Proposal:H.011582.6
Parish:Vermilion
Routes:LA 92
Description:LA 92: N JCT LA 700 – LA 343
Type Construction:CLEARING AND GRUBBING, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, ROOT BARRIER, MILLING ASPHALT PAVEMENT, ASPHALT SURFACE TREATMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,044,141.46
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $3,735,806.22 |
| 2 | 33663 | Glenn Lege Construction Inc | $3,736,721.35 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $3,844,346.81 |
| 4 | 00481 | COASTAL BRIDGE CO., L.L.C. | $4,567,808.52 |
| 5 | 51821 | Elliott Construction, LLC | $4,863,063.07 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction Inc | - 3 - Diamond B Construction Co., L.L.C. | - 4 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.5 | LUMP | 10,710.00 | 10,710.00 | 15,830.00 | 15,830.00 | 5,400.00 | 5,400.00 | 18,000.00 | 18,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 333 | SQYD | 25.50 | 8,491.50 | 20.00 | 6,660.00 | 12.00 | 3,996.00 | 55.00 | 18,315.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 784 | LNFT | 13.80 | 10,819.20 | 8.90 | 6,977.60 | 14.00 | 10,976.00 | 16.00 | 12,544.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,200 | CUYD | 24.50 | 29,400.00 | 13.00 | 15,600.00 | 1.00 | 1,200.00 | 15.00 | 18,000.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 56 | EACH | 127.50 | 7,140.00 | 190.00 | 10,640.00 | 56.00 | 3,136.00 | 50.00 | 2,800.00 | | 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 79,014 | SQYD | 6.90 | 545,196.60 | 5.85 | 462,231.90 | 6.00 | 474,084.00 | 5.00 | 395,070.00 | | 0007 | 303-02-00100 | Removal of Existing Patches | 570 | SQYD | 10.20 | 5,814.00 | 1.50 | 855.00 | 1.00 | 570.00 | 1.00 | 570.00 | | 0008 | 304-01-00100 | Lime | 102.9 | TON | 270.30 | 27,813.87 | 225.00 | 23,152.50 | 190.00 | 19,551.00 | 225.00 | 23,152.50 | | 0009 | 304-05-00100 | Lime Treatment (Type E) | 7,840.5 | SQYD | 4.10 | 32,146.05 | 3.72 | 29,166.66 | 1.15 | 9,016.58 | 0.25 | 1,960.13 | | 0010 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 63,060 | SQYD | 4.10 | 258,546.00 | 7.00 | 441,420.00 | 8.00 | 504,480.00 | 14.00 | 882,840.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,297 | CUYD | 22.00 | 72,534.00 | 20.30 | 66,929.10 | 45.00 | 148,365.00 | 90.00 | 296,730.00 | | 0012 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 400 | SQYD | 83.00 | 33,200.00 | 35.30 | 14,120.00 | 154.00 | 61,600.00 | 30.00 | 12,000.00 | | 0013 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 140 | CUYD | 200.00 | 28,000.00 | 35.50 | 4,970.00 | 43.00 | 6,020.00 | 145.00 | 20,300.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 21,165.9 | TON | 97.00 | 2,053,092.30 | 71.75 | 1,518,653.33 | 79.00 | 1,672,106.10 | 75.00 | 1,587,442.50 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 827.9 | TON | 135.00 | 111,766.50 | 94.00 | 77,822.60 | 110.00 | 91,069.00 | 125.00 | 103,487.50 | | 0016 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 51,147 | GAL | 2.87 | 146,791.89 | 3.12 | 159,578.64 | 2.84 | 145,257.48 | 2.85 | 145,768.95 | | 0017 | 507-02-00200 | Aggregate (S2) | 75,217 | SQYD | 1.15 | 86,499.55 | 1.24 | 93,269.08 | 1.15 | 86,499.55 | 1.15 | 86,499.55 | | 0018 | 507-02-00300 | Aggregate (S3) | 75,217 | SQYD | 0.95 | 71,456.15 | 1.03 | 77,473.51 | 0.95 | 71,456.15 | 0.95 | 71,456.15 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 72,050 | SQYD | 5.07 | 365,293.50 | 1.50 | 108,075.00 | 2.85 | 205,342.50 | 3.00 | 216,150.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,004 | CUYD | 100.00 | -700,400.00 | 0.10 | -700.40 | 1.00 | -7,004.00 | 0.01 | -70.04 | | 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 116 | SQYD | 120.00 | 13,920.00 | 93.00 | 10,788.00 | 136.00 | 15,776.00 | 130.00 | 15,080.00 | | 0022 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 24 | LNFT | 280.50 | 6,732.00 | 125.00 | 3,000.00 | 165.00 | 3,960.00 | 165.00 | 3,960.00 | | 0023 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,020.00 | 3,060.00 | 315.00 | 945.00 | 1,500.00 | 4,500.00 | 1,200.00 | 3,600.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 325.2 | LNFT | 46.00 | 14,959.20 | 50.00 | 16,260.00 | 46.00 | 14,959.20 | 40.50 | 13,170.60 | | 0025 | 704-03-00100 | Blocked Out Guard rail | 169 | LNFT | 24.00 | 4,056.00 | 26.65 | 4,503.85 | 41.00 | 6,929.00 | 23.25 | 3,929.25 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 76.50 | 15,300.00 | 111.00 | 22,200.00 | 102.00 | 20,400.00 | 75.50 | 15,100.00 | | 0027 | 704-10-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 2,705.00 | 18,935.00 | 2,665.00 | 18,655.00 | 2,450.00 | 17,150.00 | 2,725.00 | 19,075.00 | | 0028 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 1 | EACH | 2,550.00 | 2,550.00 | 2,165.00 | 2,165.00 | 2,000.00 | 2,000.00 | 2,665.00 | 2,665.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,000.00 | 22,000.00 | 55,400.52 | 55,400.52 | 31,100.00 | 31,100.00 | 125,000.00 | 125,000.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.172 | MILE | 510.00 | 7,737.72 | 250.00 | 3,793.00 | 154.00 | 2,336.49 | 250.00 | 3,793.00 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.045 | MILE | 5,000.00 | 25,225.00 | 222.00 | 1,119.99 | 200.00 | 1,009.00 | 500.00 | 2,522.50 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.456 | MILE | 5,000.00 | 2,280.00 | 389.00 | 177.38 | 350.00 | 159.60 | 650.00 | 296.40 | | 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,672 | EACH | 2.05 | 5,477.60 | 2.25 | 6,012.00 | 2.00 | 5,344.00 | 2.00 | 5,344.00 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 6,120.00 | 6,120.00 | 10,090.00 | 10,090.00 | 3,750.00 | 3,750.00 | 10,000.00 | 10,000.00 | | 0035 | 724-01-00100 | Rumble Strips (Centerline) | 5.01 | MILE | 1,530.00 | 7,665.30 | 300.00 | 1,503.00 | 695.00 | 3,481.95 | 650.00 | 3,256.50 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.02 | MILE | 1,530.00 | 15,330.60 | 300.00 | 3,006.00 | 695.00 | 6,963.90 | 650.00 | 6,513.00 | | 0037 | 724-03-00100 | Rumble Strips (Intersection) | 2 | EACH | 3,060.00 | 6,120.00 | 1,555.00 | 3,110.00 | 2,200.00 | 4,400.00 | 450.00 | 900.00 | | 0038 | 726-01-00100 | Bedding Material | 2.7 | CUYD | 357.00 | 963.90 | 67.00 | 180.90 | 230.00 | 621.00 | 90.00 | 243.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 230,000.00 | 230,000.00 | 331,100.00 | 331,100.00 | 95,000.00 | 95,000.00 | 330,000.00 | 330,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 30 | EACH | 92.00 | 2,760.00 | 78.00 | 2,340.00 | 70.00 | 2,100.00 | 70.00 | 2,100.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 102.00 | 1,224.00 | 100.00 | 1,200.00 | 90.00 | 1,080.00 | 80.00 | 960.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 668 | EACH | 4.60 | 3,072.80 | 5.00 | 3,340.00 | 4.65 | 3,106.20 | 6.50 | 4,342.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 38 | LNFT | 8.25 | 313.50 | 9.00 | 342.00 | 8.00 | 304.00 | 10.00 | 380.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.535 | MILE | 2,500.00 | 26,337.50 | 2,720.00 | 28,655.20 | 2,545.00 | 26,811.58 | 2,775.00 | 29,234.63 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.045 | MILE | 867.00 | 4,374.02 | 944.00 | 4,762.48 | 855.00 | 4,313.48 | 1,000.00 | 5,045.00 | | 0046 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 510.00 | 1,020.00 | 555.00 | 1,110.00 | 510.00 | 1,020.00 | 400.00 | 800.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 0.047 | MILE | 3,060.00 | 143.82 | 3,330.00 | 156.51 | 2,650.00 | 124.55 | 10,000.00 | 470.00 | | 0048 | 735-01-00100 | Mailboxes | 71 | EACH | 1.05 | 74.55 | 6.00 | 426.00 | 1.00 | 71.00 | 10.00 | 710.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 71 | EACH | 115.00 | 8,165.00 | 211.00 | 14,981.00 | 112.00 | 7,952.00 | 125.00 | 8,875.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 16,635.00 | 16,635.00 | 5,500.00 | 5,500.00 | 25,000.00 | 25,000.00 | | 0051 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,912 | INLF | 2.30 | 4,397.60 | 1.25 | 2,390.00 | 2.00 | 3,824.00 | 1.70 | 3,250.40 | | 0052 | NS-MSC-18080 | Root Barrier | 3,059 | LNFT | 20.00 | 61,180.00 | 11.00 | 33,649.00 | 11.50 | 35,178.50 | 3.00 | 9,177.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,735,806.22 | | 3,736,721.35 | | 3,844,346.81 | | 4,567,808.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Elliott Construction, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.5 | LUMP | 25,000.00 | 25,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 333 | SQYD | 17.00 | 5,661.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 784 | LNFT | 10.00 | 7,840.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,200 | CUYD | 16.00 | 19,200.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 56 | EACH | 125.00 | 7,000.00 | | 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 79,014 | SQYD | 8.80 | 695,323.20 | | 0007 | 303-02-00100 | Removal of Existing Patches | 570 | SQYD | 15.00 | 8,550.00 | | 0008 | 304-01-00100 | Lime | 102.9 | TON | 230.00 | 23,667.00 | | 0009 | 304-05-00100 | Lime Treatment (Type E) | 7,840.5 | SQYD | 2.50 | 19,601.25 | | 0010 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 63,060 | SQYD | 8.95 | 564,387.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,297 | CUYD | 35.00 | 115,395.00 | | 0012 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 400 | SQYD | 50.00 | 20,000.00 | | 0013 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 140 | CUYD | 50.00 | 7,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 21,165.9 | TON | 100.00 | 2,116,590.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 827.9 | TON | 135.00 | 111,766.50 | | 0016 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 51,147 | GAL | 3.10 | 158,555.70 | | 0017 | 507-02-00200 | Aggregate (S2) | 75,217 | SQYD | 1.25 | 94,021.25 | | 0018 | 507-02-00300 | Aggregate (S3) | 75,217 | SQYD | 1.05 | 78,977.85 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 72,050 | SQYD | 1.85 | 133,292.50 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,004 | CUYD | 0.01 | -70.04 | | 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 116 | SQYD | 120.00 | 13,920.00 | | 0022 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 24 | LNFT | 150.00 | 3,600.00 | | 0023 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,675.00 | 5,025.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 325.2 | LNFT | 50.00 | 16,260.00 | | 0025 | 704-03-00100 | Blocked Out Guard rail | 169 | LNFT | 27.00 | 4,563.00 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 110.00 | 22,000.00 | | 0027 | 704-10-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 2,650.00 | 18,550.00 | | 0028 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 1 | EACH | 2,150.00 | 2,150.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.172 | MILE | 500.00 | 7,586.00 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.045 | MILE | 550.00 | 2,774.75 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.456 | MILE | 688.00 | 313.73 | | 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,672 | EACH | 2.20 | 5,878.40 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | | 0035 | 724-01-00100 | Rumble Strips (Centerline) | 5.01 | MILE | 300.00 | 1,503.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.02 | MILE | 300.00 | 3,006.00 | | 0037 | 724-03-00100 | Rumble Strips (Intersection) | 2 | EACH | 1,550.00 | 3,100.00 | | 0038 | 726-01-00100 | Bedding Material | 2.7 | CUYD | 115.00 | 310.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 30 | EACH | 65.00 | 1,950.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 105.00 | 1,260.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 668 | EACH | 8.00 | 5,344.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 38 | LNFT | 11.00 | 418.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.535 | MILE | 3,025.00 | 31,868.38 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.045 | MILE | 1,100.00 | 5,549.50 | | 0046 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 2 | EACH | 440.00 | 880.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 0.047 | MILE | 5,500.00 | 258.50 | | 0048 | 735-01-00100 | Mailboxes | 71 | EACH | 1.10 | 78.10 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 71 | EACH | 120.00 | 8,520.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | | 0051 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,912 | INLF | 1.50 | 2,868.00 | | 0052 | NS-MSC-18080 | Root Barrier | 3,059 | LNFT | 30.00 | 91,770.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,863,063.07 |
|