Proposal:H.013099.6
Parish:LaSalle
Routes:US 165
Description:US 165 @ US 84: J-TURNS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,571,731.80
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,569,862.83 |
| 2 | 49239 | WL Bass Construction Inc. | $1,668,213.30 |
| 3 | 35849 | T.L. CONSTRUCTION LLC | $1,820,906.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - WL Bass Construction Inc. | - 3 - T.L. CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.5 | LUMP | 6,500.00 | 6,500.00 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-00010 | Removal of Side Drain Safety End (Type 1) | 3 | EACH | 500.00 | 1,500.00 | 210.00 | 630.00 | 400.00 | 1,200.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,501.5 | SQYD | 9.00 | 22,513.50 | 8.00 | 20,012.00 | 4.50 | 11,256.75 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 151 | SQYD | 15.00 | 2,265.00 | 12.00 | 1,812.00 | 12.00 | 1,812.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) Station | 32 | LNFT | 15.00 | 480.00 | 16.00 | 512.00 | 37.00 | 1,184.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 746 | SQYD | 15.00 | 11,190.00 | 12.00 | 8,952.00 | 13.50 | 10,071.00 | | 0007 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 5,720.7 | SQYD | 26.00 | 148,738.20 | 16.00 | 91,531.20 | 23.00 | 131,576.10 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 7,800.00 | 7,800.00 | 7,100.00 | 7,100.00 | 7,500.00 | 7,500.00 | | 0009 | 203-01-00100 | General Excavation | 1,695 | CUYD | 20.00 | 33,900.00 | 16.00 | 27,120.00 | 15.00 | 25,425.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,714 | CUYD | 40.00 | 148,560.00 | 17.50 | 64,995.00 | 30.00 | 111,420.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 3,852.8 | LNFT | 1.75 | 6,742.40 | 1.85 | 7,127.68 | 3.00 | 11,558.40 | | 0012 | 302-02-12000 | Class II Base Course (12" Thick) | 12,435.1 | SQYD | 21.00 | 261,137.10 | 33.00 | 410,358.30 | 38.50 | 478,751.35 | | 0013 | 502-01-00100 | Asphalt Concrete | 3,772.5 | TON | 100.00 | 377,250.00 | 115.00 | 433,837.50 | 115.00 | 433,837.50 | | 0014 | 602-10-00100 | Longitudinal Shoulder Joints | 855 | LNFT | 7.00 | 5,985.00 | 5.50 | 4,702.50 | 8.35 | 7,139.25 | | 0015 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 70.00 | 5,600.00 | 70.00 | 5,600.00 | 101.00 | 8,080.00 | | 0016 | 701-15-00100 | Concrete Collar | 1 | EACH | 900.00 | 900.00 | 1,400.00 | 1,400.00 | 900.00 | 900.00 | | 0017 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,500.00 | 3,500.00 | 2,600.00 | 2,600.00 | 2,800.00 | 2,800.00 | | 0018 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 1,800.00 | 1,800.00 | 1,800.00 | 1,800.00 | 2,700.00 | 2,700.00 | | 0019 | 706-02-00200 | Concrete Drive (6" Thick) | 103 | SQYD | 57.00 | 5,871.00 | 73.00 | 7,519.00 | 60.00 | 6,180.00 | | 0020 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,880.6 | SQYD | 54.00 | 101,552.40 | 65.00 | 122,239.00 | 58.00 | 109,074.80 | | 0021 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 564.8 | SQYD | 57.00 | 32,193.60 | 67.00 | 37,841.60 | 60.00 | 33,888.00 | | 0022 | 707-01-00300 | Concrete Curb (Mountable) | 1,097.3 | LNFT | 16.00 | 17,556.80 | 18.00 | 19,751.40 | 18.00 | 19,751.40 | | 0023 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,316.9 | LNFT | 30.00 | 39,507.00 | 18.00 | 23,704.20 | 31.00 | 40,823.90 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 87,000.00 | 87,000.00 | 15,000.00 | 15,000.00 | 90,000.00 | 90,000.00 | | 0025 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,819 | LNFT | 0.50 | 1,909.50 | 0.38 | 1,451.22 | 0.40 | 1,527.60 | | 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 690 | LNFT | 0.75 | 517.50 | 1.10 | 759.00 | 1.20 | 828.00 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.528 | MILE | 400.00 | 1,011.20 | 350.00 | 884.80 | 380.00 | 960.64 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.347 | MILE | 700.00 | 3,042.90 | 600.00 | 2,608.20 | 715.00 | 3,108.11 | | 0029 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 12 | EACH | 25.00 | 300.00 | 35.00 | 420.00 | 36.00 | 432.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 2.7 | TON | 1,150.00 | 3,105.00 | 1,100.00 | 2,970.00 | 1,312.00 | 3,542.40 | | 0031 | 717-01-00100 | Seeding | 80 | LB | 16.00 | 1,280.00 | 15.00 | 1,200.00 | 20.00 | 1,600.00 | | 0032 | 718-01-00100 | Fertilizer | 1,330 | LB | 0.80 | 1,064.00 | 0.75 | 997.50 | 0.90 | 1,197.00 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 20,000.00 | 20,000.00 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.8 | MILE | 1,700.00 | 1,360.00 | 2,100.00 | 1,680.00 | 10,000.00 | 8,000.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 160,000.00 | 160,000.00 | 100,000.00 | 100,000.00 | | 0036 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 406 | SQFT | 37.00 | 15,022.00 | 35.00 | 14,210.00 | 33.40 | 13,560.40 | | 0037 | 729-08-00200 | Mounting (3 1/2" Size Post) | 4 | EACH | 1,200.00 | 4,800.00 | 1,325.00 | 5,300.00 | 1,200.00 | 4,800.00 | | 0038 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 115.00 | 575.00 | 225.00 | 1,125.00 | 125.00 | 625.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,200 | EACH | 5.00 | 6,000.00 | 5.05 | 6,060.00 | 6.00 | 7,200.00 | | 0040 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 3,819 | LNFT | 5.25 | 20,049.75 | 2.00 | 7,638.00 | 2.40 | 9,165.60 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 690 | LNFT | 10.00 | 6,900.00 | 8.00 | 5,520.00 | 9.55 | 6,589.50 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.449 | MILE | 3,400.00 | 4,926.60 | 2,777.00 | 4,023.87 | 3,300.00 | 4,781.70 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.843 | MILE | 1,500.00 | 1,264.50 | 1,227.00 | 1,034.36 | 1,453.00 | 1,224.88 | | 0044 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.451 | MILE | 5,280.00 | 2,381.28 | 2,890.00 | 1,303.39 | 3,500.00 | 1,578.50 | | 0045 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 300.00 | 1,200.00 | 150.00 | 600.00 | 180.00 | 720.00 | | 0046 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 300.00 | 1,200.00 | 150.00 | 600.00 | 180.00 | 720.00 | | 0047 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 400.00 | 1,600.00 | 150.00 | 600.00 | 180.00 | 720.00 | | 0048 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 4 | EACH | 850.00 | 3,400.00 | 200.00 | 800.00 | 239.00 | 956.00 | | 0049 | 732-05-00100 | Removal of Existing Markings | 1 | MILE | 4,000.00 | 4,000.00 | 5,400.00 | 5,400.00 | 6,400.00 | 6,400.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 36,000.00 | 36,000.00 | 10,000.00 | 10,000.00 | | 0051 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 46,639 | INLF | 0.40 | 18,655.60 | 1.22 | 56,899.58 | 0.35 | 16,323.65 | | 0052 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 7,366 | INLF | 1.00 | 7,366.00 | 1.50 | 11,049.00 | 1.50 | 11,049.00 | | 0053 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 630 | INLF | 3.00 | 1,890.00 | 1.80 | 1,134.00 | 3.25 | 2,047.50 | | 0054 | NS-729-00030 | Breakaway Square Tubing Sign Support - Wet Concrete | 20 | EACH | 500.00 | 10,000.00 | 615.00 | 12,300.00 | 716.00 | 14,320.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,569,862.83 | | 1,668,213.30 | | 1,820,906.93 |
|