Proposal:H.000428.6
Parish:Calcasieu
Routes:LA 12
Description:LA 12 BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF CONCRETE DECK GIRDER BRIDGES, ASPHALT CONCRETE PAVEMENT, MILLING ASPHALT PAVEMENT, RIPRAP, TEMPORARY DETOUR ROADS, PRECAST CONCRETE PILES, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGES, CONCRETE BRIDGE RAILING, CONCRETE APPROACH SLABS, TEMPORARY DETOUR BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$29,365,313.09
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $24,239,899.10 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $26,563,472.29 |
| 3 | 49239 | WL Bass Construction Inc. | $28,457,922.97 |
| 4 | 34567 | James Construction Group LLC | $36,438,234.91 |
| 5 | 47347 | Kiewit Louisiana Co. | $40,685,831.40 |
| 6 | 00271 | Massman Construction Co. | $41,824,131.17 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - WL Bass Construction Inc. | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 16 | LUMP | 425,000.00 | 425,000.00 | 800,000.00 | 800,000.00 | 160,000.00 | 160,000.00 | 600,000.00 | 600,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 2,069.4 | SQYD | 2.50 | 5,173.50 | 20.00 | 41,388.00 | 10.00 | 20,694.00 | 10.00 | 20,694.00 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,020.84 | SQYD | 5.00 | 5,104.20 | 10.00 | 10,208.40 | 3.20 | 3,266.69 | 40.00 | 40,833.60 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 1,048.6 | SQYD | 5.00 | 5,243.00 | 10.00 | 10,486.00 | 3.20 | 3,355.52 | 12.00 | 12,583.20 | | 0005 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120200471, 642'X26' CONCRETE DECK GIRDER) | 16,692 | SQFT | 9.00 | 150,228.00 | 30.00 | 500,760.00 | 5.00 | 83,460.00 | 20.00 | 333,840.00 | | 0006 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120200901, 602’X26’ CONCRETE DECK GIRDER) | 15,652 | SQFT | 7.50 | 117,390.00 | 30.00 | 469,560.00 | 5.00 | 78,260.00 | 20.00 | 313,040.00 | | 0007 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120202201, 362’X26’ CONCRETE DECK GIRDER) | 9,412 | SQFT | 9.00 | 84,708.00 | 30.00 | 282,360.00 | 5.00 | 47,060.00 | 30.00 | 282,360.00 | | 0008 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120202521, 402’X26’ CONCRETE DECK GIRDER) | 10,452 | SQFT | 9.00 | 94,068.00 | 30.00 | 313,560.00 | 5.00 | 52,260.00 | 25.00 | 261,300.00 | | 0009 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120202941, 242’X26’ CONCRETE DECK GIRDER) | 6,292 | SQFT | 7.50 | 47,190.00 | 30.00 | 188,760.00 | 5.00 | 31,460.00 | 30.00 | 188,760.00 | | 0010 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120203171, 362’X26’ CONCRETE DECK GIRDER) | 9,412 | SQFT | 7.50 | 70,590.00 | 30.00 | 282,360.00 | 5.00 | 47,060.00 | 30.00 | 282,360.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 3,138.85 | LNFT | 7.00 | 21,971.95 | 3.00 | 9,416.55 | 3.90 | 12,241.52 | 25.00 | 78,471.25 | | 0012 | 203-01-00100 | General Excavation | 232 | CUYD | 22.00 | 5,104.00 | 40.00 | 9,280.00 | 17.00 | 3,944.00 | 55.00 | 12,760.00 | | 0013 | 203-02-00100 | Drainage Excavation | 5,060 | CUYD | 18.00 | 91,080.00 | 18.00 | 91,080.00 | 19.00 | 96,140.00 | 25.00 | 126,500.00 | | 0014 | 203-03-00100 | Embankment | 4,310 | CUYD | 22.00 | 94,820.00 | 37.00 | 159,470.00 | 20.00 | 86,200.00 | 12.00 | 51,720.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 35 | EACH | 40.00 | 1,400.00 | 115.00 | 4,025.00 | 146.00 | 5,110.00 | 330.00 | 11,550.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 18,091 | LNFT | 4.00 | 72,364.00 | 2.50 | 45,227.50 | 1.75 | 31,659.25 | 2.50 | 45,227.50 | | 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 22.5 | CUYD | 135.00 | 3,037.50 | 140.00 | 3,150.00 | 80.00 | 1,800.00 | 200.00 | 4,500.00 | | 0018 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 120.00 | 12,000.00 | 70.00 | 7,000.00 | 100.00 | 10,000.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 3,877.4 | TON | 100.00 | 387,740.00 | 120.00 | 465,288.00 | 104.00 | 403,249.60 | 103.50 | 401,310.90 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,282 | TON | 100.00 | 128,200.00 | 135.00 | 173,070.00 | 150.00 | 192,300.00 | 150.00 | 192,300.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 33,204 | SQYD | 2.00 | 66,408.00 | 1.25 | 41,505.00 | 2.90 | 96,291.60 | 10.00 | 332,040.00 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,378 | CUYD | 1.00 | -1,378.00 | 1.40 | -1,929.20 | 2.00 | -2,756.00 | 0.01 | -13.78 | | 0023 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 100 | SQYD | 150.00 | 15,000.00 | 25.00 | 2,500.00 | 440.00 | 44,000.00 | 170.00 | 17,000.00 | | 0024 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 1,168.75 | LNFT | 26.00 | 30,387.50 | 21.00 | 24,543.75 | 21.00 | 24,543.75 | 32.00 | 37,400.00 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 600 | LNFT | 80.00 | 48,000.00 | 65.00 | 39,000.00 | 65.00 | 39,000.00 | 120.00 | 72,000.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 9,700 | SQYD | 61.00 | 591,700.00 | 70.00 | 679,000.00 | 65.00 | 630,500.00 | 85.00 | 824,500.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 29,940 | SQYD | 0.10 | 2,994.00 | 2.00 | 59,880.00 | 2.00 | 59,880.00 | 5.00 | 149,700.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 100,000.00 | 100,000.00 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.349 | MILE | 700.00 | 4,444.30 | 370.00 | 2,349.13 | 385.00 | 2,444.37 | 375.00 | 2,380.88 | | 0031 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 281 | EACH | 7.25 | 2,037.25 | 4.00 | 1,124.00 | 3.80 | 1,067.80 | 4.00 | 1,124.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 24.3 | TON | 800.00 | 19,440.00 | 775.00 | 18,832.50 | 720.00 | 17,496.00 | 775.00 | 18,832.50 | | 0033 | 717-01-00100 | Seeding | 325 | LB | 19.00 | 6,175.00 | 18.00 | 5,850.00 | 15.50 | 5,037.50 | 18.00 | 5,850.00 | | 0034 | 718-01-00100 | Fertilizer | 16,233 | LB | 0.70 | 11,363.10 | 0.60 | 9,739.80 | 0.75 | 12,174.75 | 1.00 | 16,233.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 135,000.00 | 135,000.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 2.115 | MILE | 350.00 | 740.25 | 870.00 | 1,840.05 | 335.00 | 708.53 | 775.00 | 1,639.13 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.231 | MILE | 350.00 | 1,480.85 | 880.00 | 3,723.28 | 335.00 | 1,417.39 | 775.00 | 3,279.03 | | 0038 | 725-01-00100 | Temporary Detour Roads | 26,704.2 | SQYD | 110.00 | 2,937,462.00 | 90.00 | 2,403,378.00 | 127.00 | 3,391,433.40 | 100.00 | 2,670,420.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 2,300,000.00 | 2,300,000.00 | 2,400,000.00 | 2,400,000.00 | 2,800,000.00 | 2,800,000.00 | 3,690,000.00 | 3,690,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 24 | EACH | 82.00 | 1,968.00 | 2,500.00 | 60,000.00 | 85.00 | 2,040.00 | 125.00 | 3,000.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 281 | EACH | 7.00 | 1,967.00 | 5.00 | 1,405.00 | 5.00 | 1,405.00 | 5.00 | 1,405.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.231 | MILE | 3,200.00 | 13,539.20 | 2,800.00 | 11,846.80 | 2,777.00 | 11,749.49 | 2,700.00 | 11,423.70 | | 0043 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 2.115 | MILE | 900.00 | 1,903.50 | 775.00 | 1,639.13 | 777.00 | 1,643.36 | 800.00 | 1,692.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | 200,000.00 | 200,000.00 | 400,000.00 | 400,000.00 | | 0045 | 804-01-00600 | Precast Concrete Piles (24") | 32,478 | LNFT | 125.00 | 4,059,750.00 | 85.00 | 2,760,630.00 | 108.00 | 3,507,624.00 | 135.00 | 4,384,530.00 | | 0046 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 6 | EACH | 20,000.00 | 120,000.00 | 20,000.00 | 120,000.00 | 8,000.00 | 48,000.00 | 100,000.00 | 600,000.00 | | 0047 | 804-14-00100 | Dynamic Monitoring Assistance | 48 | EACH | 615.00 | 29,520.00 | 1,500.00 | 72,000.00 | 125.00 | 6,000.00 | 2,500.00 | 120,000.00 | | 0048 | 804-15-00100 | Dynamic Monitoring Instrumentation | 1 | LUMP | 6,000.00 | 6,000.00 | 60,000.00 | 60,000.00 | 15,000.00 | 15,000.00 | 2,500.00 | 2,500.00 | | 0049 | 805-01-00200 | Class A1 Concrete (Deck) | 3,349.2 | CUYD | 750.00 | 2,511,900.00 | 730.00 | 2,444,916.00 | 900.00 | 3,014,280.00 | 1,150.00 | 3,851,580.00 | | 0050 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 1,029 | CUYD | 1,100.00 | 1,131,900.00 | 925.00 | 951,825.00 | 1,400.00 | 1,440,600.00 | 1,500.00 | 1,543,500.00 | | 0051 | 805-08-00100 | Precast-Prestressed Concrete Girders (Type Quad Beam) | 22,436 | LNFT | 70.00 | 1,570,520.00 | 80.00 | 1,794,880.00 | 105.00 | 2,355,780.00 | 100.00 | 2,243,600.00 | | 0052 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 35,682 | SQFT | 2.00 | 71,364.00 | 1.00 | 35,682.00 | 1.25 | 44,602.50 | 1.00 | 35,682.00 | | 0053 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 35,682 | SQFT | 2.00 | 71,364.00 | 0.50 | 17,841.00 | 1.10 | 39,250.20 | 1.00 | 35,682.00 | | 0054 | 806-01-00100 | Deformed Reinforcing Steel | 1,070,910 | LB | 1.00 | 1,070,910.00 | 1.16 | 1,242,255.60 | 1.15 | 1,231,546.50 | 1.50 | 1,606,365.00 | | 0055 | 807-01-00100 | Structural Metalwork (Grade 36) (AASHTO M270, GR 36) | 2,403 | LUMP | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | | 0056 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 732 | LUMP | 24,000.00 | 24,000.00 | 12,000.00 | 12,000.00 | 16,000.00 | 16,000.00 | 5,000.00 | 5,000.00 | | 0057 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,248 | LNFT | 120.00 | 149,760.00 | 105.00 | 131,040.00 | 75.00 | 93,600.00 | 120.00 | 149,760.00 | | 0058 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 4,720 | LNFT | 85.00 | 401,200.00 | 60.00 | 283,200.00 | 75.00 | 354,000.00 | 140.00 | 660,800.00 | | 0059 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 19,188 | SQFT | 40.00 | 767,520.00 | 28.00 | 537,264.00 | 25.00 | 479,700.00 | 55.00 | 1,055,340.00 | | 0060 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 316 | SFIN | 75.00 | 23,700.00 | 60.00 | 18,960.00 | 80.00 | 25,280.00 | 90.00 | 28,440.00 | | 0061 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,683 | SFIN | 62.00 | 104,346.00 | 70.00 | 117,810.00 | 82.00 | 138,006.00 | 110.00 | 185,130.00 | | 0062 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 1,040 | LNFT | 200.00 | 208,000.00 | 350.00 | 364,000.00 | 150.00 | 156,000.00 | 265.00 | 275,600.00 | | 0063 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 73,599 | SQFT | 50.00 | 3,679,950.00 | 75.00 | 5,519,925.00 | 88.00 | 6,476,712.00 | 105.00 | 7,727,895.00 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 456 | LNFT | 10.00 | 4,560.00 | 10.00 | 4,560.00 | 15.00 | 6,840.00 | 28.00 | 12,768.00 | | 0065 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 16,151 | INLF | 1.00 | 16,151.00 | 1.00 | 16,151.00 | 1.75 | 28,264.25 | 1.00 | 16,151.00 | | 0066 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,696 | INLF | 2.50 | 9,240.00 | 1.00 | 3,696.00 | 2.50 | 9,240.00 | 1.00 | 3,696.00 | | 0067 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 24 | EACH | 2,800.00 | 67,200.00 | 90.00 | 2,160.00 | 2,500.00 | 60,000.00 | 3,300.00 | 79,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 24,239,899.10 | | 26,563,472.29 | | 28,457,922.97 | | 36,438,234.91 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Kiewit Louisiana Co. | - 6 - Massman Construction Co. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 16 | LUMP | 350,000.00 | 350,000.00 | 1,414,000.00 | 1,414,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 2,069.4 | SQYD | 15.45 | 31,972.23 | 5.00 | 10,347.00 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,020.84 | SQYD | 14.26 | 14,557.18 | 7.50 | 7,656.30 | | 0004 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 1,048.6 | SQYD | 39.45 | 41,367.27 | 6.00 | 6,291.60 | | 0005 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120200471, 642'X26' CONCRETE DECK GIRDER) | 16,692 | SQFT | 25.00 | 417,300.00 | 45.00 | 751,140.00 | | 0006 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120200901, 602’X26’ CONCRETE DECK GIRDER) | 15,652 | SQFT | 25.00 | 391,300.00 | 45.00 | 704,340.00 | | 0007 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120202201, 362’X26’ CONCRETE DECK GIRDER) | 9,412 | SQFT | 25.00 | 235,300.00 | 40.00 | 376,480.00 | | 0008 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120202521, 402’X26’ CONCRETE DECK GIRDER) | 10,452 | SQFT | 25.00 | 261,300.00 | 40.00 | 418,080.00 | | 0009 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120202941, 242’X26’ CONCRETE DECK GIRDER) | 6,292 | SQFT | 25.00 | 157,300.00 | 40.00 | 251,680.00 | | 0010 | 202-02-04500 | Removal of Bridge (STR. NO. 07100120203171, 362’X26’ CONCRETE DECK GIRDER) | 9,412 | SQFT | 25.00 | 235,300.00 | 40.00 | 376,480.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 3,138.85 | LNFT | 11.98 | 37,603.42 | 8.00 | 25,110.80 | | 0012 | 203-01-00100 | General Excavation | 232 | CUYD | 184.15 | 42,722.80 | 20.00 | 4,640.00 | | 0013 | 203-02-00100 | Drainage Excavation | 5,060 | CUYD | 15.00 | 75,900.00 | 15.00 | 75,900.00 | | 0014 | 203-03-00100 | Embankment | 4,310 | CUYD | 27.87 | 120,119.70 | 25.00 | 107,750.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 35 | EACH | 125.86 | 4,405.10 | 275.00 | 9,625.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 18,091 | LNFT | 2.03 | 36,724.73 | 2.50 | 45,227.50 | | 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 22.5 | CUYD | 243.01 | 5,467.73 | 250.00 | 5,625.00 | | 0018 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 150.00 | 15,000.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 3,877.4 | TON | 113.28 | 439,231.87 | 120.00 | 465,288.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,282 | TON | 164.17 | 210,465.94 | 150.00 | 192,300.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 33,204 | SQYD | 3.23 | 107,248.92 | 4.50 | 149,418.00 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,378 | CUYD | 0.01 | -13.78 | 2.00 | -2,756.00 | | 0023 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 100 | SQYD | 505.00 | 50,500.00 | 100.00 | 10,000.00 | | 0024 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 1,168.75 | LNFT | 24.08 | 28,143.50 | 22.50 | 26,296.88 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 600 | LNFT | 98.50 | 59,100.00 | 91.50 | 54,900.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 9,700 | SQYD | 83.14 | 806,458.00 | 68.00 | 659,600.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 29,940 | SQYD | 2.54 | 76,047.60 | 2.25 | 67,365.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 75,000.00 | 75,000.00 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.349 | MILE | 542.00 | 3,441.16 | 400.00 | 2,539.60 | | 0031 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 281 | EACH | 5.00 | 1,405.00 | 4.00 | 1,124.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 24.3 | TON | 848.00 | 20,606.40 | 710.00 | 17,253.00 | | 0033 | 717-01-00100 | Seeding | 325 | LB | 19.70 | 6,402.50 | 15.00 | 4,875.00 | | 0034 | 718-01-00100 | Fertilizer | 16,233 | LB | 0.66 | 10,713.78 | 0.70 | 11,363.10 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 2.115 | MILE | 358.00 | 757.17 | 325.00 | 687.38 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.231 | MILE | 358.00 | 1,514.70 | 325.00 | 1,375.08 | | 0038 | 725-01-00100 | Temporary Detour Roads | 26,704.2 | SQYD | 40.00 | 1,068,168.00 | 130.00 | 3,471,546.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 3,600,000.00 | 3,600,000.00 | 4,100,000.00 | 4,100,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 24 | EACH | 99.00 | 2,376.00 | 91.00 | 2,184.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 281 | EACH | 6.00 | 1,686.00 | 5.00 | 1,405.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.231 | MILE | 3,034.00 | 12,836.85 | 2,915.00 | 12,333.37 | | 0043 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 2.115 | MILE | 1,084.00 | 2,292.66 | 820.00 | 1,734.30 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 750,000.00 | 750,000.00 | 100,000.00 | 100,000.00 | | 0045 | 804-01-00600 | Precast Concrete Piles (24") | 32,478 | LNFT | 129.05 | 4,191,285.90 | 125.00 | 4,059,750.00 | | 0046 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 6 | EACH | 90,000.00 | 540,000.00 | 25,000.00 | 150,000.00 | | 0047 | 804-14-00100 | Dynamic Monitoring Assistance | 48 | EACH | 1,450.00 | 69,600.00 | 2,200.00 | 105,600.00 | | 0048 | 804-15-00100 | Dynamic Monitoring Instrumentation | 1 | LUMP | 5,800.00 | 5,800.00 | 5,000.00 | 5,000.00 | | 0049 | 805-01-00200 | Class A1 Concrete (Deck) | 3,349.2 | CUYD | 1,547.98 | 5,184,494.62 | 1,500.00 | 5,023,800.00 | | 0050 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 1,029 | CUYD | 2,598.41 | 2,673,763.89 | 2,200.00 | 2,263,800.00 | | 0051 | 805-08-00100 | Precast-Prestressed Concrete Girders (Type Quad Beam) | 22,436 | LNFT | 147.72 | 3,314,245.92 | 105.00 | 2,355,780.00 | | 0052 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 35,682 | SQFT | 3.14 | 112,041.48 | 2.00 | 71,364.00 | | 0053 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 35,682 | SQFT | 0.51 | 18,197.82 | 1.50 | 53,523.00 | | 0054 | 806-01-00100 | Deformed Reinforcing Steel | 1,070,910 | LB | 1.25 | 1,338,637.50 | 1.15 | 1,231,546.50 | | 0055 | 807-01-00100 | Structural Metalwork (Grade 36) (AASHTO M270, GR 36) | 2,403 | LUMP | 100,000.00 | 100,000.00 | 15,000.00 | 15,000.00 | | 0056 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 732 | LUMP | 100,000.00 | 100,000.00 | 16,000.00 | 16,000.00 | | 0057 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,248 | LNFT | 95.00 | 118,560.00 | 85.00 | 106,080.00 | | 0058 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 4,720 | LNFT | 93.00 | 438,960.00 | 85.00 | 401,200.00 | | 0059 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 19,188 | SQFT | 43.61 | 836,788.68 | 20.00 | 383,760.00 | | 0060 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 316 | SFIN | 194.16 | 61,354.56 | 75.00 | 23,700.00 | | 0061 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,683 | SFIN | 113.54 | 191,087.82 | 90.00 | 151,470.00 | | 0062 | 815-02-00200 | Sealed Expansion Joint (End Dams and Preformed Silicone Seal) | 1,040 | LNFT | 322.61 | 335,514.40 | 175.00 | 182,000.00 | | 0063 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 73,599 | SQFT | 138.62 | 10,202,293.38 | 150.00 | 11,039,850.00 | | 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 456 | LNFT | 8.00 | 3,648.00 | 10.00 | 4,560.00 | | 0065 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 16,151 | INLF | 1.00 | 16,151.00 | 0.76 | 12,274.76 | | 0066 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,696 | INLF | 1.00 | 3,696.00 | 1.75 | 6,468.00 | | 0067 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 24 | EACH | 3,612.00 | 86,688.00 | 3,350.00 | 80,400.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 40,685,831.40 | | 41,824,131.17 |
|