Proposal:H.009765.6
Parish:LaSalle
Description:JENA: MULTI-MODAL CONNECTIVITY
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PATH, STAMPED ASPHALT TREATMENT, ASPHALT CONCRETE OVERLAY, LIGHTING, PEDESTRIAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,360,278.70
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $1,168,381.86 |
| 2 | 32044 | Quality Design & Construction, LLC | $1,262,074.86 |
| 3 | 49239 | WL Bass Construction Inc. | $1,288,676.40 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $1,533,203.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - Quality Design & Construction, LLC | - 3 - WL Bass Construction Inc. | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 39,818.39 | 39,818.39 | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 156 | SQYD | 9.00 | 1,404.00 | 21.24 | 3,313.44 | 2.50 | 390.00 | 27.00 | 4,212.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 143 | SQYD | 9.00 | 1,287.00 | 27.61 | 3,948.23 | 8.00 | 1,144.00 | 32.00 | 4,576.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 110 | LNFT | 9.00 | 990.00 | 32.05 | 3,525.50 | 2.00 | 220.00 | 24.00 | 2,640.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) (From Sta. No. 9+42.42 to Sta. No. 11+36.23) | 194 | LNFT | 5.00 | 970.00 | 17.09 | 3,315.46 | 8.80 | 1,707.20 | 32.00 | 6,208.00 | | 0006 | 202-03-38000 | Relocation of Sign (Sta. No. 7+00 R) | 1 | EACH | 200.00 | 200.00 | 289.38 | 289.38 | 600.00 | 600.00 | 1.00 | 1.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 35,812.44 | 35,812.44 | 26,000.00 | 26,000.00 | 50,000.00 | 50,000.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 448 | CUYD | 25.00 | 11,200.00 | 24.37 | 10,917.76 | 12.00 | 5,376.00 | 18.00 | 8,064.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 30 | EACH | 25.00 | 750.00 | 9.52 | 285.60 | 35.00 | 1,050.00 | 60.00 | 1,800.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 185.00 | 925.00 | 107.08 | 535.40 | 150.00 | 750.00 | 300.00 | 1,500.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 3,620 | LNFT | 3.70 | 13,394.00 | 4.47 | 16,181.40 | 1.89 | 6,841.80 | 2.50 | 9,050.00 | | 0012 | 302-02-06000 | Class II Base Course (6" Thick) | 2,809.2 | SQYD | 18.00 | 50,565.60 | 21.88 | 61,465.30 | 27.00 | 75,848.40 | 31.00 | 87,085.20 | | 0013 | 302-02-06000 | Class II Base Course (6" Thick) (Street and Parking Area) | 1,153.3 | SQYD | 18.00 | 20,759.40 | 27.99 | 32,280.87 | 29.00 | 33,445.70 | 32.00 | 36,905.60 | | 0014 | 502-01-00100 | Asphalt Concrete (Bike Lane and Shared-Use Path) | 367 | TON | 170.00 | 62,390.00 | 144.10 | 52,884.70 | 170.00 | 62,390.00 | 140.00 | 51,380.00 | | 0015 | 502-01-00100 | Asphalt Concrete (Street and Parking Area) | 420.6 | TON | 140.00 | 58,884.00 | 144.10 | 60,608.46 | 145.00 | 60,987.00 | 140.00 | 58,884.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement (Bike Lane) | 543 | SQYD | 6.00 | 3,258.00 | 8.14 | 4,420.02 | 13.00 | 7,059.00 | 17.00 | 9,231.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement Street and Parking Area | 2,661 | SQYD | 6.00 | 15,966.00 | 8.14 | 21,660.54 | 4.00 | 10,644.00 | 11.00 | 29,271.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -23 | CUYD | 0.01 | -0.23 | 0.10 | -2.30 | 1.00 | -23.00 | 1.00 | -23.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement (Street and Parking Area) | -111 | CUYD | 0.01 | -1.11 | 0.10 | -11.10 | 1.00 | -111.00 | 1.00 | -111.00 | | 0020 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 423 | LNFT | 62.00 | 26,226.00 | 41.66 | 17,622.18 | 80.00 | 33,840.00 | 110.00 | 46,530.00 | | 0021 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 58 | LNFT | 82.00 | 4,756.00 | 58.61 | 3,399.38 | 87.00 | 5,046.00 | 195.00 | 11,310.00 | | 0022 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 43 | LNFT | 200.00 | 8,600.00 | 129.28 | 5,559.04 | 165.00 | 7,095.00 | 230.00 | 9,890.00 | | 0023 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 15 | LNFT | 150.00 | 2,250.00 | 97.96 | 1,469.40 | 115.00 | 1,725.00 | 170.00 | 2,550.00 | | 0024 | 701-12-01020 | Corrugated Metal Pipe (Extension) (15") | 20 | LNFT | 150.00 | 3,000.00 | 152.90 | 3,058.00 | 67.00 | 1,340.00 | 135.00 | 2,700.00 | | 0025 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,000.00 | 2,000.00 | 806.81 | 1,613.62 | 1,000.00 | 2,000.00 | 2,100.00 | 4,200.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 110 | LNFT | 1.00 | 110.00 | 27.59 | 3,034.90 | 15.00 | 1,650.00 | 20.00 | 2,200.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,500.00 | 10,000.00 | 3,125.68 | 12,502.72 | 3,700.00 | 14,800.00 | 4,500.00 | 18,000.00 | | 0028 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 3,500.00 | 7,000.00 | 4,884.79 | 9,769.58 | 3,750.00 | 7,500.00 | 6,500.00 | 13,000.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 12 | SQYD | 95.00 | 1,140.00 | 139.15 | 1,669.80 | 100.00 | 1,200.00 | 225.00 | 2,700.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 2.00 | 24.00 | 47.28 | 567.36 | 2.50 | 30.00 | 4.00 | 48.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 34,321.15 | 34,321.15 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | | 0032 | 717-01-00100 | Seeding | 11 | LB | 15.00 | 165.00 | 18.26 | 200.86 | 50.00 | 550.00 | 50.00 | 550.00 | | 0033 | 718-01-00100 | Fertilizer | 294 | LB | 0.50 | 147.00 | 1.22 | 358.68 | 5.00 | 1,470.00 | 5.00 | 1,470.00 | | 0034 | 726-01-00100 | Bedding Material | 54.5 | CUYD | 92.00 | 5,014.00 | 117.53 | 6,405.39 | 110.00 | 5,995.00 | 100.00 | 5,450.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 58,249.69 | 58,249.69 | 100,000.00 | 100,000.00 | 140,000.00 | 140,000.00 | | 0036 | 729-01-00100 | Sign (Type A) | 44 | SQFT | 45.00 | 1,980.00 | 44.70 | 1,966.80 | 25.00 | 1,100.00 | 30.00 | 1,320.00 | | 0037 | 729-21-00100 | U-Channel Post | 4 | EACH | 220.00 | 880.00 | 223.50 | 894.00 | 100.00 | 400.00 | 20.00 | 80.00 | | 0038 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 4,585 | LNFT | 1.10 | 5,043.50 | 1.29 | 5,914.65 | 1.15 | 5,272.75 | 1.00 | 4,585.00 | | 0039 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 3,456 | LNFT | 2.20 | 7,603.20 | 1.56 | 5,391.36 | 1.40 | 4,838.40 | 1.50 | 5,184.00 | | 0040 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 402 | LNFT | 3.40 | 1,366.80 | 2.46 | 988.92 | 2.20 | 884.40 | 2.00 | 804.00 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 402 | LNFT | 9.20 | 3,698.40 | 9.50 | 3,819.00 | 8.50 | 3,417.00 | 8.00 | 3,216.00 | | 0042 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 10 | EACH | 150.00 | 1,500.00 | 217.91 | 2,179.10 | 195.00 | 1,950.00 | 200.00 | 2,000.00 | | 0043 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 10 | EACH | 155.00 | 1,550.00 | 217.91 | 2,179.10 | 210.00 | 2,100.00 | 275.00 | 2,750.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 35,201.25 | 35,201.25 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | | 0045 | 822-01-00100 | Trenching and Backfilling | 7,929 | LNFT | 5.00 | 39,645.00 | 2.11 | 16,730.19 | 7.00 | 55,503.00 | 4.30 | 34,094.70 | | 0046 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2 #4, 1 #8) | 1,188 | LNFT | 5.70 | 6,771.60 | 12.35 | 14,671.80 | 4.95 | 5,880.60 | 5.00 | 5,940.00 | | 0047 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2 #8, 1 #10) | 2,836 | LNFT | 4.80 | 13,612.80 | 10.39 | 29,466.04 | 4.15 | 11,769.40 | 4.20 | 11,911.20 | | 0048 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (3 #10) | 4,371 | LNFT | 5.00 | 21,855.00 | 9.72 | 42,486.12 | 4.25 | 18,576.75 | 4.30 | 18,795.30 | | 0049 | 822-02-00700 | Conduit w Conductors (PVC/HDPE) (3") (3 #3) | 116 | LNFT | 9.20 | 1,067.20 | 45.91 | 5,325.56 | 8.00 | 928.00 | 8.10 | 939.60 | | 0050 | 822-02-02700 | Conduit w Conductors (Rigid Galv Steel) (3") (2 #4, 1 #8) | 80 | LNFT | 30.00 | 2,400.00 | 82.07 | 6,565.60 | 26.15 | 2,092.00 | 26.50 | 2,120.00 | | 0051 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 636 | LNFT | 28.00 | 17,808.00 | 36.34 | 23,112.24 | 24.00 | 15,264.00 | 24.00 | 15,264.00 | | 0052 | 822-04-00300 | Jacked or Bored Casing (8" Dia) (PVC/HDPE) | 26 | LNFT | 37.00 | 962.00 | 472.79 | 12,292.54 | 32.00 | 832.00 | 32.00 | 832.00 | | 0053 | 822-05-02100 | Light Pole (Double Arm) | 10 | EACH | 3,500.00 | 35,000.00 | 1,741.96 | 17,419.60 | 3,075.00 | 30,750.00 | 3,110.00 | 31,100.00 | | 0054 | 822-05-02100 | Light Pole (Single Arm) | 44 | EACH | 3,100.00 | 136,400.00 | 910.96 | 40,082.24 | 2,684.00 | 118,096.00 | 2,720.00 | 119,680.00 | | 0055 | 822-07-02800 | Luminaire (90 Watt) (LED) | 64 | EACH | 2,000.00 | 128,000.00 | 2,104.81 | 134,707.84 | 1,783.00 | 114,112.00 | 1,800.00 | 115,200.00 | | 0056 | 822-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 6,200.00 | 6,200.00 | 19,865.80 | 19,865.80 | 5,450.00 | 5,450.00 | 5,520.00 | 5,520.00 | | 0057 | 822-10-00100 | Fabricated Light Pole Support | 48 | EACH | 180.00 | 8,640.00 | 1,561.15 | 74,935.20 | 158.00 | 7,584.00 | 160.00 | 7,680.00 | | 0058 | 822-10-00100 | Fabricated Light Pole Support (Breakaway) | 6 | EACH | 920.00 | 5,520.00 | 2,239.66 | 13,437.96 | 812.50 | 4,875.00 | 823.00 | 4,938.00 | | 0059 | 822-16-00200 | Underground Junction Box (11" x 18") | 8 | EACH | 550.00 | 4,400.00 | 454.13 | 3,633.04 | 500.00 | 4,000.00 | 501.00 | 4,008.00 | | 0060 | 822-16-00300 | Underground Junction Box (13" x 24") | 1 | EACH | 580.00 | 580.00 | 634.74 | 634.74 | 515.00 | 515.00 | 522.00 | 522.00 | | 0061 | 822-21-00100 | Duct Marker (Concrete) | 15 | EACH | 400.00 | 6,000.00 | 111.75 | 1,676.25 | 355.00 | 5,325.00 | 360.00 | 5,400.00 | | 0062 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 7,929 | LNFT | 0.30 | 2,378.70 | 0.23 | 1,823.67 | 0.25 | 1,982.25 | 0.25 | 1,982.25 | | 0063 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,872 | INLF | 1.00 | 3,872.00 | 1.12 | 4,336.64 | 1.25 | 4,840.00 | 1.00 | 3,872.00 | | 0064 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 919 | INLF | 1.00 | 919.00 | 1.55 | 1,424.45 | 1.25 | 1,148.75 | 1.00 | 919.00 | | 0065 | NS-700-00011 | Bollard | 20 | EACH | 300.00 | 6,000.00 | 421.13 | 8,422.60 | 350.00 | 7,000.00 | 675.00 | 13,500.00 | | 0066 | NS-706-00100 | Truncated Dome System (Asphalt Concrete Pavement) | 13 | EACH | 475.00 | 6,175.00 | 672.66 | 8,744.58 | 1,700.00 | 22,100.00 | 485.00 | 6,305.00 | | 0067 | NS-744-00101 | Flexible Post Traffic Delineators | 96 | EACH | 135.00 | 12,960.00 | 25.87 | 2,483.52 | 125.00 | 12,000.00 | 75.00 | 7,200.00 | | 0068 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 2 | EACH | 295.00 | 590.00 | 672.66 | 1,345.32 | 1,100.00 | 2,200.00 | 550.00 | 1,100.00 | | 0069 | TS-520-00100 | Stamped Asphalt Treatment (Street and Parking Area) | 1,515 | SQYD | 42.00 | 63,630.00 | 44.59 | 67,553.85 | 22.00 | 33,330.00 | 78.00 | 118,170.00 | | 0070 | TS-800-00100 | Pedestrian Bridge (70' x 12' Bridge) (Installed with footings) | 1 | LUMP | 115,000.00 | 115,000.00 | 139,312.05 | 139,312.05 | 219,000.00 | 219,000.00 | 150,000.00 | 150,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,168,381.86 | | 1,262,074.86 | | 1,288,676.40 | | 1,533,203.85 |
|