Bid Tabulations for the Letting of 6/13/2018 LA DOTD Headquarters

Proposal:H.013099.6
Parish:LaSalle
Routes:US 165
Description:US 165 @ US 84: J-TURNS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,571,731.80
Rank License BidderConstruction Bid
112312GILCHRIST CONSTRUCTION CO. LLC$1,569,862.83
249239WL Bass Construction Inc.$1,668,213.30
335849T.L. CONSTRUCTION LLC$1,820,906.93


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
WL Bass Construction Inc.
- 3 -
T.L. CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.5   LUMP6,500.006,500.005,000.005,000.0020,000.0020,000.00
0002202-02-00010Removal of Side Drain Safety End (Type 1)3     EACH500.001,500.00210.00630.00400.001,200.00
0003202-02-02020Removal of Asphalt Pavement 2,501.5   SQYD9.0022,513.508.0020,012.004.5011,256.75
0004202-02-06100Removal of Concrete Walks and Drives 151     SQYD15.002,265.0012.001,812.0012.001,812.00
0005202-02-32120Removal of Pipe (Side Drain) Station32     LNFT15.00480.0016.00512.0037.001,184.00
0006202-02-32500Removal of Portland Cement Concrete Pavement 746     SQYD15.0011,190.0012.008,952.0013.5010,071.00
0007202-02-38500Removal of Surfacing and Stabilized Base 5,720.7   SQYD26.00148,738.2016.0091,531.2023.00131,576.10
0008202-02-40100Removal of Traffic Signal Equipment 1     LUMP7,800.007,800.007,100.007,100.007,500.007,500.00
0009203-01-00100General Excavation 1,695     CUYD20.0033,900.0016.0027,120.0015.0025,425.00
0010203-07-00100Borrow (Vehicular Measurement) 3,714     CUYD40.00148,560.0017.5064,995.0030.00111,420.00
0011204-06-00100Temporary Silt Fencing 3,852.8   LNFT1.756,742.401.857,127.683.0011,558.40
0012302-02-12000Class II Base Course (12" Thick) 12,435.1   SQYD21.00261,137.1033.00410,358.3038.50478,751.35
0013502-01-00100Asphalt Concrete 3,772.5   TON100.00377,250.00115.00433,837.50115.00433,837.50
0014602-10-00100Longitudinal Shoulder Joints 855     LNFT7.005,985.005.504,702.508.357,139.25
0015701-05-01060Side Drain Pipe (24" RCP/PP/CMP) 80     LNFT70.005,600.0070.005,600.00101.008,080.00
0016701-15-00100Concrete Collar 1     EACH900.00900.001,400.001,400.00900.00900.00
0017702-04-00200Adjusting Catch Basins 1     EACH3,500.003,500.002,600.002,600.002,800.002,800.00
0018702-08-00100Side Drain Safety End (Type 1) 1     EACH1,800.001,800.001,800.001,800.002,700.002,700.00
0019706-02-00200Concrete Drive (6" Thick) 103     SQYD57.005,871.0073.007,519.0060.006,180.00
0020706-03-00100Incidental Concrete Paving (4" Thick) 1,880.6   SQYD54.00101,552.4065.00122,239.0058.00109,074.80
0021706-03-00300Incidental Concrete Paving (6" Thick) 564.8   SQYD57.0032,193.6067.0037,841.6060.0033,888.00
0022707-01-00300Concrete Curb (Mountable) 1,097.3   LNFT16.0017,556.8018.0019,751.4018.0019,751.40
0023707-03-00100Combination Concrete Curb and Gutter 1,316.9   LNFT30.0039,507.0018.0023,704.2031.0040,823.90
0024713-01-00100Temporary Signs and Barricades 1     LUMP87,000.0087,000.0015,000.0015,000.0090,000.0090,000.00
0025713-02-00300Temporary Pavement Markings (8" Width) 3,819     LNFT0.501,909.500.381,451.220.401,527.60
0026713-02-00500Temporary Pavement Markings (24" Width) 690     LNFT0.75517.501.10759.001.20828.00
0027713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.528 MILE400.001,011.20350.00884.80380.00960.64
0028713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 4.347 MILE700.003,042.90600.002,608.20715.003,108.11
0029713-05-00100Temporary Pavement Legends & Symbols (Arrow) 12     EACH25.00300.0035.00420.0036.00432.00
0030716-01-00100Mulch (Vegetative) 2.7   TON1,150.003,105.001,100.002,970.001,312.003,542.40
0031717-01-00100Seeding 80     LB16.001,280.0015.001,200.0020.001,600.00
0032718-01-00100Fertilizer 1,330     LB0.801,064.000.75997.500.901,197.00
0033722-02-00100Project Site Laboratory (Equipped) 1     EACH5,000.005,000.002,500.002,500.0020,000.0020,000.00
0034724-02-00100Rumble Strips (Shoulder/Edge) 0.8   MILE1,700.001,360.002,100.001,680.0010,000.008,000.00
0035727-01-00100Mobilization 1     LUMP100,000.00100,000.00160,000.00160,000.00100,000.00100,000.00
0036729-01-00102Sign (Type A)(Furnish and Install) 406     SQFT37.0015,022.0035.0014,210.0033.4013,560.40
0037729-08-00200Mounting (3 1/2" Size Post) 4     EACH1,200.004,800.001,325.005,300.001,200.004,800.00
0038729-22-00100Square Tubing Post with 2-1/4" Anchor 5     EACH115.00575.00225.001,125.00125.00625.00
0039731-02-00100Reflectorized Raised Pavement Markers 1,200     EACH5.006,000.005.056,060.006.007,200.00
0040732-01-02040Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 3,819     LNFT5.2520,049.752.007,638.002.409,165.60
0041732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 690     LNFT10.006,900.008.005,520.009.556,589.50
0042732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.449 MILE3,400.004,926.602,777.004,023.873,300.004,781.70
0043732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.843 MILE1,500.001,264.501,227.001,034.361,453.001,224.88
0044732-03-02040Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.451 MILE5,280.002,381.282,890.001,303.393,500.001,578.50
0045732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 4     EACH300.001,200.00150.00600.00180.00720.00
0046732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 4     EACH300.001,200.00150.00600.00180.00720.00
0047732-04-01120Plastic Pavement Legends and Symbols (Arrow - Merge) 4     EACH400.001,600.00150.00600.00180.00720.00
0048732-04-01121Plastic Pavement Legends and Symbols (U-Turn) 4     EACH850.003,400.00200.00800.00239.00956.00
0049732-05-00100Removal of Existing Markings 1     MILE4,000.004,000.005,400.005,400.006,400.006,400.00
0050740-01-00100Construction Layout 1     LUMP10,000.0010,000.0036,000.0036,000.0010,000.0010,000.00
0051NS-500-00340Saw Cutting Asphalt Concrete Pavement 46,639     INLF0.4018,655.601.2256,899.580.3516,323.65
0052NS-500-00360Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement 7,366     INLF1.007,366.001.5011,049.001.5011,049.00
0053NS-600-00220Saw Cutting Portland Cement Concrete Pavement 630     INLF3.001,890.001.801,134.003.252,047.50
0054NS-729-00030Breakaway Square Tubing Sign Support - Wet Concrete 20     EACH500.0010,000.00615.0012,300.00716.0014,320.00
           
  CONTRACTOR TOTAL   1,569,862.83 1,668,213.30 1,820,906.93