Proposal:H.007416.6
Parish:Calcasieu
Description:1ST AVE PEDESTRIAN TRAIL
Type Construction:GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, CONCRETE SIDEWALK, BOLLARDS, AND RELATED WORK.
Estimated Construction Cost:$537,441.60
| Rank | License | Bidder | Construction Bid |
| 1 | 14648 | Mcmanus Construction, LLC | $540,810.90 |
| 2 | 36384 | JOHN BAILEY, INC. | $612,828.40 |
| 3 | 52306 | SIEMA CONSTRUCTION, LLC | $635,857.52 |
| 4 | 55950 | Brown Industrial Construction, LLC | $954,069.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Mcmanus Construction, LLC | - 2 - JOHN BAILEY, INC. | - 3 - SIEMA CONSTRUCTION, LLC | - 4 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | 1,120.00 | 1,120.00 | 18,000.00 | 18,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 89 | SQYD | 20.00 | 1,780.00 | 25.00 | 2,225.00 | 17.00 | 1,513.00 | 60.00 | 5,340.00 | | 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 187.2 | SQYD | 20.00 | 3,744.00 | 25.00 | 4,680.00 | 61.00 | 11,419.20 | 60.00 | 11,232.00 | | 0004 | 202-03-38000 | Relocation of Sign (Stop Signs) (Sta. Nos. 122+25.04, 122+25.41, & 130+51.34) | 3 | EACH | 300.00 | 900.00 | 150.00 | 450.00 | 50.00 | 150.00 | 300.00 | 900.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 65,000.00 | 65,000.00 | 100,000.00 | 100,000.00 | 116,000.00 | 116,000.00 | 267,000.00 | 267,000.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 35 | EACH | 24.00 | 840.00 | 35.00 | 1,225.00 | 21.00 | 735.00 | 20.00 | 700.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 5,873 | LNFT | 6.50 | 38,174.50 | 2.50 | 14,682.50 | 1.50 | 8,809.50 | 1.50 | 8,809.50 | | 0008 | 302-02-06000 | Class II Base Course (6" Thick) (Stone or Recycled PCC) | 3,735.8 | SQYD | 17.00 | 63,508.60 | 30.00 | 112,074.00 | 27.00 | 100,866.60 | 35.00 | 130,753.00 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 120.00 | 3,000.00 | 100.00 | 2,500.00 | 95.00 | 2,375.00 | 100.00 | 2,500.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 313.4 | TON | 141.00 | 44,189.40 | 176.00 | 55,158.40 | 159.00 | 49,830.60 | 125.00 | 39,175.00 | | 0011 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 187.2 | SQYD | 90.00 | 16,848.00 | 125.00 | 23,400.00 | 305.00 | 57,096.00 | 400.00 | 74,880.00 | | 0012 | 701-07-00200 | Yard Drain Pipe (6") | 6 | LNFT | 40.00 | 240.00 | 50.00 | 300.00 | 23.00 | 138.00 | 90.00 | 540.00 | | 0013 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,000.00 | 8,000.00 | 3,000.00 | 6,000.00 | 5,200.00 | 10,400.00 | 4,000.00 | 8,000.00 | | 0014 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | 1,350.00 | 2,700.00 | 1,800.00 | 3,600.00 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 2,500.00 | 7,500.00 | 2,500.00 | 7,500.00 | 1,660.00 | 4,980.00 | 2,500.00 | 7,500.00 | | 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 562.5 | SQYD | 60.00 | 33,750.00 | 65.00 | 36,562.50 | 109.00 | 61,312.50 | 62.00 | 34,875.00 | | 0017 | 706-01-00300 | Concrete Walk (6" Thick) | 57.2 | SQYD | 60.00 | 3,432.00 | 75.00 | 4,290.00 | 250.00 | 14,300.00 | 150.00 | 8,580.00 | | 0018 | 706-04-00100 | Handicapped Curb Ramps | 42 | EACH | 3,000.00 | 126,000.00 | 2,000.00 | 84,000.00 | 1,610.00 | 67,620.00 | 1,700.00 | 71,400.00 | | 0019 | 707-01-00200 | Concrete Curb (Barrier) (6") | 224.3 | LNFT | 10.00 | 2,243.00 | 35.00 | 7,850.50 | 25.00 | 5,607.50 | 10.00 | 2,243.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 17,800.00 | 17,800.00 | 40,000.00 | 40,000.00 | | 0021 | 726-01-00100 | Bedding Material | 2 | CUYD | 150.00 | 300.00 | 200.00 | 400.00 | 90.00 | 180.00 | 300.00 | 600.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 93,262.00 | 93,262.00 | | 0023 | 739-01-00100 | Hydro-Seeding | 2.49 | ACRE | 4,500.00 | 11,205.00 | 1,800.00 | 4,482.00 | 2,200.00 | 5,478.00 | 3,295.00 | 8,204.55 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | 45,000.00 | 45,000.00 | | 0025 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 6,718.8 | INLF | 3.00 | 20,156.40 | 1.25 | 8,398.50 | 1.15 | 7,726.62 | 4.00 | 26,875.20 | | 0026 | NS-P10-00001 | Adjusting Sanitary Sewer Cleanout | 1 | EACH | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | 250.00 | 250.00 | 600.00 | 600.00 | | 0027 | TS-700-02080 | Bollard (60" Long Concrete Filled Steel Bollard)(Painted Yellow Enamel)(With Concrete Foundation) | 29 | EACH | 1,000.00 | 29,000.00 | 2,850.00 | 82,650.00 | 1,050.00 | 30,450.00 | 1,500.00 | 43,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 540,810.90 | | 612,828.40 | | 635,857.52 | | 954,069.25 |
|