Proposal:H.009766.6
Parish:Terrebonne
Routes:LA 24
Description:WPARK AVE: ROYCE ST - MARIETTA PL SIDEWALK
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PORTLAND CEMENT CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$578,173.14
| Rank | License | Bidder | Construction Bid |
| 1 | 34263 | La Contracting Enterprise LLC | $569,997.65 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $587,304.40 |
| 3 | 63897 | TL Hawk, LLC | $652,244.00 |
| 4 | 48896 | Command Construction Industries LLC | $713,863.50 |
| 5 | 32059 | Pipeline Constr & Maintenance Inc | $877,260.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - La Contracting Enterprise LLC | - 2 - Byron E. Talbot Contractor, Inc. | - 3 - TL Hawk, LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 13,000.00 | 13,000.00 | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 7,200.00 | 7,200.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 167 | SQYD | 27.00 | 4,509.00 | 15.50 | 2,588.50 | 10.00 | 1,670.00 | 25.00 | 4,175.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 63 | LNFT | 13.00 | 819.00 | 15.50 | 976.50 | 5.00 | 315.00 | 1.00 | 63.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) (12" RCP) | 77 | LNFT | 17.00 | 1,309.00 | 12.00 | 924.00 | 35.00 | 2,695.00 | 10.00 | 770.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (15" CMP) | 50 | LNFT | 17.00 | 850.00 | 12.00 | 600.00 | 35.00 | 1,750.00 | 10.00 | 500.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (15" RCP) | 68 | LNFT | 19.00 | 1,292.00 | 12.00 | 816.00 | 35.00 | 2,380.00 | 10.00 | 680.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | 69 | LNFT | 19.00 | 1,311.00 | 12.00 | 828.00 | 35.00 | 2,415.00 | 10.00 | 690.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 203 | LNFT | 16.00 | 3,248.00 | 12.00 | 2,436.00 | 35.00 | 7,105.00 | 10.00 | 2,030.00 | | 0010 | 202-02-32180 | Removal of Pipe Headwalls | 13 | EACH | 550.00 | 7,150.00 | 250.00 | 3,250.00 | 700.00 | 9,100.00 | 500.00 | 6,500.00 | | 0011 | 202-03-38000 | Relocation of Sign (Traffic Signs) | 20 | EACH | 65.00 | 1,300.00 | 99.00 | 1,980.00 | 50.00 | 1,000.00 | 50.00 | 1,000.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 32,000.00 | 32,000.00 | 8,500.00 | 8,500.00 | 4,515.00 | 4,515.00 | 1,000.00 | 1,000.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 96 | CUYD | 26.00 | 2,496.00 | 28.00 | 2,688.00 | 25.00 | 2,400.00 | 25.00 | 2,400.00 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 1,691 | LNFT | 7.50 | 12,682.50 | 10.00 | 16,910.00 | 6.00 | 10,146.00 | 1.00 | 1,691.00 | | 0015 | 204-02-00100 | Temporary Hay Bales | 210 | EACH | 25.00 | 5,250.00 | 25.00 | 5,250.00 | 24.00 | 5,040.00 | 1.00 | 210.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 7,630 | LNFT | 2.00 | 15,260.00 | 2.00 | 15,260.00 | 2.75 | 20,982.50 | 1.00 | 7,630.00 | | 0017 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 270 | CUYD | 90.00 | 24,300.00 | 71.00 | 19,170.00 | 90.00 | 24,300.00 | 50.00 | 13,500.00 | | 0018 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 37 | LNFT | 51.00 | 1,887.00 | 50.00 | 1,850.00 | 90.00 | 3,330.00 | 75.00 | 2,775.00 | | 0019 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 208 | LNFT | 58.00 | 12,064.00 | 38.00 | 7,904.00 | 75.00 | 15,600.00 | 100.00 | 20,800.00 | | 0020 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 25 | LNFT | 96.00 | 2,400.00 | 75.00 | 1,875.00 | 85.00 | 2,125.00 | 125.00 | 3,125.00 | | 0021 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 10 | LNFT | 200.00 | 2,000.00 | 150.00 | 1,500.00 | 115.00 | 1,150.00 | 150.00 | 1,500.00 | | 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 347 | LNFT | 73.00 | 25,331.00 | 55.00 | 19,085.00 | 115.00 | 39,905.00 | 115.00 | 39,905.00 | | 0023 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 38 | LNFT | 47.00 | 1,786.00 | 40.00 | 1,520.00 | 75.00 | 2,850.00 | 135.00 | 5,130.00 | | 0024 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 90 | LNFT | 71.00 | 6,390.00 | 55.00 | 4,950.00 | 115.00 | 10,350.00 | 115.00 | 10,350.00 | | 0025 | 701-07-00200 | Yard Drain Pipe (6") | 10 | LNFT | 40.00 | 400.00 | 20.00 | 200.00 | 25.00 | 250.00 | 25.00 | 250.00 | | 0026 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 198 | LNFT | 49.00 | 9,702.00 | 50.00 | 9,900.00 | 85.00 | 16,830.00 | 100.00 | 19,800.00 | | 0027 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 18 | LNFT | 190.00 | 3,420.00 | 100.00 | 1,800.00 | 125.00 | 2,250.00 | 150.00 | 2,700.00 | | 0028 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 5 | LNFT | 370.00 | 1,850.00 | 150.00 | 750.00 | 165.00 | 825.00 | 250.00 | 1,250.00 | | 0029 | 701-15-00100 | Concrete Collar | 10 | EACH | 600.00 | 6,000.00 | 950.00 | 9,500.00 | 950.00 | 9,500.00 | 1,000.00 | 10,000.00 | | 0030 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 3,800.00 | 3,800.00 | 2,400.00 | 2,400.00 | 4,500.00 | 4,500.00 | 4,000.00 | 4,000.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 2,500.00 | 32,500.00 | 2,700.00 | 35,100.00 | 3,000.00 | 39,000.00 | 4,000.00 | 52,000.00 | | 0032 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 4,500.00 | 4,500.00 | 3,200.00 | 3,200.00 | 5,500.00 | 5,500.00 | 4,500.00 | 4,500.00 | | 0033 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,800.00 | 5,600.00 | 2,000.00 | 4,000.00 | 1,210.00 | 2,420.00 | 2,500.00 | 5,000.00 | | 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 2,643.8 | SQYD | 47.00 | 124,258.60 | 60.00 | 158,628.00 | 48.00 | 126,902.40 | 60.00 | 158,628.00 | | 0035 | 706-01-00300 | Concrete Walk (6" Thick) | 52.9 | SQYD | 63.00 | 3,332.70 | 90.00 | 4,761.00 | 75.00 | 3,967.50 | 70.00 | 3,703.00 | | 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 618.9 | SQYD | 57.00 | 35,277.30 | 85.00 | 52,606.50 | 54.00 | 33,420.60 | 70.00 | 43,323.00 | | 0037 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 65.4 | SQYD | 63.00 | 4,120.20 | 85.00 | 5,559.00 | 60.00 | 3,924.00 | 70.00 | 4,578.00 | | 0038 | 706-04-00100 | Handicapped Curb Ramps (Type 4) | 9 | EACH | 750.00 | 6,750.00 | 1,200.00 | 10,800.00 | 1,100.00 | 9,900.00 | 2,000.00 | 18,000.00 | | 0039 | 707-01-00200 | Concrete Curb (Barrier) | 40 | LNFT | 14.00 | 560.00 | 16.50 | 660.00 | 20.00 | 800.00 | 50.00 | 2,000.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 7,500.00 | 7,500.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0041 | 717-01-00100 | Seeding (Hull Bermuda) | 40 | LB | 25.00 | 1,000.00 | 22.00 | 880.00 | 20.00 | 800.00 | 20.00 | 800.00 | | 0042 | 718-01-00100 | Fertilizer (8-8-8) | 1,270 | LB | 0.80 | 1,016.00 | 0.72 | 914.40 | 0.65 | 825.50 | 1.00 | 1,270.00 | | 0043 | 726-01-00100 | Bedding Material | 114.7 | CUYD | 100.00 | 11,470.00 | 100.00 | 11,470.00 | 90.00 | 10,323.00 | 75.00 | 8,602.50 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 31,300.00 | 31,300.00 | 22,500.00 | 22,500.00 | 45,825.00 | 45,825.00 | 70,000.00 | 70,000.00 | | 0045 | 729-01-00100 | Sign (Type A) | 28 | SQFT | 31.00 | 868.00 | 33.00 | 924.00 | 25.00 | 700.00 | 30.00 | 840.00 | | 0046 | 729-21-00100 | U-Channel Post | 7 | EACH | 93.00 | 651.00 | 139.00 | 973.00 | 75.00 | 525.00 | 100.00 | 700.00 | | 0047 | 735-01-00100 | Mailboxes | 11 | EACH | 1.25 | 13.75 | 5.50 | 60.50 | 1.00 | 11.00 | 10.00 | 110.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 180.00 | 1,980.00 | 200.00 | 2,200.00 | 145.00 | 1,595.00 | 150.00 | 1,650.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0050 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 9.72 | CUYD | 1,100.00 | 10,692.00 | 3,000.00 | 29,160.00 | 1,250.00 | 12,150.00 | 2,000.00 | 19,440.00 | | 0051 | 805-01-00900 | Class A1 Concrete (Pipe Headwalls) | 16.36 | CUYD | 1,100.00 | 17,996.00 | 1,500.00 | 24,540.00 | 1,200.00 | 19,632.00 | 2,000.00 | 32,720.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel (Pipe Headwalls) | 925 | LB | 3.00 | 2,775.00 | 10.00 | 9,250.00 | 1.50 | 1,387.50 | 3.00 | 2,775.00 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel (Retaining Wall) | 1,162 | LB | 4.30 | 4,996.60 | 10.00 | 11,620.00 | 1.50 | 1,743.00 | 3.00 | 3,486.00 | | 0054 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,850 | INLF | 4.00 | 11,400.00 | 1.75 | 4,987.50 | 1.00 | 2,850.00 | 1.00 | 2,850.00 | | 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 714 | INLF | 6.00 | 4,284.00 | 1.75 | 1,249.50 | 1.00 | 714.00 | 1.00 | 714.00 | | 0056 | NS-ENH-01040 | Adjusting Utility Boxes stations 30+06.01, 32+01.21, 33+80.22, 38+43.22, 38+45.56, 60+24.74, 60+45.25 | 7 | EACH | 350.00 | 2,450.00 | 450.00 | 3,150.00 | 650.00 | 4,550.00 | 250.00 | 1,750.00 | | 0057 | NS-MSC-00120 | Drainage Structure (Conflict Box) | 1 | EACH | 5,400.00 | 5,400.00 | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 569,997.65 | | 587,304.40 | | 652,244.00 | | 713,863.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Pipeline Constr & Maintenance Inc | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 27,500.00 | 27,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,150.00 | 7,150.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 167 | SQYD | 26.40 | 4,408.80 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 63 | LNFT | 26.40 | 1,663.20 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) (12" RCP) | 77 | LNFT | 33.00 | 2,541.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (15" CMP) | 50 | LNFT | 33.00 | 1,650.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (15" RCP) | 68 | LNFT | 33.00 | 2,244.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | 69 | LNFT | 33.00 | 2,277.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 203 | LNFT | 33.00 | 6,699.00 | | 0010 | 202-02-32180 | Removal of Pipe Headwalls | 13 | EACH | 132.00 | 1,716.00 | | 0011 | 202-03-38000 | Relocation of Sign (Traffic Signs) | 20 | EACH | 132.00 | 2,640.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 17,424.00 | 17,424.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 96 | CUYD | 37.81 | 3,629.76 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 1,691 | LNFT | 33.00 | 55,803.00 | | 0015 | 204-02-00100 | Temporary Hay Bales | 210 | EACH | 45.10 | 9,471.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 7,630 | LNFT | 6.53 | 49,823.90 | | 0017 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 270 | CUYD | 86.40 | 23,328.00 | | 0018 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 37 | LNFT | 68.00 | 2,516.00 | | 0019 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 208 | LNFT | 81.07 | 16,862.56 | | 0020 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 25 | LNFT | 113.48 | 2,837.00 | | 0021 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 10 | LNFT | 144.48 | 1,444.80 | | 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 347 | LNFT | 100.12 | 34,741.64 | | 0023 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 38 | LNFT | 100.12 | 3,804.56 | | 0024 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 90 | LNFT | 100.12 | 9,010.80 | | 0025 | 701-07-00200 | Yard Drain Pipe (6") | 10 | LNFT | 100.12 | 1,001.20 | | 0026 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 198 | LNFT | 58.03 | 11,489.94 | | 0027 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 18 | LNFT | 96.97 | 1,745.46 | | 0028 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 5 | LNFT | 138.36 | 691.80 | | 0029 | 701-15-00100 | Concrete Collar | 10 | EACH | 1,000.00 | 10,000.00 | | 0030 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 4,074.95 | 4,074.95 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 13 | EACH | 3,020.00 | 39,260.00 | | 0032 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 3,350.05 | 3,350.05 | | 0033 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,811.60 | 5,623.20 | | 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 2,643.8 | SQYD | 73.10 | 193,261.78 | | 0035 | 706-01-00300 | Concrete Walk (6" Thick) | 52.9 | SQYD | 100.00 | 5,290.00 | | 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 618.9 | SQYD | 100.00 | 61,890.00 | | 0037 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 65.4 | SQYD | 100.00 | 6,540.00 | | 0038 | 706-04-00100 | Handicapped Curb Ramps (Type 4) | 9 | EACH | 2,000.00 | 18,000.00 | | 0039 | 707-01-00200 | Concrete Curb (Barrier) | 40 | LNFT | 35.00 | 1,400.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | | 0041 | 717-01-00100 | Seeding (Hull Bermuda) | 40 | LB | 20.00 | 800.00 | | 0042 | 718-01-00100 | Fertilizer (8-8-8) | 1,270 | LB | 20.58 | 26,136.60 | | 0043 | 726-01-00100 | Bedding Material | 114.7 | CUYD | 106.56 | 12,222.43 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 72,000.00 | 72,000.00 | | 0045 | 729-01-00100 | Sign (Type A) | 28 | SQFT | 50.40 | 1,411.20 | | 0046 | 729-21-00100 | U-Channel Post | 7 | EACH | 144.00 | 1,008.00 | | 0047 | 735-01-00100 | Mailboxes | 11 | EACH | 150.00 | 1,650.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 240.00 | 2,640.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | | 0050 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 9.72 | CUYD | 150.00 | 1,458.00 | | 0051 | 805-01-00900 | Class A1 Concrete (Pipe Headwalls) | 16.36 | CUYD | 150.00 | 2,454.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel (Pipe Headwalls) | 925 | LB | 2.40 | 2,220.00 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel (Retaining Wall) | 1,162 | LB | 2.40 | 2,788.80 | | 0054 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,850 | INLF | 10.80 | 30,780.00 | | 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 714 | INLF | 13.68 | 9,767.52 | | 0056 | NS-ENH-01040 | Adjusting Utility Boxes stations 30+06.01, 32+01.21, 33+80.22, 38+43.22, 38+45.56, 60+24.74, 60+45.25 | 7 | EACH | 400.00 | 2,800.00 | | 0057 | NS-MSC-00120 | Drainage Structure (Conflict Box) | 1 | EACH | 4,320.00 | 4,320.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 877,260.95 |
|