Proposal:H.012577.6
Parish:Calcasieu
Routes:LA 14
Description:LA 14: LA 3186 - 0.793 MI S I-210
Type Construction:THIN ASPHALT CONCRETE (OGFC) PAVEMENT, PAVEMENT REPAIR SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$593,806.82
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $725,605.35 |
| 2 | 21982 | Forby Contracting, Inc. | $807,435.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Forby Contracting, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 1,575.2 | TON | 140.00 | 220,528.00 | 134.00 | 211,076.80 | | 0002 | 602-03-00100 | Cleaning and Sealing Random cracks | 800 | LNFT | 6.00 | 4,800.00 | 4.00 | 3,200.00 | | 0003 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 67 | SQYD | 250.00 | 16,750.00 | 195.00 | 13,065.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 27,000.00 | 27,000.00 | 50,000.00 | 50,000.00 | | 0005 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 460 | LNFT | 0.01 | 4.60 | 0.50 | 230.00 | | 0006 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 89 | LNFT | 0.01 | 0.89 | 1.00 | 89.00 | | 0007 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3 | MILE | 450.00 | 1,350.00 | 400.00 | 1,200.00 | | 0008 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3 | MILE | 0.01 | 0.03 | 500.00 | 1,500.00 | | 0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.172 | MILE | 0.01 | 0.03 | 600.00 | 1,903.20 | | 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 123,000.00 | 123,000.00 | 200,000.00 | 200,000.00 | | 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 467 | EACH | 6.00 | 2,802.00 | 5.00 | 2,335.00 | | 0012 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 460 | LNFT | 3.00 | 1,380.00 | 2.00 | 920.00 | | 0013 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 89 | LNFT | 10.00 | 890.00 | 9.00 | 801.00 | | 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.172 | MILE | 3,400.00 | 10,784.80 | 3,300.00 | 10,467.60 | | 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3 | MILE | 1,200.00 | 3,600.00 | 1,100.00 | 3,300.00 | | 0016 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.025 | MILE | 2,000.00 | 50.00 | 1,500.00 | 37.50 | | 0017 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.073 | MILE | 5,000.00 | 365.00 | 3,500.00 | 255.50 | | 0018 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 300.00 | 4,800.00 | 250.00 | 4,000.00 | | 0019 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 300.00 | 900.00 | 250.00 | 750.00 | | 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 5,000.00 | 5,000.00 | | 0021 | NS-602-00014 | Pavement Repair System | 613 | CUFT | 500.00 | 306,500.00 | 485.00 | 297,305.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 725,605.35 | | 807,435.60 |
|