Proposal:H.012860.6
Parish:St. Martin
Routes:LA 31
Description:LA 31: 0.12 MI SE LA 94 - LA 336-1
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE WALKS, HANDICAPPED CURB RAMPS, DRILLED SHAFT FOUNDATIONS, SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$1,090,837.78
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,648,134.91 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,669,679.40 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,920,662.75 |
| 4 | 51821 | Elliott Construction, LLC | $1,932,960.68 |
| 5 | 33663 | Glenn Lege Construction Inc | $2,381,269.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - Diamond B Construction Co., L.L.C. | - 4 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 47,500.00 | 47,500.00 | 45,000.00 | 45,000.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,200 | LNFT | 7.50 | 9,000.00 | 25.00 | 30,000.00 | 12.00 | 14,400.00 | 8.50 | 10,200.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 344 | SQYD | 12.00 | 4,128.00 | 20.00 | 6,880.00 | 12.00 | 4,128.00 | 45.00 | 15,480.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 252 | LNFT | 7.50 | 1,890.00 | 15.00 | 3,780.00 | 12.00 | 3,024.00 | 35.00 | 8,820.00 | | 0005 | 202-02-36000 | Removal of Railroad Grade Crossing | 1 | EACH | 6,500.00 | 6,500.00 | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 | 4,500.00 | 4,500.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | 1,900.00 | 1,900.00 | 1,900.00 | 1,900.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 885 | LNFT | 3.00 | 2,655.00 | 3.00 | 2,655.00 | 3.50 | 3,097.50 | 2.00 | 1,770.00 | | 0008 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 350.00 | 8,750.00 | 105.00 | 2,625.00 | 76.00 | 1,900.00 | 50.00 | 1,250.00 | | 0009 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 60 | CUYD | 100.00 | 6,000.00 | 90.00 | 5,400.00 | 68.00 | 4,080.00 | 50.00 | 3,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 4,198.7 | TON | 97.75 | 410,422.93 | 94.69 | 397,574.90 | 98.00 | 411,472.60 | 115.00 | 482,850.50 | | 0011 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 6,843 | GAL | 3.50 | 23,950.50 | 3.40 | 23,266.20 | 2.75 | 18,818.25 | 3.00 | 20,529.00 | | 0012 | 507-02-00200 | Aggregate (S2) | 10,064 | SQYD | 1.85 | 18,618.40 | 1.80 | 18,115.20 | 2.65 | 26,669.60 | 2.65 | 26,669.60 | | 0013 | 507-02-00300 | Aggregate (S3) | 10,064 | SQYD | 1.50 | 15,096.00 | 1.80 | 18,115.20 | 2.25 | 22,644.00 | 2.50 | 25,160.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 17,720 | SQYD | 2.50 | 44,300.00 | 3.69 | 65,386.80 | 1.35 | 23,922.00 | 3.00 | 53,160.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,107 | CUYD | 15.00 | -16,605.00 | 0.01 | -11.07 | 1.00 | -1,107.00 | 0.01 | -11.07 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,346 | SQYD | 130.00 | 174,980.00 | 125.00 | 168,250.00 | 110.00 | 148,060.00 | 140.00 | 188,440.00 | | 0017 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 14,131 | LNFT | 3.40 | 48,045.40 | 2.50 | 35,327.50 | 5.50 | 77,720.50 | 3.75 | 52,991.25 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 40 | LNFT | 95.00 | 3,800.00 | 80.00 | 3,200.00 | 137.00 | 5,480.00 | 125.00 | 5,000.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 300 | LNFT | 100.00 | 30,000.00 | 170.00 | 51,000.00 | 165.00 | 49,500.00 | 270.00 | 81,000.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 455 | LNFT | 110.00 | 50,050.00 | 169.00 | 76,895.00 | 180.00 | 81,900.00 | 150.00 | 68,250.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 302 | LNFT | 130.00 | 39,260.00 | 90.00 | 27,180.00 | 183.00 | 55,266.00 | 125.00 | 37,750.00 | | 0022 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 48 | LNFT | 130.00 | 6,240.00 | 140.00 | 6,720.00 | 155.00 | 7,440.00 | 340.00 | 16,320.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,097 | LNFT | 10.00 | 10,970.00 | 30.00 | 32,910.00 | 7.00 | 7,679.00 | 13.00 | 14,261.00 | | 0024 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,750.00 | 3,750.00 | 4,100.00 | 4,100.00 | 5,500.00 | 5,500.00 | 5,300.00 | 5,300.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,750.00 | 3,750.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 3,350.00 | 3,350.00 | | 0026 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 4,500.00 | 9,000.00 | 2,750.00 | 5,500.00 | 4,750.00 | 9,500.00 | 7,000.00 | 14,000.00 | | 0027 | 702-03-00700 | Catch Basins (CB-08) | 5 | EACH | 6,500.00 | 32,500.00 | 4,069.00 | 20,345.00 | 10,000.00 | 50,000.00 | 8,250.00 | 41,250.00 | | 0028 | 702-03-00800 | Catch Basins (CB-09) | 27 | EACH | 6,500.00 | 175,500.00 | 3,000.00 | 81,000.00 | 8,250.00 | 222,750.00 | 5,575.00 | 150,525.00 | | 0029 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 15 | EACH | 150.00 | 2,250.00 | 250.00 | 3,750.00 | 525.00 | 7,875.00 | 200.00 | 3,000.00 | | 0030 | 706-01-00100 | Concrete Walk (4" Thick) | 122 | SQYD | 75.00 | 9,150.00 | 65.00 | 7,930.00 | 90.00 | 10,980.00 | 60.00 | 7,320.00 | | 0031 | 706-04-00100 | Handicapped Curb Ramps | 24 | EACH | 1,750.00 | 42,000.00 | 1,850.00 | 44,400.00 | 2,100.00 | 50,400.00 | 2,500.00 | 60,000.00 | | 0032 | 707-01-00100 | Concrete Curb | 60 | LNFT | 25.00 | 1,500.00 | 35.00 | 2,100.00 | 60.00 | 3,600.00 | 60.00 | 3,600.00 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,200 | LNFT | 35.00 | 42,000.00 | 25.00 | 30,000.00 | 65.00 | 78,000.00 | 45.00 | 54,000.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 101,000.00 | 101,000.00 | 87,000.00 | 87,000.00 | 65,000.00 | 65,000.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.339 | MILE | 150.00 | 350.85 | 450.00 | 1,052.55 | 154.00 | 360.21 | 500.00 | 1,169.50 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.55 | MILE | 500.00 | 275.00 | 500.00 | 275.00 | 515.00 | 283.25 | 575.00 | 316.25 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.423 | MILE | 650.00 | 1,574.95 | 625.00 | 1,514.38 | 630.00 | 1,526.49 | 715.00 | 1,732.45 | | 0038 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 25.00 | 50.00 | 50.00 | 100.00 | 50.00 | 100.00 | 58.00 | 116.00 | | 0039 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 25.00 | 50.00 | 45.00 | 90.00 | 45.00 | 90.00 | 52.00 | 104.00 | | 0040 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 1 | EACH | 50.00 | 50.00 | 100.00 | 100.00 | 100.00 | 100.00 | 115.00 | 115.00 | | 0041 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 412 | EACH | 1.50 | 618.00 | 2.00 | 824.00 | 2.50 | 1,030.00 | 2.85 | 1,174.20 | | 0042 | 726-01-00100 | Bedding Material | 30 | CUYD | 85.00 | 2,550.00 | 45.00 | 1,350.00 | 135.00 | 4,050.00 | 120.00 | 3,600.00 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 125,000.00 | 125,000.00 | 165,000.00 | 165,000.00 | 170,000.00 | 170,000.00 | | 0044 | 729-01-00100 | Sign (Type A) | 1.875 | SQFT | 75.00 | 140.63 | 1,325.00 | 2,484.38 | 40.00 | 75.00 | 50.00 | 93.75 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 141 | EACH | 8.00 | 1,128.00 | 8.00 | 1,128.00 | 8.55 | 1,205.55 | 9.00 | 1,269.00 | | 0046 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 273 | LNFT | 1.00 | 273.00 | 1.00 | 273.00 | 1.00 | 273.00 | 1.15 | 313.95 | | 0047 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 57 | LNFT | 2.00 | 114.00 | 3.00 | 171.00 | 3.25 | 185.25 | 3.45 | 196.65 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 61 | LNFT | 8.00 | 488.00 | 9.00 | 549.00 | 10.00 | 610.00 | 10.25 | 625.25 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.423 | MILE | 3,500.00 | 8,480.50 | 3,500.00 | 8,480.50 | 3,750.00 | 9,086.25 | 3,995.00 | 9,679.89 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.55 | MILE | 1,250.00 | 687.50 | 1,500.00 | 825.00 | 1,550.00 | 852.50 | 1,715.00 | 943.25 | | 0051 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.143 | MILE | 1,500.00 | 214.50 | 2,000.00 | 286.00 | 2,100.00 | 300.30 | 2,285.00 | 326.76 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 325.00 | 325.00 | 300.00 | 300.00 | 300.00 | 300.00 | 350.00 | 350.00 | | 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 325.00 | 325.00 | 300.00 | 300.00 | 300.00 | 300.00 | 350.00 | 350.00 | | 0054 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 57 | EACH | 350.00 | 19,950.00 | 400.00 | 22,800.00 | 400.00 | 22,800.00 | 460.00 | 26,220.00 | | 0055 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 275.00 | 550.00 | 250.00 | 500.00 | 265.00 | 530.00 | 285.00 | 570.00 | | 0056 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 550.00 | 550.00 | 570.00 | 570.00 | | 0057 | 735-01-00100 | Mailboxes | 8 | EACH | 15.00 | 120.00 | 15.00 | 120.00 | 10.00 | 80.00 | 12.00 | 96.00 | | 0058 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 150.00 | 1,200.00 | 125.00 | 1,000.00 | 255.00 | 2,040.00 | 287.00 | 2,296.00 | | 0059 | 736-01-00100 | Trenching and Backfilling | 35 | LNFT | 7.50 | 262.50 | 500.00 | 17,500.00 | 6.00 | 210.00 | 6.50 | 227.50 | | 0060 | 736-03-00100 | Jacking or Boring | 60 | LNFT | 100.00 | 6,000.00 | 200.00 | 12,000.00 | 38.00 | 2,280.00 | 38.00 | 2,280.00 | | 0061 | 736-04-00001 | Signal Pole (Pedestal Pole) | 2 | EACH | 2,500.00 | 5,000.00 | 1,543.68 | 3,087.36 | 1,750.00 | 3,500.00 | 1,775.00 | 3,550.00 | | 0062 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 1 | EACH | 17,500.00 | 17,500.00 | 17,500.00 | 17,500.00 | 18,500.00 | 18,500.00 | 20,250.00 | 20,250.00 | | 0063 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 8 | EACH | 1,000.00 | 8,000.00 | 1,300.00 | 10,400.00 | 1,225.00 | 9,800.00 | 1,180.00 | 9,440.00 | | 0064 | 736-06-00100 | Signal Service | 1 | EACH | 2,000.00 | 2,000.00 | 1,865.00 | 1,865.00 | 2,800.00 | 2,800.00 | 2,800.00 | 2,800.00 | | 0065 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 6,500.00 | 6,500.00 | 6,900.00 | 6,900.00 | 9,750.00 | 9,750.00 | 9,500.00 | 9,500.00 | | 0066 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 650.00 | 1,950.00 | 900.00 | 2,700.00 | 625.00 | 1,875.00 | 615.00 | 1,845.00 | | 0067 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 20 | LNFT | 2.50 | 50.00 | 5.00 | 100.00 | 5.50 | 110.00 | 5.50 | 110.00 | | 0068 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 130 | LNFT | 4.50 | 585.00 | 8.40 | 1,092.00 | 6.75 | 877.50 | 6.50 | 845.00 | | 0069 | 736-12-02014 | Conductor (2c, #14 awg) | 145 | LNFT | 2.00 | 290.00 | 5.50 | 797.50 | 7.15 | 1,036.75 | 7.00 | 1,015.00 | | 0070 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 35 | LNFT | 3.75 | 131.25 | 5.00 | 175.00 | 7.75 | 271.25 | 7.50 | 262.50 | | 0071 | 736-12-06014 | Conductor (6c, #14 awg) | 570 | LNFT | 2.50 | 1,425.00 | 3.50 | 1,995.00 | 7.50 | 4,275.00 | 7.50 | 4,275.00 | | 0072 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 2 | EACH | 2,500.00 | 5,000.00 | 1,570.00 | 3,140.00 | 455.00 | 910.00 | 455.00 | 910.00 | | 0073 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 1 | EACH | 4,500.00 | 4,500.00 | 7,708.00 | 7,708.00 | 5,100.00 | 5,100.00 | 4,925.00 | 4,925.00 | | 0074 | 736-17-00000 | Video Detection Cabinet Components | 1 | EACH | 9,500.00 | 9,500.00 | 8,950.00 | 8,950.00 | 12,000.00 | 12,000.00 | 10,700.00 | 10,700.00 | | 0075 | 736-18-00000 | Video Detection Camera | 2 | EACH | 2,500.00 | 5,000.00 | 1,826.00 | 3,652.00 | 2,200.00 | 4,400.00 | 2,150.00 | 4,300.00 | | 0076 | 736-19-00000 | Video Camera Cable | 110 | LNFT | 3.50 | 385.00 | 10.00 | 1,100.00 | 13.00 | 1,430.00 | 13.25 | 1,457.50 | | 0077 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 1,000.00 | 2,000.00 | 1,450.00 | 2,900.00 | 1,100.00 | 2,200.00 | 1,075.00 | 2,150.00 | | 0078 | 736-22-00000 | Pedestrian Push Button | 2 | EACH | 250.00 | 500.00 | 350.00 | 700.00 | 135.00 | 270.00 | 135.00 | 270.00 | | 0079 | 739-01-00100 | Hydro-Seeding | 0.07 | ACRE | 25,000.00 | 1,750.00 | 25,000.00 | 1,750.00 | 22,000.00 | 1,540.00 | 29,000.00 | 2,030.00 | | 0080 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0081 | 741-11-00200 | Adjusting Water Valve and Meter Box | 19 | EACH | 750.00 | 14,250.00 | 250.00 | 4,750.00 | 275.00 | 5,225.00 | 275.00 | 5,225.00 | | 0082 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 14,400 | INLF | 1.35 | 19,440.00 | 1.50 | 21,600.00 | 1.00 | 14,400.00 | 1.45 | 20,880.00 | | 0083 | NS-736-00001 | GPS | 1 | EACH | 1,150.00 | 1,150.00 | 1,400.00 | 1,400.00 | 1,575.00 | 1,575.00 | 1,550.00 | 1,550.00 | | 0084 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 17,500.00 | 17,500.00 | 18,500.00 | 18,500.00 | 19,000.00 | 19,000.00 | 18,300.00 | 18,300.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,648,134.91 | | 1,669,679.40 | | 1,920,662.75 | | 1,932,960.68 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Glenn Lege Construction Inc | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 48,000.00 | 48,000.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,200 | LNFT | 10.05 | 12,060.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 344 | SQYD | 35.10 | 12,074.40 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 252 | LNFT | 23.85 | 6,010.20 | | 0005 | 202-02-36000 | Removal of Railroad Grade Crossing | 1 | EACH | 6,000.00 | 6,000.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 2,475.00 | 2,475.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 885 | LNFT | 4.50 | 3,982.50 | | 0008 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 225.75 | 5,643.75 | | 0009 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 60 | CUYD | 210.15 | 12,609.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 4,198.7 | TON | 170.93 | 717,683.79 | | 0011 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 6,843 | GAL | 4.05 | 27,714.15 | | 0012 | 507-02-00200 | Aggregate (S2) | 10,064 | SQYD | 3.45 | 34,720.80 | | 0013 | 507-02-00300 | Aggregate (S3) | 10,064 | SQYD | 3.11 | 31,299.04 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 17,720 | SQYD | 4.65 | 82,398.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,107 | CUYD | 1.50 | -1,660.50 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,346 | SQYD | 183.23 | 246,627.58 | | 0017 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 14,131 | LNFT | 5.55 | 78,427.05 | | 0018 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 40 | LNFT | 250.13 | 10,005.20 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 300 | LNFT | 189.53 | 56,859.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 455 | LNFT | 240.45 | 109,404.75 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 302 | LNFT | 261.90 | 79,093.80 | | 0022 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 48 | LNFT | 310.05 | 14,882.40 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,097 | LNFT | 15.00 | 16,455.00 | | 0024 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,625.00 | 5,625.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,875.00 | 4,875.00 | | 0026 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 9,375.00 | 18,750.00 | | 0027 | 702-03-00700 | Catch Basins (CB-08) | 5 | EACH | 11,100.00 | 55,500.00 | | 0028 | 702-03-00800 | Catch Basins (CB-09) | 27 | EACH | 6,300.00 | 170,100.00 | | 0029 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 15 | EACH | 1,275.00 | 19,125.00 | | 0030 | 706-01-00100 | Concrete Walk (4" Thick) | 122 | SQYD | 81.45 | 9,936.90 | | 0031 | 706-04-00100 | Handicapped Curb Ramps | 24 | EACH | 2,377.50 | 57,060.00 | | 0032 | 707-01-00100 | Concrete Curb | 60 | LNFT | 59.48 | 3,568.80 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,200 | LNFT | 44.25 | 53,100.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 11,250.00 | 11,250.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.339 | MILE | 750.00 | 1,754.25 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.55 | MILE | 750.00 | 412.50 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.423 | MILE | 937.50 | 2,271.56 | | 0038 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 75.00 | 150.00 | | 0039 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 67.50 | 135.00 | | 0040 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 1 | EACH | 150.00 | 150.00 | | 0041 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 412 | EACH | 4.50 | 1,854.00 | | 0042 | 726-01-00100 | Bedding Material | 30 | CUYD | 120.00 | 3,600.00 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 73,612.50 | 73,612.50 | | 0044 | 729-01-00100 | Sign (Type A) | 1.875 | SQFT | 75.00 | 140.63 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 141 | EACH | 12.00 | 1,692.00 | | 0046 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 273 | LNFT | 1.50 | 409.50 | | 0047 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 57 | LNFT | 4.50 | 256.50 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 61 | LNFT | 13.50 | 823.50 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.423 | MILE | 5,250.00 | 12,720.75 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.55 | MILE | 2,250.00 | 1,237.50 | | 0051 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.143 | MILE | 3,000.00 | 429.00 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 450.00 | 450.00 | | 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 450.00 | 450.00 | | 0054 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 57 | EACH | 600.00 | 34,200.00 | | 0055 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 375.00 | 750.00 | | 0056 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 750.00 | 750.00 | | 0057 | 735-01-00100 | Mailboxes | 8 | EACH | 75.00 | 600.00 | | 0058 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 300.00 | 2,400.00 | | 0059 | 736-01-00100 | Trenching and Backfilling | 35 | LNFT | 8.25 | 288.75 | | 0060 | 736-03-00100 | Jacking or Boring | 60 | LNFT | 49.50 | 2,970.00 | | 0061 | 736-04-00001 | Signal Pole (Pedestal Pole) | 2 | EACH | 2,325.00 | 4,650.00 | | 0062 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 1 | EACH | 26,547.00 | 26,547.00 | | 0063 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 8 | EACH | 1,543.76 | 12,350.08 | | 0064 | 736-06-00100 | Signal Service | 1 | EACH | 3,675.00 | 3,675.00 | | 0065 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 12,474.00 | 12,474.00 | | 0066 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 803.75 | 2,411.25 | | 0067 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 20 | LNFT | 7.13 | 142.60 | | 0068 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 130 | LNFT | 8.52 | 1,107.60 | | 0069 | 736-12-02014 | Conductor (2c, #14 awg) | 145 | LNFT | 9.15 | 1,326.75 | | 0070 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 35 | LNFT | 9.86 | 345.10 | | 0071 | 736-12-06014 | Conductor (6c, #14 awg) | 570 | LNFT | 9.56 | 5,449.20 | | 0072 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 2 | EACH | 594.00 | 1,188.00 | | 0073 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 1 | EACH | 6,450.00 | 6,450.00 | | 0074 | 736-17-00000 | Video Detection Cabinet Components | 1 | EACH | 14,047.50 | 14,047.50 | | 0075 | 736-18-00000 | Video Detection Camera | 2 | EACH | 2,824.50 | 5,649.00 | | 0076 | 736-19-00000 | Video Camera Cable | 110 | LNFT | 17.34 | 1,907.40 | | 0077 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 1,403.75 | 2,807.50 | | 0078 | 736-22-00000 | Pedestrian Push Button | 2 | EACH | 177.75 | 355.50 | | 0079 | 739-01-00100 | Hydro-Seeding | 0.07 | ACRE | 15,000.00 | 1,050.00 | | 0080 | 740-01-00100 | Construction Layout | 1 | LUMP | 24,225.00 | 24,225.00 | | 0081 | 741-11-00200 | Adjusting Water Valve and Meter Box | 19 | EACH | 1,500.00 | 28,500.00 | | 0082 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 14,400 | INLF | 2.25 | 32,400.00 | | 0083 | NS-736-00001 | GPS | 1 | EACH | 2,012.51 | 2,012.51 | | 0084 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 24,034.50 | 24,034.50 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,381,269.04 |
|