Search


Bid Tabulations for the Letting of 12/12/2018 LA DOTD Headquarters

Proposal:H.012172.6
Parish:St. Tammany
Routes:I-12
Description:I-12: LA 59 - BAYOU LACOMBE
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, THIN ASPHALT CONCRETE (OGFC), AND RELATED WORK.
Estimated Construction Cost:$8,736,335.02
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$12,000.00
Rank License BidderConstruction BidBidder's Proposed
Contract Time
Total Bid
106276Barriere Construction Co., LLC.$7,493,893.9390.00$8,573,893.93
212487Diamond B Construction Co., L.L.C.$8,434,499.1460.00$9,154,499.14
302179Boh Bros. Construction Co., LLC.$8,904,876.42150.00$10,704,876.42
462139HUEY P. STOCKSTILL, LLC$9,261,641.25128.00$10,797,641.25


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Barriere Construction Co., LLC.
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
Boh Bros. Construction Co., LLC.
- 4 -
HUEY P. STOCKSTILL, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP200,000.00200,000.00255,000.00255,000.00200,000.00200,000.00200,000.00200,000.00
0002202-02-14500Removal of Guard Rail 3,414     LNFT9.0030,726.007.2524,751.5010.0034,140.008.0027,312.00
0003202-02-38300Removal of Sign and U-Channel Post 24     EACH11.00264.005.75138.0010.00240.0010.00240.00
0004203-07-00100Borrow (Vehicular Measurement) 630     CUYD80.0050,400.0035.0022,050.0050.0031,500.0061.0038,430.00
0005204-06-00100Temporary Silt Fencing 1,000     LNFT3.503,500.002.752,750.001.501,500.002.502,500.00
0006501-03-00100Thin Asphalt Concrete (OGFC) 14,206     TON90.001,278,540.00145.002,059,870.0098.001,392,188.00150.002,130,900.00
0007502-01-00100Asphalt Concrete 41,896.6   TON90.003,770,694.0090.003,770,694.0098.004,105,866.80100.004,189,660.00
0008509-01-00100Milling Asphalt Pavement 379,193     SQYD2.25853,184.252.50947,982.502.00758,386.002.25853,184.25
0009509-02-00100Contractor Retained Reclaimed Asphalt Pavement -21,065     CUYD1.00-21,065.001.00-21,065.001.00-21,065.000.000.00
0010510-01-00300Pavement Patching (18" Minimum Thickness) 191     SQYD200.0038,200.00138.0026,358.00200.0038,200.00200.0038,200.00
0011704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) 2,773.9   LNFT22.0061,025.8025.0069,347.5025.0069,347.5022.0061,025.80
0012704-05-00300Guard Rail Anchor Sections – 31”, (Trailing End) 80     LNFT110.008,800.00110.008,800.00100.008,000.0098.007,840.00
0013704-07-00200Guard Rail Transitions (Double Thrie Beam) 150     LNFT79.0011,850.0078.0011,700.0080.0012,000.0080.0012,000.00
0014704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 14     EACH2,300.0032,200.002,550.0035,700.002,600.0036,400.002,400.0033,600.00
0015706-03-00300Incidental Concrete Paving (6" Thick) 2,140     SQYD65.00139,100.0065.00139,100.0075.00160,500.00120.00256,800.00
0016707-01-00100Concrete Curb 81     LNFT65.005,265.0092.007,452.0050.004,050.0046.003,726.00
0017713-01-00100Temporary Signs and Barricades 1     LUMP250,000.00250,000.00170,000.00170,000.00850,000.00850,000.00378,800.00378,800.00
0018713-02-00300Temporary Pavement Markings (8" Width) 2,716     LNFT0.0127.160.551,493.800.501,358.000.35950.60
0019713-02-00500Temporary Pavement Markings (24" Width) 1,358     LNFT0.0113.581.001,358.001.001,358.001.001,358.00
0020713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.116 MILE1.000.12146.0016.941.000.12165.0019.14
0021713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 46.14  MILE1.0046.14500.0023,070.00400.0018,456.001.0046.14
0022713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 92.28  MILE1.0092.28650.0059,982.00600.0055,368.001.0092.28
0023716-01-00100Mulch (Vegetative) 37.3   TON1,500.0055,950.00515.0019,209.50300.0011,190.00500.0018,650.00
0024717-01-00100Seeding 256     LB22.005,632.0011.002,816.0020.005,120.0010.002,560.00
0025718-01-00100Fertilizer 8,608     LB1.008,608.000.504,304.001.008,608.000.453,873.60
0026724-02-00100Rumble Strips (Shoulder/Edge) 30.76  MILE650.0019,994.00525.0016,149.00500.0015,380.00494.0015,195.44
0027727-01-00100Mobilization 1     LUMP470,000.00470,000.00565,750.00565,750.00875,000.00875,000.00800,000.00800,000.00
0028729-16-00300Object Marker Assembly (Type 3) 24     EACH90.002,160.0082.001,968.00100.002,400.0085.002,040.00
0029731-02-00100Reflectorized Raised Pavement Markers 5,650     EACH7.5042,375.006.2535,312.506.0033,900.007.0039,550.00
0030732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 2,716     LNFT2.256,111.002.556,925.801.504,074.002.005,432.00
0031732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 1,358     LNFT7.009,506.0013.0017,654.006.508,827.006.008,148.00
0032732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 30.76  MILE3,300.00101,508.002,950.0090,742.002,600.0079,976.003,000.0092,280.00
0033732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 15.38  MILE1,000.0015,380.001,100.0016,918.001,000.0015,380.00950.0014,611.00
0034732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.116 MILE3,500.00406.007,250.00841.003,000.00348.003,000.00348.00
0035732-03-02101Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) 0.094 MILE6,500.00611.002,900.00272.6010,000.00940.006,000.00564.00
0036732-05-00100Removal of Existing Markings CONCRETE BRIDGE DECK0.094 MILE8,400.00789.606,250.00587.5010,000.00940.007,500.00705.00
0037740-01-00100Construction Layout 1     LUMP18,000.0018,000.005,500.005,500.0040,000.0040,000.0015,000.0015,000.00
0038NS-713-00009Portable Changeable Message Sign (with communications) 6     EACH4,000.0024,000.005,500.0033,000.007,500.0045,000.001,000.006,000.00
             
  CONTRACTOR TOTAL   7,493,893.93 8,434,499.14 8,904,876.42 9,261,641.25