Proposal:H.013076.6
Parish:Calcasieu
Routes:US 90
Description:US 90: I-10 OVERPASS INTERIM REPAIRS (HBI)
Type Construction:REMOVAL OF BRIDGE DECK (HYDRO DEMOLITION), CLEANING AND PAINTING, LATEX MODIFIED CONCRETE OVERLAY, STRUCTURAL CONCRETE PATCHING, BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$1,997,537.48
Maximum Number of Days Allowed for Construction:60
Calculated Daily User Cost:$15,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 26435 | C.E.C., Inc. | $1,450,162.60 | 35.00 | $1,975,162.60 |
| 2 | 44133 | Gibson & Associates Inc. | $1,366,987.80 | 47.00 | $2,071,987.80 |
| 3 | 33131 | AMERICAN CONTRACTING & SERVICES,INC | $1,758,490.00 | 50.00 | $2,508,490.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - Gibson & Associates Inc. | - 3 - AMERICAN CONTRACTING & SERVICES,INC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 168.4 | SQYD | 90.00 | 15,156.00 | 46.00 | 7,746.40 | 15.00 | 2,526.00 | | 0002 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) 2" Depth | 36,400 | SFIN | 8.00 | 291,200.00 | 6.70 | 243,880.00 | 8.25 | 300,300.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 313.5 | LNFT | 15.00 | 4,702.50 | 13.20 | 4,138.20 | 12.00 | 3,762.00 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 1,000.00 | 2,000.00 | 27.50 | 55.00 | 25.00 | 50.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 47.9 | TON | 500.00 | 23,950.00 | 425.00 | 20,357.50 | 550.00 | 26,345.00 | | 0007 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 437.5 | LNFT | 27.00 | 11,812.50 | 26.40 | 11,550.00 | 24.00 | 10,500.00 | | 0008 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 84.00 | 4,200.00 | 104.50 | 5,225.00 | 95.00 | 4,750.00 | | 0009 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,720.00 | 7,440.00 | 3,740.00 | 7,480.00 | 3,400.00 | 6,800.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 72,000.00 | 72,000.00 | 275,000.00 | 275,000.00 | | 0011 | 713-11-00100 | Portable Changeable Message Signs | 3 | EACH | 2,400.00 | 7,200.00 | 5,300.00 | 15,900.00 | 2,800.00 | 8,400.00 | | 0012 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0013 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 125,000.00 | 125,000.00 | 175,849.00 | 175,849.00 | | 0014 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 108.00 | 216.00 | 100.00 | 200.00 | 85.00 | 170.00 | | 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 304 | EACH | 8.40 | 2,553.60 | 7.70 | 2,340.80 | 7.00 | 2,128.00 | | 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.572 | MILE | 5,400.00 | 3,088.80 | 4,950.00 | 2,831.40 | 4,484.27 | 2,565.00 | | 0017 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 0.286 | MILE | 1,800.00 | 514.80 | 1,650.00 | 471.90 | 1,468.53 | 420.00 | | 0018 | 732-05-00100 | Removal of Existing Markings | 0.858 | MILE | 9,800.00 | 8,408.40 | 7,700.00 | 6,606.60 | 6,934.73 | 5,950.00 | | 0019 | 811-01-00100 | Cleaning and Painting Estimated 4,000 Sq. Ft. | 1 | LUMP | 195,000.00 | 195,000.00 | 197,010.00 | 197,010.00 | 170,000.00 | 170,000.00 | | 0020 | 815-03-00200 | Joint Seal (Preformed Silicone) | 56 | LNFT | 120.00 | 6,720.00 | 100.00 | 5,600.00 | 110.00 | 6,160.00 | | 0021 | 830-01-00100 | Bridge Superstructure Repair Bearing | 1 | EACH | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 13,000.00 | 13,000.00 | | 0022 | 830-01-00100 | Bridge Superstructure Repair Joint Cover Plate Removal | 2 | EACH | 4,200.00 | 8,400.00 | 5,000.00 | 10,000.00 | 6,000.00 | 12,000.00 | | 0023 | 830-07-00100 | Structural Concrete Patching | 65 | SQFT | 420.00 | 27,300.00 | 275.00 | 17,875.00 | 250.00 | 16,250.00 | | 0024 | 830-10-00100 | Epoxy Injection | 185 | LNFT | 80.00 | 14,800.00 | 88.00 | 16,280.00 | 125.00 | 23,125.00 | | 0025 | NS-602-00011 | Expansion Joint Rehabilitation | 197 | LNFT | 600.00 | 118,200.00 | 340.00 | 66,980.00 | 500.00 | 98,500.00 | | 0026 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 110 | LNFT | 600.00 | 66,000.00 | 850.00 | 93,500.00 | 1,700.00 | 187,000.00 | | 0027 | NS-830-00800 | Latex Modified Concrete Overlay | 36,400 | SFIN | 11.00 | 400,400.00 | 10.40 | 378,560.00 | 9.60 | 349,440.00 | | 0028 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs | 140 | SQFT | 185.00 | 25,900.00 | 160.00 | 22,400.00 | 125.00 | 17,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,450,162.60 | | 1,366,987.80 | | 1,758,490.00 |
|