Bid Tabulations for the Letting of 11/14/2018 LA DOTD Headquarters

Proposal:H.013183.6
Parish:Tangipahoa
Routes:LA 16
Description:LA 16: TANGIPAHOA RIVER BR REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE (STEEL GIRDER BRIDGE), GRADING, PAVEMENT PATCHING, CLASS II BASE COURSE, SUBGRADE LAYER (TREATED), ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, LANDSCAPING, TEMPORARY DETOUR BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$7,703,177.00
Rank License BidderConstruction Bid
139462JB JAMES CONSTRUCTION LLC$6,953,669.06
255950Brown Industrial Construction, LLC$7,227,992.66
349239WL Bass Construction Inc.$7,982,612.19
400481COASTAL BRIDGE CO., L.L.C.$9,332,265.95
500755L & A Contracting Co.$11,913,298.10


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
JB JAMES CONSTRUCTION LLC
- 2 -
Brown Industrial Construction, LLC
- 3 -
WL Bass Construction Inc.
- 4 -
COASTAL BRIDGE CO., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 3     LUMP600,000.00600,000.00225,000.00225,000.00100,000.00100,000.0050,000.0050,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP38,000.0038,000.0075,150.0075,150.005,000.005,000.0025,000.0025,000.00
0003202-02-02000Removal of Asphalt Drives 246     SQYD10.002,460.0018.004,428.005.001,230.0015.003,690.00
0004202-02-02020Removal of Asphalt Pavement 1,258.7   SQYD10.0012,587.006.007,552.205.506,922.856.508,181.55
0005202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,258.7   SQYD10.0012,587.0010.0012,587.003.003,776.1014.0017,621.80
0006202-02-04501Removal of Bridge STR. NO. 62530470101461 (362'-1" x 33'-6" STEEL GIRDER BRIDGE)1     LUMP400,000.00400,000.00232,554.00232,554.00120,000.00120,000.00200,000.00200,000.00
0007202-02-14500Removal of Guard Rail 560.6   LNFT5.002,803.008.004,484.802.001,121.209.005,045.40
0008203-02-00100Drainage Excavation 5,392     CUYD15.0080,880.0014.0075,488.0013.0070,096.0020.00107,840.00
0009203-05-00100Excavation and Embankment 1     LUMP250,000.00250,000.00122,001.00122,001.00180,000.00180,000.0080,000.0080,000.00
0010204-06-00100Temporary Silt Fencing 2,494     LNFT3.007,482.001.754,364.501.503,741.002.004,988.00
0011302-02-08500Class II Base Course (8-1/2" Thick) 4,298.1   SQYD16.0068,769.6026.00111,750.6034.40147,854.6448.00206,308.80
0012305-01-04020Subgrade Layer (12" Thick) (Treated) 4,299     SQYD11.0047,289.009.0038,691.005.0021,495.0018.7580,606.25
0013401-01-00100Aggregate Surface Course (Net Section) 137     CUYD110.0015,070.00100.0013,700.0070.009,590.00150.0020,550.00
0014502-01-00100Asphalt Concrete 1,363.8   TON80.00109,104.0090.00122,742.00105.00143,199.00180.00245,484.00
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 338.8   TON170.0057,596.00170.0057,596.00150.0050,820.00230.0077,924.00
0016510-01-00300Pavement Patching (18" Minimum Thickness) 102     SQYD105.0010,710.00105.0010,710.00240.0024,480.00260.0026,520.00
0017704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) 278.2   LNFT22.006,120.4025.006,955.0022.006,120.4030.008,346.00
0018704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT95.009,500.0060.006,000.0095.009,500.0075.007,500.00
0019704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 1     EACH2,400.002,400.004,000.004,000.002,400.002,400.003,500.003,500.00
0020704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 3     EACH2,200.006,600.002,500.007,500.002,200.006,600.003,200.009,600.00
0021711-03-00400Riprap (55 lb) 224.6   TON80.0017,968.00102.0022,909.2086.0019,315.6095.0021,337.00
0022711-03-00700Riprap (440 lb) 9,879.9   TON75.00740,992.50100.00987,990.00110.001,086,789.00125.001,234,987.50
0023711-04-00100Geotextile Fabric 7,027     SQYD3.0021,081.002.0014,054.002.7519,324.255.0035,135.00
0024713-01-00100Temporary Signs and Barricades 1     LUMP75,000.0075,000.0050,000.0050,000.0045,000.0045,000.0055,000.0055,000.00
0025713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 0.334 MILE375.00125.25640.00213.76650.00217.101,775.00592.85
0026713-06-00100Temporary Reflectorized Raised Pavement Markers 24     EACH15.00360.006.00144.006.50156.0025.00600.00
0027716-01-00100Mulch (Vegetative) 3.2   TON850.002,720.001,160.003,712.001,160.003,712.001,400.004,480.00
0028717-01-00100Seeding 48     LB15.00720.0023.001,104.0022.301,070.4025.001,200.00
0029718-01-00100Fertilizer 1,600     LB0.50800.000.50800.000.51816.000.60960.00
0030719-04-00100Landscaping 1     LUMP25,000.0025,000.0020,000.0020,000.0015,000.0015,000.0050,000.0050,000.00
0031722-01-00100Project Site Laboratory 1     EACH20,000.0020,000.0020,000.0020,000.0010,000.0010,000.0050,000.0050,000.00
0032725-01-00100Temporary Detour Roads 4,367     SQYD48.00209,616.0080.00349,360.0098.00427,966.00115.00502,205.00
0033727-01-00100Mobilization 1     LUMP650,000.00650,000.00685,000.00685,000.00800,000.00800,000.00350,000.00350,000.00
0034729-01-00102Sign (Type A)(Furnish and Install) 92     SQFT18.001,656.0045.004,140.0018.001,656.0025.002,300.00
0035729-02-00102Sign (Type B)(Furnish and Install) 13.6   SQFT18.00244.8050.00680.0018.00244.8027.00367.20
0036729-16-00300Object Marker Assembly (Type 3) 4     EACH85.00340.00100.00400.0085.00340.0085.00340.00
0037729-22-00100Square Tubing Post with 2-1/4" Anchor 14     EACH80.001,120.00175.002,450.0080.001,120.00150.002,100.00
0038731-02-00100Reflectorized Raised Pavement Markers 71     EACH15.001,065.007.00497.008.00568.0012.00852.00
0039731-03-00100Removal of Raised Pavement Markers 0.008 MILE1.250.019,375.0075.0012,000.0096.007,900.0063.20
0040732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.167 MILE4,511.575,265.004,000.004,668.005,000.005,835.004,250.004,959.75
0041732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.137 MILE2,554.74350.002,100.00287.702,200.00301.401,250.00171.25
0042732-05-00100Removal of Existing Markings 0.084 MILE4,761.90400.007,700.00646.8010,000.00840.008,500.00714.00
0043735-01-00100Mailboxes 1     EACH130.00130.00250.00250.00130.00130.00125.00125.00
0044740-01-00100Construction Layout 1     LUMP60,000.0060,000.00130,000.00130,000.0080,000.0080,000.0050,000.0050,000.00
0045804-01-00800Precast Concrete Piles (36") 3,640     LNFT220.00800,800.00275.001,001,000.00335.001,219,400.00275.001,001,000.00
0046804-05-00800Precast Concrete Test Piles (36") 1     EACH70,000.0070,000.0085,000.0085,000.0050,000.0050,000.0070,000.0070,000.00
0047804-09-00800Static Load Test (Precast Concrete Piles (36")) 1     EACH90,000.0090,000.00115,000.00115,000.0080,000.0080,000.00225,000.00225,000.00
0048804-14-00100Dynamic Monitoring Assistance 7     EACH1,500.0010,500.002,500.0017,500.00400.002,800.003,500.0024,500.00
0049805-01-00200Class A1 Concrete (Deck) 491.3   CUYD825.00405,322.50950.00466,735.001,200.00589,560.001,400.00687,820.00
0050805-01-00300Class A1 Concrete (Bent Cap) 184.25  CUYD1,400.00257,950.001,150.00211,887.501,500.00276,375.001,600.00294,800.00
0051805-08-01100Precast-Prestressed Concrete Girders (Type LG-25) 790     LNFT180.00142,200.00180.00142,200.00275.00217,250.00200.00158,000.00
0052805-08-01200Precast-Prestressed Concrete Girder (Type LG-36) 1,073     LNFT200.00214,600.00208.00223,184.00325.00348,725.00240.00257,520.00
0053805-18-00100Concrete Finish (Class 2 Rubbed Finish) 4,870.5   SQFT1.004,870.501.004,870.501.004,870.501.205,844.60
0054805-18-00200Concrete Finish (Class 3 Special Finish) 4,870.5   SQFT1.004,870.501.004,870.501.105,357.551.205,844.60
0055806-01-00100Deformed Reinforcing Steel 153,764     LB1.00153,764.001.40215,269.601.10169,140.401.30199,893.20
0056807-01-00100Structural Metalwork (Grade 36) 300     LUMP7,500.007,500.006,000.006,000.0020,000.0020,000.004,000.004,000.00
0057807-02-00100Structural Metalwork (Anchor Bolts) 50     LUMP7,500.007,500.005,000.005,000.0010,000.0010,000.004,000.004,000.00
0058810-01-00100Concrete Bridge Railing (Standard) 384     LNFT90.0034,560.0080.0030,720.0090.0034,560.00140.0053,760.00
0059810-01-00200Concrete Bridge Railing (Slotted) 432     LNFT100.0043,200.0095.0041,040.0095.0041,040.00150.0064,800.00
0060813-01-00100Concrete Approach Slabs (Cast-in-Place) 3,200     SQFT40.00128,000.0050.00160,000.0065.00208,000.0080.00256,000.00
0061814-02-00100Elastomeric Bearing Pads (Reinforced) 456     SFIN70.0031,920.0090.0041,040.0060.0027,360.0070.0031,920.00
0062815-02-00100Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) 80     LNFT275.0022,000.00200.0016,000.00200.0016,000.00230.0018,400.00
0063817-01-00200Temporary Detour Bridge (Steel Truss) 10,920     SQFT85.00928,200.0089.00971,880.00110.001,201,200.00218.002,380,560.00
0064NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 240     LNFT10.002,400.003.00720.007.001,680.0011.902,856.00
0065NS-500-00260Sawcuts in Asphalt Concrete Lifts 80     LNFT10.00800.008.00640.001.25100.0011.90952.00
0066NS-500-00340Saw Cutting Asphalt Concrete Pavement 600     INLF1.00600.008.004,800.001.25750.006.003,600.00
0067NS-700-00810Impact Attenuator (Construction Zone)(Test Level 3) 2     EACH8,600.0017,200.0010,000.0020,000.0012,000.0024,000.0012,000.0024,000.00
             
  CONTRACTOR TOTAL   6,953,669.06 7,227,992.66 7,982,612.19 9,332,265.95



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
L & A Contracting Co.
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 3     LUMP650,000.00650,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP12,000.0012,000.00
0003202-02-02000Removal of Asphalt Drives 246     SQYD7.701,894.20
0004202-02-02020Removal of Asphalt Pavement 1,258.7   SQYD7.709,691.99
0005202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,258.7   SQYD22.0027,691.40
0006202-02-04501Removal of Bridge STR. NO. 62530470101461 (362'-1" x 33'-6" STEEL GIRDER BRIDGE)1     LUMP350,000.00350,000.00
0007202-02-14500Removal of Guard Rail 560.6   LNFT6.603,699.96
0008203-02-00100Drainage Excavation 5,392     CUYD9.0748,905.44
0009203-05-00100Excavation and Embankment 1     LUMP500,000.00500,000.00
0010204-06-00100Temporary Silt Fencing 2,494     LNFT5.5013,717.00
0011302-02-08500Class II Base Course (8-1/2" Thick) 4,298.1   SQYD48.00206,308.80
0012305-01-04020Subgrade Layer (12" Thick) (Treated) 4,299     SQYD27.50118,222.50
0013401-01-00100Aggregate Surface Course (Net Section) 137     CUYD190.6426,117.68
0014502-01-00100Asphalt Concrete 1,363.8   TON110.55150,768.09
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 338.8   TON165.8356,183.20
0016510-01-00300Pavement Patching (18" Minimum Thickness) 102     SQYD221.1722,559.34
0017704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) 278.2   LNFT24.206,732.44
0018704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT104.5010,450.00
0019704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 1     EACH2,640.002,640.00
0020704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 3     EACH2,420.007,260.00
0021711-03-00400Riprap (55 lb) 224.6   TON84.0018,866.40
0022711-03-00700Riprap (440 lb) 9,879.9   TON141.601,398,993.84
0023711-04-00100Geotextile Fabric 7,027     SQYD4.2029,513.40
0024713-01-00100Temporary Signs and Barricades 1     LUMP56,050.0056,050.00
0025713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 0.334 MILE1,650.00551.10
0026713-06-00100Temporary Reflectorized Raised Pavement Markers 24     EACH22.00528.00
0027716-01-00100Mulch (Vegetative) 3.2   TON1,275.304,080.96
0028717-01-00100Seeding 48     LB24.521,176.96
0029718-01-00100Fertilizer 1,600     LB0.56896.00
0030719-04-00100Landscaping 1     LUMP100,000.00100,000.00
0031722-01-00100Project Site Laboratory 1     EACH36,000.0036,000.00
0032725-01-00100Temporary Detour Roads 4,367     SQYD309.501,351,586.50
0033727-01-00100Mobilization 1     LUMP750,000.00750,000.00
0034729-01-00102Sign (Type A)(Furnish and Install) 92     SQFT19.801,821.60
0035729-02-00102Sign (Type B)(Furnish and Install) 13.6   SQFT19.80269.28
0036729-16-00300Object Marker Assembly (Type 3) 4     EACH93.50374.00
0037729-22-00100Square Tubing Post with 2-1/4" Anchor 14     EACH88.001,232.00
0038731-02-00100Reflectorized Raised Pavement Markers 71     EACH11.00781.00
0039731-03-00100Removal of Raised Pavement Markers 0.008 MILE5,808.0046.46
0040732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.167 MILE3,850.004,492.95
0041732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.137 MILE1,100.00150.70
0042732-05-00100Removal of Existing Markings 0.084 MILE8,250.00693.00
0043735-01-00100Mailboxes 1     EACH143.00143.00
0044740-01-00100Construction Layout 1     LUMP400,000.00400,000.00
0045804-01-00800Precast Concrete Piles (36") 3,640     LNFT202.73737,937.20
0046804-05-00800Precast Concrete Test Piles (36") 1     EACH31,250.0031,250.00
0047804-09-00800Static Load Test (Precast Concrete Piles (36")) 1     EACH32,180.0032,180.00
0048804-14-00100Dynamic Monitoring Assistance 7     EACH1,288.009,016.00
0049805-01-00200Class A1 Concrete (Deck) 491.3   CUYD935.18459,453.93
0050805-01-00300Class A1 Concrete (Bent Cap) 184.25  CUYD826.50152,282.63
0051805-08-01100Precast-Prestressed Concrete Girders (Type LG-25) 790     LNFT248.80196,552.00
0052805-08-01200Precast-Prestressed Concrete Girder (Type LG-36) 1,073     LNFT284.72305,504.56
0053805-18-00100Concrete Finish (Class 2 Rubbed Finish) 4,870.5   SQFT1.386,721.29
0054805-18-00200Concrete Finish (Class 3 Special Finish) 4,870.5   SQFT2.2010,715.10
0055806-01-00100Deformed Reinforcing Steel 153,764     LB1.45222,957.80
0056807-01-00100Structural Metalwork (Grade 36) 300     LUMP5,084.005,084.00
0057807-02-00100Structural Metalwork (Anchor Bolts) 50     LUMP4,886.004,886.00
0058810-01-00100Concrete Bridge Railing (Standard) 384     LNFT98.2637,731.84
0059810-01-00200Concrete Bridge Railing (Slotted) 432     LNFT105.3045,489.60
0060813-01-00100Concrete Approach Slabs (Cast-in-Place) 3,200     SQFT66.72213,504.00
0061814-02-00100Elastomeric Bearing Pads (Reinforced) 456     SFIN65.6629,940.96
0062815-02-00100Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) 80     LNFT228.2618,260.80
0063817-01-00200Temporary Detour Bridge (Steel Truss) 10,920     SQFT275.003,003,000.00
0064NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 240     LNFT27.506,600.00
0065NS-500-00260Sawcuts in Asphalt Concrete Lifts 80     LNFT1.40112.00
0066NS-500-00340Saw Cutting Asphalt Concrete Pavement 600     INLF1.40840.00
0067NS-700-00810Impact Attenuator (Construction Zone)(Test Level 3) 2     EACH94.60189.20
       
  CONTRACTOR TOTAL   11,913,298.10