Proposal:H.011077.6
Parish:Madison
Routes:I-20
Description:I-20: MOUND TO DELTA SCALES PHASE 2
Type Construction:MILLING ASPHALT PAVEMENT, THIN ASPHALT CONCRETE (OGFC), ASPHALT CONCRETE OVERLAY, WEIGH IN MOTION SYSTEM REPAIR, AND RELATED WORK.
Estimated Construction Cost:$3,454,374.86
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $3,975,838.00 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,100,002.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 8,888.4 | TON | 155.00 | 1,377,702.00 | 185.00 | 1,644,354.00 | | 0002 | 502-01-00100 | Asphalt Concrete | 11,068.9 | TON | 121.00 | 1,339,336.90 | 142.00 | 1,571,783.80 | | 0003 | 509-01-00100 | Milling Asphalt Pavement | 102,870 | SQYD | 3.00 | 308,610.00 | 2.50 | 257,175.00 | | 0004 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 149 | SQYD | 295.00 | 43,955.00 | 125.00 | 18,625.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 90,000.00 | 90,000.00 | | 0006 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 27.993 | MILE | 200.00 | 5,598.60 | 200.00 | 5,598.60 | | 0007 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 27.993 | MILE | 400.00 | 11,197.20 | 450.00 | 12,596.85 | | 0008 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 48.318 | MILE | 800.00 | 38,654.40 | 600.00 | 28,990.80 | | 0009 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 3,000.00 | 12,000.00 | 2,750.00 | 11,000.00 | | 0010 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.711 | MILE | 300.00 | 4,713.30 | 300.00 | 4,713.30 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 315,000.00 | 315,000.00 | 80,000.00 | 80,000.00 | | 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,773 | EACH | 6.00 | 22,638.00 | 6.00 | 22,638.00 | | 0013 | 731-03-00100 | Removal of Raised Pavement Markers | 0.656 | MILE | 4,000.00 | 2,624.00 | 650.00 | 426.40 | | 0014 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 4,188 | LNFT | 2.50 | 10,470.00 | 3.00 | 12,564.00 | | 0015 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 734 | LNFT | 12.00 | 8,808.00 | 10.00 | 7,340.00 | | 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 22.216 | MILE | 3,000.00 | 66,648.00 | 3,000.00 | 66,648.00 | | 0017 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.513 | MILE | 1,000.00 | 7,513.00 | 1,100.00 | 8,264.30 | | 0018 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.933 | MILE | 3,000.00 | 5,799.00 | 4,600.00 | 8,891.80 | | 0019 | 732-03-04000 | Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Contrast) | 2.03 | MILE | 8,000.00 | 16,240.00 | 10,000.00 | 20,300.00 | | 0020 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 4 | EACH | 600.00 | 2,400.00 | 1,100.00 | 4,400.00 | | 0021 | 732-05-00100 | Removal of Existing Markings | 2.087 | MILE | 5,000.00 | 10,435.00 | 6,500.00 | 13,565.50 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | | 0023 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 4,826 | LNFT | 2.50 | 12,065.00 | 2.00 | 9,652.00 | | 0024 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,690 | LNFT | 2.50 | 4,225.00 | 2.00 | 3,380.00 | | 0025 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 13,032 | LNFT | 1.75 | 22,806.00 | 3.00 | 39,096.00 | | 0026 | NS-602-00001 | Milling Concrete Pavement | 533.3 | SQYD | 12.00 | 6,399.60 | 15.00 | 7,999.50 | | 0027 | NS-MSC-00263 | Weigh In Motion (WIM) System Repair | 1 | LUMP | 100,000.00 | 100,000.00 | 135,000.00 | 135,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,975,838.00 | | 4,100,002.85 |
|