Proposal:H.007271.6
Parish:Orleans
Description:CANAL BLVD (R.E. LEE - AMETHYST)
Type Construction:GRADING, DRAINAGE STRUCTURES, SANITARY SEWER, CLASS II BASE COURSE, TRAFFIC SIGNALIZATION (TEMPORARY), ASPHALT CONCRETE PAVEMENT, CONCRETE WALKS AND DRIVES, AND RELATED WORK.
Estimated Construction Cost:$5,706,627.60
| Rank | License | Bidder | Construction Bid |
| 1 | 44187 | Palmisano Construction LLC | $4,520,571.30 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,665,665.40 |
| 3 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $4,797,555.85 |
| 4 | 48896 | Command Construction Industries LLC | $4,994,513.70 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,281,909.65 |
| 6 | 02179 | Boh Bros. Construction Co., LLC. | $5,294,790.44 |
| 7 | 01033 | Wallace C. Drennan, Inc. | $6,088,759.58 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Palmisano Construction LLC | - 2 - Barriere Construction Co., LLC | - 3 - BEVERLY CONSTRUCTION CO. LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,000.00 | 7,000.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 | 1,000.00 | 1,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 4,617.8 | LNFT | 1.00 | 4,617.80 | 5.00 | 23,089.00 | 3.00 | 13,853.40 | 1.00 | 4,617.80 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,569 | SQYD | 9.00 | 14,121.00 | 9.00 | 14,121.00 | 24.00 | 37,656.00 | 30.00 | 47,070.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 17,467 | SQYD | 9.00 | 157,203.00 | 9.00 | 157,203.00 | 8.00 | 139,736.00 | 10.00 | 174,670.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 189.6 | SQYD | 13.00 | 2,464.80 | 9.00 | 1,706.40 | 11.00 | 2,085.60 | 10.00 | 1,896.00 | | 0007 | 202-03-38000 | Relocation of Sign (Type A) | 37 | EACH | 25.00 | 925.00 | 80.00 | 2,960.00 | 85.00 | 3,145.00 | 50.00 | 1,850.00 | | 0008 | 203-01-00100 | General Excavation | 13,693 | CUYD | 12.50 | 171,162.50 | 20.00 | 273,860.00 | 13.00 | 178,009.00 | 20.00 | 273,860.00 | | 0009 | 203-03-00100 | Embankment | 372 | CUYD | 40.00 | 14,880.00 | 50.00 | 18,600.00 | 60.00 | 22,320.00 | 1.00 | 372.00 | | 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 9,347 | CUYD | 27.50 | 257,042.50 | 20.00 | 186,940.00 | 22.00 | 205,634.00 | 30.00 | 280,410.00 | | 0011 | 203-08-00100 | Geotextile Fabric | 20,235 | SQYD | 1.00 | 20,235.00 | 1.00 | 20,235.00 | 1.25 | 25,293.75 | 1.00 | 20,235.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 192 | EACH | 8.00 | 1,536.00 | 9.00 | 1,728.00 | 12.00 | 2,304.00 | 10.00 | 1,920.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,107 | LNFT | 2.00 | 2,214.00 | 2.00 | 2,214.00 | 2.50 | 2,767.50 | 10.00 | 11,070.00 | | 0014 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 18,694 | SQYD | 24.00 | 448,656.00 | 25.00 | 467,350.00 | 21.00 | 392,574.00 | 20.00 | 373,880.00 | | 0015 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 5,498 | SQYD | 8.00 | 43,984.00 | 9.00 | 49,482.00 | 8.50 | 46,733.00 | 20.00 | 109,960.00 | | 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 51.6 | CUYD | 45.00 | 2,322.00 | 100.00 | 5,160.00 | 60.00 | 3,096.00 | 50.00 | 2,580.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 7,141.1 | TON | 70.00 | 499,877.00 | 87.00 | 621,275.70 | 75.00 | 535,582.50 | 75.00 | 535,582.50 | | 0018 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,705 | LNFT | 100.00 | 170,500.00 | 75.00 | 127,875.00 | 84.00 | 143,220.00 | 90.00 | 153,450.00 | | 0019 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 710 | LNFT | 110.00 | 78,100.00 | 85.00 | 60,350.00 | 94.00 | 66,740.00 | 100.00 | 71,000.00 | | 0020 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,323 | LNFT | 120.00 | 158,760.00 | 90.00 | 119,070.00 | 105.00 | 138,915.00 | 125.00 | 165,375.00 | | 0021 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 231 | LNFT | 185.00 | 42,735.00 | 150.00 | 34,650.00 | 150.00 | 34,650.00 | 200.00 | 46,200.00 | | 0022 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 76 | LNFT | 400.00 | 30,400.00 | 290.00 | 22,040.00 | 300.00 | 22,800.00 | 400.00 | 30,400.00 | | 0023 | 701-07-00200 | Yard Drain Pipe (6") | 52 | LNFT | 35.00 | 1,820.00 | 50.00 | 2,600.00 | 20.00 | 1,040.00 | 15.00 | 780.00 | | 0024 | 701-07-00500 | Yard Drain Pipe (12") | 22 | LNFT | 35.00 | 770.00 | 75.00 | 1,650.00 | 30.00 | 660.00 | 25.00 | 550.00 | | 0025 | 701-09-00100 | Pipe Fittings | 10 | EACH | 600.00 | 6,000.00 | 750.00 | 7,500.00 | 700.00 | 7,000.00 | 1,100.00 | 11,000.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 8,878 | LNFT | 2.00 | 17,756.00 | 0.05 | 443.90 | 3.00 | 26,634.00 | 1.00 | 8,878.00 | | 0027 | 702-03-00500 | Catch Basins (CB-06) | 25 | EACH | 4,750.00 | 118,750.00 | 5,000.00 | 125,000.00 | 5,000.00 | 125,000.00 | 4,000.00 | 100,000.00 | | 0028 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 8,450.00 | 84,500.00 | 10,000.00 | 100,000.00 | 9,000.00 | 90,000.00 | 8,000.00 | 80,000.00 | | 0029 | 702-04-00100 | Adjusting Manholes | 18 | EACH | 350.00 | 6,300.00 | 750.00 | 13,500.00 | 700.00 | 12,600.00 | 500.00 | 9,000.00 | | 0030 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 1,550.00 | 3,100.00 | 750.00 | 1,500.00 | 700.00 | 1,400.00 | 500.00 | 1,000.00 | | 0031 | 706-01-00100 | Concrete Walk (4" Thick) | 702.1 | SQYD | 35.00 | 24,573.50 | 90.00 | 63,189.00 | 90.00 | 63,189.00 | 100.00 | 70,210.00 | | 0032 | 706-02-00200 | Concrete Drive (6" Thick) | 489.6 | SQYD | 52.50 | 25,704.00 | 100.00 | 48,960.00 | 100.00 | 48,960.00 | 75.00 | 36,720.00 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 8,176 | LNFT | 23.00 | 188,048.00 | 25.00 | 204,400.00 | 25.00 | 204,400.00 | 20.00 | 163,520.00 | | 0034 | 710-01-00100 | Flowable Fill | 492 | CUYD | 245.00 | 120,540.00 | 225.00 | 110,700.00 | 230.00 | 113,160.00 | 150.00 | 73,800.00 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 47,000.00 | 47,000.00 | 55,000.00 | 55,000.00 | 100,000.00 | 100,000.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.736 | MILE | 950.00 | 699.20 | 1,000.00 | 736.00 | 650.00 | 478.40 | 800.00 | 588.80 | | 0037 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.006 | MILE | 12,500.00 | 12,575.00 | 2,000.00 | 2,012.00 | 9,500.00 | 9,557.00 | 8,000.00 | 8,048.00 | | 0038 | 721-01-00100 | Mowing | 15 | CYCL | 400.00 | 6,000.00 | 100.00 | 1,500.00 | 1,000.00 | 15,000.00 | 1,800.00 | 27,000.00 | | 0039 | 726-01-00100 | Bedding Material | 491 | CUYD | 18.00 | 8,838.00 | 50.00 | 24,550.00 | 55.00 | 27,005.00 | 100.00 | 49,100.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 375,000.00 | 375,000.00 | 154,784.00 | 154,784.00 | 218,000.00 | 218,000.00 | 500,000.00 | 500,000.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 8 | EACH | 20.00 | 160.00 | 20.00 | 160.00 | 7.00 | 56.00 | 10.00 | 80.00 | | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 356 | LNFT | 6.25 | 2,225.00 | 7.00 | 2,492.00 | 7.00 | 2,492.00 | 5.00 | 1,780.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.173 | MILE | 3,750.00 | 648.75 | 3,000.00 | 519.00 | 3,000.00 | 519.00 | 3,000.00 | 519.00 | | 0044 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 2.228 | MILE | 4,000.00 | 8,912.00 | 3,300.00 | 7,352.40 | 4,200.00 | 9,357.60 | 3,000.00 | 6,684.00 | | 0045 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.803 | MILE | 3,750.00 | 3,011.25 | 3,800.00 | 3,051.40 | 8,000.00 | 6,424.00 | 4,000.00 | 3,212.00 | | 0046 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.068 | MILE | 5,500.00 | 374.00 | 6,600.00 | 448.80 | 22,000.00 | 1,496.00 | 4,000.00 | 272.00 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.042 | MILE | 500.00 | 21.00 | 900.00 | 37.80 | 800.00 | 33.60 | 800.00 | 33.60 | | 0048 | 732-03-02041 | Plastic Pavement Striping (Dotted Line)(6" W)(3' L)(Thermo 90 mil) | 0.2 | MILE | 4,500.00 | 900.00 | 3,500.00 | 700.00 | 3,500.00 | 700.00 | 3,000.00 | 600.00 | | 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 12 | EACH | 250.00 | 3,000.00 | 200.00 | 2,400.00 | 230.00 | 2,760.00 | 300.00 | 3,600.00 | | 0050 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 250.00 | 250.00 | 200.00 | 200.00 | 250.00 | 250.00 | 300.00 | 300.00 | | 0051 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 11 | EACH | 250.00 | 2,750.00 | 200.00 | 2,200.00 | 400.00 | 4,400.00 | 300.00 | 3,300.00 | | 0052 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 250.00 | 250.00 | 200.00 | 200.00 | 250.00 | 250.00 | 300.00 | 300.00 | | 0053 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 11,000.00 | 11,000.00 | 17,500.00 | 17,500.00 | 5,000.00 | 5,000.00 | 50,000.00 | 50,000.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 0.19 | ACRE | 6,500.00 | 1,235.00 | 7,000.00 | 1,330.00 | 1,300.00 | 247.00 | 25,000.00 | 4,750.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 32,000.00 | 32,000.00 | 1,000.00 | 1,000.00 | | 0056 | 741-11-00200 | Adjusting Water Valve and Meter Box | 20 | EACH | 185.00 | 3,700.00 | 100.00 | 2,000.00 | 650.00 | 13,000.00 | 50.00 | 1,000.00 | | 0057 | NS-300-00060 | Geogrid | 17,735 | SQYD | 1.00 | 17,735.00 | 2.00 | 35,470.00 | 1.50 | 26,602.50 | 1.00 | 17,735.00 | | 0058 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,360 | INLF | 1.00 | 1,360.00 | 1.00 | 1,360.00 | 1.00 | 1,360.00 | 1.00 | 1,360.00 | | 0059 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 380 | INLF | 1.00 | 380.00 | 2.00 | 760.00 | 1.00 | 380.00 | 1.00 | 380.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,360 | INLF | 1.00 | 1,360.00 | 2.00 | 2,720.00 | 1.00 | 1,360.00 | 1.00 | 1,360.00 | | 0061 | NS-702-00001 | Cleaning Existing Catch Basin | 2 | EACH | 600.00 | 1,200.00 | 100.00 | 200.00 | 500.00 | 1,000.00 | 100.00 | 200.00 | | 0062 | NS-P36-00013 | Street Name Signs | 12 | EACH | 350.00 | 4,200.00 | 275.00 | 3,300.00 | 200.00 | 2,400.00 | 250.00 | 3,000.00 | | 0063 | NS-P36-00016 | Project Sign | 2 | EACH | 1,500.00 | 3,000.00 | 2,000.00 | 4,000.00 | 1,200.00 | 2,400.00 | 1,000.00 | 2,000.00 | | 0064 | NS-P36-00026 | Manhole (No 1) | 29 | EACH | 2,500.00 | 72,500.00 | 4,000.00 | 116,000.00 | 4,000.00 | 116,000.00 | 3,000.00 | 87,000.00 | | 0065 | NS-P36-00065 | Manhole (No 2) | 5 | EACH | 5,000.00 | 25,000.00 | 7,000.00 | 35,000.00 | 4,500.00 | 22,500.00 | 5,000.00 | 25,000.00 | | 0066 | NS-P36-00067 | Manhole (D-3340) | 2 | EACH | 5,500.00 | 11,000.00 | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 | 8,000.00 | 16,000.00 | | 0067 | NS-P36-00069 | Tree Protection | 1 | LUMP | 6,000.00 | 6,000.00 | 12,000.00 | 12,000.00 | 13,000.00 | 13,000.00 | 10,000.00 | 10,000.00 | | 0068 | NS-P36-00070 | Tree Trimming | 1 | LUMP | 40,000.00 | 40,000.00 | 36,000.00 | 36,000.00 | 37,000.00 | 37,000.00 | 10,000.00 | 10,000.00 | | 0069 | NS-P36-00071 | Root Pruning and Trenching | 1 | LUMP | 18,000.00 | 18,000.00 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 | 1,000.00 | 1,000.00 | | 0070 | NS-P36-00072 | Gravel Bed and Filter Cloth Over Tree Roots | 280 | SQYD | 50.00 | 14,000.00 | 20.00 | 5,600.00 | 25.00 | 7,000.00 | 75.00 | 21,000.00 | | 0071 | NS-P36-00083 | Sidewalk at Intersection (Concrete)-Handi Ramps & Warn Tile | 516 | SQYD | 57.50 | 29,670.00 | 100.00 | 51,600.00 | 110.00 | 56,760.00 | 50.00 | 25,800.00 | | 0072 | NS-P36-00084 | Sidewalk in Median (Concrete)-Handi Ramps & Warn Tile | 142 | SQYD | 50.00 | 7,100.00 | 100.00 | 14,200.00 | 110.00 | 15,620.00 | 50.00 | 7,100.00 | | 0073 | NS-P36-00204 | Water Main with Main Line Fittings (8 inch Diameter) | 2,111 | LNFT | 60.00 | 126,660.00 | 85.00 | 179,435.00 | 88.00 | 185,768.00 | 50.00 | 105,550.00 | | 0074 | NS-P36-00205 | Water Main with Main Line Fittings (12 inch Diameter) | 2,296 | LNFT | 78.00 | 179,088.00 | 110.00 | 252,560.00 | 105.00 | 241,080.00 | 80.00 | 183,680.00 | | 0075 | NS-P36-00208 | Replace Water House Connection (1 inch) | 41 | EACH | 1,350.00 | 55,350.00 | 900.00 | 36,900.00 | 850.00 | 34,850.00 | 500.00 | 20,500.00 | | 0076 | NS-P36-00209 | Fire Hydrant Leads (6 inch Diameter) | 8 | EACH | 1,750.00 | 14,000.00 | 1,500.00 | 12,000.00 | 1,500.00 | 12,000.00 | 1,000.00 | 8,000.00 | | 0077 | NS-P36-00210 | Fire Hydrants | 8 | EACH | 6,750.00 | 54,000.00 | 3,500.00 | 28,000.00 | 6,000.00 | 48,000.00 | 7,500.00 | 60,000.00 | | 0078 | NS-P36-00211 | Water Meter Box (1 inch)(Replace) | 21 | EACH | 550.00 | 11,550.00 | 750.00 | 15,750.00 | 650.00 | 13,650.00 | 750.00 | 15,750.00 | | 0079 | NS-P36-00212 | Water Valves with Water Valve Manhole (8 inch Diameter) | 9 | EACH | 7,250.00 | 65,250.00 | 9,000.00 | 81,000.00 | 8,500.00 | 76,500.00 | 8,000.00 | 72,000.00 | | 0080 | NS-P36-00213 | Water Valves with Water Valve Manhole (12 inch Diameter) | 6 | EACH | 9,500.00 | 57,000.00 | 11,000.00 | 66,000.00 | 13,500.00 | 81,000.00 | 12,000.00 | 72,000.00 | | 0081 | NS-P36-00215 | Sewer Mains (Install)(8 inch Diameter) | 3,381 | LNFT | 87.00 | 294,147.00 | 85.00 | 287,385.00 | 132.00 | 446,292.00 | 125.00 | 422,625.00 | | 0082 | NS-P36-00220 | Sewer Manhole (Install) | 16 | EACH | 2,750.00 | 44,000.00 | 4,000.00 | 64,000.00 | 4,500.00 | 72,000.00 | 5,000.00 | 80,000.00 | | 0083 | NS-P36-00221 | Sewer House Connection | 41 | EACH | 1,500.00 | 61,500.00 | 900.00 | 36,900.00 | 850.00 | 34,850.00 | 1,200.00 | 49,200.00 | | 0084 | NS-P36-70118 | Pipe Lining (Cured In-Place) (18 inch) | 175 | LNFT | 185.00 | 32,375.00 | 200.00 | 35,000.00 | 160.00 | 28,000.00 | 150.00 | 26,250.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,520,571.30 | | 4,665,665.40 | | 4,797,555.85 | | 4,994,513.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barber Bros. Contracting Co., L.L.C | - 6 - Boh Bros. Construction Co., LLC. | - 7 - Wallace C. Drennan, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 1,900.00 | 1,900.00 | 1.00 | 1.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 23,000.00 | 23,000.00 | 77,000.00 | 77,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 4,617.8 | LNFT | 7.50 | 34,633.50 | 1.00 | 4,617.80 | 0.10 | 461.78 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,569 | SQYD | 12.00 | 18,828.00 | 14.00 | 21,966.00 | 5.00 | 7,845.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 17,467 | SQYD | 15.00 | 262,005.00 | 10.00 | 174,670.00 | 15.00 | 262,005.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 189.6 | SQYD | 34.00 | 6,446.40 | 20.00 | 3,792.00 | 5.00 | 948.00 | | 0007 | 202-03-38000 | Relocation of Sign (Type A) | 37 | EACH | 75.00 | 2,775.00 | 80.00 | 2,960.00 | 100.00 | 3,700.00 | | 0008 | 203-01-00100 | General Excavation | 13,693 | CUYD | 20.50 | 280,706.50 | 14.00 | 191,702.00 | 15.00 | 205,395.00 | | 0009 | 203-03-00100 | Embankment | 372 | CUYD | 58.00 | 21,576.00 | 60.00 | 22,320.00 | 50.00 | 18,600.00 | | 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 9,347 | CUYD | 28.00 | 261,716.00 | 28.00 | 261,716.00 | 20.00 | 186,940.00 | | 0011 | 203-08-00100 | Geotextile Fabric | 20,235 | SQYD | 1.54 | 31,161.90 | 1.50 | 30,352.50 | 1.00 | 20,235.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 192 | EACH | 8.50 | 1,632.00 | 10.00 | 1,920.00 | 10.00 | 1,920.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,107 | LNFT | 2.00 | 2,214.00 | 2.50 | 2,767.50 | 1.00 | 1,107.00 | | 0014 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 18,694 | SQYD | 23.50 | 439,309.00 | 25.00 | 467,350.00 | 22.00 | 411,268.00 | | 0015 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 5,498 | SQYD | 8.50 | 46,733.00 | 9.00 | 49,482.00 | 22.00 | 120,956.00 | | 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 51.6 | CUYD | 135.00 | 6,966.00 | 100.00 | 5,160.00 | 50.00 | 2,580.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 7,141.1 | TON | 80.00 | 571,288.00 | 69.00 | 492,735.90 | 85.00 | 606,993.50 | | 0018 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,705 | LNFT | 89.00 | 151,745.00 | 82.00 | 139,810.00 | 120.00 | 204,600.00 | | 0019 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 710 | LNFT | 95.00 | 67,450.00 | 90.00 | 63,900.00 | 130.00 | 92,300.00 | | 0020 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,323 | LNFT | 112.00 | 148,176.00 | 130.00 | 171,990.00 | 140.00 | 185,220.00 | | 0021 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 231 | LNFT | 140.00 | 32,340.00 | 190.00 | 43,890.00 | 150.00 | 34,650.00 | | 0022 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 76 | LNFT | 270.00 | 20,520.00 | 400.00 | 30,400.00 | 500.00 | 38,000.00 | | 0023 | 701-07-00200 | Yard Drain Pipe (6") | 52 | LNFT | 32.00 | 1,664.00 | 40.00 | 2,080.00 | 35.00 | 1,820.00 | | 0024 | 701-07-00500 | Yard Drain Pipe (12") | 22 | LNFT | 65.00 | 1,430.00 | 50.00 | 1,100.00 | 45.00 | 990.00 | | 0025 | 701-09-00100 | Pipe Fittings | 10 | EACH | 800.00 | 8,000.00 | 790.00 | 7,900.00 | 770.00 | 7,700.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 8,878 | LNFT | 2.00 | 17,756.00 | 24.00 | 213,072.00 | 0.10 | 887.80 | | 0027 | 702-03-00500 | Catch Basins (CB-06) | 25 | EACH | 5,200.00 | 130,000.00 | 4,890.00 | 122,250.00 | 5,600.00 | 140,000.00 | | 0028 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 8,500.00 | 85,000.00 | 9,600.00 | 96,000.00 | 10,500.00 | 105,000.00 | | 0029 | 702-04-00100 | Adjusting Manholes | 18 | EACH | 750.00 | 13,500.00 | 790.00 | 14,220.00 | 1,000.00 | 18,000.00 | | 0030 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 750.00 | 1,500.00 | 1,980.00 | 3,960.00 | 1,500.00 | 3,000.00 | | 0031 | 706-01-00100 | Concrete Walk (4" Thick) | 702.1 | SQYD | 72.00 | 50,551.20 | 60.00 | 42,126.00 | 100.00 | 70,210.00 | | 0032 | 706-02-00200 | Concrete Drive (6" Thick) | 489.6 | SQYD | 85.00 | 41,616.00 | 70.00 | 34,272.00 | 75.00 | 36,720.00 | | 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 8,176 | LNFT | 29.00 | 237,104.00 | 25.00 | 204,400.00 | 25.00 | 204,400.00 | | 0034 | 710-01-00100 | Flowable Fill | 492 | CUYD | 230.00 | 113,160.00 | 175.00 | 86,100.00 | 300.00 | 147,600.00 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 65,000.00 | 65,000.00 | 44,000.00 | 44,000.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.736 | MILE | 619.90 | 456.25 | 810.00 | 596.16 | 2,000.00 | 1,472.00 | | 0037 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.006 | MILE | 8,697.81 | 8,750.00 | 8,200.00 | 8,249.20 | 12,000.00 | 12,072.00 | | 0038 | 721-01-00100 | Mowing | 15 | CYCL | 1,750.00 | 26,250.00 | 320.00 | 4,800.00 | 1,000.00 | 15,000.00 | | 0039 | 726-01-00100 | Bedding Material | 491 | CUYD | 14.00 | 6,874.00 | 1.00 | 491.00 | 15.00 | 7,365.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 520,000.00 | 520,000.00 | 150,000.00 | 150,000.00 | 588,000.00 | 588,000.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 8 | EACH | 6.50 | 52.00 | 8.00 | 64.00 | 25.00 | 200.00 | | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 356 | LNFT | 7.00 | 2,492.00 | 6.00 | 2,136.00 | 9.00 | 3,204.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.173 | MILE | 2,898.84 | 501.50 | 2,880.00 | 498.24 | 5,500.00 | 951.50 | | 0044 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 2.228 | MILE | 3,985.66 | 8,880.05 | 3,510.00 | 7,820.28 | 5,500.00 | 12,254.00 | | 0045 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.803 | MILE | 7,471.98 | 6,000.00 | 4,100.00 | 3,292.30 | 7,500.00 | 6,022.50 | | 0046 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.068 | MILE | 17,647.06 | 1,200.00 | 4,100.00 | 278.80 | 25,000.00 | 1,700.00 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.042 | MILE | 904.76 | 38.00 | 780.00 | 32.76 | 10,000.00 | 420.00 | | 0048 | 732-03-02041 | Plastic Pavement Striping (Dotted Line)(6" W)(3' L)(Thermo 90 mil) | 0.2 | MILE | 3,500.00 | 700.00 | 3,520.00 | 704.00 | 6,000.00 | 1,200.00 | | 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 12 | EACH | 225.00 | 2,700.00 | 190.00 | 2,280.00 | 200.00 | 2,400.00 | | 0050 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 245.00 | 245.00 | 190.00 | 190.00 | 200.00 | 200.00 | | 0051 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 11 | EACH | 400.00 | 4,400.00 | 190.00 | 2,090.00 | 300.00 | 3,300.00 | | 0052 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 250.00 | 250.00 | 190.00 | 190.00 | 300.00 | 300.00 | | 0053 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 4,700.00 | 4,700.00 | 10,300.00 | 10,300.00 | 25,000.00 | 25,000.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 0.19 | ACRE | 5,000.00 | 950.00 | 6,600.00 | 1,254.00 | 33,000.00 | 6,270.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 57,000.00 | 57,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0056 | 741-11-00200 | Adjusting Water Valve and Meter Box | 20 | EACH | 225.00 | 4,500.00 | 390.00 | 7,800.00 | 500.00 | 10,000.00 | | 0057 | NS-300-00060 | Geogrid | 17,735 | SQYD | 1.61 | 28,553.35 | 2.00 | 35,470.00 | 2.50 | 44,337.50 | | 0058 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,360 | INLF | 1.00 | 1,360.00 | 0.75 | 1,020.00 | 1.00 | 1,360.00 | | 0059 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 380 | INLF | 1.00 | 380.00 | 1.25 | 475.00 | 2.00 | 760.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,360 | INLF | 1.00 | 1,360.00 | 1.00 | 1,360.00 | 2.00 | 2,720.00 | | 0061 | NS-702-00001 | Cleaning Existing Catch Basin | 2 | EACH | 350.00 | 700.00 | 550.00 | 1,100.00 | 100.00 | 200.00 | | 0062 | NS-P36-00013 | Street Name Signs | 12 | EACH | 250.00 | 3,000.00 | 270.00 | 3,240.00 | 300.00 | 3,600.00 | | 0063 | NS-P36-00016 | Project Sign | 2 | EACH | 2,400.00 | 4,800.00 | 1,270.00 | 2,540.00 | 1,500.00 | 3,000.00 | | 0064 | NS-P36-00026 | Manhole (No 1) | 29 | EACH | 3,560.00 | 103,240.00 | 3,760.00 | 109,040.00 | 5,000.00 | 145,000.00 | | 0065 | NS-P36-00065 | Manhole (No 2) | 5 | EACH | 4,600.00 | 23,000.00 | 4,670.00 | 23,350.00 | 6,000.00 | 30,000.00 | | 0066 | NS-P36-00067 | Manhole (D-3340) | 2 | EACH | 8,400.00 | 16,800.00 | 5,400.00 | 10,800.00 | 15,000.00 | 30,000.00 | | 0067 | NS-P36-00069 | Tree Protection | 1 | LUMP | 5,000.00 | 5,000.00 | 28,500.00 | 28,500.00 | 10,000.00 | 10,000.00 | | 0068 | NS-P36-00070 | Tree Trimming | 1 | LUMP | 5,000.00 | 5,000.00 | 28,000.00 | 28,000.00 | 10,000.00 | 10,000.00 | | 0069 | NS-P36-00071 | Root Pruning and Trenching | 1 | LUMP | 34,000.00 | 34,000.00 | 43,000.00 | 43,000.00 | 10,000.00 | 10,000.00 | | 0070 | NS-P36-00072 | Gravel Bed and Filter Cloth Over Tree Roots | 280 | SQYD | 75.00 | 21,000.00 | 25.00 | 7,000.00 | 10.00 | 2,800.00 | | 0071 | NS-P36-00083 | Sidewalk at Intersection (Concrete)-Handi Ramps & Warn Tile | 516 | SQYD | 112.00 | 57,792.00 | 85.00 | 43,860.00 | 133.00 | 68,628.00 | | 0072 | NS-P36-00084 | Sidewalk in Median (Concrete)-Handi Ramps & Warn Tile | 142 | SQYD | 144.00 | 20,448.00 | 100.00 | 14,200.00 | 133.00 | 18,886.00 | | 0073 | NS-P36-00204 | Water Main with Main Line Fittings (8 inch Diameter) | 2,111 | LNFT | 74.00 | 156,214.00 | 100.00 | 211,100.00 | 88.00 | 185,768.00 | | 0074 | NS-P36-00205 | Water Main with Main Line Fittings (12 inch Diameter) | 2,296 | LNFT | 86.00 | 197,456.00 | 110.00 | 252,560.00 | 99.00 | 227,304.00 | | 0075 | NS-P36-00208 | Replace Water House Connection (1 inch) | 41 | EACH | 1,040.00 | 42,640.00 | 1,360.00 | 55,760.00 | 888.00 | 36,408.00 | | 0076 | NS-P36-00209 | Fire Hydrant Leads (6 inch Diameter) | 8 | EACH | 6,000.00 | 48,000.00 | 1,140.00 | 9,120.00 | 88.00 | 704.00 | | 0077 | NS-P36-00210 | Fire Hydrants | 8 | EACH | 3,400.00 | 27,200.00 | 8,100.00 | 64,800.00 | 8,800.00 | 70,400.00 | | 0078 | NS-P36-00211 | Water Meter Box (1 inch)(Replace) | 21 | EACH | 600.00 | 12,600.00 | 800.00 | 16,800.00 | 2,900.00 | 60,900.00 | | 0079 | NS-P36-00212 | Water Valves with Water Valve Manhole (8 inch Diameter) | 9 | EACH | 5,600.00 | 50,400.00 | 8,800.00 | 79,200.00 | 8,000.00 | 72,000.00 | | 0080 | NS-P36-00213 | Water Valves with Water Valve Manhole (12 inch Diameter) | 6 | EACH | 8,700.00 | 52,200.00 | 14,000.00 | 84,000.00 | 12,000.00 | 72,000.00 | | 0081 | NS-P36-00215 | Sewer Mains (Install)(8 inch Diameter) | 3,381 | LNFT | 115.00 | 388,815.00 | 147.00 | 497,007.00 | 200.00 | 676,200.00 | | 0082 | NS-P36-00220 | Sewer Manhole (Install) | 16 | EACH | 3,900.00 | 62,400.00 | 5,900.00 | 94,400.00 | 10,000.00 | 160,000.00 | | 0083 | NS-P36-00221 | Sewer House Connection | 41 | EACH | 1,460.00 | 59,860.00 | 3,540.00 | 145,140.00 | 2,500.00 | 102,500.00 | | 0084 | NS-P36-70118 | Pipe Lining (Cured In-Place) (18 inch) | 175 | LNFT | 150.00 | 26,250.00 | 160.00 | 28,000.00 | 188.00 | 32,900.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,281,909.65 | | 5,294,790.44 | | 6,088,759.58 |
|