Proposal:H.012172.6
Parish:St. Tammany
Routes:I-12
Description:I-12: LA 59 - BAYOU LACOMBE
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, THIN ASPHALT CONCRETE (OGFC), AND RELATED WORK.
Estimated Construction Cost:$8,736,335.02
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$12,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 06276 | Barriere Construction Co., LLC. | $7,493,893.93 | 90.00 | $8,573,893.93 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $8,434,499.14 | 60.00 | $9,154,499.14 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $8,904,876.42 | 150.00 | $10,704,876.42 |
| 4 | 62139 | HUEY P. STOCKSTILL, LLC | $9,261,641.25 | 128.00 | $10,797,641.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - Boh Bros. Construction Co., LLC. | - 4 - HUEY P. STOCKSTILL, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 200,000.00 | 200,000.00 | 255,000.00 | 255,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 3,414 | LNFT | 9.00 | 30,726.00 | 7.25 | 24,751.50 | 10.00 | 34,140.00 | 8.00 | 27,312.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 24 | EACH | 11.00 | 264.00 | 5.75 | 138.00 | 10.00 | 240.00 | 10.00 | 240.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 630 | CUYD | 80.00 | 50,400.00 | 35.00 | 22,050.00 | 50.00 | 31,500.00 | 61.00 | 38,430.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 1,000 | LNFT | 3.50 | 3,500.00 | 2.75 | 2,750.00 | 1.50 | 1,500.00 | 2.50 | 2,500.00 | | 0006 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 14,206 | TON | 90.00 | 1,278,540.00 | 145.00 | 2,059,870.00 | 98.00 | 1,392,188.00 | 150.00 | 2,130,900.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 41,896.6 | TON | 90.00 | 3,770,694.00 | 90.00 | 3,770,694.00 | 98.00 | 4,105,866.80 | 100.00 | 4,189,660.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 379,193 | SQYD | 2.25 | 853,184.25 | 2.50 | 947,982.50 | 2.00 | 758,386.00 | 2.25 | 853,184.25 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -21,065 | CUYD | 1.00 | -21,065.00 | 1.00 | -21,065.00 | 1.00 | -21,065.00 | 0.00 | 0.00 | | 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 191 | SQYD | 200.00 | 38,200.00 | 138.00 | 26,358.00 | 200.00 | 38,200.00 | 200.00 | 38,200.00 | | 0011 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 2,773.9 | LNFT | 22.00 | 61,025.80 | 25.00 | 69,347.50 | 25.00 | 69,347.50 | 22.00 | 61,025.80 | | 0012 | 704-05-00300 | Guard Rail Anchor Sections – 31”, (Trailing End) | 80 | LNFT | 110.00 | 8,800.00 | 110.00 | 8,800.00 | 100.00 | 8,000.00 | 98.00 | 7,840.00 | | 0013 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 79.00 | 11,850.00 | 78.00 | 11,700.00 | 80.00 | 12,000.00 | 80.00 | 12,000.00 | | 0014 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 14 | EACH | 2,300.00 | 32,200.00 | 2,550.00 | 35,700.00 | 2,600.00 | 36,400.00 | 2,400.00 | 33,600.00 | | 0015 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 2,140 | SQYD | 65.00 | 139,100.00 | 65.00 | 139,100.00 | 75.00 | 160,500.00 | 120.00 | 256,800.00 | | 0016 | 707-01-00100 | Concrete Curb | 81 | LNFT | 65.00 | 5,265.00 | 92.00 | 7,452.00 | 50.00 | 4,050.00 | 46.00 | 3,726.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 170,000.00 | 170,000.00 | 850,000.00 | 850,000.00 | 378,800.00 | 378,800.00 | | 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,716 | LNFT | 0.01 | 27.16 | 0.55 | 1,493.80 | 0.50 | 1,358.00 | 0.35 | 950.60 | | 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,358 | LNFT | 0.01 | 13.58 | 1.00 | 1,358.00 | 1.00 | 1,358.00 | 1.00 | 1,358.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.116 | MILE | 1.00 | 0.12 | 146.00 | 16.94 | 1.00 | 0.12 | 165.00 | 19.14 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 46.14 | MILE | 1.00 | 46.14 | 500.00 | 23,070.00 | 400.00 | 18,456.00 | 1.00 | 46.14 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 92.28 | MILE | 1.00 | 92.28 | 650.00 | 59,982.00 | 600.00 | 55,368.00 | 1.00 | 92.28 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 37.3 | TON | 1,500.00 | 55,950.00 | 515.00 | 19,209.50 | 300.00 | 11,190.00 | 500.00 | 18,650.00 | | 0024 | 717-01-00100 | Seeding | 256 | LB | 22.00 | 5,632.00 | 11.00 | 2,816.00 | 20.00 | 5,120.00 | 10.00 | 2,560.00 | | 0025 | 718-01-00100 | Fertilizer | 8,608 | LB | 1.00 | 8,608.00 | 0.50 | 4,304.00 | 1.00 | 8,608.00 | 0.45 | 3,873.60 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 30.76 | MILE | 650.00 | 19,994.00 | 525.00 | 16,149.00 | 500.00 | 15,380.00 | 494.00 | 15,195.44 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 470,000.00 | 470,000.00 | 565,750.00 | 565,750.00 | 875,000.00 | 875,000.00 | 800,000.00 | 800,000.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 24 | EACH | 90.00 | 2,160.00 | 82.00 | 1,968.00 | 100.00 | 2,400.00 | 85.00 | 2,040.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,650 | EACH | 7.50 | 42,375.00 | 6.25 | 35,312.50 | 6.00 | 33,900.00 | 7.00 | 39,550.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,716 | LNFT | 2.25 | 6,111.00 | 2.55 | 6,925.80 | 1.50 | 4,074.00 | 2.00 | 5,432.00 | | 0031 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,358 | LNFT | 7.00 | 9,506.00 | 13.00 | 17,654.00 | 6.50 | 8,827.00 | 6.00 | 8,148.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 30.76 | MILE | 3,300.00 | 101,508.00 | 2,950.00 | 90,742.00 | 2,600.00 | 79,976.00 | 3,000.00 | 92,280.00 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 15.38 | MILE | 1,000.00 | 15,380.00 | 1,100.00 | 16,918.00 | 1,000.00 | 15,380.00 | 950.00 | 14,611.00 | | 0034 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.116 | MILE | 3,500.00 | 406.00 | 7,250.00 | 841.00 | 3,000.00 | 348.00 | 3,000.00 | 348.00 | | 0035 | 732-03-02101 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) | 0.094 | MILE | 6,500.00 | 611.00 | 2,900.00 | 272.60 | 10,000.00 | 940.00 | 6,000.00 | 564.00 | | 0036 | 732-05-00100 | Removal of Existing Markings CONCRETE BRIDGE DECK | 0.094 | MILE | 8,400.00 | 789.60 | 6,250.00 | 587.50 | 10,000.00 | 940.00 | 7,500.00 | 705.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 5,500.00 | 5,500.00 | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | | 0038 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 6 | EACH | 4,000.00 | 24,000.00 | 5,500.00 | 33,000.00 | 7,500.00 | 45,000.00 | 1,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,493,893.93 | | 8,434,499.14 | | 8,904,876.42 | | 9,261,641.25 |
|