Proposal:H.013193.6
Parish:East Feliciana, West Feliciana
Routes:US 61
Description:US 61: THOMPSON CREEK BR REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE (STEEL GIRDER BRIDGE), REMOVAL OF BRIDGE DECK (HYDRODEMOLITION), REMOVAL OF BRIDGE PILE (PPC PILES), GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, STEEL PILES, GIRDER SPAN BRIDGE, CONCRETE APPROACH SLABS (CAST-IN-PLACE), TEMPORARY DETOUR ROADS, AND RELATED WORK.
Estimated Construction Cost:$10,345,758.68
| Rank | License | Bidder | Construction Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $9,236,300.28 |
| 2 | 55950 | Brown Industrial Construction, LLC | $10,558,920.98 |
| 3 | 34567 | James Construction Group LLC | $10,888,881.20 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $12,013,630.64 |
| 5 | 00755 | L & A Contracting Co. | $13,608,093.92 |
| 6 | 49239 | WL Bass Construction Inc. | $13,636,897.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - Brown Industrial Construction, LLC | - 3 - James Construction Group LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 460,000.00 | 460,000.00 | 600,000.00 | 600,000.00 | 50,000.00 | 50,000.00 | 132,000.00 | 132,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 45,000.00 | 45,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 500.00 | 500.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 111 | SQYD | 20.00 | 2,220.00 | 8.00 | 888.00 | 20.00 | 2,220.00 | 14.00 | 1,554.00 | | 0004 | 202-02-04501 | Removal of Bridge STR. NO. 61630190400001, STEEL GIRDER BRIDGE | 1 | LUMP | 500,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | 565,600.00 | 565,600.00 | 600,000.00 | 600,000.00 | | 0005 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) Details A | 480 | SFIN | 50.00 | 24,000.00 | 65.00 | 31,200.00 | 19.06 | 9,148.80 | 65.00 | 31,200.00 | | 0006 | 202-02-04570 | Removal of Bridge Pile 24" PPC PILES | 7 | EACH | 1,000.00 | 7,000.00 | 1,600.00 | 11,200.00 | 1,169.51 | 8,186.57 | 5,000.00 | 35,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 908.4 | LNFT | 7.47 | 6,785.75 | 5.00 | 4,542.00 | 20.00 | 18,168.00 | 14.00 | 12,717.60 | | 0008 | 203-02-00100 | Drainage Excavation | 8,533 | CUYD | 10.00 | 85,330.00 | 9.00 | 76,797.00 | 12.91 | 110,161.03 | 11.00 | 93,863.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 80,000.00 | 80,000.00 | 6,524.82 | 6,524.82 | 50,000.00 | 50,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 7,126 | LNFT | 3.00 | 21,378.00 | 2.00 | 14,252.00 | 2.00 | 14,252.00 | 1.70 | 12,114.20 | | 0011 | 502-01-00100 | Asphalt Concrete | 1,254.2 | TON | 104.00 | 130,436.80 | 105.00 | 131,691.00 | 100.00 | 125,420.00 | 120.00 | 150,504.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 371.8 | TON | 104.00 | 38,667.20 | 110.00 | 40,898.00 | 100.00 | 37,180.00 | 120.00 | 44,616.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 3,429 | SQYD | 3.00 | 10,287.00 | 3.00 | 10,287.00 | 3.00 | 10,287.00 | 3.50 | 12,001.50 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -142 | CUYD | 15.00 | -2,130.00 | 0.01 | -1.42 | 15.00 | -2,130.00 | 17.00 | -2,414.00 | | 0015 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 102 | SQYD | 140.00 | 14,280.00 | 140.00 | 14,280.00 | 140.00 | 14,280.00 | 160.00 | 16,320.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 916.6 | LNFT | 23.50 | 21,540.10 | 24.00 | 21,998.40 | 25.00 | 22,915.00 | 28.00 | 25,664.80 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 75.00 | 7,500.00 | 95.00 | 9,500.00 | 70.00 | 7,000.00 | 110.00 | 11,000.00 | | 0018 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 2 | EACH | 6,000.00 | 12,000.00 | 5,400.00 | 10,800.00 | 6,700.00 | 13,400.00 | 7,600.00 | 15,200.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 2,650.00 | 5,300.00 | 2,200.00 | 4,400.00 | 2,500.00 | 5,000.00 | 4,200.00 | 8,400.00 | | 0020 | 711-03-00400 | Riprap (55 lb) | 600 | TON | 80.00 | 48,000.00 | 85.00 | 51,000.00 | 100.00 | 60,000.00 | 70.00 | 42,000.00 | | 0021 | 711-03-00700 | Riprap (440 lb) | 12,698 | TON | 80.00 | 1,015,840.00 | 86.00 | 1,092,028.00 | 140.00 | 1,777,720.00 | 70.00 | 888,860.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 8,807 | SQYD | 2.00 | 17,614.00 | 2.00 | 17,614.00 | 3.00 | 26,421.00 | 1.70 | 14,971.90 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 175,000.00 | 175,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.525 | MILE | 625.00 | 2,203.13 | 600.00 | 2,115.00 | 615.00 | 2,167.88 | 750.00 | 2,643.75 | | 0025 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 175 | EACH | 850.00 | 148,750.00 | 1,000.00 | 175,000.00 | 550.00 | 96,250.00 | 1,550.00 | 271,250.00 | | 0026 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 20 | EACH | 50.00 | 1,000.00 | 270.00 | 5,400.00 | 200.00 | 4,000.00 | 165.00 | 3,300.00 | | 0027 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 6,500.00 | 26,000.00 | 1,500.00 | 6,000.00 | 10,000.00 | 40,000.00 | 12,000.00 | 48,000.00 | | 0028 | 717-01-00100 | Seeding | 60 | LB | 23.65 | 1,419.00 | 24.00 | 1,440.00 | 20.00 | 1,200.00 | 28.00 | 1,680.00 | | 0029 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.54 | 1,080.00 | 0.55 | 1,100.00 | 1.00 | 2,000.00 | 1.00 | 2,000.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.574 | MILE | 400.00 | 229.60 | 6,600.00 | 3,788.40 | 6,000.00 | 3,444.00 | 460.00 | 264.04 | | 0032 | 725-01-00100 | Temporary Detour Roads | 2,825.3 | SQYD | 100.00 | 282,530.00 | 95.00 | 268,403.50 | 120.00 | 339,036.00 | 135.00 | 381,415.50 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 850,000.00 | 850,000.00 | 1,050,000.00 | 1,050,000.00 | 1,100,000.00 | 1,100,000.00 | 1,196,000.00 | 1,196,000.00 | | 0034 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 32.3 | SQFT | 18.00 | 581.40 | 18.00 | 581.40 | 20.00 | 646.00 | 20.00 | 646.00 | | 0035 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 28.8 | SQFT | 18.00 | 518.40 | 18.00 | 518.40 | 20.00 | 576.00 | 20.00 | 576.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 100.00 | 300.00 | 90.00 | 270.00 | 75.00 | 225.00 | 105.00 | 315.00 | | 0037 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 7 | EACH | 85.00 | 595.00 | 85.00 | 595.00 | 100.00 | 700.00 | 100.00 | 700.00 | | 0038 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 2 | EACH | 125.00 | 250.00 | 125.00 | 250.00 | 125.00 | 250.00 | 145.00 | 290.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 379 | EACH | 8.00 | 3,032.00 | 4.00 | 1,516.00 | 4.00 | 1,516.00 | 7.00 | 2,653.00 | | 0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 75 | LNFT | 3.00 | 225.00 | 1.50 | 112.50 | 1.50 | 112.50 | 2.50 | 187.50 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 19 | LNFT | 10.00 | 190.00 | 8.50 | 161.50 | 8.00 | 152.00 | 8.00 | 152.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.572 | MILE | 4,000.00 | 10,288.00 | 2,200.00 | 5,658.40 | 2,000.00 | 5,144.00 | 3,500.00 | 9,002.00 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.286 | MILE | 1,000.00 | 1,286.00 | 600.00 | 771.60 | 600.00 | 771.60 | 1,000.00 | 1,286.00 | | 0044 | 732-05-00100 | Removal of Existing Markings | 1.286 | MILE | 5,000.00 | 6,430.00 | 1,500.00 | 1,929.00 | 1,500.00 | 1,929.00 | 5,200.00 | 6,687.20 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 160,000.00 | 160,000.00 | 145,000.00 | 145,000.00 | 120,000.00 | 120,000.00 | | 0046 | 804-01-00200 | Precast Concrete Piles (14") | 128 | LNFT | 120.00 | 15,360.00 | 160.00 | 20,480.00 | 360.00 | 46,080.00 | 36.00 | 4,608.00 | | 0047 | 804-01-00600 | Precast Concrete Piles (24") | 1,980 | LNFT | 150.00 | 297,000.00 | 175.00 | 346,500.00 | 135.00 | 267,300.00 | 155.00 | 306,900.00 | | 0048 | 804-01-00800 | Precast Concrete Piles (36") | 5,445 | LNFT | 220.00 | 1,197,900.00 | 260.00 | 1,415,700.00 | 240.00 | 1,306,800.00 | 325.00 | 1,769,625.00 | | 0049 | 804-03-02000 | Steel Piles (36" Pipe) | 1,000 | LNFT | 400.00 | 400,000.00 | 480.00 | 480,000.00 | 375.00 | 375,000.00 | 360.00 | 360,000.00 | | 0050 | 804-05-00800 | Precast Concrete Test Piles (36") | 1 | EACH | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 81,500.00 | 81,500.00 | 460,000.00 | 460,000.00 | | 0051 | 804-09-00800 | Static Load Test (Precast Concrete Piles (36")) | 1 | EACH | 100,000.00 | 100,000.00 | 90,000.00 | 90,000.00 | 100,000.00 | 100,000.00 | 68,000.00 | 68,000.00 | | 0052 | 804-14-00100 | Dynamic Monitoring Assistance | 11 | EACH | 1,500.00 | 16,500.00 | 2,500.00 | 27,500.00 | 6,500.00 | 71,500.00 | 5,700.00 | 62,700.00 | | 0053 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 25,000.00 | 25,000.00 | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 8,700.00 | 8,700.00 | | 0054 | 805-01-00200 | Class A1 Concrete (Deck) | 1,227.78 | CUYD | 600.00 | 736,668.00 | 800.00 | 982,224.00 | 750.00 | 920,835.00 | 950.00 | 1,166,391.00 | | 0055 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 515.03 | CUYD | 900.00 | 463,527.00 | 1,020.00 | 525,330.60 | 1,250.00 | 643,787.50 | 2,200.00 | 1,133,066.00 | | 0056 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 4,478 | LNFT | 225.00 | 1,007,550.00 | 230.00 | 1,029,940.00 | 275.00 | 1,231,450.00 | 255.00 | 1,141,890.00 | | 0057 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 11,198 | SQFT | 1.00 | 11,198.00 | 1.00 | 11,198.00 | 1.00 | 11,198.00 | 3.00 | 33,594.00 | | 0058 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 11,198 | SQFT | 1.00 | 11,198.00 | 1.50 | 16,797.00 | 1.00 | 11,198.00 | 3.50 | 39,193.00 | | 0059 | 806-01-00100 | Deformed Reinforcing Steel | 356,839 | LB | 1.10 | 392,522.90 | 1.30 | 463,890.70 | 1.50 | 535,258.50 | 1.35 | 481,732.65 | | 0060 | 807-01-00100 | Structural Metalwork (Grade 36) | 771 | LUMP | 5,000.00 | 5,000.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | | 0061 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 50 | LUMP | 5,000.00 | 5,000.00 | 2,600.00 | 2,600.00 | 2,500.00 | 2,500.00 | 1,150.00 | 1,150.00 | | 0062 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,376 | LNFT | 75.00 | 103,200.00 | 85.00 | 116,960.00 | 100.00 | 137,600.00 | 105.00 | 144,480.00 | | 0063 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 500 | LNFT | 95.00 | 47,500.00 | 110.00 | 55,000.00 | 90.00 | 45,000.00 | 120.00 | 60,000.00 | | 0064 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 45.00 | 144,000.00 | 32.00 | 102,400.00 | 70.00 | 224,000.00 | 75.00 | 240,000.00 | | 0065 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 844 | SFIN | 55.00 | 46,420.00 | 84.00 | 70,896.00 | 80.00 | 67,520.00 | 60.00 | 50,640.00 | | 0066 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 160 | LNFT | 325.00 | 52,000.00 | 240.00 | 38,400.00 | 300.00 | 48,000.00 | 255.00 | 40,800.00 | | 0067 | 830-07-00100 | Structural Concrete Patching | 64 | SQFT | 450.00 | 28,800.00 | 110.00 | 7,040.00 | 450.00 | 28,800.00 | 400.00 | 25,600.00 | | 0068 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 10.00 | 2,400.00 | 6.00 | 1,440.00 | 2.50 | 600.00 | 20.00 | 4,800.00 | | 0069 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 80 | LNFT | 10.00 | 800.00 | 8.00 | 640.00 | 11.00 | 880.00 | 8.00 | 640.00 | | 0070 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 17,200.00 | 17,200.00 | 9,000.00 | 9,000.00 | 8,600.00 | 8,600.00 | 10,000.00 | 10,000.00 | | 0071 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 1 | EACH | 1,600.00 | 1,600.00 | 2,000.00 | 2,000.00 | 1,600.00 | 1,600.00 | 2,000.00 | 2,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,236,300.28 | | 10,558,920.98 | | 10,888,881.20 | | 12,013,630.64 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - L & A Contracting Co. | - 6 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 1,000,000.00 | 1,000,000.00 | 500,000.00 | 500,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 111 | SQYD | 7.56 | 839.16 | 5.00 | 555.00 | | 0004 | 202-02-04501 | Removal of Bridge STR. NO. 61630190400001, STEEL GIRDER BRIDGE | 1 | LUMP | 600,000.00 | 600,000.00 | 350,000.00 | 350,000.00 | | 0005 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) Details A | 480 | SFIN | 63.51 | 30,484.80 | 70.00 | 33,600.00 | | 0006 | 202-02-04570 | Removal of Bridge Pile 24" PPC PILES | 7 | EACH | 16,000.00 | 112,000.00 | 650.00 | 4,550.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 908.4 | LNFT | 7.56 | 6,867.50 | 3.00 | 2,725.20 | | 0008 | 203-02-00100 | Drainage Excavation | 8,533 | CUYD | 8.58 | 73,213.14 | 12.00 | 102,396.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 250,000.00 | 250,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 7,126 | LNFT | 5.40 | 38,480.40 | 1.50 | 10,689.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 1,254.2 | TON | 112.00 | 140,470.40 | 108.00 | 135,453.60 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 371.8 | TON | 112.00 | 41,641.60 | 120.00 | 44,616.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 3,429 | SQYD | 3.26 | 11,178.54 | 6.00 | 20,574.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -142 | CUYD | 16.29 | -2,313.18 | 0.01 | -1.42 | | 0015 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 102 | SQYD | 152.00 | 15,504.00 | 270.00 | 27,540.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 916.6 | LNFT | 26.00 | 23,831.60 | 25.00 | 22,915.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 102.60 | 10,260.00 | 70.00 | 7,000.00 | | 0018 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 2 | EACH | 5,832.00 | 11,664.00 | 6,700.00 | 13,400.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 2,376.00 | 4,752.00 | 2,500.00 | 5,000.00 | | 0020 | 711-03-00400 | Riprap (55 lb) | 600 | TON | 73.45 | 44,070.00 | 65.00 | 39,000.00 | | 0021 | 711-03-00700 | Riprap (440 lb) | 12,698 | TON | 120.00 | 1,523,760.00 | 76.00 | 965,048.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 8,807 | SQYD | 4.20 | 36,989.40 | 2.25 | 19,815.75 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 186,220.00 | 186,220.00 | 125,000.00 | 125,000.00 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.525 | MILE | 756.00 | 2,664.90 | 600.00 | 2,115.00 | | 0025 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 175 | EACH | 4,196.00 | 734,300.00 | 440.00 | 77,000.00 | | 0026 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 20 | EACH | 729.25 | 14,585.00 | 125.00 | 2,500.00 | | 0027 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 21,600.00 | 86,400.00 | 16,000.00 | 64,000.00 | | 0028 | 717-01-00100 | Seeding | 60 | LB | 25.54 | 1,532.40 | 24.00 | 1,440.00 | | 0029 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.58 | 1,160.00 | 0.60 | 1,200.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 60,000.00 | 60,000.00 | 25,000.00 | 25,000.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.574 | MILE | 432.00 | 247.97 | 500.00 | 287.00 | | 0032 | 725-01-00100 | Temporary Detour Roads | 2,825.3 | SQYD | 170.65 | 482,137.45 | 110.00 | 310,783.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 750,000.00 | 750,000.00 | 1,350,000.00 | 1,350,000.00 | | 0034 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 32.3 | SQFT | 19.45 | 628.24 | 20.00 | 646.00 | | 0035 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 28.8 | SQFT | 19.45 | 560.16 | 20.00 | 576.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 97.20 | 291.60 | 75.00 | 225.00 | | 0037 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 7 | EACH | 91.80 | 642.60 | 100.00 | 700.00 | | 0038 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 2 | EACH | 135.00 | 270.00 | 125.00 | 250.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 379 | EACH | 6.50 | 2,463.50 | 4.00 | 1,516.00 | | 0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 75 | LNFT | 4.32 | 324.00 | 1.50 | 112.50 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 19 | LNFT | 13.00 | 247.00 | 8.50 | 161.50 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.572 | MILE | 3,456.00 | 8,888.83 | 2,200.00 | 5,658.40 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.286 | MILE | 1,200.00 | 1,543.20 | 600.00 | 771.60 | | 0044 | 732-05-00100 | Removal of Existing Markings | 1.286 | MILE | 5,702.00 | 7,332.77 | 1,600.00 | 2,057.60 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 543,275.00 | 543,275.00 | 130,000.00 | 130,000.00 | | 0046 | 804-01-00200 | Precast Concrete Piles (14") | 128 | LNFT | 182.17 | 23,317.76 | 225.00 | 28,800.00 | | 0047 | 804-01-00600 | Precast Concrete Piles (24") | 1,980 | LNFT | 129.22 | 255,855.60 | 250.00 | 495,000.00 | | 0048 | 804-01-00800 | Precast Concrete Piles (36") | 5,445 | LNFT | 236.32 | 1,286,762.40 | 645.00 | 3,512,025.00 | | 0049 | 804-03-02000 | Steel Piles (36" Pipe) | 1,000 | LNFT | 447.00 | 447,000.00 | 700.00 | 700,000.00 | | 0050 | 804-05-00800 | Precast Concrete Test Piles (36") | 1 | EACH | 51,285.00 | 51,285.00 | 100,000.00 | 100,000.00 | | 0051 | 804-09-00800 | Static Load Test (Precast Concrete Piles (36")) | 1 | EACH | 50,543.00 | 50,543.00 | 150,000.00 | 150,000.00 | | 0052 | 804-14-00100 | Dynamic Monitoring Assistance | 11 | EACH | 2,371.00 | 26,081.00 | 250.00 | 2,750.00 | | 0053 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 10,800.00 | 10,800.00 | 15,000.00 | 15,000.00 | | 0054 | 805-01-00200 | Class A1 Concrete (Deck) | 1,227.78 | CUYD | 1,015.00 | 1,246,196.70 | 900.00 | 1,105,002.00 | | 0055 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 515.03 | CUYD | 1,323.50 | 681,642.21 | 910.00 | 468,677.30 | | 0056 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 4,478 | LNFT | 284.00 | 1,271,752.00 | 285.00 | 1,276,230.00 | | 0057 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 11,198 | SQFT | 1.35 | 15,117.30 | 1.25 | 13,997.50 | | 0058 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 11,198 | SQFT | 2.16 | 24,187.68 | 1.25 | 13,997.50 | | 0059 | 806-01-00100 | Deformed Reinforcing Steel | 356,839 | LB | 1.75 | 624,468.25 | 1.10 | 392,522.90 | | 0060 | 807-01-00100 | Structural Metalwork (Grade 36) | 771 | LUMP | 5,280.00 | 5,280.00 | 150,000.00 | 150,000.00 | | 0061 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 50 | LUMP | 2,854.00 | 2,854.00 | 29,000.00 | 29,000.00 | | 0062 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,376 | LNFT | 93.60 | 128,793.60 | 85.00 | 116,960.00 | | 0063 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 500 | LNFT | 103.40 | 51,700.00 | 85.00 | 42,500.00 | | 0064 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 76.67 | 245,344.00 | 70.00 | 224,000.00 | | 0065 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 844 | SFIN | 57.56 | 48,580.64 | 60.00 | 50,640.00 | | 0066 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 160 | LNFT | 241.68 | 38,668.80 | 210.00 | 33,600.00 | | 0067 | 830-07-00100 | Structural Concrete Patching | 64 | SQFT | 5,977.00 | 382,528.00 | 560.00 | 35,840.00 | | 0068 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 27.00 | 6,480.00 | 9.00 | 2,160.00 | | 0069 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 80 | LNFT | 5.40 | 432.00 | 4.00 | 320.00 | | 0070 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 9,288.00 | 9,288.00 | 14,500.00 | 14,500.00 | | 0071 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 1 | EACH | 1,728.00 | 1,728.00 | 1,500.00 | 1,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,608,093.92 | | 13,636,897.93 |
|