Proposal:H.012154.6
Parish:Tangipahoa
Routes:LA 38
Description:LA 38: US 51 - LA 1054
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,269,786.72
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,958,947.75 |
| 2 | 06276 | Barriere Construction Co., LLC. | $2,071,083.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Barriere Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of Damaged Paved Ditch | 4 | SQYD | 500.00 | 2,000.00 | 5.00 | 20.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 2,152.9 | SQYD | 3.25 | 6,996.93 | 1.00 | 2,152.90 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 2,152.9 | SQYD | 3.25 | 6,996.93 | 3.30 | 7,104.57 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 100 | LNFT | 30.00 | 3,000.00 | 42.00 | 4,200.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 2,468.75 | LNFT | 13.25 | 32,710.94 | 7.50 | 18,515.63 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 20 | EACH | 10.00 | 200.00 | 10.00 | 200.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 954 | CUYD | 12.50 | 11,925.00 | 55.00 | 52,470.00 | | 0008 | 203-10-00100 | Cleaning Existing Ditches | 150 | LNFT | 7.75 | 1,162.50 | 8.00 | 1,200.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 60 | EACH | 26.00 | 1,560.00 | 10.00 | 600.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 6,604 | LNFT | 2.00 | 13,208.00 | 1.50 | 9,906.00 | | 0011 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 5,135 | SQYD | 7.55 | 38,769.25 | 8.00 | 41,080.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 16,477.6 | TON | 70.50 | 1,161,670.80 | 71.00 | 1,169,909.60 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,392.6 | TON | 113.00 | 157,363.80 | 71.00 | 98,874.60 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 79,479 | SQYD | 1.35 | 107,296.65 | 2.00 | 158,958.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,250 | CUYD | 1.00 | -4,250.00 | 1.00 | -4,250.00 | | 0016 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 585 | SQYD | 52.00 | 30,420.00 | 50.00 | 29,250.00 | | 0017 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 75 | SQYD | 180.00 | 13,500.00 | 90.00 | 6,750.00 | | 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 641 | LNFT | 4.00 | 2,564.00 | 3.50 | 2,243.50 | | 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 621 | LNFT | 5.00 | 3,105.00 | 3.50 | 2,173.50 | | 0020 | 602-03-00100 | Cleaning and Sealing Random cracks | 200 | LNFT | 6.00 | 1,200.00 | 4.50 | 900.00 | | 0021 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 575.00 | 575.00 | 115.00 | 115.00 | | 0022 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 5,750.00 | 5,750.00 | 3,000.00 | 3,000.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 612.5 | LNFT | 26.00 | 15,925.00 | 25.00 | 15,312.50 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 500 | LNFT | 79.00 | 39,500.00 | 95.00 | 47,500.00 | | 0025 | 704-09-00100 | Guard Rail Anchor Block | 20 | EACH | 2,100.00 | 42,000.00 | 1,900.00 | 38,000.00 | | 0026 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 20 | EACH | 2,550.00 | 51,000.00 | 2,700.00 | 54,000.00 | | 0027 | 707-01-00100 | Concrete Curb | 270 | LNFT | 56.00 | 15,120.00 | 65.00 | 17,550.00 | | 0028 | 707-01-00200 | Concrete Curb (Barrier) | 20 | LNFT | 56.00 | 1,120.00 | 38.00 | 760.00 | | 0029 | 707-01-00300 | Concrete Curb (Mountable) | 80 | LNFT | 50.00 | 4,000.00 | 38.00 | 3,040.00 | | 0030 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 30 | SQYD | 245.00 | 7,350.00 | 105.00 | 3,150.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 30 | SQYD | 0.85 | 25.50 | 1.00 | 30.00 | | 0032 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 4 | SQYD | 715.00 | 2,860.00 | 225.00 | 900.00 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,000.00 | 22,000.00 | 95,000.00 | 95,000.00 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 339 | LNFT | 0.25 | 84.75 | 1.00 | 339.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.58 | MILE | 154.00 | 1,167.32 | 1.00 | 7.58 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.363 | MILE | 1.00 | 7.36 | 1.00 | 7.36 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.008 | MILE | 1.00 | 35.01 | 1.00 | 35.01 | | 0038 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 4 | SQYD | 10.00 | 40.00 | 27.00 | 108.00 | | 0039 | 724-01-00100 | Rumble Strips (Centerline) | 3.269 | MILE | 720.00 | 2,353.68 | 270.00 | 882.63 | | 0040 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.537 | MILE | 500.00 | 3,268.50 | 270.00 | 1,764.99 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 70,000.00 | 70,000.00 | 95,000.00 | 95,000.00 | | 0042 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 90.00 | 360.00 | 75.00 | 300.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 100.00 | 2,000.00 | 95.00 | 1,900.00 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,828 | EACH | 4.15 | 24,186.20 | 5.00 | 29,140.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 113 | LNFT | 10.00 | 1,130.00 | 9.00 | 1,017.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.669 | MILE | 2,425.00 | 28,297.33 | 2,500.00 | 29,172.50 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.454 | MILE | 750.00 | 1,840.50 | 725.00 | 1,779.15 | | 0048 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.017 | MILE | 2,400.00 | 40.80 | 4,500.00 | 76.50 | | 0049 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 300.00 | 300.00 | 325.00 | 325.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 300.00 | 300.00 | 325.00 | 325.00 | | 0051 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 600.00 | 1,200.00 | 400.00 | 800.00 | | 0052 | 735-01-00100 | Mailboxes | 47 | EACH | 1.00 | 47.00 | 10.00 | 470.00 | | 0053 | 735-02-00100 | Mailbox Supports (Single) | 47 | EACH | 130.00 | 6,110.00 | 150.00 | 7,050.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 2.76 | ACRE | 1,650.00 | 4,554.00 | 1,800.00 | 4,968.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,958,947.75 | | 2,071,083.52 |
|