Bid Tabulations for the Letting of 7/11/2018 LA DOTD Headquarters

Proposal:H.011896.6
Parish:Claiborne
Routes:LA 9
Description:CORNEY LAKE BRIDGE REPAIR
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$1,023,342.00
Rank License BidderConstruction Bid
144133Gibson & Associates Inc.$1,191,725.26
226435C.E.C., Inc.$1,394,813.30
333131AMERICAN CONTRACTING & SERVICES,INC$1,415,697.88


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Gibson & Associates Inc.
- 2 -
C.E.C., Inc.
- 3 -
AMERICAN CONTRACTING & SERVICES,INC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.5   LUMP34,000.0034,000.0010,000.0010,000.0026,000.0026,000.00
0002202-02-02020Removal of Asphalt Pavement 222.2   SQYD50.0011,110.0045.009,999.0035.007,777.00
0003202-02-04510Removal of Bridge Deck (Hydro Demolition) (Deck)32,255     SFIN7.90254,814.509.00290,295.0010.00322,550.00
0004202-02-04530Removal of Bridge Component (Hydro Demolition) (Posts)29     LNFT290.008,410.001,300.0037,700.00400.0011,600.00
0005202-02-04540Removal of Bridge Component (Rails)8     EACH1,300.0010,400.003,600.0028,800.002,000.0016,000.00
0006202-02-14500Removal of Guard Rail 351.3   LNFT6.602,318.5818.006,323.4012.004,215.60
0007203-07-00100Borrow (Vehicular Measurement) 450     CUYD42.4119,084.5040.0018,000.0075.0033,750.00
0008204-06-00100Temporary Silt Fencing 920     LNFT7.506,900.003.002,760.005.004,600.00
0009502-01-00100Asphalt Concrete 115.9   TON450.0052,155.00330.0038,247.00350.0040,565.00
0010502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 99.8   TON450.0044,910.00250.0024,950.00350.0034,930.00
0011509-01-00100Milling Asphalt Pavement 4,021     SQYD6.6026,538.608.5034,178.5012.0048,252.00
0012704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 81.25  LNFT71.505,809.3860.004,875.0055.004,468.75
0013704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) 262.5   LNFT26.406,930.0030.007,875.0022.505,906.25
0014704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT93.509,350.0090.009,000.0065.006,500.00
0015704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH3,025.0012,100.004,950.0019,800.002,500.0010,000.00
0016713-01-00100Temporary Signs and Barricades 1     LUMP27,000.0027,000.0030,000.0030,000.0020,000.0020,000.00
0017713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 1.054 MILE854.70900.851,000.001,054.00796.96840.00
0018724-01-00100Rumble Strips (Centerline) 0.074 MILE550.0040.7060,000.004,440.00115,000.008,510.00
0019727-01-00100Mobilization 1     LUMP103,500.00103,500.00130,000.00130,000.00141,569.78141,569.78
0020731-02-00100Reflectorized Raised Pavement Markers 70     EACH18.701,309.0010.80756.009.00630.00
0021732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.054 MILE3,054.703,219.656,600.006,956.405,479.135,775.00
0022810-01-00400Concrete Bridge Railing (Concrete Bridge Railing)80     LNFT365.0029,200.001,500.00120,000.00750.0060,000.00
0023830-07-00100Structural Concrete Patching 925.3   SQFT140.00129,542.0080.0074,024.00225.00208,192.50
0024NS-830-00800Latex Modified Concrete Overlay 32,255     SFIN10.50338,677.5014.00451,570.0011.70377,383.50
0025NS-830-01200Carbon Fiber Reinforced Polymer Repairs 184.5   SQFT290.0053,505.00180.0033,210.0085.0015,682.50
           
  CONTRACTOR TOTAL   1,191,725.26 1,394,813.30 1,415,697.88