Proposal:H.011773.6
Parish:East Baton Rouge
Description:HANKS DR/LANDIS DR PED IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, CONCRETE WALKS AND DRIVES, DRAINAGE STRUCTURES, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$747,953.50
| Rank | License | Bidder | Construction Bid |
| 1 | 05693 | Industrial Enterprises, Inc. | $505,616.91 |
| 2 | 34263 | La Contracting Enterprise LLC | $549,965.60 |
| 3 | 38466 | Gulf States Contractors LLC | $565,667.10 |
| 4 | 48896 | Command Construction Industries LLC | $574,707.50 |
| 5 | 28190 | Bucktown Contractors & Co. | $623,100.00 |
| 6 | 57931 | KCR CONTRACTORS, LLC | $651,232.74 |
| 7 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $669,392.60 |
| 8 | 42486 | Covenant General Contractors, Inc. | $714,687.00 |
| 9 | 63897 | TL Hawk, LLC | $716,561.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Industrial Enterprises, Inc. | - 2 - La Contracting Enterprise LLC | - 3 - Gulf States Contractors LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.75 | LUMP | 4,600.00 | 4,600.00 | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 172.50 | 1,380.00 | 1,000.00 | 8,000.00 | 500.00 | 4,000.00 | 500.00 | 4,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 408 | SQYD | 17.25 | 7,038.00 | 19.00 | 7,752.00 | 15.00 | 6,120.00 | 10.00 | 4,080.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (As Shown in the Plans) | 1,128 | LNFT | 6.90 | 7,783.20 | 13.00 | 14,664.00 | 15.00 | 16,920.00 | 10.00 | 11,280.00 | | 0005 | 202-02-38240 | Removal of Signs and Supports | 1 | EACH | 28.75 | 28.75 | 30.00 | 30.00 | 5.00 | 5.00 | 25.00 | 25.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 28.75 | 86.25 | 30.00 | 90.00 | 5.00 | 15.00 | 25.00 | 75.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,750.00 | 5,750.00 | 21,000.00 | 21,000.00 | 15,000.00 | 15,000.00 | 1,000.00 | 1,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 350 | EACH | 13.80 | 4,830.00 | 20.00 | 7,000.00 | 1.00 | 350.00 | 1.00 | 350.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,556 | LNFT | 1.73 | 4,421.88 | 1.85 | 4,728.60 | 0.25 | 639.00 | 5.00 | 12,780.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 337 | CUYD | 57.50 | 19,377.50 | 88.00 | 29,656.00 | 50.00 | 16,850.00 | 1.00 | 337.00 | | 0011 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 16 | SQYD | 207.00 | 3,312.00 | 350.00 | 5,600.00 | 225.00 | 3,600.00 | 200.00 | 3,200.00 | | 0012 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,036 | LNFT | 52.20 | 54,079.20 | 43.00 | 44,548.00 | 58.00 | 60,088.00 | 75.00 | 77,700.00 | | 0013 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 446 | LNFT | 64.57 | 28,798.22 | 54.00 | 24,084.00 | 80.00 | 35,680.00 | 100.00 | 44,600.00 | | 0014 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 324 | LNFT | 77.80 | 25,207.20 | 70.00 | 22,680.00 | 80.00 | 25,920.00 | 125.00 | 40,500.00 | | 0015 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 290 | LNFT | 94.55 | 27,419.50 | 87.00 | 25,230.00 | 95.00 | 27,550.00 | 150.00 | 43,500.00 | | 0016 | 701-07-00500 | Yard Drain Pipe (12") | 18 | LNFT | 90.76 | 1,633.68 | 43.00 | 774.00 | 100.00 | 1,800.00 | 50.00 | 900.00 | | 0017 | 701-14-00100 | Cleaning Existing Pipes | 87 | LNFT | 6.90 | 600.30 | 40.00 | 3,480.00 | 5.00 | 435.00 | 10.00 | 870.00 | | 0018 | 701-15-00100 | Concrete Collar | 1 | EACH | 460.00 | 460.00 | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 41 | EACH | 2,001.00 | 82,041.00 | 2,350.00 | 96,350.00 | 3,000.00 | 123,000.00 | 2,250.00 | 92,250.00 | | 0020 | 702-03-00200 | Catch Basins (CB-02) | 6 | EACH | 2,714.00 | 16,284.00 | 4,000.00 | 24,000.00 | 3,850.00 | 23,100.00 | 3,000.00 | 18,000.00 | | 0021 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 1,345.50 | 1,345.50 | 3,500.00 | 3,500.00 | 2,650.00 | 2,650.00 | 3,000.00 | 3,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 1,194.2 | SQYD | 51.75 | 61,799.85 | 46.00 | 54,933.20 | 55.00 | 65,681.00 | 50.00 | 59,710.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 673.5 | SQYD | 86.25 | 58,089.38 | 52.00 | 35,022.00 | 60.00 | 40,410.00 | 55.00 | 37,042.50 | | 0024 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 45 | SQYD | 86.25 | 3,881.25 | 48.00 | 2,160.00 | 100.00 | 4,500.00 | 50.00 | 2,250.00 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 690.00 | 2,760.00 | 750.00 | 3,000.00 | 1,500.00 | 6,000.00 | 1,000.00 | 4,000.00 | | 0026 | 710-01-00100 | Flowable Fill | 13 | CUYD | 155.25 | 2,018.25 | 215.00 | 2,795.00 | 200.00 | 2,600.00 | 200.00 | 2,600.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 11,500.00 | 11,500.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 | | 0028 | 726-01-00100 | Bedding Material | 223.1 | CUYD | 69.00 | 15,393.90 | 100.00 | 22,310.00 | 1.00 | 223.10 | 100.00 | 22,310.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 4,600.00 | 4,600.00 | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 19.2 | SQFT | 34.50 | 662.40 | 36.00 | 691.20 | 30.00 | 576.00 | 25.00 | 480.00 | | 0031 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 3 | EACH | 143.75 | 431.25 | 150.00 | 450.00 | 125.00 | 375.00 | 115.00 | 345.00 | | 0032 | 735-01-00100 | Mailboxes | 29 | EACH | 9.20 | 266.80 | 10.00 | 290.00 | 8.00 | 232.00 | 15.00 | 435.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 207.00 | 3,933.00 | 220.00 | 4,180.00 | 180.00 | 3,420.00 | 140.00 | 2,660.00 | | 0034 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 258.75 | 1,293.75 | 275.00 | 1,375.00 | 225.00 | 1,125.00 | 175.00 | 875.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 3,450.00 | 1,552.50 | 5,500.00 | 2,475.00 | 4,500.00 | 2,025.00 | 2,500.00 | 1,125.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,800.00 | 13,800.00 | 11,000.00 | 11,000.00 | 5,500.00 | 5,500.00 | 1,000.00 | 1,000.00 | | 0037 | 741-11-00200 | Adjusting Water Valve and Meter Box | 8 | EACH | 86.25 | 690.00 | 475.00 | 3,800.00 | 100.00 | 800.00 | 100.00 | 800.00 | | 0038 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 4 | EACH | 1,725.00 | 6,900.00 | 720.00 | 2,880.00 | 100.00 | 400.00 | 1,000.00 | 4,000.00 | | 0039 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 3 | EACH | 1,150.00 | 3,450.00 | 1,500.00 | 4,500.00 | 550.00 | 1,650.00 | 500.00 | 1,500.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 60 | INLF | 0.92 | 55.20 | 1.20 | 72.00 | 1.00 | 60.00 | 1.00 | 60.00 | | 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 5,068 | INLF | 1.15 | 5,828.20 | 1.70 | 8,615.60 | 1.00 | 5,068.00 | 1.00 | 5,068.00 | | 0042 | NS-MSC-00120 | Drainage Structure (Weir Inlet) | 2 | EACH | 3,737.50 | 7,475.00 | 3,800.00 | 7,600.00 | 2,000.00 | 4,000.00 | 3,000.00 | 6,000.00 | | 0043 | TS-700-00100 | Trench Drains (STA. NOS. 108+25.18 and 124+95.16) | 2 | EACH | 1,380.00 | 2,760.00 | 825.00 | 1,650.00 | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 505,616.91 | | 549,965.60 | | 565,667.10 | | 574,707.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Bucktown Contractors & Co. | - 6 - KCR CONTRACTORS, LLC | - 7 - KORT's CONSTRUCTION SERVICES, INC. | - 8 - Covenant General Contractors, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.75 | LUMP | 7,805.00 | 7,805.00 | 4,025.00 | 4,025.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 750.00 | 6,000.00 | 460.00 | 3,680.00 | 400.00 | 3,200.00 | 700.00 | 5,600.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 408 | SQYD | 9.00 | 3,672.00 | 4.60 | 1,876.80 | 15.00 | 6,120.00 | 25.00 | 10,200.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (As Shown in the Plans) | 1,128 | LNFT | 20.00 | 22,560.00 | 10.93 | 12,329.04 | 10.00 | 11,280.00 | 10.00 | 11,280.00 | | 0005 | 202-02-38240 | Removal of Signs and Supports | 1 | EACH | 25.00 | 25.00 | 172.50 | 172.50 | 30.00 | 30.00 | 200.00 | 200.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 25.00 | 75.00 | 40.25 | 120.75 | 30.00 | 90.00 | 350.00 | 1,050.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 9,500.00 | 9,500.00 | 22,425.00 | 22,425.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 350 | EACH | 15.00 | 5,250.00 | 17.72 | 6,202.00 | 16.00 | 5,600.00 | 15.00 | 5,250.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,556 | LNFT | 2.00 | 5,112.00 | 1.75 | 4,473.00 | 1.75 | 4,473.00 | 5.00 | 12,780.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 337 | CUYD | 75.00 | 25,275.00 | 143.75 | 48,443.75 | 85.00 | 28,645.00 | 80.00 | 26,960.00 | | 0011 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 16 | SQYD | 350.00 | 5,600.00 | 373.75 | 5,980.00 | 140.00 | 2,240.00 | 100.00 | 1,600.00 | | 0012 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,036 | LNFT | 63.00 | 65,268.00 | 61.29 | 63,496.44 | 75.00 | 77,700.00 | 80.00 | 82,880.00 | | 0013 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 446 | LNFT | 66.00 | 29,436.00 | 70.35 | 31,376.10 | 83.00 | 37,018.00 | 100.00 | 44,600.00 | | 0014 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 324 | LNFT | 89.00 | 28,836.00 | 78.40 | 25,401.60 | 98.00 | 31,752.00 | 120.00 | 38,880.00 | | 0015 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 290 | LNFT | 105.00 | 30,450.00 | 118.47 | 34,356.30 | 112.00 | 32,480.00 | 150.00 | 43,500.00 | | 0016 | 701-07-00500 | Yard Drain Pipe (12") | 18 | LNFT | 40.00 | 720.00 | 23.00 | 414.00 | 20.00 | 360.00 | 40.00 | 720.00 | | 0017 | 701-14-00100 | Cleaning Existing Pipes | 87 | LNFT | 25.00 | 2,175.00 | 23.00 | 2,001.00 | 35.00 | 3,045.00 | 30.00 | 2,610.00 | | 0018 | 701-15-00100 | Concrete Collar | 1 | EACH | 735.00 | 735.00 | 575.00 | 575.00 | 2,500.00 | 2,500.00 | 850.00 | 850.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 41 | EACH | 2,800.00 | 114,800.00 | 2,430.15 | 99,636.15 | 2,800.00 | 114,800.00 | 2,500.00 | 102,500.00 | | 0020 | 702-03-00200 | Catch Basins (CB-02) | 6 | EACH | 3,330.00 | 19,980.00 | 3,376.40 | 20,258.40 | 3,600.00 | 21,600.00 | 4,200.00 | 25,200.00 | | 0021 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 1,300.00 | 1,300.00 | 2,012.50 | 2,012.50 | 1,900.00 | 1,900.00 | 2,500.00 | 2,500.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 1,194.2 | SQYD | 55.00 | 65,681.00 | 53.54 | 63,937.47 | 55.00 | 65,681.00 | 55.00 | 65,681.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 673.5 | SQYD | 87.00 | 58,594.50 | 62.94 | 42,390.09 | 65.00 | 43,777.50 | 70.00 | 47,145.00 | | 0024 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 45 | SQYD | 75.00 | 3,375.00 | 63.25 | 2,846.25 | 65.00 | 2,925.00 | 55.00 | 2,475.00 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 1,350.00 | 5,400.00 | 1,380.00 | 5,520.00 | 2,100.00 | 8,400.00 | 1,500.00 | 6,000.00 | | 0026 | 710-01-00100 | Flowable Fill | 13 | CUYD | 250.00 | 3,250.00 | 218.50 | 2,840.50 | 160.00 | 2,080.00 | 200.00 | 2,600.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,500.00 | 14,500.00 | 8,625.00 | 8,625.00 | 31,000.00 | 31,000.00 | 5,500.00 | 5,500.00 | | 0028 | 726-01-00100 | Bedding Material | 223.1 | CUYD | 75.00 | 16,732.50 | 80.50 | 17,959.55 | 65.00 | 14,501.50 | 80.00 | 17,848.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 20,500.00 | 20,500.00 | 55,250.00 | 55,250.00 | 15,000.00 | 15,000.00 | 33,997.00 | 33,997.00 | | 0030 | 729-01-00100 | Sign (Type A) | 19.2 | SQFT | 30.00 | 576.00 | 25.88 | 496.90 | 38.00 | 729.60 | 30.00 | 576.00 | | 0031 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 3 | EACH | 130.00 | 390.00 | 126.50 | 379.50 | 160.00 | 480.00 | 375.00 | 1,125.00 | | 0032 | 735-01-00100 | Mailboxes | 29 | EACH | 15.00 | 435.00 | 17.25 | 500.25 | 10.00 | 290.00 | 25.00 | 725.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 150.00 | 2,850.00 | 132.25 | 2,512.75 | 230.00 | 4,370.00 | 230.00 | 4,370.00 | | 0034 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 200.00 | 1,000.00 | 247.25 | 1,236.25 | 290.00 | 1,450.00 | 300.00 | 1,500.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 5,000.00 | 2,250.00 | 5,175.00 | 2,328.75 | 5,700.00 | 2,565.00 | 2,500.00 | 1,125.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,000.00 | 13,000.00 | 5,462.35 | 5,462.35 | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | | 0037 | 741-11-00200 | Adjusting Water Valve and Meter Box | 8 | EACH | 400.00 | 3,200.00 | 575.00 | 4,600.00 | 450.00 | 3,600.00 | 650.00 | 5,200.00 | | 0038 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 4 | EACH | 500.00 | 2,000.00 | 5,750.00 | 23,000.00 | 450.00 | 1,800.00 | 1,000.00 | 4,000.00 | | 0039 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 3 | EACH | 1,700.00 | 5,100.00 | 1,380.00 | 4,140.00 | 2,700.00 | 8,100.00 | 3,500.00 | 10,500.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 60 | INLF | 1.50 | 90.00 | 0.81 | 48.60 | 1.25 | 75.00 | 7.00 | 420.00 | | 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 5,068 | INLF | 1.50 | 7,602.00 | 1.15 | 5,828.20 | 1.25 | 6,335.00 | 5.00 | 25,340.00 | | 0042 | NS-MSC-00120 | Drainage Structure (Weir Inlet) | 2 | EACH | 4,200.00 | 8,400.00 | 3,162.50 | 6,325.00 | 6,000.00 | 12,000.00 | 4,500.00 | 9,000.00 | | 0043 | TS-700-00100 | Trench Drains (STA. NOS. 108+25.18 and 124+95.16) | 2 | EACH | 1,800.00 | 3,600.00 | 2,875.00 | 5,750.00 | 2,700.00 | 5,400.00 | 200.00 | 400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 623,100.00 | | 651,232.74 | | 669,392.60 | | 714,687.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - TL Hawk, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.75 | LUMP | 25,000.00 | 25,000.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 400.00 | 3,200.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 408 | SQYD | 25.00 | 10,200.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (As Shown in the Plans) | 1,128 | LNFT | 20.00 | 22,560.00 | | 0005 | 202-02-38240 | Removal of Signs and Supports | 1 | EACH | 100.00 | 100.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 25.00 | 75.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 350 | EACH | 19.00 | 6,650.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,556 | LNFT | 2.50 | 6,390.00 | | 0010 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 337 | CUYD | 100.00 | 33,700.00 | | 0011 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 16 | SQYD | 200.00 | 3,200.00 | | 0012 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,036 | LNFT | 45.00 | 46,620.00 | | 0013 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 446 | LNFT | 75.00 | 33,450.00 | | 0014 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 324 | LNFT | 85.00 | 27,540.00 | | 0015 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 290 | LNFT | 110.00 | 31,900.00 | | 0016 | 701-07-00500 | Yard Drain Pipe (12") | 18 | LNFT | 30.00 | 540.00 | | 0017 | 701-14-00100 | Cleaning Existing Pipes | 87 | LNFT | 20.00 | 1,740.00 | | 0018 | 701-15-00100 | Concrete Collar | 1 | EACH | 500.00 | 500.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 41 | EACH | 3,000.00 | 123,000.00 | | 0020 | 702-03-00200 | Catch Basins (CB-02) | 6 | EACH | 5,500.00 | 33,000.00 | | 0021 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 2,000.00 | 2,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 1,194.2 | SQYD | 58.00 | 69,263.60 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 673.5 | SQYD | 62.00 | 41,757.00 | | 0024 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 45 | SQYD | 55.00 | 2,475.00 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 1,000.00 | 4,000.00 | | 0026 | 710-01-00100 | Flowable Fill | 13 | CUYD | 300.00 | 3,900.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | | 0028 | 726-01-00100 | Bedding Material | 223.1 | CUYD | 115.00 | 25,656.50 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 70,300.00 | 70,300.00 | | 0030 | 729-01-00100 | Sign (Type A) | 19.2 | SQFT | 25.00 | 480.00 | | 0031 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 3 | EACH | 115.00 | 345.00 | | 0032 | 735-01-00100 | Mailboxes | 29 | EACH | 15.00 | 435.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 140.00 | 2,660.00 | | 0034 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 175.00 | 875.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 4,500.00 | 2,025.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | | 0037 | 741-11-00200 | Adjusting Water Valve and Meter Box | 8 | EACH | 500.00 | 4,000.00 | | 0038 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 4 | EACH | 800.00 | 3,200.00 | | 0039 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 3 | EACH | 500.00 | 1,500.00 | | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 60 | INLF | 7.00 | 420.00 | | 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 5,068 | INLF | 3.00 | 15,204.00 | | 0042 | NS-MSC-00120 | Drainage Structure (Weir Inlet) | 2 | EACH | 7,500.00 | 15,000.00 | | 0043 | TS-700-00100 | Trench Drains (STA. NOS. 108+25.18 and 124+95.16) | 2 | EACH | 850.00 | 1,700.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 716,561.10 |
|