Proposal:H.012160.6
Parish:Orleans
Routes:US 90
Description:US 90: FLOODWALL - CHEF PASS BRIDGE
Type Construction:MILLING ASPHALT CONCRETE, MILLING CONCRETE PAVEMENT, ASPHALT CONCRETE OVERLAY, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$2,271,989.80
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $1,861,324.70 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,025,777.00 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,038,280.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 1,000.00 | 1,000.00 | 3,500.00 | 3,500.00 | 2,900.00 | 2,900.00 | | 0002 | 202-03-38000 | Relocation of Sign (ADJUST SIGN HEIGHT) | 6 | EACH | 150.00 | 900.00 | 50.00 | 300.00 | 50.00 | 300.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,676 | CUYD | 20.00 | 33,520.00 | 25.00 | 41,900.00 | 20.00 | 33,520.00 | | 0004 | 401-01-00100 | Aggregate Surface Course (Net Section) | 53.8 | CUYD | 100.00 | 5,380.00 | 100.00 | 5,380.00 | 52.00 | 2,797.60 | | 0005 | 502-01-00100 | Asphalt Concrete | 21,605.9 | TON | 70.00 | 1,512,413.00 | 73.00 | 1,577,230.70 | 67.00 | 1,447,595.30 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,373 | TON | 79.00 | 108,467.00 | 73.00 | 100,229.00 | 64.00 | 87,872.00 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 10,468 | SQYD | 2.25 | 23,553.00 | 2.00 | 20,936.00 | 2.50 | 26,170.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -421.9 | CUYD | 2.00 | -843.80 | 0.01 | -4.22 | 0.01 | -4.22 | | 0009 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 200 | SQYD | 115.00 | 23,000.00 | 170.00 | 34,000.00 | 150.00 | 30,000.00 | | 0010 | 701-11-01040 | Reinforced Concrete Pipe Arch (Extension) (24" Equiv.) | 8 | LNFT | 100.00 | 800.00 | 110.00 | 880.00 | 150.00 | 1,200.00 | | 0011 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,000.00 | 1,000.00 | 1,750.00 | 1,750.00 | 1,000.00 | 1,000.00 | | 0012 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 1,600.00 | 1,600.00 | 1,650.00 | 1,650.00 | | 0013 | 702-04-00200 | Adjusting Catch Basins | 15 | EACH | 1,500.00 | 22,500.00 | 300.00 | 4,500.00 | 1,975.00 | 29,625.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 65,000.00 | 65,000.00 | | 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.867 | MILE | 10.00 | 118.67 | 1.00 | 11.87 | 1.00 | 11.87 | | 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.867 | MILE | 10.00 | 118.67 | 1.00 | 11.87 | 1.00 | 11.87 | | 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.733 | MILE | 20.00 | 474.66 | 1.00 | 23.73 | 1.00 | 23.73 | | 0018 | 717-01-00100 | Seeding | 100 | LB | 20.00 | 2,000.00 | 15.00 | 1,500.00 | 15.00 | 1,500.00 | | 0019 | 718-01-00100 | Fertilizer | 2,195 | LB | 1.00 | 2,195.00 | 0.75 | 1,646.25 | 0.75 | 1,646.25 | | 0020 | 724-01-00100 | Rumble Strips (Centerline) | 3.018 | MILE | 500.00 | 1,509.00 | 300.00 | 905.40 | 300.00 | 905.40 | | 0021 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.018 | MILE | 500.00 | 1,509.00 | 300.00 | 905.40 | 300.00 | 905.40 | | 0022 | 726-01-00100 | Bedding Material | 2 | CUYD | 100.00 | 200.00 | 150.00 | 300.00 | 120.00 | 240.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 31,000.00 | 31,000.00 | 125,000.00 | 125,000.00 | 200,000.00 | 200,000.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,054 | EACH | 5.00 | 15,270.00 | 10.00 | 30,540.00 | 6.50 | 19,851.00 | | 0025 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,662 | LNFT | 4.00 | 10,648.00 | 6.00 | 15,972.00 | 6.00 | 15,972.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.055 | MILE | 2,000.00 | 18,110.00 | 2,500.00 | 22,637.50 | 2,950.00 | 26,712.25 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.018 | MILE | 1,250.00 | 3,772.50 | 950.00 | 2,867.10 | 950.00 | 2,867.10 | | 0028 | 735-01-00100 | Mailboxes | 11 | EACH | 10.00 | 110.00 | 8.00 | 88.00 | 8.00 | 88.00 | | 0029 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 200.00 | 2,200.00 | 210.00 | 2,310.00 | 200.00 | 2,200.00 | | 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 13,256.40 | 13,256.40 | 29,000.00 | 29,000.00 | | 0031 | NS-602-00001 | Milling Concrete Pavement | 560 | SQYD | 15.00 | 8,400.00 | 10.00 | 5,600.00 | 12.00 | 6,720.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,861,324.70 | | 2,025,777.00 | | 2,038,280.55 |
|