Proposal:H.012176.6
Parish:Jefferson Davis
Routes:I-10
Description:I-10: LA 99 - ACADIA P/L
Type Construction:GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, THIN ASPAHLT CONCRETE (OGFC), CLEANING AND FILLING LONGITUDINAL JOINTS, CONCRETE PIER PROTECTION, AND RELATED WORK.
Estimated Construction Cost:$13,216,900.42
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$12,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 00481 | COASTAL BRIDGE CO., L.L.C. | $13,769,669.69 | 100.00 | $14,969,669.69 |
| 2 | 34356 | Prairie Contractors LLC | $15,273,230.75 | 200.00 | $17,673,230.75 |
| 3 | 00183 | R. E. Heidt Construction Co., LLC | $15,173,027.24 | 265.00 | $18,353,027.24 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $17,629,243.90 | 290.00 | $21,109,243.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - COASTAL BRIDGE CO., L.L.C. | - 2 - Prairie Contractors LLC | - 3 - R. E. Heidt Construction Co., LLC | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 1,624 | SQYD | 10.00 | 16,240.00 | 22.00 | 35,728.00 | 35.35 | 57,408.40 | 6.00 | 9,744.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 10,692 | LNFT | 10.00 | 106,920.00 | 11.25 | 120,285.00 | 11.11 | 118,788.12 | 10.00 | 106,920.00 | | 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,624 | SQYD | 45.00 | 73,080.00 | 30.00 | 48,720.00 | 45.45 | 73,810.80 | 25.00 | 40,600.00 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 150.00 | 600.00 | 60.00 | 240.00 | 50.50 | 202.00 | 275.00 | 1,100.00 | | 0005 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,759.9 | SQYD | 10.00 | 17,599.00 | 23.00 | 40,477.70 | 30.30 | 53,324.97 | 18.00 | 31,678.20 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 235,079.34 | 235,079.34 | 110,000.00 | 110,000.00 | 94,000.00 | 94,000.00 | 420,000.00 | 420,000.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,037 | CUYD | 10.00 | 10,370.00 | 30.00 | 31,110.00 | 18.18 | 18,852.66 | 30.00 | 31,110.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 44 | EACH | 110.00 | 4,840.00 | 165.00 | 7,260.00 | 353.50 | 15,554.00 | 160.00 | 7,040.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,150 | LNFT | 2.50 | 5,375.00 | 2.00 | 4,300.00 | 4.79 | 10,298.50 | 2.00 | 4,300.00 | | 0010 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 19,660.4 | TON | 111.59 | 2,193,904.04 | 126.00 | 2,477,210.40 | 122.00 | 2,398,568.80 | 135.00 | 2,654,154.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 78,476.6 | TON | 75.00 | 5,885,745.00 | 80.00 | 6,278,128.00 | 100.00 | 7,847,660.00 | 95.00 | 7,455,277.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,440.7 | TON | 110.00 | 268,477.00 | 150.00 | 366,105.00 | 100.00 | 244,070.00 | 160.00 | 390,512.00 | | 0013 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 6,052.4 | TON | 140.00 | 847,336.00 | 118.00 | 714,183.20 | 154.00 | 932,069.60 | 180.00 | 1,089,432.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 423,929 | SQYD | 2.69 | 1,140,369.01 | 2.60 | 1,102,215.40 | 0.83 | 351,861.07 | 2.00 | 847,858.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -17,040 | CUYD | 0.01 | -170.40 | 100.00 | -1,704,000.00 | 0.40 | -6,816.00 | 1.00 | -17,040.00 | | 0016 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 14,587 | LNFT | 2.50 | 36,467.50 | 2.50 | 36,467.50 | 2.50 | 36,467.50 | 2.60 | 37,926.20 | | 0017 | 602-03-00100 | Cleaning and Sealing Random cracks | 1,431 | LNFT | 3.65 | 5,223.15 | 4.00 | 5,724.00 | 3.68 | 5,266.08 | 4.00 | 5,724.00 | | 0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,044 | LNFT | 40.00 | 41,760.00 | 34.00 | 35,496.00 | 33.33 | 34,796.52 | 40.00 | 41,760.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 6,432.4 | LNFT | 25.00 | 160,810.00 | 22.50 | 144,729.00 | 22.22 | 142,927.93 | 26.00 | 167,242.40 | | 0020 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | 812.6 | LNFT | 40.00 | 32,504.00 | 34.00 | 27,628.40 | 33.33 | 27,083.96 | 40.00 | 32,504.00 | | 0021 | 704-05-00300 | Guard Rail Anchor Sections – 31”, (Trailing End) | 194.4 | LNFT | 70.00 | 13,608.00 | 135.00 | 26,244.00 | 131.30 | 25,524.72 | 73.00 | 14,191.20 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 550 | LNFT | 80.50 | 44,275.00 | 70.00 | 38,500.00 | 65.65 | 36,107.50 | 85.00 | 46,750.00 | | 0023 | 704-09-00100 | Guard Rail Anchor Block | 4 | EACH | 3,500.00 | 14,000.00 | 3,750.00 | 15,000.00 | 3,535.00 | 14,140.00 | 3,800.00 | 15,200.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 40 | EACH | 2,620.00 | 104,800.00 | 2,450.00 | 98,000.00 | 2,424.00 | 96,960.00 | 2,800.00 | 112,000.00 | | 0025 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,105 | SQYD | 135.00 | 149,175.00 | 130.00 | 143,650.00 | 126.25 | 139,506.25 | 95.00 | 104,975.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 1,121,000.00 | 1,121,000.00 | 48,985.00 | 48,985.00 | 1,000,000.00 | 1,000,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 69.5 | MILE | 450.00 | 31,275.00 | 1,900.00 | 132,050.00 | 250.00 | 17,375.00 | 220.00 | 15,290.00 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 69.5 | MILE | 500.00 | 34,750.00 | 1.00 | 69.50 | 505.00 | 35,097.50 | 520.00 | 36,140.00 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 140.2 | MILE | 625.00 | 87,625.00 | 1.00 | 140.20 | 631.25 | 88,501.25 | 650.00 | 91,130.00 | | 0030 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 121 | EACH | 705.00 | 85,305.00 | 1,900.00 | 229,900.00 | 1,893.75 | 229,143.75 | 1,300.00 | 157,300.00 | | 0031 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 79 | EACH | 69.00 | 5,451.00 | 400.00 | 31,600.00 | 378.75 | 29,921.25 | 60.00 | 4,740.00 | | 0032 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 4,800.00 | 28,800.00 | 12,000.00 | 72,000.00 | 11,362.50 | 68,175.00 | 22,500.00 | 135,000.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 85 | SQYD | 55.00 | 4,675.00 | 3.00 | 255.00 | 3.54 | 300.90 | 2.75 | 233.75 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 46.749 | MILE | 450.00 | 21,037.05 | 650.00 | 30,386.85 | 272.70 | 12,748.45 | 450.00 | 21,037.05 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 1,325,000.00 | 1,325,000.00 | 1,535,000.00 | 1,535,000.00 | 1,183,000.00 | 1,183,000.00 | 1,700,000.00 | 1,700,000.00 | | 0036 | 729-01-00100 | Sign (Type A) | 476 | SQFT | 20.00 | 9,520.00 | 30.00 | 14,280.00 | 25.25 | 12,019.00 | 22.00 | 10,472.00 | | 0037 | 729-04-00100 | Sign (Type D) | 50 | SQFT | 28.00 | 1,400.00 | 35.00 | 1,750.00 | 32.32 | 1,616.00 | 30.00 | 1,500.00 | | 0038 | 729-08-00100 | Mounting (2 1/2" Size Post) | 5 | EACH | 850.00 | 4,250.00 | 1,500.00 | 7,500.00 | 1,161.50 | 5,807.50 | 900.00 | 4,500.00 | | 0039 | 729-08-00200 | Mounting (3 1/2" Size Post) | 9 | EACH | 1,025.00 | 9,225.00 | 1,750.00 | 15,750.00 | 1,515.00 | 13,635.00 | 1,100.00 | 9,900.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 40 | EACH | 80.00 | 3,200.00 | 100.00 | 4,000.00 | 90.90 | 3,636.00 | 85.00 | 3,400.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 7,244 | EACH | 6.50 | 47,086.00 | 6.55 | 47,448.20 | 6.57 | 47,593.08 | 7.25 | 52,519.00 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 46.749 | MILE | 3,000.00 | 140,247.00 | 3,050.00 | 142,584.45 | 3,030.00 | 141,649.47 | 3,200.00 | 149,596.80 | | 0043 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.49 | MILE | 7,500.00 | 11,175.00 | 7,700.00 | 11,473.00 | 7,575.00 | 11,286.75 | 7,800.00 | 11,622.00 | | 0044 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.228 | MILE | 50,000.00 | 11,400.00 | 55,000.00 | 12,540.00 | 50,500.00 | 11,514.00 | 50,000.00 | 11,400.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 23.159 | MILE | 1,000.00 | 23,159.00 | 1,050.00 | 24,316.95 | 1,010.00 | 23,390.59 | 1,100.00 | 25,474.90 | | 0046 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.807 | MILE | 4,000.00 | 3,228.00 | 5,000.00 | 4,035.00 | 4,040.00 | 3,260.28 | 1,200.00 | 968.40 | | 0047 | 732-05-00100 | Removal of Existing Markings | 0.435 | MILE | 5,000.00 | 2,175.00 | 10,000.00 | 4,350.00 | 5,050.00 | 2,196.75 | 5,200.00 | 2,262.00 | | 0048 | 739-01-00100 | Hydro-Seeding | 12 | ACRE | 1,650.00 | 19,800.00 | 1,400.00 | 16,800.00 | 2,688.62 | 32,263.44 | 1,500.00 | 18,000.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 1,200,000.00 | 1,200,000.00 | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | | 0050 | 810-06-00100 | Concrete Pier Protection System (Vehicle) LA 97 & LA 102 | 434 | LNFT | 250.00 | 108,500.00 | 800.00 | 347,200.00 | 540.35 | 234,511.90 | 900.00 | 390,600.00 | | 0051 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 25,000.00 | 50,000.00 | 10,000.00 | 20,000.00 | 10,000.00 | 20,000.00 | 12,500.00 | 25,000.00 | | 0052 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 2,500.00 | 5,000.00 | 2,000.00 | 4,000.00 | 1,212.00 | 2,424.00 | 1,000.00 | 2,000.00 | | 0053 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad - Soil | 24 | EACH | 125.00 | 3,000.00 | 650.00 | 15,600.00 | 555.50 | 13,332.00 | 550.00 | 13,200.00 | | 0054 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 280 | LNFT | 125.00 | 35,000.00 | 85.00 | 23,800.00 | 75.75 | 21,210.00 | 125.00 | 35,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,769,669.69 | | 15,273,230.75 | | 15,173,027.24 | | 17,629,243.90 |
|