Proposal:H.011494.6-R1
Parish:St. Mary
Routes:US 90
Description:US 90: ATCHAFALAYA RIVER BRIDGE REHABILITATION
Type Construction:CLEANING AND PAINTING, BRIDGE SUPERSTRUCTURE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$19,582,534.95
| Rank | License | Bidder | Construction Bid |
| 1 | 62559 | Seminole Equipment, Inc. | $11,964,750.00 |
| 2 | 63847 | Elite Industrial Painting, Inc. | $14,263,700.00 |
| 3 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $15,335,351.00 |
| 4 | 57588 | NORTH STAR PAINTING COMPANY, INC. | $16,001,837.63 |
| 5 | BLA01 | Blastech Enterprises Inc. | $17,167,495.50 |
| 6 | 47645 | Olympus Painting Contractors, Inc. | $18,753,328.58 |
| 7 | 55663 | Intech Contracting, LLC | $20,976,080.00 |
| 8 | 39452 | M&J Construction Company of Pinellas County Inc. | $22,638,562.75 |
| 9 | 57058 | Monoko, LLC of Florida | $24,623,760.00 |
| 10 | 24429 | Abhe & Svoboda, Inc. | $34,041,225.97 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Seminole Equipment, Inc. | - 2 - Elite Industrial Painting, Inc. | - 3 - SOUTHERN ROAD & BRIDGE, LLC | - 4 - NORTH STAR PAINTING COMPANY, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of DEBRIS - BRIDGE SUBSTRUCTURE | 1 | LUMP | 5,000.00 | 5,000.00 | 225,874.00 | 225,874.00 | 100,000.00 | 100,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-00050 | Removal of DEBRIS - BRIDGE SUPERSTRUCTURE | 1 | LUMP | 5,000.00 | 5,000.00 | 219,648.00 | 219,648.00 | 100,000.00 | 100,000.00 | 22,000.00 | 22,000.00 | | 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 80,000.00 | 80,000.00 | 850,000.00 | 850,000.00 | 38,151.88 | 38,151.88 | | 0004 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.705 | MILE | 10,000.00 | 17,050.00 | 8,800.00 | 15,004.00 | 7,000.00 | 11,935.00 | 10,000.00 | 17,050.00 | | 0005 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 452 | EACH | 5.00 | 2,260.00 | 2.50 | 1,130.00 | 7.00 | 3,164.00 | 5.00 | 2,260.00 | | 0006 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 248 | EACH | 700.00 | 173,600.00 | 450.00 | 111,600.00 | 650.00 | 161,200.00 | 800.00 | 198,400.00 | | 0007 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 5,000.00 | 20,000.00 | 15,000.00 | 60,000.00 | 250.00 | 1,000.00 | 900.00 | 3,600.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 1,500,000.00 | 1,500,000.00 | 713,185.00 | 713,185.00 | 1,300,000.00 | 1,300,000.00 | 1,500,000.00 | 1,500,000.00 | | 0009 | 731-02-00100 | Reflectorized Raised Pavement Markers | 886 | EACH | 5.00 | 4,430.00 | 3.50 | 3,101.00 | 7.00 | 6,202.00 | 5.00 | 4,430.00 | | 0010 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 1.67 | MILE | 4,000.00 | 6,680.00 | 3,500.00 | 5,845.00 | 5,000.00 | 8,350.00 | 4,000.00 | 6,680.00 | | 0011 | 732-05-00100 | Removal of Existing Markings | 1.67 | MILE | 2,000.00 | 3,340.00 | 3,500.00 | 5,845.00 | 7,000.00 | 11,690.00 | 2,000.00 | 3,340.00 | | 0012 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 25,450.00 | 25,450.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | | 0013 | 807-03-00100 | Structural Metalwork (Access System) | 4,200 | LUMP | 76,000.00 | 76,000.00 | 227,000.00 | 227,000.00 | 250,000.00 | 250,000.00 | 72,388.00 | 72,388.00 | | 0014 | 811-01-00100 | Cleaning and Painting [ENTIRE TRUSS, PIER W2 TO PIER E2] | 1 | LUMP | 8,500,000.00 | 8,500,000.00 | 11,055,976.39 | 11,055,976.39 | 11,000,000.00 | 11,000,000.00 | 12,650,000.00 | 12,650,000.00 | | 0015 | 822-09-00100 | Electrical System NAVIGATION LIGHT SYSTEM | 1 | LUMP | 256,000.00 | 256,000.00 | 366,000.00 | 366,000.00 | 215,000.00 | 215,000.00 | 150,205.75 | 150,205.75 | | 0016 | 830-01-00100 | Bridge Superstructure Repair [BARRIER RAIL REPAIR] | 5 | EACH | 8,100.00 | 40,500.00 | 2,500.00 | 12,500.00 | 3,000.00 | 15,000.00 | 7,700.00 | 38,500.00 | | 0017 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD ANGLE REPLACEMENT] | 45 | EACH | 6,000.00 | 270,000.00 | 2,524.12 | 113,585.40 | 3,000.00 | 135,000.00 | 5,610.00 | 252,450.00 | | 0018 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD DIAPHRAGM REPLACEMENT] | 4 | EACH | 31,750.00 | 127,000.00 | 24,092.10 | 96,368.38 | 30,000.00 | 120,000.00 | 30,250.00 | 121,000.00 | | 0019 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD WEB SPLICE REPLACEMENT, COMPRESSION MEMBER] | 8 | EACH | 7,000.00 | 56,000.00 | 5,750.92 | 46,007.36 | 6,800.00 | 54,400.00 | 6,700.00 | 53,600.00 | | 0020 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD WEB SPLICE REPLACEMENT, TENSION MEMBER] | 13 | EACH | 3,600.00 | 46,800.00 | 8,643.47 | 112,365.11 | 10,000.00 | 130,000.00 | 3,410.00 | 44,330.00 | | 0021 | 830-01-00100 | Bridge Superstructure Repair [DRAIN HOLE MODIFICATIONS] | 101 | EACH | 530.00 | 53,530.00 | 250.00 | 25,250.00 | 300.00 | 30,300.00 | 506.00 | 51,106.00 | | 0022 | 830-01-00100 | Bridge Superstructure Repair [FALSE CHORD RETROFIT] | 8 | EACH | 25,100.00 | 200,800.00 | 15,000.00 | 120,000.00 | 18,500.00 | 148,000.00 | 23,892.00 | 191,136.00 | | 0023 | 830-01-00100 | Bridge Superstructure Repair [GUSSET PLATE BOLT REPLACEMENT] | 4 | EACH | 18,000.00 | 72,000.00 | 14,400.00 | 57,600.00 | 17,200.00 | 68,800.00 | 17,160.00 | 68,640.00 | | 0024 | 830-01-00100 | Bridge Superstructure Repair [GUSSET PLATE STIFFENING ANGLE RETROFIT] | 32 | EACH | 3,275.00 | 104,800.00 | 3,124.20 | 99,974.40 | 3,850.00 | 123,200.00 | 3,120.00 | 99,840.00 | | 0025 | 830-01-00100 | Bridge Superstructure Repair [LOWER LATERAL BRACING CONNECTION PLATE REPLACEMENT] | 14 | EACH | 9,775.00 | 136,850.00 | 12,828.64 | 179,600.96 | 15,000.00 | 210,000.00 | 9,306.00 | 130,284.00 | | 0026 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 2,966 | EACH | 85.00 | 252,110.00 | 65.00 | 192,790.00 | 85.00 | 252,110.00 | 81.00 | 240,246.00 | | 0027 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 5,000.00 | 10,000.00 | 46,000.00 | 92,000.00 | 2,500.00 | 5,000.00 | 8,600.00 | 17,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,964,750.00 | | 14,263,700.00 | | 15,335,351.00 | | 16,001,837.63 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Blastech Enterprises Inc. | - 6 - Olympus Painting Contractors, Inc. | - 7 - Intech Contracting, LLC | - 8 - M&J Construction Company of Pinellas County Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of DEBRIS - BRIDGE SUBSTRUCTURE | 1 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-00050 | Removal of DEBRIS - BRIDGE SUPERSTRUCTURE | 1 | LUMP | 15,000.00 | 15,000.00 | 100,000.00 | 100,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | | 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 71,352.00 | 71,352.00 | 50,000.00 | 50,000.00 | 195,665.00 | 195,665.00 | | 0004 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.705 | MILE | 7,500.00 | 12,787.50 | 12,000.00 | 20,460.00 | 10,000.00 | 17,050.00 | 10,325.00 | 17,604.13 | | 0005 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 452 | EACH | 4.00 | 1,808.00 | 6.00 | 2,712.00 | 5.00 | 2,260.00 | 11.80 | 5,333.60 | | 0006 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 248 | EACH | 500.00 | 124,000.00 | 1,209.60 | 299,980.80 | 500.00 | 124,000.00 | 2,110.79 | 523,475.92 | | 0007 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 3,500.00 | 14,000.00 | 16,000.00 | 64,000.00 | 5,000.00 | 20,000.00 | 24,276.00 | 97,104.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 1,500,000.00 | 1,500,000.00 | 782,000.00 | 782,000.00 | 2,000,000.00 | 2,000,000.00 | 2,131,250.00 | 2,131,250.00 | | 0009 | 731-02-00100 | Reflectorized Raised Pavement Markers | 886 | EACH | 5.00 | 4,430.00 | 6.00 | 5,316.00 | 5.00 | 4,430.00 | 11.80 | 10,454.80 | | 0010 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 1.67 | MILE | 1,500.00 | 2,505.00 | 4,800.00 | 8,016.00 | 5,000.00 | 8,350.00 | 6,490.00 | 10,838.30 | | 0011 | 732-05-00100 | Removal of Existing Markings | 1.67 | MILE | 5,500.00 | 9,185.00 | 2,400.00 | 4,008.00 | 5,000.00 | 8,350.00 | 5,900.00 | 9,853.00 | | 0012 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 7,200.00 | 7,200.00 | | 0013 | 807-03-00100 | Structural Metalwork (Access System) | 4,200 | LUMP | 66,000.00 | 66,000.00 | 270,000.00 | 270,000.00 | 100,000.00 | 100,000.00 | 270,000.00 | 270,000.00 | | 0014 | 811-01-00100 | Cleaning and Painting [ENTIRE TRUSS, PIER W2 TO PIER E2] | 1 | LUMP | 14,000,000.00 | 14,000,000.00 | 15,400,000.00 | 15,400,000.00 | 17,725,000.00 | 17,725,000.00 | 17,500,000.00 | 17,500,000.00 | | 0015 | 822-09-00100 | Electrical System NAVIGATION LIGHT SYSTEM | 1 | LUMP | 160,000.00 | 160,000.00 | 300,000.00 | 300,000.00 | 159,000.00 | 159,000.00 | 533,739.00 | 533,739.00 | | 0016 | 830-01-00100 | Bridge Superstructure Repair [BARRIER RAIL REPAIR] | 5 | EACH | 7,000.00 | 35,000.00 | 3,000.00 | 15,000.00 | 2,500.00 | 12,500.00 | 3,000.00 | 15,000.00 | | 0017 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD ANGLE REPLACEMENT] | 45 | EACH | 5,100.00 | 229,500.00 | 3,028.95 | 136,302.75 | 2,000.00 | 90,000.00 | 3,029.00 | 136,305.00 | | 0018 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD DIAPHRAGM REPLACEMENT] | 4 | EACH | 27,500.00 | 110,000.00 | 28,911.54 | 115,646.16 | 10,000.00 | 40,000.00 | 28,911.00 | 115,644.00 | | 0019 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD WEB SPLICE REPLACEMENT, COMPRESSION MEMBER] | 8 | EACH | 6,100.00 | 48,800.00 | 6,901.11 | 55,208.88 | 6,000.00 | 48,000.00 | 6,901.00 | 55,208.00 | | 0020 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD WEB SPLICE REPLACEMENT, TENSION MEMBER] | 13 | EACH | 3,100.00 | 40,300.00 | 10,327.17 | 134,253.21 | 5,000.00 | 65,000.00 | 10,372.00 | 134,836.00 | | 0021 | 830-01-00100 | Bridge Superstructure Repair [DRAIN HOLE MODIFICATIONS] | 101 | EACH | 460.00 | 46,460.00 | 300.00 | 30,300.00 | 500.00 | 50,500.00 | 300.00 | 30,300.00 | | 0022 | 830-01-00100 | Bridge Superstructure Repair [FALSE CHORD RETROFIT] | 8 | EACH | 21,800.00 | 174,400.00 | 18,000.00 | 144,000.00 | 5,000.00 | 40,000.00 | 18,000.00 | 144,000.00 | | 0023 | 830-01-00100 | Bridge Superstructure Repair [GUSSET PLATE BOLT REPLACEMENT] | 4 | EACH | 15,600.00 | 62,400.00 | 17,280.00 | 69,120.00 | 7,000.00 | 28,000.00 | 17,280.00 | 69,120.00 | | 0024 | 830-01-00100 | Bridge Superstructure Repair [GUSSET PLATE STIFFENING ANGLE RETROFIT] | 32 | EACH | 2,850.00 | 91,200.00 | 3,748.80 | 119,961.60 | 3,500.00 | 112,000.00 | 3,749.00 | 119,968.00 | | 0025 | 830-01-00100 | Bridge Superstructure Repair [LOWER LATERAL BRACING CONNECTION PLATE REPLACEMENT] | 14 | EACH | 8,460.00 | 118,440.00 | 15,394.37 | 215,521.18 | 7,000.00 | 98,000.00 | 15,394.00 | 215,516.00 | | 0026 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 2,966 | EACH | 80.00 | 237,280.00 | 95.00 | 281,770.00 | 40.00 | 118,640.00 | 78.00 | 231,348.00 | | 0027 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 8,000.00 | 16,000.00 | 4,200.00 | 8,400.00 | 2,500.00 | 5,000.00 | 14,400.00 | 28,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,167,495.50 | | 18,753,328.58 | | 20,976,080.00 | | 22,638,562.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Monoko, LLC of Florida | - 10 - Abhe & Svoboda, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of DEBRIS - BRIDGE SUBSTRUCTURE | 1 | LUMP | 10,000.00 | 10,000.00 | 23,165.87 | 23,165.87 | | 0002 | 202-02-00050 | Removal of DEBRIS - BRIDGE SUPERSTRUCTURE | 1 | LUMP | 10,000.00 | 10,000.00 | 9,000.00 | 9,000.00 | | 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000.00 | 1,000.00 | 303,200.00 | 303,200.00 | | 0004 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.705 | MILE | 11,000.00 | 18,755.00 | 12,500.00 | 21,312.50 | | 0005 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 452 | EACH | 5.00 | 2,260.00 | 7.50 | 3,390.00 | | 0006 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 248 | EACH | 500.00 | 124,000.00 | 1,200.00 | 297,600.00 | | 0007 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 1,000.00 | 4,000.00 | 22,300.00 | 89,200.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 1,650,610.00 | 1,650,610.00 | 3,406,000.00 | 3,406,000.00 | | 0009 | 731-02-00100 | Reflectorized Raised Pavement Markers | 886 | EACH | 5.00 | 4,430.00 | 8.00 | 7,088.00 | | 0010 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 1.67 | MILE | 5,000.00 | 8,350.00 | 5,000.00 | 8,350.00 | | 0011 | 732-05-00100 | Removal of Existing Markings | 1.67 | MILE | 5,000.00 | 8,350.00 | 5,000.00 | 8,350.00 | | 0012 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | | 0013 | 807-03-00100 | Structural Metalwork (Access System) | 4,200 | LUMP | 237,000.00 | 237,000.00 | 533,000.00 | 533,000.00 | | 0014 | 811-01-00100 | Cleaning and Painting [ENTIRE TRUSS, PIER W2 TO PIER E2] | 1 | LUMP | 20,400,000.00 | 20,400,000.00 | 26,888,619.60 | 26,888,619.60 | | 0015 | 822-09-00100 | Electrical System NAVIGATION LIGHT SYSTEM | 1 | LUMP | 250,000.00 | 250,000.00 | 216,500.00 | 216,500.00 | | 0016 | 830-01-00100 | Bridge Superstructure Repair [BARRIER RAIL REPAIR] | 5 | EACH | 525.00 | 2,625.00 | 21,000.00 | 105,000.00 | | 0017 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD ANGLE REPLACEMENT] | 45 | EACH | 3,150.00 | 141,750.00 | 5,000.00 | 225,000.00 | | 0018 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD DIAPHRAGM REPLACEMENT] | 4 | EACH | 3,500.00 | 14,000.00 | 19,500.00 | 78,000.00 | | 0019 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD WEB SPLICE REPLACEMENT, COMPRESSION MEMBER] | 8 | EACH | 5,000.00 | 40,000.00 | 14,500.00 | 116,000.00 | | 0020 | 830-01-00100 | Bridge Superstructure Repair [BOTTOM CHORD WEB SPLICE REPLACEMENT, TENSION MEMBER] | 13 | EACH | 17,500.00 | 227,500.00 | 22,000.00 | 286,000.00 | | 0021 | 830-01-00100 | Bridge Superstructure Repair [DRAIN HOLE MODIFICATIONS] | 101 | EACH | 500.00 | 50,500.00 | 400.00 | 40,400.00 | | 0022 | 830-01-00100 | Bridge Superstructure Repair [FALSE CHORD RETROFIT] | 8 | EACH | 54,000.00 | 432,000.00 | 45,000.00 | 360,000.00 | | 0023 | 830-01-00100 | Bridge Superstructure Repair [GUSSET PLATE BOLT REPLACEMENT] | 4 | EACH | 55,000.00 | 220,000.00 | 26,500.00 | 106,000.00 | | 0024 | 830-01-00100 | Bridge Superstructure Repair [GUSSET PLATE STIFFENING ANGLE RETROFIT] | 32 | EACH | 4,850.00 | 155,200.00 | 5,000.00 | 160,000.00 | | 0025 | 830-01-00100 | Bridge Superstructure Repair [LOWER LATERAL BRACING CONNECTION PLATE REPLACEMENT] | 14 | EACH | 20,000.00 | 280,000.00 | 24,800.00 | 347,200.00 | | 0026 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 2,966 | EACH | 105.00 | 311,430.00 | 125.00 | 370,750.00 | | 0027 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 5,000.00 | 10,000.00 | 12,300.00 | 24,600.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 24,623,760.00 | | 34,041,225.97 |
|