Proposal:H.012550.6
Parish:Grant
Routes:LA 123
Description:LA 123: LA 8 TO US 167
Type Construction:PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$440,250.05
| Rank | License | Bidder | Construction Bid |
| 1 | 05635 | Dreher Contracting, LLC | $377,725.79 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Dreher Contracting, LLC |
| Unit Price | Total Amount |
| 0001 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 55,241 | GAL | 2.30 | 127,054.30 |
| 0002 | 507-02-00200 | Aggregate (S2) | 81,238 | SQYD | 0.98 | 79,613.24 |
| 0003 | 507-02-00300 | Aggregate (S3) | 81,238 | SQYD | 0.75 | 60,928.50 |
| 0004 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 132 | SQYD | 120.00 | 15,840.00 |
| 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 21,000.00 | 21,000.00 |
| 0006 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 7.00 | 168.00 |
| 0007 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.27 | MILE | 425.00 | 1,389.75 |
| 0008 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.46 | MILE | 650.00 | 11,999.00 |
| 0009 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 3,033 | EACH | 2.00 | 6,066.00 |
| 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 22,000.00 | 22,000.00 |
| 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,085 | EACH | 5.50 | 5,967.50 |
| 0012 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 20.00 | 960.00 |
| 0013 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 18.46 | MILE | 800.00 | 14,768.00 |
| 0014 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 3.27 | MILE | 450.00 | 1,471.50 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,500.00 | 8,500.00 |
| | | | | | | |
| | | CONTRACTOR TOTAL | | | | 377,725.79 |