Proposal:H.012149.6
Parish:LaSalle
Routes:LA 127
Description:LA 127: LA 776 - 1.4 MI. S. LA 460
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,260,700.19
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $1,031,711.05 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,032,424.14 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,345,028.01 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) 2.607 acres | 2.607 | LUMP | 11,000.00 | 11,000.00 | 12,000.00 | 12,000.00 | 32,000.00 | 32,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 410 | LNFT | 16.00 | 6,560.00 | 19.25 | 7,892.50 | 15.00 | 6,150.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) STATIONS 69+73, 100+82, 174+95 | 209 | LNFT | 9.00 | 1,881.00 | 9.35 | 1,954.15 | 30.00 | 6,270.00 | | 0004 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 500.00 | 1,000.00 | 490.00 | 980.00 | 1,700.00 | 3,400.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 490 | CUYD | 35.00 | 17,150.00 | 1.00 | 490.00 | 24.00 | 11,760.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,108 | CUYD | 22.00 | 24,376.00 | 39.00 | 43,212.00 | 60.00 | 66,480.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 45.00 | 4,500.00 | 40.00 | 4,000.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 5,099.3 | TON | 90.00 | 458,937.00 | 75.00 | 382,447.50 | 99.00 | 504,830.70 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 432.4 | TON | 90.00 | 38,916.00 | 160.00 | 69,184.00 | 99.00 | 42,807.60 | | 0010 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 14,613 | GAL | 2.65 | 38,724.45 | 2.65 | 38,724.45 | 2.75 | 40,185.75 | | 0011 | 507-02-00300 | Aggregate (S3) | 47,138 | SQYD | 1.05 | 49,494.90 | 1.00 | 47,138.00 | 1.00 | 47,138.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 47,138 | SQYD | 1.00 | 47,138.00 | 1.25 | 58,922.50 | 1.75 | 82,491.50 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,006 | CUYD | 1.00 | -1,006.00 | 1.00 | -1,006.00 | 1.00 | -1,006.00 | | 0014 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,000 | SQYD | 125.00 | 125,000.00 | 105.00 | 105,000.00 | 135.00 | 135,000.00 | | 0015 | 701-01-02001 | Cross Drain Pipe (24" RCP/PP/CMP) | 192 | LNFT | 120.00 | 23,040.00 | 153.00 | 29,376.00 | 300.00 | 57,600.00 | | 0016 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | 40 | LNFT | 125.00 | 5,000.00 | 194.00 | 7,760.00 | 370.00 | 14,800.00 | | 0017 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 48 | LNFT | 110.00 | 5,280.00 | 215.00 | 10,320.00 | 350.00 | 16,800.00 | | 0018 | 701-15-00100 | Concrete Collar | 6 | EACH | 650.00 | 3,900.00 | 1,500.00 | 9,000.00 | 1,400.00 | 8,400.00 | | 0019 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 232 | LNFT | 1.00 | 232.00 | 6.50 | 1,508.00 | 15.00 | 3,480.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 175 | LNFT | 24.00 | 4,200.00 | 24.00 | 4,200.00 | 26.00 | 4,550.00 | | 0021 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 55.00 | 2,750.00 | 54.00 | 2,700.00 | 65.00 | 3,250.00 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 68.00 | 6,800.00 | 70.00 | 7,000.00 | 80.00 | 8,000.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 70 | SQYD | 100.00 | 7,000.00 | 130.00 | 9,100.00 | 90.00 | 6,300.00 | | 0025 | 711-02-00200 | Riprap (10 lb) | 4 | CUYD | 100.00 | 400.00 | 524.00 | 2,096.00 | 500.00 | 2,000.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 70 | SQYD | 5.00 | 350.00 | 1.00 | 70.00 | 3.50 | 245.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 22,000.00 | 22,000.00 | 22,000.00 | 22,000.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.839 | MILE | 200.00 | 1,567.80 | 154.00 | 1,207.21 | 210.00 | 1,646.19 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.38 | MILE | 300.00 | 414.00 | 250.00 | 345.00 | 1.00 | 1.38 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.389 | MILE | 100.00 | 1,538.90 | 479.00 | 7,371.33 | 1.00 | 15.39 | | 0031 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,036 | EACH | 2.00 | 2,072.00 | 2.00 | 2,072.00 | 2.00 | 2,072.00 | | 0032 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 175 | SQYD | 7.00 | 1,225.00 | 5.25 | 918.75 | 1.78 | 311.50 | | 0033 | 726-01-00100 | Bedding Material | 87.6 | CUYD | 100.00 | 8,760.00 | 105.00 | 9,198.00 | 125.00 | 10,950.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 63,000.00 | 63,000.00 | 60,000.00 | 60,000.00 | 130,000.00 | 130,000.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 100.00 | 2,000.00 | 80.00 | 1,600.00 | 75.00 | 1,500.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 90.00 | 360.00 | 85.00 | 340.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 945 | EACH | 5.00 | 4,725.00 | 5.25 | 4,961.25 | 7.00 | 6,615.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.695 | MILE | 2,800.00 | 21,546.00 | 3,200.00 | 24,624.00 | 3,200.00 | 24,624.00 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.69 | MILE | 1,000.00 | 690.00 | 1,000.00 | 690.00 | 1,100.00 | 759.00 | | 0040 | 732-05-00100 | Removal of Existing Markings | 0.023 | MILE | 2,000.00 | 46.00 | 3,500.00 | 80.50 | 25,000.00 | 575.00 | | 0041 | 735-01-00100 | Mailboxes | 14 | EACH | 5.00 | 70.00 | 1.00 | 14.00 | 20.00 | 280.00 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 150.00 | 1,200.00 | 275.00 | 2,200.00 | 130.00 | 1,040.00 | | 0043 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 250.00 | 750.00 | 275.00 | 825.00 | 275.00 | 825.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 1.25 | ACRE | 3,000.00 | 3,750.00 | 2,975.00 | 3,718.75 | 1,500.00 | 1,875.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 8,300.00 | 8,300.00 | 8,000.00 | 8,000.00 | | 0046 | 805-01-00900 | Class A1 Concrete STATION 36+58 | 4 | CUYD | 1,200.00 | 4,800.00 | 3,400.00 | 13,600.00 | 2,500.00 | 10,000.00 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel | 211 | LB | 3.00 | 633.00 | 1.75 | 369.25 | 6.00 | 1,266.00 | | 0048 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 1 | EACH | 3,000.00 | 3,000.00 | 3,100.00 | 3,100.00 | 1,400.00 | 1,400.00 | | 0049 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,600.00 | 10,400.00 | 2,575.00 | 10,300.00 | 3,000.00 | 12,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,031,711.05 | | 1,032,424.14 | | 1,345,028.01 |
|