Proposal:H.002263.6
Parish:Jefferson
Description:JEAN LAFITTE: DOWNTOWN SIDEWALKS, PHASE 1
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CONCRETE SIDEWALKS, LIGHTING, LANDSCAPING, AND RELATED WORK.
Estimated Construction Cost:$190,709.60
| Rank | License | Bidder | Construction Bid |
| 1 | 57835 | Roubion Roads & Streets LLC | $332,403.57 |
| 2 | 24901 | Hard Rock Construction LLC | $391,784.57 |
| 3 | 48896 | Command Construction Industries LLC | $434,371.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Roubion Roads & Streets LLC | - 2 - Hard Rock Construction LLC | - 3 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,407.23 | 1,407.23 | 9,000.00 | 9,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,942.94 | 1,942.94 | 1,680.00 | 1,680.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 5 | LNFT | 20.69 | 103.45 | 78.00 | 390.00 | 20.00 | 100.00 | | 0004 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 61.43 | 430.01 | 33.00 | 231.00 | 10.00 | 70.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 147.36 | 147.36 | 336.00 | 336.00 | 250.00 | 250.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 3,865 | LNFT | 2.16 | 8,348.40 | 2.25 | 8,696.25 | 1.00 | 3,865.00 | | 0007 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 40 | LNFT | 121.38 | 4,855.20 | 158.00 | 6,320.00 | 125.00 | 5,000.00 | | 0008 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 84 | LNFT | 137.56 | 11,555.04 | 210.00 | 17,640.00 | 150.00 | 12,600.00 | | 0009 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,450.48 | 8,900.96 | 5,985.00 | 11,970.00 | 5,000.00 | 10,000.00 | | 0010 | 706-01-00100 | Concrete Walk (4" Thick) | 635.4 | SQYD | 59.67 | 37,914.32 | 100.00 | 63,540.00 | 75.00 | 47,655.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,613.83 | 6,613.83 | 8,500.00 | 8,500.00 | 15,000.00 | 15,000.00 | | 0012 | 717-01-00100 | Seeding (Hulled Bermuda) | 3 | LB | 67.43 | 202.29 | 56.00 | 168.00 | 30.00 | 90.00 | | 0013 | 718-01-00100 | Fertilizer (8-8-8) | 100 | LB | 6.07 | 607.00 | 6.00 | 600.00 | 5.00 | 500.00 | | 0014 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) (Butterfly Iris, Diestes SPP., Full Pot, 18" Height) | 12 | EACH | 13.49 | 161.88 | 9.00 | 108.00 | 10.00 | 120.00 | | 0015 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) (Indian Hawthorn, Rhaphilepis Indica, 24" Height, 24" Spread) | 6 | EACH | 32.37 | 194.22 | 28.00 | 168.00 | 25.00 | 150.00 | | 0016 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) (Juniper Chinesis 'Parsonil', Parsoni Juniper, 18" Height, 18" Spread) | 4 | EACH | 24.00 | 96.00 | 28.00 | 112.00 | 25.00 | 100.00 | | 0017 | 719-01-06160 | Plants (Plant) (Container) (30 gallon) (Bald Cypress, Taxodium Distichum, 2" Caliper, Single Trunk, 10' - 12' Height) | 11 | EACH | 126.00 | 1,386.00 | 336.00 | 3,696.00 | 250.00 | 2,750.00 | | 0018 | 719-01-06160 | Plants (Plant) (Container) (30 gallon) (Natchez White Crepe Myrtle, Lagerstroemia Indica 'Natchez', 2" Caliper, Multi-Trunk, 3 Cane Minimum, Full Crown) | 2 | EACH | 946.00 | 1,892.00 | 336.00 | 672.00 | 250.00 | 500.00 | | 0019 | 719-01-06180 | Plants (Plant) (Container) (45 gallon) (Southern Oak, Quercus Virginiana, 3.5" Caliper, Single Trunk) | 7 | EACH | 1,652.07 | 11,564.49 | 840.00 | 5,880.00 | 850.00 | 5,950.00 | | 0020 | 719-02-00200 | Top Dressing Mulch (4" Depth) (Pine Straw) | 200 | SQYD | 4.05 | 810.00 | 5.60 | 1,120.00 | 12.00 | 2,400.00 | | 0021 | 719-03-00300 | Bed Preparation (10" Depth) | 200 | SQYD | 4.05 | 810.00 | 20.00 | 4,000.00 | 10.00 | 2,000.00 | | 0022 | 726-01-00100 | Bedding Material | 15.82 | CUYD | 60.69 | 960.12 | 76.00 | 1,202.32 | 75.00 | 1,186.50 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 12,807.98 | 12,807.98 | 44,000.00 | 44,000.00 | 40,000.00 | 40,000.00 | | 0024 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 50 | LNFT | 67.43 | 3,371.50 | 16.00 | 800.00 | 20.00 | 1,000.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,016.08 | 9,016.08 | 4,500.00 | 4,500.00 | 20,000.00 | 20,000.00 | | 0026 | 822-01-00100 | Trenching and Backfilling | 835 | LNFT | 8.58 | 7,164.30 | 8.70 | 7,264.50 | 10.00 | 8,350.00 | | 0028 | 822-04-00100 | Jacked or Bored Casing (4" Dia) (PVC/HDPE) | 320 | LNFT | 31.35 | 10,032.00 | 32.00 | 10,240.00 | 50.00 | 16,000.00 | | 0029 | 822-05-02100 | Light Pole (16', Aluminum) | 14 | EACH | 8,360.00 | 117,040.00 | 8,500.00 | 119,000.00 | 9,000.00 | 126,000.00 | | 0030 | 822-07-01000 | Luminaire (150 Watt) (High Pressure Sodium) | 14 | EACH | 2,035.00 | 28,490.00 | 2,100.00 | 29,400.00 | 2,000.00 | 28,000.00 | | 0031 | 822-08-00100 | Electrical Service Point (Pedestal) (With Meter, Contactor, and Photo Cell) | 1 | EACH | 3,190.00 | 3,190.00 | 3,248.00 | 3,248.00 | 5,000.00 | 5,000.00 | | 0032 | 822-16-00100 | Underground Junction Box (12" x 12") (With Drive Over Cover) | 1 | EACH | 440.00 | 440.00 | 450.00 | 450.00 | 1,000.00 | 1,000.00 | | 0033 | 822-18-00100 | Service Pole | 1 | EACH | 1,650.00 | 1,650.00 | 1,680.00 | 1,680.00 | 5,000.00 | 5,000.00 | | 0034 | 822-21-00100 | Duct Marker (Concrete) | 1 | EACH | 132.00 | 132.00 | 135.00 | 135.00 | 500.00 | 500.00 | | 0035 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 835 | LNFT | 0.30 | 250.50 | 0.50 | 417.50 | 1.00 | 835.00 | | 0036 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 60 | INLF | 4.60 | 276.00 | 10.00 | 600.00 | 5.00 | 300.00 | | 0037 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 1,579.76 | 1,579.76 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | | 0038 | NS-719-00002 | Tree Trimming | 1 | LUMP | 4,045.89 | 4,045.89 | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 | | 0039 | NS-719-00003 | Root Pruning | 1 | LUMP | 4,045.89 | 4,045.89 | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 | | 0040 | NS-ENH-02000 | Benches (Park) (6' Metal) | 8 | EACH | 1,869.66 | 14,957.28 | 1,551.00 | 12,408.00 | 1,500.00 | 12,000.00 | | 0041 | NS-ENH-19100 | Sign (Gateway) (At Entrance to Park) | 1 | EACH | 12,946.85 | 12,946.85 | 5,040.00 | 5,040.00 | 25,000.00 | 25,000.00 | | 0042 | 822-02-00400 | Conduit w Conductors (PVC/HDPE) (1-1/2") (3#8C, 1#10 Ground) | 12 | LNFT | 5.40 | 64.80 | 6.00 | 72.00 | 50.00 | 600.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 332,403.57 | | 391,784.57 | | 434,371.50 |
|