Proposal:H.012131.6
Parish:Evangeline
Routes:LA 95
Description:LA 95: LA 104 - LA 29
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACED CEMENT STABILIZED BASE COURSE, PAVEMENT WIDENING, ASPHALTIC SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$6,376,458.00
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,375,913.55 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $5,456,671.64 |
| 3 | 08815 | W. E. MCDONALD & SON, LLC. | $5,777,988.09 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $6,014,315.54 |
| 5 | 00481 | COASTAL BRIDGE CO., L.L.C. | $6,269,626.91 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - W. E. MCDONALD & SON, LLC. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.12 | LUMP | 7,000.00 | 7,000.00 | 12,250.00 | 12,250.00 | 28,000.00 | 28,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 640 | SQYD | 10.00 | 6,400.00 | 17.50 | 11,200.00 | 5.25 | 3,360.00 | 10.00 | 6,400.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 36.4 | SQYD | 30.00 | 1,092.00 | 102.00 | 3,712.80 | 50.00 | 1,820.00 | 50.00 | 1,820.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 347 | SQYD | 27.00 | 9,369.00 | 27.00 | 9,369.00 | 19.00 | 6,593.00 | 10.00 | 3,470.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 1,819 | LNFT | 13.00 | 23,647.00 | 12.00 | 21,828.00 | 13.00 | 23,647.00 | 12.00 | 21,828.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 25 | LNFT | 40.00 | 1,000.00 | 38.50 | 962.50 | 1.00 | 25.00 | 10.00 | 250.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 36" CMP | 151 | LNFT | 32.00 | 4,832.00 | 6.35 | 958.85 | 1.00 | 151.00 | 10.00 | 1,510.00 | | 0008 | 202-02-38200 | Removal of Signs | 166 | EACH | 7.00 | 1,162.00 | 9.50 | 1,577.00 | 43.00 | 7,138.00 | 6.00 | 996.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 14,500.00 | 14,500.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,500 | CUYD | 18.50 | 46,250.00 | 19.75 | 49,375.00 | 18.00 | 45,000.00 | 20.00 | 50,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 94 | EACH | 125.00 | 11,750.00 | 27.00 | 2,538.00 | 27.00 | 2,538.00 | 115.00 | 10,810.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 6.00 | 1,800.00 | 5.00 | 1,500.00 | 5.50 | 1,650.00 | 6.00 | 1,800.00 | | 0013 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 135,556 | SQYD | 6.01 | 814,691.56 | 4.85 | 657,446.60 | 6.25 | 847,225.00 | 6.50 | 881,114.00 | | 0014 | 303-02-00100 | Removal of Existing Patches | 5,000 | SQYD | 1.00 | 5,000.00 | 0.50 | 2,500.00 | 5.70 | 28,500.00 | 6.50 | 32,500.00 | | 0015 | 304-01-00100 | Lime | 301.07 | TON | 240.00 | 72,256.80 | 215.00 | 64,730.05 | 240.00 | 72,256.80 | 150.00 | 45,160.50 | | 0016 | 304-04-00300 | Lime Treatment (Type D) (10" Thick) | 38,231 | SQYD | 2.55 | 97,489.05 | 1.75 | 66,904.25 | 2.50 | 95,577.50 | 2.75 | 105,135.25 | | 0017 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 59,266 | SQYD | 7.70 | 456,348.20 | 5.95 | 352,632.70 | 7.55 | 447,458.30 | 8.25 | 488,944.50 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,740 | CUYD | 15.50 | 88,970.00 | 30.00 | 172,200.00 | 12.00 | 68,880.00 | 32.00 | 183,680.00 | | 0019 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 57.00 | 2,850.00 | 1.00 | 50.00 | 60.00 | 3,000.00 | | 0020 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 67.00 | 3,350.00 | 1.00 | 50.00 | 60.00 | 3,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 28,990.4 | TON | 74.00 | 2,145,289.60 | 83.00 | 2,406,203.20 | 78.00 | 2,261,251.20 | 84.00 | 2,435,193.60 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,965.5 | TON | 45.00 | 88,447.50 | 145.00 | 284,997.50 | 79.00 | 155,274.50 | 84.00 | 165,102.00 | | 0023 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 87,817 | GAL | 2.75 | 241,496.75 | 2.90 | 254,669.30 | 2.25 | 197,588.25 | 2.90 | 254,669.30 | | 0024 | 507-02-00200 | Aggregate (S2) | 129,144 | SQYD | 1.00 | 129,144.00 | 1.00 | 129,144.00 | 1.25 | 161,430.00 | 1.05 | 135,601.20 | | 0025 | 507-02-00300 | Aggregate (S3) | 129,144 | SQYD | 0.82 | 105,898.08 | 0.85 | 109,772.40 | 1.05 | 135,601.20 | 0.90 | 116,229.60 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 107,963 | SQYD | 1.86 | 200,811.18 | 1.50 | 161,944.50 | 2.10 | 226,722.30 | 2.00 | 215,926.00 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,698 | CUYD | 0.01 | -66.98 | 1.00 | -6,698.00 | 0.01 | -66.98 | 1.00 | -6,698.00 | | 0028 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 268 | SQYD | 93.00 | 24,924.00 | 142.00 | 38,056.00 | 108.00 | 28,944.00 | 125.00 | 33,500.00 | | 0029 | 510-02-00100 | Pavement Widening LA 104 Turnout | 63.1 | SQYD | 150.00 | 9,465.00 | 250.00 | 15,775.00 | 1.10 | 69.41 | 145.00 | 9,149.50 | | 0030 | 701-06-02080 | Side Drain Pipe Arch (Erosion) (36" CMPA) | 224 | LNFT | 120.00 | 26,880.00 | 118.00 | 26,432.00 | 105.00 | 23,520.00 | 145.00 | 32,480.00 | | 0031 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 25 | LNFT | 205.00 | 5,125.00 | 235.00 | 5,875.00 | 135.00 | 3,375.00 | 300.00 | 7,500.00 | | 0032 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 26 | LNFT | 230.00 | 5,980.00 | 220.00 | 5,720.00 | 145.00 | 3,770.00 | 300.00 | 7,800.00 | | 0033 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 6 | LNFT | 260.00 | 1,560.00 | 670.00 | 4,020.00 | 330.00 | 1,980.00 | 500.00 | 3,000.00 | | 0034 | 701-15-00100 | Concrete Collar | 6 | EACH | 1,100.00 | 6,600.00 | 1,200.00 | 7,200.00 | 775.00 | 4,650.00 | 1,400.00 | 8,400.00 | | 0035 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 45.00 | 4,500.00 | 45.00 | 4,500.00 | 45.00 | 4,500.00 | 80.00 | 8,000.00 | | 0036 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 862.5 | LNFT | 40.00 | 34,500.00 | 42.00 | 36,225.00 | 42.00 | 36,225.00 | 42.00 | 36,225.00 | | 0037 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 562.5 | LNFT | 23.00 | 12,937.50 | 23.00 | 12,937.50 | 24.00 | 13,500.00 | 27.00 | 15,187.50 | | 0038 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 275 | LNFT | 67.00 | 18,425.00 | 69.00 | 18,975.00 | 70.00 | 19,250.00 | 77.00 | 21,175.00 | | 0039 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 1 | EACH | 2,200.00 | 2,200.00 | 2,100.00 | 2,100.00 | 2,200.00 | 2,200.00 | 3,200.00 | 3,200.00 | | 0040 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,300.00 | 13,200.00 | 3,175.00 | 12,700.00 | 3,250.00 | 13,000.00 | 3,200.00 | 12,800.00 | | 0041 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 11 | EACH | 2,500.00 | 27,500.00 | 2,555.00 | 28,105.00 | 2,600.00 | 28,600.00 | 3,200.00 | 35,200.00 | | 0042 | 706-02-00200 | Concrete Drive (6" Thick) | 276.3 | SQYD | 125.00 | 34,537.50 | 90.00 | 24,867.00 | 30.00 | 8,289.00 | 70.00 | 19,341.00 | | 0043 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 190 | SQYD | 180.00 | 34,200.00 | 71.00 | 13,490.00 | 60.00 | 11,400.00 | 77.00 | 14,630.00 | | 0044 | 711-04-00100 | Geotextile Fabric | 190 | SQYD | 7.00 | 1,330.00 | 1.75 | 332.50 | 2.00 | 380.00 | 3.00 | 570.00 | | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 42,000.00 | 42,000.00 | 57,500.00 | 57,500.00 | 10,500.00 | 10,500.00 | 35,000.00 | 35,000.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.309 | MILE | 1.00 | 26.31 | 154.00 | 4,051.59 | 323.00 | 8,497.81 | 210.00 | 5,524.89 | | 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.857 | MILE | 1,000.00 | 5,857.00 | 300.00 | 1,757.10 | 2.00 | 11.71 | 300.00 | 1,757.10 | | 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.869 | MILE | 3,250.00 | 84,074.25 | 550.00 | 14,227.95 | 671.00 | 17,358.10 | 550.00 | 14,227.95 | | 0049 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 4,650 | EACH | 2.00 | 9,300.00 | 2.00 | 9,300.00 | 3.75 | 17,437.50 | 2.25 | 10,462.50 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | 8,500.00 | 8,500.00 | 6,000.00 | 6,000.00 | | 0051 | 724-01-00100 | Rumble Strips (Centerline) | 7.3 | MILE | 750.00 | 5,475.00 | 750.00 | 5,475.00 | 300.00 | 2,190.00 | 640.00 | 4,672.00 | | 0052 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 14.7 | MILE | 750.00 | 11,025.00 | 525.00 | 7,717.50 | 300.00 | 4,410.00 | 640.00 | 9,408.00 | | 0053 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 2,000.00 | 2,000.00 | 3,250.00 | 3,250.00 | 1,700.00 | 1,700.00 | 2,500.00 | 2,500.00 | | 0054 | 726-01-00100 | Bedding Material | 69.5 | CUYD | 125.00 | 8,687.50 | 105.00 | 7,297.50 | 100.00 | 6,950.00 | 130.00 | 9,035.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 210,000.00 | 210,000.00 | 112,000.00 | 112,000.00 | 315,000.00 | 315,000.00 | 315,000.00 | 315,000.00 | | 0056 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 596 | SQFT | 18.00 | 10,728.00 | 18.00 | 10,728.00 | 28.00 | 16,688.00 | 18.00 | 10,728.00 | | 0057 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 358.1 | SQFT | 18.00 | 6,445.80 | 18.00 | 6,445.80 | 33.00 | 11,817.30 | 18.00 | 6,445.80 | | 0058 | 729-16-00200 | Object Marker Assembly (Type 2) | 51 | EACH | 65.00 | 3,315.00 | 86.00 | 4,386.00 | 86.00 | 4,386.00 | 67.00 | 3,417.00 | | 0059 | 729-16-00300 | Object Marker Assembly (Type 3) | 28 | EACH | 90.00 | 2,520.00 | 97.00 | 2,716.00 | 97.00 | 2,716.00 | 105.00 | 2,940.00 | | 0060 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 156 | EACH | 105.00 | 16,380.00 | 105.00 | 16,380.00 | 323.00 | 50,388.00 | 105.00 | 16,380.00 | | 0061 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,407 | EACH | 6.00 | 8,442.00 | 5.00 | 7,035.00 | 5.50 | 7,738.50 | 5.00 | 7,035.00 | | 0062 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 113 | LNFT | 3.00 | 339.00 | 2.00 | 226.00 | 1,166.00 | 131,758.00 | 2.00 | 226.00 | | 0063 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 15.00 | 180.00 | 10.00 | 120.00 | 7.50 | 90.00 | 10.00 | 120.00 | | 0064 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.869 | MILE | 3,250.00 | 84,074.25 | 3,350.00 | 86,661.15 | 3,450.00 | 89,248.05 | 3,150.00 | 81,487.35 | | 0065 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.857 | MILE | 1,100.00 | 6,442.70 | 1,000.00 | 5,857.00 | 1,020.00 | 5,974.14 | 1,000.00 | 5,857.00 | | 0066 | 732-05-00100 | Removal of Existing Markings | 0.076 | MILE | 10,000.00 | 760.00 | 4,775.00 | 362.90 | 5,000.00 | 380.00 | 5,000.00 | 380.00 | | 0067 | 735-01-00100 | Mailboxes | 52 | EACH | 10.00 | 520.00 | 1.00 | 52.00 | 32.00 | 1,664.00 | 1.00 | 52.00 | | 0068 | 735-02-00100 | Mailbox Supports (Single) | 52 | EACH | 125.00 | 6,500.00 | 120.00 | 6,240.00 | 195.00 | 10,140.00 | 125.00 | 6,500.00 | | 0069 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 32,000.00 | 32,000.00 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | | 0070 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 195 | INLF | 4.00 | 780.00 | 8.50 | 1,657.50 | 5.50 | 1,072.50 | 8.00 | 1,560.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,375,913.55 | | 5,456,671.64 | | 5,777,988.09 | | 6,014,315.54 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.12 | LUMP | 20,000.00 | 20,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 640 | SQYD | 20.00 | 12,800.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 36.4 | SQYD | 75.00 | 2,730.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 347 | SQYD | 15.00 | 5,205.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 1,819 | LNFT | 12.00 | 21,828.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 25 | LNFT | 30.00 | 750.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 36" CMP | 151 | LNFT | 30.00 | 4,530.00 | | 0008 | 202-02-38200 | Removal of Signs | 166 | EACH | 25.00 | 4,150.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,500 | CUYD | 22.00 | 55,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 94 | EACH | 25.00 | 2,350.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 5.00 | 1,500.00 | | 0013 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 135,556 | SQYD | 8.25 | 1,118,337.00 | | 0014 | 303-02-00100 | Removal of Existing Patches | 5,000 | SQYD | 1.50 | 7,500.00 | | 0015 | 304-01-00100 | Lime | 301.07 | TON | 205.00 | 61,719.35 | | 0016 | 304-04-00300 | Lime Treatment (Type D) (10" Thick) | 38,231 | SQYD | 2.50 | 95,577.50 | | 0017 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 59,266 | SQYD | 7.50 | 444,495.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,740 | CUYD | 15.00 | 86,100.00 | | 0019 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 55.00 | 2,750.00 | | 0020 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 55.00 | 2,750.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 28,990.4 | TON | 80.00 | 2,319,232.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,965.5 | TON | 135.00 | 265,342.50 | | 0023 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 87,817 | GAL | 2.35 | 206,369.95 | | 0024 | 507-02-00200 | Aggregate (S2) | 129,144 | SQYD | 1.27 | 164,012.88 | | 0025 | 507-02-00300 | Aggregate (S3) | 129,144 | SQYD | 1.08 | 139,475.52 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 107,963 | SQYD | 2.25 | 242,916.75 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,698 | CUYD | 0.01 | -66.98 | | 0028 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 268 | SQYD | 120.00 | 32,160.00 | | 0029 | 510-02-00100 | Pavement Widening LA 104 Turnout | 63.1 | SQYD | 160.00 | 10,096.00 | | 0030 | 701-06-02080 | Side Drain Pipe Arch (Erosion) (36" CMPA) | 224 | LNFT | 70.00 | 15,680.00 | | 0031 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 25 | LNFT | 105.00 | 2,625.00 | | 0032 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 26 | LNFT | 115.00 | 2,990.00 | | 0033 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 6 | LNFT | 200.00 | 1,200.00 | | 0034 | 701-15-00100 | Concrete Collar | 6 | EACH | 500.00 | 3,000.00 | | 0035 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 75.00 | 7,500.00 | | 0036 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 862.5 | LNFT | 40.00 | 34,500.00 | | 0037 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 562.5 | LNFT | 25.00 | 14,062.50 | | 0038 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 275 | LNFT | 75.00 | 20,625.00 | | 0039 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | 1 | EACH | 3,100.00 | 3,100.00 | | 0040 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,100.00 | 12,400.00 | | 0041 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 11 | EACH | 3,100.00 | 34,100.00 | | 0042 | 706-02-00200 | Concrete Drive (6" Thick) | 276.3 | SQYD | 65.00 | 17,959.50 | | 0043 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 190 | SQYD | 125.00 | 23,750.00 | | 0044 | 711-04-00100 | Geotextile Fabric | 190 | SQYD | 10.00 | 1,900.00 | | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 62,000.00 | 62,000.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.309 | MILE | 400.00 | 10,523.60 | | 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.857 | MILE | 500.00 | 2,928.50 | | 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.869 | MILE | 625.00 | 16,168.13 | | 0049 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 4,650 | EACH | 1.60 | 7,440.00 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | | 0051 | 724-01-00100 | Rumble Strips (Centerline) | 7.3 | MILE | 280.00 | 2,044.00 | | 0052 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 14.7 | MILE | 280.00 | 4,116.00 | | 0053 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 1,500.00 | 1,500.00 | | 0054 | 726-01-00100 | Bedding Material | 69.5 | CUYD | 150.00 | 10,425.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | | 0056 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 596 | SQFT | 30.00 | 17,880.00 | | 0057 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 358.1 | SQFT | 30.00 | 10,743.00 | | 0058 | 729-16-00200 | Object Marker Assembly (Type 2) | 51 | EACH | 65.00 | 3,315.00 | | 0059 | 729-16-00300 | Object Marker Assembly (Type 3) | 28 | EACH | 100.00 | 2,800.00 | | 0060 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 156 | EACH | 150.00 | 23,400.00 | | 0061 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,407 | EACH | 6.00 | 8,442.00 | | 0062 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 113 | LNFT | 1.85 | 209.05 | | 0063 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 7.00 | 84.00 | | 0064 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.869 | MILE | 2,888.00 | 74,709.67 | | 0065 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.857 | MILE | 950.00 | 5,564.15 | | 0066 | 732-05-00100 | Removal of Existing Markings | 0.076 | MILE | 4,669.00 | 354.84 | | 0067 | 735-01-00100 | Mailboxes | 52 | EACH | 10.00 | 520.00 | | 0068 | 735-02-00100 | Mailbox Supports (Single) | 52 | EACH | 150.00 | 7,800.00 | | 0069 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | | 0070 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 195 | INLF | 8.50 | 1,657.50 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,269,626.91 |
|