Proposal:H.002301.6
Parish:East Baton Rouge
Routes:LA 37
Description:NORTH SHERWOOD FOREST DRIVE IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$16,258,972.02
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $13,475,086.70 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $14,402,697.23 |
| 3 | 29595 | Boone Services LLC | $15,070,845.58 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $15,475,188.60 |
| 5 | 34567 | James Construction Group LLC | $16,002,522.94 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - KCR CONTRACTORS, LLC | - 3 - Boone Services LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.1 | LUMP | 250,000.00 | 250,000.00 | 510,960.00 | 510,960.00 | 150,965.00 | 150,965.00 | 56,000.00 | 56,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 21,610.20 | 21,610.20 | 705,299.00 | 705,299.00 | 80,000.00 | 80,000.00 | | 0003 | 202-02-00010 | Removal of Building (Wood Building STA 123+75 LT) | 1 | EACH | 0.00 | 0.00 | 2,500.00 | 2,500.00 | 2,750.00 | 2,750.00 | 0.00 | 0.00 | | 0004 | 202-02-00010 | Removal of Building (Wood Building STA 124+25 LT) | 1 | EACH | 0.00 | 0.00 | 4,500.00 | 4,500.00 | 14,300.00 | 14,300.00 | 0.00 | 0.00 | | 0005 | 202-02-00010 | Removal of Building (Wood Building STA 125+00 LT) | 1 | EACH | 0.00 | 0.00 | 4,500.00 | 4,500.00 | 10,450.00 | 10,450.00 | 0.00 | 0.00 | | 0006 | 202-02-00010 | Removal of Loading Ramp (STA 119+75 LT) | 1 | EACH | 5,000.00 | 5,000.00 | 1,750.00 | 1,750.00 | 2,750.00 | 2,750.00 | 8,000.00 | 8,000.00 | | 0007 | 202-02-00010 | Removal of Loading Ramp (STA 119+75 RT) | 1 | EACH | 5,000.00 | 5,000.00 | 1,750.00 | 1,750.00 | 2,750.00 | 2,750.00 | 8,000.00 | 8,000.00 | | 0008 | 202-02-00010 | Removal of Pipe Rail Fence (STA 115+00 LT) | 1 | EACH | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | 1,650.00 | 1,650.00 | 5,000.00 | 5,000.00 | | 0009 | 202-02-00010 | Removal of Pipe Rail Fence (Sta. 120+20 Rt.) | 1 | EACH | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | 1,650.00 | 1,650.00 | 5,000.00 | 5,000.00 | | 0010 | 202-02-00010 | Removal of Pipe Rail Fence (Sta. 156+00 Rt.) | 1 | EACH | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | 1,650.00 | 1,650.00 | 5,000.00 | 5,000.00 | | 0011 | 202-02-00010 | Removal of Pipe Rail Fence (Sta. 156+64) | 1 | EACH | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | 1,650.00 | 1,650.00 | 5,000.00 | 5,000.00 | | 0012 | 202-02-02000 | Removal of Asphalt Drives | 2,610 | SQYD | 10.00 | 26,100.00 | 1.59 | 4,149.90 | 8.49 | 22,158.90 | 10.00 | 26,100.00 | | 0013 | 202-02-06060 | Removal of Concrete Catch Basin | 21 | EACH | 250.00 | 5,250.00 | 345.00 | 7,245.00 | 495.00 | 10,395.00 | 750.00 | 15,750.00 | | 0014 | 202-02-06100 | Removal of Concrete Walks and Drives | 6,797 | SQYD | 10.00 | 67,970.00 | 1.35 | 9,175.95 | 9.30 | 63,212.10 | 16.50 | 112,150.50 | | 0015 | 202-02-12000 | Removal of Fence | 137 | LNFT | 10.00 | 1,370.00 | 3.77 | 516.49 | 1.10 | 150.70 | 10.00 | 1,370.00 | | 0016 | 202-02-12020 | Removal of Fence (Chain Link) | 3,714 | LNFT | 10.00 | 37,140.00 | 2.29 | 8,505.06 | 1.10 | 4,085.40 | 6.00 | 22,284.00 | | 0017 | 202-02-14500 | Removal of Guard Rail | 201.7 | LNFT | 10.00 | 2,017.00 | 11.50 | 2,319.55 | 10.45 | 2,107.77 | 15.00 | 3,025.50 | | 0018 | 202-02-26000 | Removal of Manholes | 17 | EACH | 250.00 | 4,250.00 | 431.25 | 7,331.25 | 990.00 | 16,830.00 | 800.00 | 13,600.00 | | 0019 | 202-02-32000 | Removal of Paved Ditches | 17 | SQYD | 25.00 | 425.00 | 5.75 | 97.75 | 18.07 | 307.19 | 94.00 | 1,598.00 | | 0020 | 202-02-32180 | Removal of Pipe Headwalls | 4 | EACH | 2,000.00 | 8,000.00 | 1,150.00 | 4,600.00 | 2,571.00 | 10,284.00 | 900.00 | 3,600.00 | | 0021 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 5,460 | SQYD | 30.00 | 163,800.00 | 3.21 | 17,526.60 | 9.86 | 53,835.60 | 15.50 | 84,630.00 | | 0022 | 202-02-38240 | Removal of Signs and Supports | 23 | EACH | 250.00 | 5,750.00 | 36.75 | 845.25 | 11.00 | 253.00 | 15.00 | 345.00 | | 0023 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 21,041.1 | SQYD | 1.00 | 21,041.10 | 2.69 | 56,600.56 | 11.80 | 248,284.98 | 8.50 | 178,849.35 | | 0024 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,000.00 | 1,000.00 | 7,196.64 | 7,196.64 | 7,920.00 | 7,920.00 | 8,500.00 | 8,500.00 | | 0025 | 203-01-00100 | General Excavation | 26,078 | CUYD | 10.00 | 260,780.00 | 7.53 | 196,367.34 | 19.93 | 519,734.54 | 11.50 | 299,897.00 | | 0026 | 203-02-00100 | Drainage Excavation | 200 | CUYD | 10.00 | 2,000.00 | 11.00 | 2,200.00 | 17.33 | 3,466.00 | 50.00 | 10,000.00 | | 0027 | 203-03-00100 | Embankment | 16,686 | CUYD | 1.00 | 16,686.00 | 13.99 | 233,437.14 | 9.86 | 164,523.96 | 18.00 | 300,348.00 | | 0028 | 204-02-00100 | Temporary Hay or Straw Bales | 607 | EACH | 5.00 | 3,035.00 | 12.19 | 7,399.33 | 13.38 | 8,121.66 | 20.00 | 12,140.00 | | 0029 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 500.00 | 2,000.00 | 130.77 | 523.08 | 110.65 | 442.60 | 150.00 | 600.00 | | 0030 | 204-06-00100 | Temporary Silt Fencing | 14,439 | LNFT | 5.00 | 72,195.00 | 1.39 | 20,070.21 | 2.83 | 40,862.37 | 2.00 | 28,878.00 | | 0031 | 204-07-00100 | Temporary Stone Construction Entrance | 4 | EACH | 500.00 | 2,000.00 | 3,225.00 | 12,900.00 | 5,645.00 | 22,580.00 | 4,500.00 | 18,000.00 | | 0032 | 302-02-03100 | Class II Base Course (8" Thick) (Stone) | 68,812.2 | SQYD | 25.00 | 1,720,305.00 | 25.32 | 1,742,324.90 | 20.11 | 1,383,813.34 | 24.00 | 1,651,492.80 | | 0033 | 304-05-00100 | Lime Treatment (Type E) | 975.38 | TON | 100.00 | 97,538.00 | 211.21 | 206,010.01 | 354.33 | 345,606.40 | 425.00 | 414,536.50 | | 0034 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 5,000 | CUYD | 0.01 | 50.00 | 51.50 | 257,500.00 | 68.72 | 343,600.00 | 55.00 | 275,000.00 | | 0035 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 64,047.2 | SQYD | 60.00 | 3,842,832.00 | 72.22 | 4,625,488.78 | 68.72 | 4,401,323.58 | 72.00 | 4,611,398.40 | | 0036 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 2,285.8 | SQYD | 75.00 | 171,435.00 | 79.34 | 181,355.37 | 69.30 | 158,405.94 | 90.00 | 205,722.00 | | 0037 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 84 | EACH | 100.00 | 8,400.00 | 300.00 | 25,200.00 | 385.00 | 32,340.00 | 365.00 | 30,660.00 | | 0038 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 401.5 | SQYD | 150.00 | 60,225.00 | 141.36 | 56,756.04 | 102.48 | 41,145.72 | 300.00 | 120,450.00 | | 0039 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 40 | LNFT | 500.00 | 20,000.00 | 267.87 | 10,714.80 | 416.45 | 16,658.00 | 700.00 | 28,000.00 | | 0040 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 192 | LNFT | 125.00 | 24,000.00 | 115.93 | 22,258.56 | 110.22 | 21,162.24 | 177.00 | 33,984.00 | | 0041 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 5,007 | LNFT | 75.00 | 375,525.00 | 58.45 | 292,659.15 | 41.17 | 206,138.19 | 68.00 | 340,476.00 | | 0042 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 2,715 | LNFT | 85.00 | 230,775.00 | 64.71 | 175,687.65 | 48.45 | 131,541.75 | 75.50 | 204,982.50 | | 0043 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 2,807 | LNFT | 95.00 | 266,665.00 | 79.74 | 223,830.18 | 69.85 | 196,068.95 | 94.00 | 263,858.00 | | 0044 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 663 | LNFT | 115.00 | 76,245.00 | 98.47 | 65,285.61 | 105.17 | 69,727.71 | 120.00 | 79,560.00 | | 0045 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,865 | LNFT | 125.00 | 233,125.00 | 109.54 | 204,292.10 | 122.15 | 227,809.75 | 125.00 | 233,125.00 | | 0046 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 289 | LNFT | 80.00 | 23,120.00 | 80.74 | 23,333.86 | 43.11 | 12,458.79 | 100.00 | 28,900.00 | | 0047 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 126 | LNFT | 90.00 | 11,340.00 | 92.12 | 11,607.12 | 52.08 | 6,562.08 | 110.00 | 13,860.00 | | 0048 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 740 | LNFT | 100.00 | 74,000.00 | 96.40 | 71,336.00 | 65.34 | 48,351.60 | 144.00 | 106,560.00 | | 0049 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 80 | LNFT | 130.00 | 10,400.00 | 140.01 | 11,200.80 | 102.93 | 8,234.40 | 185.00 | 14,800.00 | | 0050 | 701-09-00100 | Fabricating Pipe Fittings | 2 | EACH | 1,000.00 | 2,000.00 | 920.00 | 1,840.00 | 1,876.00 | 3,752.00 | 2,300.00 | 4,600.00 | | 0051 | 701-14-00100 | Cleaning Existing Pipes | 868 | LNFT | 10.00 | 8,680.00 | 11.50 | 9,982.00 | 9.11 | 7,907.48 | 26.50 | 23,002.00 | | 0052 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 4,000.00 | 4,000.00 | 3,171.17 | 3,171.17 | 3,560.00 | 3,560.00 | 11,000.00 | 11,000.00 | | 0053 | 702-02-00200 | Manholes (R-CB-11) | 16 | EACH | 5,000.00 | 80,000.00 | 3,081.94 | 49,311.04 | 3,191.00 | 51,056.00 | 5,100.00 | 81,600.00 | | 0054 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 5,500.00 | 11,000.00 | 5,006.49 | 10,012.98 | 4,645.00 | 9,290.00 | 13,500.00 | 27,000.00 | | 0055 | 702-03-00100 | Catch Basins (CB-01) | 50 | EACH | 3,000.00 | 150,000.00 | 1,992.75 | 99,637.50 | 2,840.00 | 142,000.00 | 3,400.00 | 170,000.00 | | 0056 | 702-03-00500 | Catch Basins (CB-06) | 83 | EACH | 5,000.00 | 415,000.00 | 3,192.54 | 264,980.82 | 4,136.00 | 343,288.00 | 4,500.00 | 373,500.00 | | 0057 | 702-03-00600 | Catch Basins (CB-07) | 5 | EACH | 7,500.00 | 37,500.00 | 3,477.63 | 17,388.15 | 4,910.00 | 24,550.00 | 8,800.00 | 44,000.00 | | 0058 | 702-03-00700 | Catch Basins (CB-08) | 20 | EACH | 10,000.00 | 200,000.00 | 5,432.07 | 108,641.40 | 7,565.00 | 151,300.00 | 10,600.00 | 212,000.00 | | 0059 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 1,000.00 | 6,000.00 | 1,380.00 | 8,280.00 | 2,536.00 | 15,216.00 | 3,100.00 | 18,600.00 | | 0060 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 300.00 | 600.00 | 57.50 | 115.00 | 830.00 | 1,660.00 | 500.00 | 1,000.00 | | 0061 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 2,000.00 | 4,000.00 | 1,610.00 | 3,220.00 | 2,275.00 | 4,550.00 | 3,500.00 | 7,000.00 | | 0062 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 2,500.00 | 2,500.00 | 1,552.50 | 1,552.50 | 2,275.00 | 2,275.00 | 12,000.00 | 12,000.00 | | 0063 | 703-03-00100 | Perforated Pipe Underdrains | 15,269 | LNFT | 12.00 | 183,228.00 | 13.33 | 203,535.77 | 11.01 | 168,111.69 | 11.00 | 167,959.00 | | 0064 | 705-01-00100 | Barbed Wire Fence | 1,120 | LNFT | 5.00 | 5,600.00 | 6.83 | 7,649.60 | 6.60 | 7,392.00 | 20.00 | 22,400.00 | | 0065 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 103 | LNFT | 30.00 | 3,090.00 | 21.00 | 2,163.00 | 77.00 | 7,931.00 | 25.00 | 2,575.00 | | 0066 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 2,128 | LNFT | 20.00 | 42,560.00 | 35.70 | 75,969.60 | 37.40 | 79,587.20 | 40.00 | 85,120.00 | | 0067 | 705-08-09060 | 20-Foot Double Gates for Chain Link Fence (7-Foot Height) | 1 | DBGT | 2,000.00 | 2,000.00 | 3,978.43 | 3,978.43 | 1,320.00 | 1,320.00 | 3,000.00 | 3,000.00 | | 0068 | 706-01-00100 | Concrete Walk (4" Thick) | 7,525.9 | SQYD | 55.00 | 413,924.50 | 42.37 | 318,872.38 | 38.69 | 291,177.07 | 61.00 | 459,079.90 | | 0069 | 706-02-00200 | Concrete Drive (6" Thick) | 3,815 | SQYD | 60.00 | 228,900.00 | 63.29 | 241,451.35 | 58.77 | 224,207.55 | 80.00 | 305,200.00 | | 0070 | 706-02-00300 | Concrete Drive (8" Thick) | 1,039.9 | SQYD | 65.00 | 67,593.50 | 86.71 | 90,169.73 | 88.71 | 92,249.53 | 91.00 | 94,630.90 | | 0071 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 215.2 | SQYD | 55.00 | 11,836.00 | 57.71 | 12,419.19 | 42.55 | 9,156.76 | 67.00 | 14,418.40 | | 0072 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 1,500.00 | 13,500.00 | 1,150.00 | 10,350.00 | 1,050.00 | 9,450.00 | 2,000.00 | 18,000.00 | | 0073 | 707-01-00200 | Concrete Curb (Barrier) | 3,098.2 | LNFT | 10.00 | 30,982.00 | 10.44 | 32,345.21 | 10.94 | 33,894.31 | 14.00 | 43,374.80 | | 0074 | 707-01-00300 | Concrete Curb (Mountable) | 17,192.8 | LNFT | 1.00 | 17,192.80 | 10.67 | 183,447.18 | 7.91 | 135,995.05 | 10.00 | 171,928.00 | | 0075 | 708-01-00100 | Right-of-Way Monument | 52 | EACH | 250.00 | 13,000.00 | 181.73 | 9,449.96 | 245.00 | 12,740.00 | 250.00 | 13,000.00 | | 0076 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 97,750.00 | 97,750.00 | 205,570.00 | 205,570.00 | 300,000.00 | 300,000.00 | | 0077 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 35,170 | LNFT | 0.05 | 1,758.50 | 0.21 | 7,385.70 | 0.22 | 7,737.40 | 0.20 | 7,034.00 | | 0078 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 1,000.00 | 1,000.00 | 5,250.00 | 5,250.00 | 5,000.00 | 5,000.00 | 35,000.00 | 35,000.00 | | 0079 | 725-01-00100 | Temporary Detour Roads | 1,613.6 | SQYD | 50.00 | 80,680.00 | 70.97 | 114,517.19 | 62.07 | 100,156.15 | 71.00 | 114,565.60 | | 0080 | 726-01-00100 | Bedding Material | 3,125 | CUYD | 25.00 | 78,125.00 | 48.99 | 153,093.75 | 36.09 | 112,781.25 | 45.00 | 140,625.00 | | 0081 | 727-01-00100 | Mobilization | 1 | LUMP | 1,250,000.00 | 1,250,000.00 | 740,165.00 | 740,165.00 | 1,280,595.00 | 1,280,595.00 | 520,000.00 | 520,000.00 | | 0082 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 341.3 | SQFT | 40.00 | 13,652.00 | 76.37 | 26,065.08 | 32.55 | 11,109.32 | 35.00 | 11,945.50 | | 0083 | 729-01-00103 | Sign (Type A)(Relocate) | 9 | SQFT | 50.00 | 450.00 | 78.75 | 708.75 | 11.00 | 99.00 | 12.00 | 108.00 | | 0084 | 729-08-00100 | Mounting (2 1/2" Size Post) | 27 | EACH | 1,200.00 | 32,400.00 | 787.50 | 21,262.50 | 93.50 | 2,524.50 | 100.00 | 2,700.00 | | 0085 | 729-16-00100 | Object Marker Assembly (Type 1) | 8 | EACH | 75.00 | 600.00 | 68.25 | 546.00 | 60.50 | 484.00 | 65.00 | 520.00 | | 0086 | 729-21-00100 | U-Channel Post | 7 | EACH | 100.00 | 700.00 | 46.99 | 328.93 | 93.50 | 654.50 | 100.00 | 700.00 | | 0087 | 731-02-00100 | Reflectorized Raised Pavement Markers | 978 | EACH | 10.00 | 9,780.00 | 6.12 | 5,985.36 | 7.15 | 6,992.70 | 7.00 | 6,846.00 | | 0088 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 33,335 | LNFT | 0.50 | 16,667.50 | 0.63 | 21,001.05 | 0.66 | 22,001.10 | 0.65 | 21,667.75 | | 0089 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,530 | LNFT | 1.00 | 1,530.00 | 2.10 | 3,213.00 | 2.20 | 3,366.00 | 2.25 | 3,442.50 | | 0090 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 429 | LNFT | 3.00 | 1,287.00 | 2.63 | 1,128.27 | 2.75 | 1,179.75 | 2.80 | 1,201.20 | | 0091 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 472 | LNFT | 10.00 | 4,720.00 | 7.35 | 3,469.20 | 7.70 | 3,634.40 | 8.00 | 3,776.00 | | 0092 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.416 | MILE | 800.00 | 3,532.80 | 1,050.00 | 4,636.80 | 1,100.00 | 4,857.60 | 1,150.00 | 5,078.40 | | 0093 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.051 | MILE | 2,500.00 | 127.50 | 2,100.00 | 107.10 | 2,200.00 | 112.20 | 2,200.00 | 112.20 | | 0094 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.356 | MILE | 2,500.00 | 890.00 | 3,150.00 | 1,121.40 | 3,300.00 | 1,174.80 | 3,300.00 | 1,174.80 | | 0095 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 9 | EACH | 500.00 | 4,500.00 | 315.00 | 2,835.00 | 330.00 | 2,970.00 | 340.00 | 3,060.00 | | 0096 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 20 | EACH | 500.00 | 10,000.00 | 257.25 | 5,145.00 | 270.00 | 5,400.00 | 280.00 | 5,600.00 | | 0097 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 500.00 | 3,500.00 | 257.25 | 1,800.75 | 270.00 | 1,890.00 | 280.00 | 1,960.00 | | 0098 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 500.00 | 3,000.00 | 262.50 | 1,575.00 | 270.00 | 1,620.00 | 290.00 | 1,740.00 | | 0099 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 500.00 | 500.00 | 525.00 | 525.00 | 550.00 | 550.00 | 600.00 | 600.00 | | 0100 | 732-05-00100 | Removal of Existing Markings | 0.365 | MILE | 10,000.00 | 3,650.00 | 5,250.00 | 1,916.25 | 5,500.00 | 2,007.50 | 5,500.00 | 2,007.50 | | 0101 | 735-01-00100 | Mailboxes | 13 | EACH | 15.00 | 195.00 | 15.75 | 204.75 | 5.50 | 71.50 | 6.00 | 78.00 | | 0102 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 150.00 | 1,800.00 | 120.75 | 1,449.00 | 205.00 | 2,460.00 | 220.00 | 2,640.00 | | 0103 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 225.75 | 225.75 | 275.00 | 275.00 | 300.00 | 300.00 | | 0104 | 736-01-00100 | Trenching and Backfilling | 590 | LNFT | 15.00 | 8,850.00 | 5.97 | 3,522.30 | 6.57 | 3,876.30 | 6.00 | 3,540.00 | | 0105 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 7,688 | LNFT | 20.00 | 153,760.00 | 11.05 | 84,952.40 | 12.16 | 93,486.08 | 12.50 | 96,100.00 | | 0106 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 3,485 | LNFT | 25.00 | 87,125.00 | 14.19 | 49,452.15 | 15.61 | 54,400.85 | 16.25 | 56,631.25 | | 0107 | 736-04-02000 | Signal Support (Pedestal Pole) | 5 | EACH | 3,000.00 | 15,000.00 | 2,280.56 | 11,402.80 | 2,510.00 | 12,550.00 | 2,600.00 | 13,000.00 | | 0108 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 13 | EACH | 1,000.00 | 13,000.00 | 879.71 | 11,436.23 | 968.00 | 12,584.00 | 1,000.00 | 13,000.00 | | 0109 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 4 | EACH | 1,000.00 | 4,000.00 | 880.97 | 3,523.88 | 970.00 | 3,880.00 | 1,000.00 | 4,000.00 | | 0110 | 736-05-02080 | Signal Hds (3 Sec, 12" Led Lens, RT. R, RT. Y, RT. G) | 1 | EACH | 1,000.00 | 1,000.00 | 880.97 | 880.97 | 970.00 | 970.00 | 1,000.00 | 1,000.00 | | 0111 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,500.00 | 3,000.00 | 1,264.63 | 2,529.26 | 1,395.00 | 2,790.00 | 1,500.00 | 3,000.00 | | 0112 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,500.00 | 3,000.00 | 1,363.26 | 2,726.52 | 1,500.00 | 3,000.00 | 1,600.00 | 3,200.00 | | 0113 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,500.00 | 4,500.00 | 1,363.26 | 4,089.78 | 1,500.00 | 4,500.00 | 1,600.00 | 4,800.00 | | 0114 | 736-06-00300 | Signal Service (Pedestal Required, Separate Disconnect for Street Lights) | 3 | EACH | 3,000.00 | 9,000.00 | 2,715.76 | 8,147.28 | 2,990.00 | 8,970.00 | 3,100.00 | 9,300.00 | | 0115 | 736-06-00500 | Signal Service (Creosote Pole Required, Separate Disconnect for Street Lights) | 3 | EACH | 3,500.00 | 10,500.00 | 3,126.20 | 9,378.60 | 3,440.00 | 10,320.00 | 3,600.00 | 10,800.00 | | 0116 | 736-09-00100 | Loop Detector | 600 | LNFT | 20.00 | 12,000.00 | 18.14 | 10,884.00 | 19.95 | 11,970.00 | 21.00 | 12,600.00 | | 0117 | 736-10-00200 | Underground Junction Box (Type E) | 14 | EACH | 600.00 | 8,400.00 | 574.58 | 8,044.12 | 635.00 | 8,890.00 | 660.00 | 9,240.00 | | 0118 | 736-10-00300 | Underground Junction Box (Type F) | 12 | EACH | 800.00 | 9,600.00 | 641.05 | 7,692.60 | 707.00 | 8,484.00 | 730.00 | 8,760.00 | | 0119 | 736-10-00400 | Underground Junction Box (Type G) | 3 | EACH | 1,000.00 | 3,000.00 | 1,038.22 | 3,114.66 | 1,143.00 | 3,429.00 | 1,200.00 | 3,600.00 | | 0120 | 736-10-00600 | Underground Junction Box (Type I) | 7 | EACH | 1,200.00 | 8,400.00 | 1,200.73 | 8,405.11 | 1,322.00 | 9,254.00 | 1,400.00 | 9,800.00 | | 0121 | 736-10-00700 | Underground Junction Box (Type J) | 5 | EACH | 1,400.00 | 7,000.00 | 1,308.87 | 6,544.35 | 1,440.00 | 7,200.00 | 1,500.00 | 7,500.00 | | 0122 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 270 | LNFT | 10.00 | 2,700.00 | 1.61 | 434.70 | 1.77 | 477.90 | 2.00 | 540.00 | | 0123 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 185 | LNFT | 10.00 | 1,850.00 | 3.10 | 573.50 | 3.41 | 630.85 | 3.60 | 666.00 | | 0124 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 175 | LNFT | 10.00 | 1,750.00 | 2.95 | 516.25 | 3.25 | 568.75 | 3.40 | 595.00 | | 0125 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,230 | LNFT | 2.00 | 8,460.00 | 1.06 | 4,483.80 | 1.17 | 4,949.10 | 1.20 | 5,076.00 | | 0126 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 825 | LNFT | 4.00 | 3,300.00 | 3.51 | 2,895.75 | 3.86 | 3,184.50 | 4.00 | 3,300.00 | | 0127 | 736-12-02020 | Conductor (3c, #14 awg) | 2,330 | LNFT | 2.00 | 4,660.00 | 1.09 | 2,539.70 | 1.20 | 2,796.00 | 1.25 | 2,912.50 | | 0128 | 736-12-04000 | Conductor (6c, #14 awg) | 1,130 | LNFT | 2.00 | 2,260.00 | 1.77 | 2,000.10 | 1.95 | 2,203.50 | 2.00 | 2,260.00 | | 0129 | 736-12-06000 | Conductor (10c, #14 awg) | 2,010 | LNFT | 2.00 | 4,020.00 | 1.60 | 3,216.00 | 1.76 | 3,537.60 | 1.80 | 3,618.00 | | 0130 | 739-01-00100 | Hydro-Seeding | 6.46 | ACRE | 1,500.00 | 9,690.00 | 1,281.50 | 8,278.49 | 1,350.00 | 8,721.00 | 1,100.00 | 7,106.00 | | 0131 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 204,000.00 | 204,000.00 | 114,125.00 | 114,125.00 | 200,000.00 | 200,000.00 | | 0132 | 742-01-00300 | Sanitary Sewer Pipe (6") Ductile Iron Pipe | 24 | LNFT | 100.00 | 2,400.00 | 1.55 | 37.20 | 136.00 | 3,264.00 | 250.00 | 6,000.00 | | 0133 | 742-01-00400 | Sanitary Sewer Pipe (8") Ductile Iron Pipe | 24 | LNFT | 125.00 | 3,000.00 | 170.00 | 4,080.00 | 161.00 | 3,864.00 | 275.00 | 6,600.00 | | 0134 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 25.92 | CUYD | 1,000.00 | 25,920.00 | 2,198.26 | 56,978.90 | 1,980.00 | 51,321.60 | 1,200.00 | 31,104.00 | | 0135 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 22.81 | CUYD | 1,000.00 | 22,810.00 | 3,120.86 | 71,186.82 | 3,181.00 | 72,558.61 | 2,500.00 | 57,025.00 | | 0136 | 805-01-00400 | Class A Concrete (Retaining Walls) | 29.23 | CUYD | 1,000.00 | 29,230.00 | 1,995.48 | 58,327.88 | 2,090.00 | 61,090.70 | 2,200.00 | 64,306.00 | | 0137 | 805-12-22020 | Reinforced Concrete Box Culverts (7' x 6') (Precast) | 240 | LNFT | 600.00 | 144,000.00 | 1,049.34 | 251,841.60 | 636.68 | 152,803.20 | 1,200.00 | 288,000.00 | | 0138 | 806-01-00100 | Deformed Reinforcing Steel | 5,748 | LB | 2.00 | 11,496.00 | 1.15 | 6,610.20 | 1.93 | 11,093.64 | 2.00 | 11,496.00 | | 0139 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 22,317 | INLF | 0.50 | 11,158.50 | 1.15 | 25,664.55 | 1.21 | 27,003.57 | 1.25 | 27,896.25 | | 0140 | NS-702-00001 | Cleaning Existing Catch Basin | 9 | EACH | 300.00 | 2,700.00 | 258.37 | 2,325.33 | 539.00 | 4,851.00 | 700.00 | 6,300.00 | | 0141 | NS-702-00002 | Cleaning Existing Manhole | 2 | EACH | 400.00 | 800.00 | 258.37 | 516.74 | 539.00 | 1,078.00 | 1,000.00 | 2,000.00 | | 0142 | NS-702-00003 | Cleaning Existing Junction Box | 1 | EACH | 1,000.00 | 1,000.00 | 258.37 | 258.37 | 539.00 | 539.00 | 1,300.00 | 1,300.00 | | 0143 | NS-736-00005 | Video Detection Cabinet Components | 3 | EACH | 10,000.00 | 30,000.00 | 8,895.58 | 26,686.74 | 9,786.00 | 29,358.00 | 10,000.00 | 30,000.00 | | 0144 | NS-736-00006 | Video Detection Camera | 9 | EACH | 2,000.00 | 18,000.00 | 2,054.36 | 18,489.24 | 2,261.00 | 20,349.00 | 2,300.00 | 20,700.00 | | 0145 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 6 | EACH | 1,000.00 | 6,000.00 | 755.16 | 4,530.96 | 832.00 | 4,992.00 | 875.00 | 5,250.00 | | 0146 | NS-736-00016 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 25,000.00 | 25,000.00 | 93,055.20 | 93,055.20 | 102,362.00 | 102,362.00 | 105,000.00 | 105,000.00 | | 0147 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 8,538 | LNFT | 2.00 | 17,076.00 | 1.90 | 16,222.20 | 2.09 | 17,844.42 | 2.20 | 18,783.60 | | 0148 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 18 | EACH | 100.00 | 1,800.00 | 102.54 | 1,845.72 | 114.00 | 2,052.00 | 118.00 | 2,124.00 | | 0149 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 36 | EACH | 100.00 | 3,600.00 | 102.54 | 3,691.44 | 114.00 | 4,104.00 | 118.00 | 4,248.00 | | 0150 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 185 | LNFT | 10.00 | 1,850.00 | 2.51 | 464.35 | 2.76 | 510.60 | 3.00 | 555.00 | | 0151 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 6 | EACH | 50.00 | 300.00 | 36.17 | 217.02 | 40.70 | 244.20 | 41.00 | 246.00 | | 0152 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 3 | EACH | 1,000.00 | 3,000.00 | 970.69 | 2,912.07 | 1,070.00 | 3,210.00 | 1,100.00 | 3,300.00 | | 0153 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 3 | EACH | 1,000.00 | 3,000.00 | 749.36 | 2,248.08 | 825.00 | 2,475.00 | 860.00 | 2,580.00 | | 0154 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 3 | EACH | 3,000.00 | 9,000.00 | 3,193.02 | 9,579.06 | 3,514.00 | 10,542.00 | 3,700.00 | 11,100.00 | | 0155 | NS-MSC-00008 | Construction Photographs And Video | 1 | LUMP | 25,000.00 | 25,000.00 | 8,625.00 | 8,625.00 | 3,300.00 | 3,300.00 | 17,000.00 | 17,000.00 | | 0156 | NS-MSC-00120 | Drainage Structure (CB-ADJUST, Adj./Conv. of Exist. C.B. or M.H.) | 7 | EACH | 2,500.00 | 17,500.00 | 1,753.75 | 12,276.25 | 2,131.00 | 14,917.00 | 6,400.00 | 44,800.00 | | 0157 | NS-P17-00009 | Pedestrian Pushbuttons | 6 | EACH | 250.00 | 1,500.00 | 224.81 | 1,348.86 | 248.00 | 1,488.00 | 260.00 | 1,560.00 | | 0158 | NS-P17-00010 | Emergency Vehicle Preemption Phase Selector | 3 | EACH | 4,000.00 | 12,000.00 | 3,997.36 | 11,992.08 | 4,398.00 | 13,194.00 | 4,600.00 | 13,800.00 | | 0159 | NS-P17-00012 | Signal Cont and Cab 54" height (TS-2, Typ 1, Eth)Install on new base | 3 | EACH | 30,000.00 | 90,000.00 | 26,678.20 | 80,034.60 | 29,348.00 | 88,044.00 | 30,000.00 | 90,000.00 | | 0160 | NS-P17-00018 | Emergency Vehicle Preemption Detector | 9 | EACH | 1,000.00 | 9,000.00 | 933.34 | 8,400.06 | 918.00 | 8,262.00 | 950.00 | 8,550.00 | | 0161 | NS-P17-00020 | LED Street Name Sign (18"xVaries) | 9 | EACH | 3,000.00 | 27,000.00 | 2,335.78 | 21,022.02 | 2,570.00 | 23,130.00 | 2,700.00 | 24,300.00 | | 0162 | NS-P17-00029 | Signal Support (Mast Arm Standard w/30 ft Arm | 1 | EACH | 15,000.00 | 15,000.00 | 14,356.50 | 14,356.50 | 15,793.00 | 15,793.00 | 16,000.00 | 16,000.00 | | 0163 | NS-P17-00033 | Signal Support (Mast Arm Standard w/35 ft Arm and 1 luminaire) | 1 | EACH | 18,000.00 | 18,000.00 | 17,570.59 | 17,570.59 | 19,329.00 | 19,329.00 | 20,000.00 | 20,000.00 | | 0164 | NS-P17-00035 | Signal Support (Mast Arm Standard w/40 ft Arm | 1 | EACH | 18,000.00 | 18,000.00 | 17,755.03 | 17,755.03 | 19,532.00 | 19,532.00 | 20,000.00 | 20,000.00 | | 0165 | NS-P17-00036 | Signal Support (Mast Arm Standard w/40 ft Arm and 1 luminaire) | 1 | EACH | 20,000.00 | 20,000.00 | 18,642.43 | 18,642.43 | 20,508.00 | 20,508.00 | 21,000.00 | 21,000.00 | | 0166 | NS-P17-00039 | Signal Support (Mast Arm Standard w/45 ft Arm and 1 luminaire) | 1 | EACH | 20,000.00 | 20,000.00 | 19,245.63 | 19,245.63 | 21,171.00 | 21,171.00 | 22,000.00 | 22,000.00 | | 0167 | NS-P17-00044 | Signal Support (Mast Arm Standard w/55 ft Arm | 2 | EACH | 23,000.00 | 46,000.00 | 20,973.00 | 41,946.00 | 23,071.00 | 46,142.00 | 24,000.00 | 48,000.00 | | 0168 | NS-P17-00047 | Signal Support (Mast Arm Standard w/60 ft Arm | 1 | EACH | 25,000.00 | 25,000.00 | 23,061.18 | 23,061.18 | 25,370.00 | 25,370.00 | 26,000.00 | 26,000.00 | | 0169 | NS-P17-00048 | Signal Support (Mast Arm Standard w/60 ft Arm and 1 luminaire) | 1 | EACH | 28,000.00 | 28,000.00 | 25,902.02 | 25,902.02 | 28,494.00 | 28,494.00 | 29,000.00 | 29,000.00 | | 0170 | NS-P17-00097 | Limestone Bedding and Backfill | 384 | CUYD | 75.00 | 28,800.00 | 100.00 | 38,400.00 | 87.74 | 33,692.16 | 85.00 | 32,640.00 | | 0171 | NS-P17-00099 | Select Material for Backfill | 15 | CUYD | 75.00 | 1,125.00 | 69.75 | 1,046.25 | 54.35 | 815.25 | 92.00 | 1,380.00 | | 0172 | NS-P17-00120 | Unrestrained Joint Sewer Force Main (10-inch diameter) | 3,231 | LNFT | 75.00 | 242,325.00 | 91.40 | 295,313.40 | 42.18 | 136,283.58 | 37.00 | 119,547.00 | | 0173 | NS-P17-00143 | Restrained Joint Sewer Force Main (10-inch diameter) | 393 | LNFT | 100.00 | 39,300.00 | 99.40 | 39,064.20 | 49.00 | 19,257.00 | 49.00 | 19,257.00 | | 0174 | NS-P17-00164 | Remove Force Main | 1 | LUMP | 50,000.00 | 50,000.00 | 178,400.00 | 178,400.00 | 110,035.00 | 110,035.00 | 65,000.00 | 65,000.00 | | 0175 | NS-P17-00165 | Fittings | 2,370 | LB | 5.00 | 11,850.00 | 5.22 | 12,371.40 | 16.03 | 37,991.10 | 13.50 | 31,995.00 | | 0176 | NS-P17-00169 | Air Release/Vacuum Valve | 3 | EACH | 10,000.00 | 30,000.00 | 9,408.33 | 28,224.99 | 8,670.00 | 26,010.00 | 10,000.00 | 30,000.00 | | 0177 | NS-P17-00171 | Force Main Tie-In (diameter) (10 inch) | 2 | EACH | 2,500.00 | 5,000.00 | 5,750.00 | 11,500.00 | 785.00 | 1,570.00 | 10,000.00 | 20,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,475,086.70 | | 14,402,697.23 | | 15,070,845.58 | | 15,475,188.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - James Construction Group LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.1 | LUMP | 420,000.00 | 420,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | | 0003 | 202-02-00010 | Removal of Building (Wood Building STA 123+75 LT) | 1 | EACH | 2,500.00 | 2,500.00 | | 0004 | 202-02-00010 | Removal of Building (Wood Building STA 124+25 LT) | 1 | EACH | 13,000.00 | 13,000.00 | | 0005 | 202-02-00010 | Removal of Building (Wood Building STA 125+00 LT) | 1 | EACH | 9,500.00 | 9,500.00 | | 0006 | 202-02-00010 | Removal of Loading Ramp (STA 119+75 LT) | 1 | EACH | 2,500.00 | 2,500.00 | | 0007 | 202-02-00010 | Removal of Loading Ramp (STA 119+75 RT) | 1 | EACH | 2,500.00 | 2,500.00 | | 0008 | 202-02-00010 | Removal of Pipe Rail Fence (STA 115+00 LT) | 1 | EACH | 1,500.00 | 1,500.00 | | 0009 | 202-02-00010 | Removal of Pipe Rail Fence (Sta. 120+20 Rt.) | 1 | EACH | 1,500.00 | 1,500.00 | | 0010 | 202-02-00010 | Removal of Pipe Rail Fence (Sta. 156+00 Rt.) | 1 | EACH | 1,500.00 | 1,500.00 | | 0011 | 202-02-00010 | Removal of Pipe Rail Fence (Sta. 156+64) | 1 | EACH | 1,500.00 | 1,500.00 | | 0012 | 202-02-02000 | Removal of Asphalt Drives | 2,610 | SQYD | 20.00 | 52,200.00 | | 0013 | 202-02-06060 | Removal of Concrete Catch Basin | 21 | EACH | 1,000.00 | 21,000.00 | | 0014 | 202-02-06100 | Removal of Concrete Walks and Drives | 6,797 | SQYD | 10.00 | 67,970.00 | | 0015 | 202-02-12000 | Removal of Fence | 137 | LNFT | 1.00 | 137.00 | | 0016 | 202-02-12020 | Removal of Fence (Chain Link) | 3,714 | LNFT | 1.00 | 3,714.00 | | 0017 | 202-02-14500 | Removal of Guard Rail | 201.7 | LNFT | 9.00 | 1,815.30 | | 0018 | 202-02-26000 | Removal of Manholes | 17 | EACH | 400.00 | 6,800.00 | | 0019 | 202-02-32000 | Removal of Paved Ditches | 17 | SQYD | 100.00 | 1,700.00 | | 0020 | 202-02-32180 | Removal of Pipe Headwalls | 4 | EACH | 3,000.00 | 12,000.00 | | 0021 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 5,460 | SQYD | 12.00 | 65,520.00 | | 0022 | 202-02-38240 | Removal of Signs and Supports | 23 | EACH | 120.00 | 2,760.00 | | 0023 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 21,041.1 | SQYD | 7.00 | 147,287.70 | | 0024 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 13,000.00 | 13,000.00 | | 0025 | 203-01-00100 | General Excavation | 26,078 | CUYD | 12.00 | 312,936.00 | | 0026 | 203-02-00100 | Drainage Excavation | 200 | CUYD | 25.00 | 5,000.00 | | 0027 | 203-03-00100 | Embankment | 16,686 | CUYD | 25.00 | 417,150.00 | | 0028 | 204-02-00100 | Temporary Hay or Straw Bales | 607 | EACH | 20.00 | 12,140.00 | | 0029 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 300.00 | 1,200.00 | | 0030 | 204-06-00100 | Temporary Silt Fencing | 14,439 | LNFT | 1.50 | 21,658.50 | | 0031 | 204-07-00100 | Temporary Stone Construction Entrance | 4 | EACH | 1,000.00 | 4,000.00 | | 0032 | 302-02-03100 | Class II Base Course (8" Thick) (Stone) | 68,812.2 | SQYD | 25.00 | 1,720,305.00 | | 0033 | 304-05-00100 | Lime Treatment (Type E) | 975.38 | TON | 300.00 | 292,614.00 | | 0034 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 5,000 | CUYD | 50.00 | 250,000.00 | | 0035 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 64,047.2 | SQYD | 62.00 | 3,970,926.40 | | 0036 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 2,285.8 | SQYD | 100.00 | 228,580.00 | | 0037 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 84 | EACH | 45.00 | 3,780.00 | | 0038 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 401.5 | SQYD | 100.00 | 40,150.00 | | 0039 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 40 | LNFT | 450.00 | 18,000.00 | | 0040 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 192 | LNFT | 150.00 | 28,800.00 | | 0041 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 5,007 | LNFT | 95.00 | 475,665.00 | | 0042 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 2,715 | LNFT | 100.00 | 271,500.00 | | 0043 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 2,807 | LNFT | 120.00 | 336,840.00 | | 0044 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 663 | LNFT | 140.00 | 92,820.00 | | 0045 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,865 | LNFT | 180.00 | 335,700.00 | | 0046 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 289 | LNFT | 100.00 | 28,900.00 | | 0047 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 126 | LNFT | 120.00 | 15,120.00 | | 0048 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 740 | LNFT | 130.00 | 96,200.00 | | 0049 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 80 | LNFT | 190.00 | 15,200.00 | | 0050 | 701-09-00100 | Fabricating Pipe Fittings | 2 | EACH | 1,000.00 | 2,000.00 | | 0051 | 701-14-00100 | Cleaning Existing Pipes | 868 | LNFT | 40.00 | 34,720.00 | | 0052 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 8,000.00 | 8,000.00 | | 0053 | 702-02-00200 | Manholes (R-CB-11) | 16 | EACH | 6,000.00 | 96,000.00 | | 0054 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 10,000.00 | 20,000.00 | | 0055 | 702-03-00100 | Catch Basins (CB-01) | 50 | EACH | 4,000.00 | 200,000.00 | | 0056 | 702-03-00500 | Catch Basins (CB-06) | 83 | EACH | 6,500.00 | 539,500.00 | | 0057 | 702-03-00600 | Catch Basins (CB-07) | 5 | EACH | 6,500.00 | 32,500.00 | | 0058 | 702-03-00700 | Catch Basins (CB-08) | 20 | EACH | 9,000.00 | 180,000.00 | | 0059 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 3,000.00 | 18,000.00 | | 0060 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 3,000.00 | 6,000.00 | | 0061 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 3,000.00 | 6,000.00 | | 0062 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 4,000.00 | 4,000.00 | | 0063 | 703-03-00100 | Perforated Pipe Underdrains | 15,269 | LNFT | 10.00 | 152,690.00 | | 0064 | 705-01-00100 | Barbed Wire Fence | 1,120 | LNFT | 8.50 | 9,520.00 | | 0065 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 103 | LNFT | 30.00 | 3,090.00 | | 0066 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 2,128 | LNFT | 25.00 | 53,200.00 | | 0067 | 705-08-09060 | 20-Foot Double Gates for Chain Link Fence (7-Foot Height) | 1 | DBGT | 2,500.00 | 2,500.00 | | 0068 | 706-01-00100 | Concrete Walk (4" Thick) | 7,525.9 | SQYD | 50.00 | 376,295.00 | | 0069 | 706-02-00200 | Concrete Drive (6" Thick) | 3,815 | SQYD | 65.00 | 247,975.00 | | 0070 | 706-02-00300 | Concrete Drive (8" Thick) | 1,039.9 | SQYD | 75.00 | 77,992.50 | | 0071 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 215.2 | SQYD | 55.00 | 11,836.00 | | 0072 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 1,600.00 | 14,400.00 | | 0073 | 707-01-00200 | Concrete Curb (Barrier) | 3,098.2 | LNFT | 25.00 | 77,455.00 | | 0074 | 707-01-00300 | Concrete Curb (Mountable) | 17,192.8 | LNFT | 3.00 | 51,578.40 | | 0075 | 708-01-00100 | Right-of-Way Monument | 52 | EACH | 220.00 | 11,440.00 | | 0076 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | | 0077 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 35,170 | LNFT | 0.05 | 1,758.50 | | 0078 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 30,000.00 | 30,000.00 | | 0079 | 725-01-00100 | Temporary Detour Roads | 1,613.6 | SQYD | 60.00 | 96,816.00 | | 0080 | 726-01-00100 | Bedding Material | 3,125 | CUYD | 50.00 | 156,250.00 | | 0081 | 727-01-00100 | Mobilization | 1 | LUMP | 1,570,000.00 | 1,570,000.00 | | 0082 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 341.3 | SQFT | 25.00 | 8,532.50 | | 0083 | 729-01-00103 | Sign (Type A)(Relocate) | 9 | SQFT | 10.00 | 90.00 | | 0084 | 729-08-00100 | Mounting (2 1/2" Size Post) | 27 | EACH | 85.00 | 2,295.00 | | 0085 | 729-16-00100 | Object Marker Assembly (Type 1) | 8 | EACH | 55.00 | 440.00 | | 0086 | 729-21-00100 | U-Channel Post | 7 | EACH | 85.00 | 595.00 | | 0087 | 731-02-00100 | Reflectorized Raised Pavement Markers | 978 | EACH | 6.00 | 5,868.00 | | 0088 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 33,335 | LNFT | 0.50 | 16,667.50 | | 0089 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,530 | LNFT | 1.00 | 1,530.00 | | 0090 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 429 | LNFT | 2.00 | 858.00 | | 0091 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 472 | LNFT | 6.50 | 3,068.00 | | 0092 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.416 | MILE | 850.00 | 3,753.60 | | 0093 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.051 | MILE | 2,500.00 | 127.50 | | 0094 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.356 | MILE | 2,457.87 | 875.00 | | 0095 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 9 | EACH | 280.00 | 2,520.00 | | 0096 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 20 | EACH | 200.00 | 4,000.00 | | 0097 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 200.00 | 1,400.00 | | 0098 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 240.00 | 1,440.00 | | 0099 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 500.00 | 500.00 | | 0100 | 732-05-00100 | Removal of Existing Markings | 0.365 | MILE | 4,500.00 | 1,642.50 | | 0101 | 735-01-00100 | Mailboxes | 13 | EACH | 15.00 | 195.00 | | 0102 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 150.00 | 1,800.00 | | 0103 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | | 0104 | 736-01-00100 | Trenching and Backfilling | 590 | LNFT | 8.00 | 4,720.00 | | 0105 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 7,688 | LNFT | 8.00 | 61,504.00 | | 0106 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 3,485 | LNFT | 12.00 | 41,820.00 | | 0107 | 736-04-02000 | Signal Support (Pedestal Pole) | 5 | EACH | 2,800.00 | 14,000.00 | | 0108 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 13 | EACH | 879.71 | 11,436.23 | | 0109 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 4 | EACH | 880.97 | 3,523.88 | | 0110 | 736-05-02080 | Signal Hds (3 Sec, 12" Led Lens, RT. R, RT. Y, RT. G) | 1 | EACH | 880.97 | 880.97 | | 0111 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,264.63 | 2,529.26 | | 0112 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,363.26 | 2,726.52 | | 0113 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,363.26 | 4,089.78 | | 0114 | 736-06-00300 | Signal Service (Pedestal Required, Separate Disconnect for Street Lights) | 3 | EACH | 2,715.76 | 8,147.28 | | 0115 | 736-06-00500 | Signal Service (Creosote Pole Required, Separate Disconnect for Street Lights) | 3 | EACH | 3,126.20 | 9,378.60 | | 0116 | 736-09-00100 | Loop Detector | 600 | LNFT | 18.14 | 10,884.00 | | 0117 | 736-10-00200 | Underground Junction Box (Type E) | 14 | EACH | 574.58 | 8,044.12 | | 0118 | 736-10-00300 | Underground Junction Box (Type F) | 12 | EACH | 641.05 | 7,692.60 | | 0119 | 736-10-00400 | Underground Junction Box (Type G) | 3 | EACH | 1,038.22 | 3,114.66 | | 0120 | 736-10-00600 | Underground Junction Box (Type I) | 7 | EACH | 1,200.73 | 8,405.11 | | 0121 | 736-10-00700 | Underground Junction Box (Type J) | 5 | EACH | 1,308.87 | 6,544.35 | | 0122 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 270 | LNFT | 1.61 | 434.70 | | 0123 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 185 | LNFT | 3.10 | 573.50 | | 0124 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 175 | LNFT | 2.95 | 516.25 | | 0125 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,230 | LNFT | 1.06 | 4,483.80 | | 0126 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 825 | LNFT | 3.51 | 2,895.75 | | 0127 | 736-12-02020 | Conductor (3c, #14 awg) | 2,330 | LNFT | 1.09 | 2,539.70 | | 0128 | 736-12-04000 | Conductor (6c, #14 awg) | 1,130 | LNFT | 1.77 | 2,000.10 | | 0129 | 736-12-06000 | Conductor (10c, #14 awg) | 2,010 | LNFT | 1.60 | 3,216.00 | | 0130 | 739-01-00100 | Hydro-Seeding | 6.46 | ACRE | 1,220.48 | 7,884.30 | | 0131 | 740-01-00100 | Construction Layout | 1 | LUMP | 148,200.00 | 148,200.00 | | 0132 | 742-01-00300 | Sanitary Sewer Pipe (6") Ductile Iron Pipe | 24 | LNFT | 40.00 | 960.00 | | 0133 | 742-01-00400 | Sanitary Sewer Pipe (8") Ductile Iron Pipe | 24 | LNFT | 40.00 | 960.00 | | 0134 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 25.92 | CUYD | 2,000.00 | 51,840.00 | | 0135 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 22.81 | CUYD | 3,000.00 | 68,430.00 | | 0136 | 805-01-00400 | Class A Concrete (Retaining Walls) | 29.23 | CUYD | 1,500.00 | 43,845.00 | | 0137 | 805-12-22020 | Reinforced Concrete Box Culverts (7' x 6') (Precast) | 240 | LNFT | 800.00 | 192,000.00 | | 0138 | 806-01-00100 | Deformed Reinforcing Steel | 5,748 | LB | 2.00 | 11,496.00 | | 0139 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 22,317 | INLF | 0.45 | 10,042.65 | | 0140 | NS-702-00001 | Cleaning Existing Catch Basin | 9 | EACH | 500.00 | 4,500.00 | | 0141 | NS-702-00002 | Cleaning Existing Manhole | 2 | EACH | 1,000.00 | 2,000.00 | | 0142 | NS-702-00003 | Cleaning Existing Junction Box | 1 | EACH | 1,000.00 | 1,000.00 | | 0143 | NS-736-00005 | Video Detection Cabinet Components | 3 | EACH | 10,000.00 | 30,000.00 | | 0144 | NS-736-00006 | Video Detection Camera | 9 | EACH | 3,000.00 | 27,000.00 | | 0145 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 6 | EACH | 1,400.00 | 8,400.00 | | 0146 | NS-736-00016 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 95,000.00 | 95,000.00 | | 0147 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 8,538 | LNFT | 2.50 | 21,345.00 | | 0148 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 18 | EACH | 13.00 | 234.00 | | 0149 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 36 | EACH | 34.00 | 1,224.00 | | 0150 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 185 | LNFT | 2.00 | 370.00 | | 0151 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 6 | EACH | 55.00 | 330.00 | | 0152 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 3 | EACH | 310.00 | 930.00 | | 0153 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 3 | EACH | 950.00 | 2,850.00 | | 0154 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 3 | EACH | 3,500.00 | 10,500.00 | | 0155 | NS-MSC-00008 | Construction Photographs And Video | 1 | LUMP | 35,000.00 | 35,000.00 | | 0156 | NS-MSC-00120 | Drainage Structure (CB-ADJUST, Adj./Conv. of Exist. C.B. or M.H.) | 7 | EACH | 3,281.19 | 22,968.33 | | 0157 | NS-P17-00009 | Pedestrian Pushbuttons | 6 | EACH | 224.81 | 1,348.86 | | 0158 | NS-P17-00010 | Emergency Vehicle Preemption Phase Selector | 3 | EACH | 3,997.36 | 11,992.08 | | 0159 | NS-P17-00012 | Signal Cont and Cab 54" height (TS-2, Typ 1, Eth)Install on new base | 3 | EACH | 26,678.20 | 80,034.60 | | 0160 | NS-P17-00018 | Emergency Vehicle Preemption Detector | 9 | EACH | 833.34 | 7,500.06 | | 0161 | NS-P17-00020 | LED Street Name Sign (18"xVaries) | 9 | EACH | 2,335.78 | 21,022.02 | | 0162 | NS-P17-00029 | Signal Support (Mast Arm Standard w/30 ft Arm | 1 | EACH | 14,356.50 | 14,356.50 | | 0163 | NS-P17-00033 | Signal Support (Mast Arm Standard w/35 ft Arm and 1 luminaire) | 1 | EACH | 17,570.59 | 17,570.59 | | 0164 | NS-P17-00035 | Signal Support (Mast Arm Standard w/40 ft Arm | 1 | EACH | 17,755.03 | 17,755.03 | | 0165 | NS-P17-00036 | Signal Support (Mast Arm Standard w/40 ft Arm and 1 luminaire) | 1 | EACH | 18,642.43 | 18,642.43 | | 0166 | NS-P17-00039 | Signal Support (Mast Arm Standard w/45 ft Arm and 1 luminaire) | 1 | EACH | 19,245.63 | 19,245.63 | | 0167 | NS-P17-00044 | Signal Support (Mast Arm Standard w/55 ft Arm | 2 | EACH | 20,973.00 | 41,946.00 | | 0168 | NS-P17-00047 | Signal Support (Mast Arm Standard w/60 ft Arm | 1 | EACH | 23,061.18 | 23,061.18 | | 0169 | NS-P17-00048 | Signal Support (Mast Arm Standard w/60 ft Arm and 1 luminaire) | 1 | EACH | 25,902.02 | 25,902.02 | | 0170 | NS-P17-00097 | Limestone Bedding and Backfill | 384 | CUYD | 86.00 | 33,024.00 | | 0171 | NS-P17-00099 | Select Material for Backfill | 15 | CUYD | 37.00 | 555.00 | | 0172 | NS-P17-00120 | Unrestrained Joint Sewer Force Main (10-inch diameter) | 3,231 | LNFT | 91.40 | 295,313.40 | | 0173 | NS-P17-00143 | Restrained Joint Sewer Force Main (10-inch diameter) | 393 | LNFT | 99.40 | 39,064.20 | | 0174 | NS-P17-00164 | Remove Force Main | 1 | LUMP | 181,400.00 | 181,400.00 | | 0175 | NS-P17-00165 | Fittings | 2,370 | LB | 4.80 | 11,376.00 | | 0176 | NS-P17-00169 | Air Release/Vacuum Valve | 3 | EACH | 8,800.00 | 26,400.00 | | 0177 | NS-P17-00171 | Force Main Tie-In (diameter) (10 inch) | 2 | EACH | 3,800.00 | 7,600.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 16,002,522.94 |
|