Proposal:H.011588.6
Parish:Vernon
Routes:LA 121
Description:LA 121: LA 28 - RAPIDES PL
Type Construction:GRADING, DRAINAGE STRUCTURES, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, MILLING ASPHALT PAVEMENT, ASPHALT SURFACE TREATMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$6,858,775.64
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,605,464.84 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $5,721,065.02 |
| 3 | 08815 | W. E. MCDONALD & SON, LLC. | $6,036,679.01 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $6,755,877.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - W. E. MCDONALD & SON, LLC. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 62 | SQYD | 40.00 | 2,480.00 | 21.00 | 1,302.00 | 35.00 | 2,170.00 | 60.00 | 3,720.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 9,667 | CUYD | 9.60 | 92,803.20 | 20.00 | 193,340.00 | 12.00 | 116,004.00 | 10.00 | 96,670.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 300.00 | 1,800.00 | 130.00 | 780.00 | 135.00 | 810.00 | 135.00 | 810.00 | | 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 123,830 | SQYD | 6.60 | 817,278.00 | 5.65 | 699,639.50 | 7.50 | 928,725.00 | 7.00 | 866,810.00 | | 0007 | 303-02-00100 | Removal of Existing Patches | 300 | SQYD | 12.00 | 3,600.00 | 5.00 | 1,500.00 | 15.00 | 4,500.00 | 11.00 | 3,300.00 | | 0008 | 304-01-00100 | Lime | 26.21 | TON | 325.00 | 8,518.25 | 200.00 | 5,242.00 | 365.00 | 9,566.65 | 350.00 | 9,173.50 | | 0009 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 1,849 | SQYD | 3.25 | 6,009.25 | 5.50 | 10,169.50 | 4.00 | 7,396.00 | 3.25 | 6,009.25 | | 0010 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 108,088 | SQYD | 6.60 | 713,380.80 | 6.00 | 648,528.00 | 7.50 | 810,660.00 | 7.00 | 756,616.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,460 | CUYD | 29.00 | 71,340.00 | 40.00 | 98,400.00 | 19.00 | 46,740.00 | 50.00 | 123,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 33,808.7 | TON | 66.00 | 2,231,374.20 | 73.00 | 2,468,035.10 | 75.00 | 2,535,652.50 | 86.00 | 2,907,548.20 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 3,045.8 | TON | 45.00 | 137,061.00 | 121.00 | 368,541.80 | 45.00 | 137,061.00 | 86.00 | 261,938.80 | | 0014 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 84,203 | GAL | 2.60 | 218,927.80 | 2.75 | 231,558.25 | 3.00 | 252,609.00 | 2.65 | 223,137.95 | | 0015 | 507-02-00200 | Aggregate (S2) | 123,830 | SQYD | 1.00 | 123,830.00 | 1.00 | 123,830.00 | 1.00 | 123,830.00 | 1.00 | 123,830.00 | | 0016 | 507-02-00300 | Aggregate (S3) | 123,830 | SQYD | 0.80 | 99,064.00 | 0.90 | 111,447.00 | 1.00 | 123,830.00 | 0.80 | 99,064.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 166,926 | SQYD | 1.50 | 250,389.00 | 1.25 | 208,657.50 | 2.25 | 375,583.50 | 2.25 | 375,583.50 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -15,424 | CUYD | 100.00 | -1,542,400.00 | 0.10 | -1,542.40 | 0.01 | -154.24 | 1.00 | -15,424.00 | | 0019 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 262 | SQYD | 56.00 | 14,672.00 | 65.00 | 17,030.00 | 65.00 | 17,030.00 | 85.00 | 22,270.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,503 | SQYD | 63.00 | 94,689.00 | 81.00 | 121,743.00 | 67.00 | 100,701.00 | 105.00 | 157,815.00 | | 0021 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 40 | LNFT | 150.00 | 6,000.00 | 140.00 | 5,600.00 | 161.00 | 6,440.00 | 140.00 | 5,600.00 | | 0022 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 80 | LNFT | 50.00 | 4,000.00 | 60.00 | 4,800.00 | 50.00 | 4,000.00 | 45.00 | 3,600.00 | | 0023 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 40 | LNFT | 150.00 | 6,000.00 | 210.00 | 8,400.00 | 160.00 | 6,400.00 | 140.00 | 5,600.00 | | 0024 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 8 | LNFT | 250.00 | 2,000.00 | 345.00 | 2,760.00 | 285.00 | 2,280.00 | 250.00 | 2,000.00 | | 0025 | 701-15-00100 | Concrete Collar | 6 | EACH | 900.00 | 5,400.00 | 1,000.00 | 6,000.00 | 945.00 | 5,670.00 | 900.00 | 5,400.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 40 | LNFT | 100.00 | 4,000.00 | 8.00 | 320.00 | 68.00 | 2,720.00 | 100.00 | 4,000.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,444,361.00 | 1,444,361.00 | 27,000.00 | 27,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 36.476 | MILE | 400.00 | 14,590.40 | 125.00 | 4,559.50 | 450.00 | 16,414.20 | 210.00 | 7,659.96 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 47.522 | MILE | 1.00 | 47.52 | 185.00 | 8,791.57 | 1.00 | 47.52 | 1.00 | 47.52 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 116.124 | MILE | 1.00 | 116.12 | 250.00 | 29,031.00 | 1.00 | 116.12 | 1.00 | 116.12 | | 0031 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 7,134 | EACH | 1.25 | 8,917.50 | 1.50 | 10,701.00 | 2.00 | 14,268.00 | 1.25 | 8,917.50 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 9 | TON | 850.00 | 7,650.00 | 825.00 | 7,425.00 | 832.00 | 7,488.00 | 800.00 | 7,200.00 | | 0033 | 717-01-00100 | Seeding | 140 | LB | 20.00 | 2,800.00 | 17.00 | 2,380.00 | 17.00 | 2,380.00 | 17.00 | 2,380.00 | | 0034 | 718-01-00100 | Fertilizer | 4,700 | LB | 0.80 | 3,760.00 | 0.70 | 3,290.00 | 0.70 | 3,290.00 | 0.70 | 3,290.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 4,000.00 | 4,000.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 16.18 | MILE | 1,300.00 | 21,034.00 | 275.00 | 4,449.50 | 280.00 | 4,530.40 | 500.00 | 8,090.00 | | 0037 | 726-01-00100 | Bedding Material | 37.5 | CUYD | 150.00 | 5,625.00 | 120.00 | 4,500.00 | 155.00 | 5,812.50 | 130.00 | 4,875.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 552,565.00 | 552,565.00 | 135,000.00 | 135,000.00 | 145,000.00 | 145,000.00 | 430,000.00 | 430,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 80.00 | 640.00 | 75.00 | 600.00 | 54.00 | 432.00 | 72.00 | 576.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,819 | EACH | 4.00 | 7,276.00 | 4.25 | 7,730.75 | 4.30 | 7,821.70 | 7.00 | 12,733.00 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 51 | LNFT | 7.00 | 357.00 | 8.00 | 408.00 | 7.50 | 382.50 | 9.00 | 459.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 33.618 | MILE | 2,550.00 | 85,725.90 | 2,700.00 | 90,768.60 | 2,685.00 | 90,264.33 | 2,600.00 | 87,406.80 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.362 | MILE | 950.00 | 9,843.90 | 925.00 | 9,584.85 | 965.00 | 9,999.33 | 1,000.00 | 10,362.00 | | 0044 | 735-01-00100 | Mailboxes | 18 | EACH | 10.00 | 180.00 | 15.00 | 270.00 | 1.00 | 18.00 | 16.00 | 288.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 18 | EACH | 200.00 | 3,600.00 | 125.00 | 2,250.00 | 165.00 | 2,970.00 | 120.00 | 2,160.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 11,500.00 | 11,500.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0047 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,244 | INLF | 4.75 | 10,659.00 | 1.00 | 2,244.00 | 5.00 | 11,220.00 | 1.00 | 2,244.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,605,464.84 | | 5,721,065.02 | | 6,036,679.01 | | 6,755,877.10 |
|