipe Extensions (Sewage Effluent Gravity Discharge) (4") | 94 | LNFT | 30.00 | 2,820.00 | 0073 | 805-02-00900 | Class A2 Concrete (Tunnel and Approaches) | 1,226.43 | CUYD | 1,200.00 | 1,471,716.00 | 0074 | 806-01-00100 | Deformed Reinforcing Steel | 211,616 | LB | 1.50 | 317,424.00 | 0075 | 807-01-00100 | Structural Metalwork (Grade 36) | 5,000 | LUMP | 5,000.00 | 5,000.00 | 0076 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#10C, 1#10 Ground) | 540 | LNFT | 7.00 | 3,780.00 | 0077 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#12C, 1#12 Ground) | 1,055 | LNFT | 7.00 | 7,385.00 | 0078 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#8C, 1#10 Ground) | 80 | LNFT | 7.00 | 560.00 | 0079 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") 2#8C, 1#8 Ground) | 690 | LNFT | 8.00 | 5,520.00 | 0080 | 822-05-02100 | Light Pole (Straight Square Steel)(Single Arm) | 17 | EACH | 5,200.00 | 88,400.00 | 0081 | 822-07-02800 | Luminaire (213W LED, Type C) | 19 | EACH | 2,050.00 | 38,950.00 | 0082 | 822-07-02800 | Luminaire (36W LED, Type A) | 10 | EACH | 1,345.00 | 13,450.00 | 0083 | 822-07-02800 | Luminaire (53W LED, Type B) | 27 | EACH | 1,220.00 | 32,940.00 | 0084 | 822-08-00200 | Electrical Service Point (Structure) (Meter, Lighting, Controller Panel, and Photocell) | 1 | EACH | 17,500.00 | 17,500.00 | 0085 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 19,094 | INLF | 1.00 | 19,094.00 | 0086 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,235 | INLF | 1.00 | 1,235.00 | 0087 | NS-700-00011 | Bollard | 3 | EACH | 1,800.00 | 5,400.00 | 0088 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 8,100.00 | 16,200.00 | 0089 | NS-P52-00039 | Sump Pump Station and Sump Control Panel | 1 | LUMP | 125,000.00 | 125,000.00 | 0090 | NS-P52-00040 | Pre-Applied Sheet Membrane Waterproofing | 1,821 | SQYD | 75.00 | 136,575.00 | 0091 | NS-P52-00041 | Self-Adhering Sheet Waterproofing | 1,830 | SQYD | 25.00 | 45,750.00 | 0092 | NS-P52-00042 | Sanitary Sewer Clean-out | 3 | EACH | 500.00 | 1,500.00 | 0093 | TS-700-00200 | Trench Drains | 28 | LF | 450.00 | 12,600.00 | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,450,511.82 |
|