Proposal:H.013183.6
Parish:Tangipahoa
Routes:LA 16
Description:LA 16: TANGIPAHOA RIVER BR REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE (STEEL GIRDER BRIDGE), GRADING, PAVEMENT PATCHING, CLASS II BASE COURSE, SUBGRADE LAYER (TREATED), ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, LANDSCAPING, TEMPORARY DETOUR BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$7,703,177.00
| Rank | License | Bidder | Construction Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $6,953,669.06 |
| 2 | 55950 | Brown Industrial Construction, LLC | $7,227,992.66 |
| 3 | 49239 | WL Bass Construction Inc. | $7,982,612.19 |
| 4 | 00481 | COASTAL BRIDGE CO., L.L.C. | $9,332,265.95 |
| 5 | 00755 | L & A Contracting Co. | $11,913,298.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - Brown Industrial Construction, LLC | - 3 - WL Bass Construction Inc. | - 4 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 600,000.00 | 600,000.00 | 225,000.00 | 225,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 38,000.00 | 38,000.00 | 75,150.00 | 75,150.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 246 | SQYD | 10.00 | 2,460.00 | 18.00 | 4,428.00 | 5.00 | 1,230.00 | 15.00 | 3,690.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 1,258.7 | SQYD | 10.00 | 12,587.00 | 6.00 | 7,552.20 | 5.50 | 6,922.85 | 6.50 | 8,181.55 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,258.7 | SQYD | 10.00 | 12,587.00 | 10.00 | 12,587.00 | 3.00 | 3,776.10 | 14.00 | 17,621.80 | | 0006 | 202-02-04501 | Removal of Bridge STR. NO. 62530470101461 (362'-1" x 33'-6" STEEL GIRDER BRIDGE) | 1 | LUMP | 400,000.00 | 400,000.00 | 232,554.00 | 232,554.00 | 120,000.00 | 120,000.00 | 200,000.00 | 200,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 560.6 | LNFT | 5.00 | 2,803.00 | 8.00 | 4,484.80 | 2.00 | 1,121.20 | 9.00 | 5,045.40 | | 0008 | 203-02-00100 | Drainage Excavation | 5,392 | CUYD | 15.00 | 80,880.00 | 14.00 | 75,488.00 | 13.00 | 70,096.00 | 20.00 | 107,840.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 250,000.00 | 250,000.00 | 122,001.00 | 122,001.00 | 180,000.00 | 180,000.00 | 80,000.00 | 80,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 2,494 | LNFT | 3.00 | 7,482.00 | 1.75 | 4,364.50 | 1.50 | 3,741.00 | 2.00 | 4,988.00 | | 0011 | 302-02-08500 | Class II Base Course (8-1/2" Thick) | 4,298.1 | SQYD | 16.00 | 68,769.60 | 26.00 | 111,750.60 | 34.40 | 147,854.64 | 48.00 | 206,308.80 | | 0012 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 4,299 | SQYD | 11.00 | 47,289.00 | 9.00 | 38,691.00 | 5.00 | 21,495.00 | 18.75 | 80,606.25 | | 0013 | 401-01-00100 | Aggregate Surface Course (Net Section) | 137 | CUYD | 110.00 | 15,070.00 | 100.00 | 13,700.00 | 70.00 | 9,590.00 | 150.00 | 20,550.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 1,363.8 | TON | 80.00 | 109,104.00 | 90.00 | 122,742.00 | 105.00 | 143,199.00 | 180.00 | 245,484.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 338.8 | TON | 170.00 | 57,596.00 | 170.00 | 57,596.00 | 150.00 | 50,820.00 | 230.00 | 77,924.00 | | 0016 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 102 | SQYD | 105.00 | 10,710.00 | 105.00 | 10,710.00 | 240.00 | 24,480.00 | 260.00 | 26,520.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 278.2 | LNFT | 22.00 | 6,120.40 | 25.00 | 6,955.00 | 22.00 | 6,120.40 | 30.00 | 8,346.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 60.00 | 6,000.00 | 95.00 | 9,500.00 | 75.00 | 7,500.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 2,400.00 | 2,400.00 | 4,000.00 | 4,000.00 | 2,400.00 | 2,400.00 | 3,500.00 | 3,500.00 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 2,200.00 | 6,600.00 | 2,500.00 | 7,500.00 | 2,200.00 | 6,600.00 | 3,200.00 | 9,600.00 | | 0021 | 711-03-00400 | Riprap (55 lb) | 224.6 | TON | 80.00 | 17,968.00 | 102.00 | 22,909.20 | 86.00 | 19,315.60 | 95.00 | 21,337.00 | | 0022 | 711-03-00700 | Riprap (440 lb) | 9,879.9 | TON | 75.00 | 740,992.50 | 100.00 | 987,990.00 | 110.00 | 1,086,789.00 | 125.00 | 1,234,987.50 | | 0023 | 711-04-00100 | Geotextile Fabric | 7,027 | SQYD | 3.00 | 21,081.00 | 2.00 | 14,054.00 | 2.75 | 19,324.25 | 5.00 | 35,135.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 55,000.00 | 55,000.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.334 | MILE | 375.00 | 125.25 | 640.00 | 213.76 | 650.00 | 217.10 | 1,775.00 | 592.85 | | 0026 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 24 | EACH | 15.00 | 360.00 | 6.00 | 144.00 | 6.50 | 156.00 | 25.00 | 600.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 3.2 | TON | 850.00 | 2,720.00 | 1,160.00 | 3,712.00 | 1,160.00 | 3,712.00 | 1,400.00 | 4,480.00 | | 0028 | 717-01-00100 | Seeding | 48 | LB | 15.00 | 720.00 | 23.00 | 1,104.00 | 22.30 | 1,070.40 | 25.00 | 1,200.00 | | 0029 | 718-01-00100 | Fertilizer | 1,600 | LB | 0.50 | 800.00 | 0.50 | 800.00 | 0.51 | 816.00 | 0.60 | 960.00 | | 0030 | 719-04-00100 | Landscaping | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | | 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | | 0032 | 725-01-00100 | Temporary Detour Roads | 4,367 | SQYD | 48.00 | 209,616.00 | 80.00 | 349,360.00 | 98.00 | 427,966.00 | 115.00 | 502,205.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 650,000.00 | 650,000.00 | 685,000.00 | 685,000.00 | 800,000.00 | 800,000.00 | 350,000.00 | 350,000.00 | | 0034 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 92 | SQFT | 18.00 | 1,656.00 | 45.00 | 4,140.00 | 18.00 | 1,656.00 | 25.00 | 2,300.00 | | 0035 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 13.6 | SQFT | 18.00 | 244.80 | 50.00 | 680.00 | 18.00 | 244.80 | 27.00 | 367.20 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 100.00 | 400.00 | 85.00 | 340.00 | 85.00 | 340.00 | | 0037 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 14 | EACH | 80.00 | 1,120.00 | 175.00 | 2,450.00 | 80.00 | 1,120.00 | 150.00 | 2,100.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 71 | EACH | 15.00 | 1,065.00 | 7.00 | 497.00 | 8.00 | 568.00 | 12.00 | 852.00 | | 0039 | 731-03-00100 | Removal of Raised Pavement Markers | 0.008 | MILE | 1.25 | 0.01 | 9,375.00 | 75.00 | 12,000.00 | 96.00 | 7,900.00 | 63.20 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.167 | MILE | 4,511.57 | 5,265.00 | 4,000.00 | 4,668.00 | 5,000.00 | 5,835.00 | 4,250.00 | 4,959.75 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.137 | MILE | 2,554.74 | 350.00 | 2,100.00 | 287.70 | 2,200.00 | 301.40 | 1,250.00 | 171.25 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.084 | MILE | 4,761.90 | 400.00 | 7,700.00 | 646.80 | 10,000.00 | 840.00 | 8,500.00 | 714.00 | | 0043 | 735-01-00100 | Mailboxes | 1 | EACH | 130.00 | 130.00 | 250.00 | 250.00 | 130.00 | 130.00 | 125.00 | 125.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 130,000.00 | 130,000.00 | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | | 0045 | 804-01-00800 | Precast Concrete Piles (36") | 3,640 | LNFT | 220.00 | 800,800.00 | 275.00 | 1,001,000.00 | 335.00 | 1,219,400.00 | 275.00 | 1,001,000.00 | | 0046 | 804-05-00800 | Precast Concrete Test Piles (36") | 1 | EACH | 70,000.00 | 70,000.00 | 85,000.00 | 85,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | | 0047 | 804-09-00800 | Static Load Test (Precast Concrete Piles (36")) | 1 | EACH | 90,000.00 | 90,000.00 | 115,000.00 | 115,000.00 | 80,000.00 | 80,000.00 | 225,000.00 | 225,000.00 | | 0048 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 1,500.00 | 10,500.00 | 2,500.00 | 17,500.00 | 400.00 | 2,800.00 | 3,500.00 | 24,500.00 | | 0049 | 805-01-00200 | Class A1 Concrete (Deck) | 491.3 | CUYD | 825.00 | 405,322.50 | 950.00 | 466,735.00 | 1,200.00 | 589,560.00 | 1,400.00 | 687,820.00 | | 0050 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 184.25 | CUYD | 1,400.00 | 257,950.00 | 1,150.00 | 211,887.50 | 1,500.00 | 276,375.00 | 1,600.00 | 294,800.00 | | 0051 | 805-08-01100 | Precast-Prestressed Concrete Girders (Type LG-25) | 790 | LNFT | 180.00 | 142,200.00 | 180.00 | 142,200.00 | 275.00 | 217,250.00 | 200.00 | 158,000.00 | | 0052 | 805-08-01200 | Precast-Prestressed Concrete Girder (Type LG-36) | 1,073 | LNFT | 200.00 | 214,600.00 | 208.00 | 223,184.00 | 325.00 | 348,725.00 | 240.00 | 257,520.00 | | 0053 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,870.5 | SQFT | 1.00 | 4,870.50 | 1.00 | 4,870.50 | 1.00 | 4,870.50 | 1.20 | 5,844.60 | | 0054 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,870.5 | SQFT | 1.00 | 4,870.50 | 1.00 | 4,870.50 | 1.10 | 5,357.55 | 1.20 | 5,844.60 | | 0055 | 806-01-00100 | Deformed Reinforcing Steel | 153,764 | LB | 1.00 | 153,764.00 | 1.40 | 215,269.60 | 1.10 | 169,140.40 | 1.30 | 199,893.20 | | 0056 | 807-01-00100 | Structural Metalwork (Grade 36) | 300 | LUMP | 7,500.00 | 7,500.00 | 6,000.00 | 6,000.00 | 20,000.00 | 20,000.00 | 4,000.00 | 4,000.00 | | 0057 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 50 | LUMP | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | | 0058 | 810-01-00100 | Concrete Bridge Railing (Standard) | 384 | LNFT | 90.00 | 34,560.00 | 80.00 | 30,720.00 | 90.00 | 34,560.00 | 140.00 | 53,760.00 | | 0059 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 432 | LNFT | 100.00 | 43,200.00 | 95.00 | 41,040.00 | 95.00 | 41,040.00 | 150.00 | 64,800.00 | | 0060 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 40.00 | 128,000.00 | 50.00 | 160,000.00 | 65.00 | 208,000.00 | 80.00 | 256,000.00 | | 0061 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 456 | SFIN | 70.00 | 31,920.00 | 90.00 | 41,040.00 | 60.00 | 27,360.00 | 70.00 | 31,920.00 | | 0062 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 80 | LNFT | 275.00 | 22,000.00 | 200.00 | 16,000.00 | 200.00 | 16,000.00 | 230.00 | 18,400.00 | | 0063 | 817-01-00200 | Temporary Detour Bridge (Steel Truss) | 10,920 | SQFT | 85.00 | 928,200.00 | 89.00 | 971,880.00 | 110.00 | 1,201,200.00 | 218.00 | 2,380,560.00 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 10.00 | 2,400.00 | 3.00 | 720.00 | 7.00 | 1,680.00 | 11.90 | 2,856.00 | | 0065 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 80 | LNFT | 10.00 | 800.00 | 8.00 | 640.00 | 1.25 | 100.00 | 11.90 | 952.00 | | 0066 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 600 | INLF | 1.00 | 600.00 | 8.00 | 4,800.00 | 1.25 | 750.00 | 6.00 | 3,600.00 | | 0067 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 8,600.00 | 17,200.00 | 10,000.00 | 20,000.00 | 12,000.00 | 24,000.00 | 12,000.00 | 24,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,953,669.06 | | 7,227,992.66 | | 7,982,612.19 | | 9,332,265.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - L & A Contracting Co. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 650,000.00 | 650,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 246 | SQYD | 7.70 | 1,894.20 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 1,258.7 | SQYD | 7.70 | 9,691.99 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,258.7 | SQYD | 22.00 | 27,691.40 | | 0006 | 202-02-04501 | Removal of Bridge STR. NO. 62530470101461 (362'-1" x 33'-6" STEEL GIRDER BRIDGE) | 1 | LUMP | 350,000.00 | 350,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 560.6 | LNFT | 6.60 | 3,699.96 | | 0008 | 203-02-00100 | Drainage Excavation | 5,392 | CUYD | 9.07 | 48,905.44 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 500,000.00 | 500,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 2,494 | LNFT | 5.50 | 13,717.00 | | 0011 | 302-02-08500 | Class II Base Course (8-1/2" Thick) | 4,298.1 | SQYD | 48.00 | 206,308.80 | | 0012 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 4,299 | SQYD | 27.50 | 118,222.50 | | 0013 | 401-01-00100 | Aggregate Surface Course (Net Section) | 137 | CUYD | 190.64 | 26,117.68 | | 0014 | 502-01-00100 | Asphalt Concrete | 1,363.8 | TON | 110.55 | 150,768.09 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 338.8 | TON | 165.83 | 56,183.20 | | 0016 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 102 | SQYD | 221.17 | 22,559.34 | | 0017 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 278.2 | LNFT | 24.20 | 6,732.44 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 104.50 | 10,450.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 2,640.00 | 2,640.00 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 2,420.00 | 7,260.00 | | 0021 | 711-03-00400 | Riprap (55 lb) | 224.6 | TON | 84.00 | 18,866.40 | | 0022 | 711-03-00700 | Riprap (440 lb) | 9,879.9 | TON | 141.60 | 1,398,993.84 | | 0023 | 711-04-00100 | Geotextile Fabric | 7,027 | SQYD | 4.20 | 29,513.40 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 56,050.00 | 56,050.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.334 | MILE | 1,650.00 | 551.10 | | 0026 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 24 | EACH | 22.00 | 528.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 3.2 | TON | 1,275.30 | 4,080.96 | | 0028 | 717-01-00100 | Seeding | 48 | LB | 24.52 | 1,176.96 | | 0029 | 718-01-00100 | Fertilizer | 1,600 | LB | 0.56 | 896.00 | | 0030 | 719-04-00100 | Landscaping | 1 | LUMP | 100,000.00 | 100,000.00 | | 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 36,000.00 | 36,000.00 | | 0032 | 725-01-00100 | Temporary Detour Roads | 4,367 | SQYD | 309.50 | 1,351,586.50 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 750,000.00 | 750,000.00 | | 0034 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 92 | SQFT | 19.80 | 1,821.60 | | 0035 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 13.6 | SQFT | 19.80 | 269.28 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 93.50 | 374.00 | | 0037 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 14 | EACH | 88.00 | 1,232.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 71 | EACH | 11.00 | 781.00 | | 0039 | 731-03-00100 | Removal of Raised Pavement Markers | 0.008 | MILE | 5,808.00 | 46.46 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.167 | MILE | 3,850.00 | 4,492.95 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.137 | MILE | 1,100.00 | 150.70 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.084 | MILE | 8,250.00 | 693.00 | | 0043 | 735-01-00100 | Mailboxes | 1 | EACH | 143.00 | 143.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 400,000.00 | 400,000.00 | | 0045 | 804-01-00800 | Precast Concrete Piles (36") | 3,640 | LNFT | 202.73 | 737,937.20 | | 0046 | 804-05-00800 | Precast Concrete Test Piles (36") | 1 | EACH | 31,250.00 | 31,250.00 | | 0047 | 804-09-00800 | Static Load Test (Precast Concrete Piles (36")) | 1 | EACH | 32,180.00 | 32,180.00 | | 0048 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 1,288.00 | 9,016.00 | | 0049 | 805-01-00200 | Class A1 Concrete (Deck) | 491.3 | CUYD | 935.18 | 459,453.93 | | 0050 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 184.25 | CUYD | 826.50 | 152,282.63 | | 0051 | 805-08-01100 | Precast-Prestressed Concrete Girders (Type LG-25) | 790 | LNFT | 248.80 | 196,552.00 | | 0052 | 805-08-01200 | Precast-Prestressed Concrete Girder (Type LG-36) | 1,073 | LNFT | 284.72 | 305,504.56 | | 0053 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,870.5 | SQFT | 1.38 | 6,721.29 | | 0054 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,870.5 | SQFT | 2.20 | 10,715.10 | | 0055 | 806-01-00100 | Deformed Reinforcing Steel | 153,764 | LB | 1.45 | 222,957.80 | | 0056 | 807-01-00100 | Structural Metalwork (Grade 36) | 300 | LUMP | 5,084.00 | 5,084.00 | | 0057 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 50 | LUMP | 4,886.00 | 4,886.00 | | 0058 | 810-01-00100 | Concrete Bridge Railing (Standard) | 384 | LNFT | 98.26 | 37,731.84 | | 0059 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 432 | LNFT | 105.30 | 45,489.60 | | 0060 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 66.72 | 213,504.00 | | 0061 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 456 | SFIN | 65.66 | 29,940.96 | | 0062 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 80 | LNFT | 228.26 | 18,260.80 | | 0063 | 817-01-00200 | Temporary Detour Bridge (Steel Truss) | 10,920 | SQFT | 275.00 | 3,003,000.00 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 27.50 | 6,600.00 | | 0065 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 80 | LNFT | 1.40 | 112.00 | | 0066 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 600 | INLF | 1.40 | 840.00 | | 0067 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 94.60 | 189.20 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,913,298.10 |
|