Search


Bid Tabulations for the Letting of 6/13/2018 LA DOTD Headquarters

Proposal:H.011490.6
Parish:Ascension
Routes:LA 30
Description:LA 30: TURN LANES @ S. PURPERA & S. HODGESON
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, MILLING ASPHALT PAVEMENT, DRAINAGE STRUCTURES, AND RELATED WORK.
Estimated Construction Cost:$968,019.80
Rank License BidderConstruction Bid
148896Command Construction Industries LLC$794,004.34
206276Barriere Construction Co., LLC$838,338.00
300481COASTAL BRIDGE CO., L.L.C.$884,816.89
412031R.J. Daigle & Sons Contractors, Inc$891,360.62
555950Brown Industrial Construction, LLC$961,335.48
600046Barber Bros. Contracting Co., L.L.C$976,396.75
749356KORT's CONSTRUCTION SERVICES, INC.$985,915.21
805693Industrial Enterprises, Inc.$1,008,544.49


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Command Construction Industries LLC
- 2 -
Barriere Construction Co., LLC
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
R.J. Daigle & Sons Contractors, Inc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP25,000.0025,000.0017,500.0017,500.005,000.005,000.0026,625.0026,625.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP15,000.0015,000.0017,500.0017,500.0035,000.0035,000.004,218.754,218.75
0003202-02-02000Removal of Asphalt Drives 237     SQYD15.003,555.005.001,185.0026.006,162.006.551,552.35
0004202-02-02020Removal of Asphalt Pavement 451     SQYD15.006,765.0010.004,510.0035.0015,785.0042.2019,032.20
0005202-02-06100Removal of Concrete Walks and Drives 1,011     SQYD15.0015,165.005.005,055.0018.0018,198.007.847,926.24
0006202-02-06140Removal of Curbs (Concrete) 138.5   LNFT5.00692.500.5069.2535.004,847.505.05699.43
0009203-01-00100General Excavation 1,440     CUYD1.001,440.0015.0021,600.0016.0023,040.0023.3533,624.00
0010203-03-00100Embankment 806     CUYD1.00806.0015.0012,090.0028.0022,568.0037.7030,386.20
0011204-02-00100Temporary Hay Bales 52     EACH5.00260.0015.00780.0015.00780.0015.63812.76
0012204-05-00100Temporary Sediment Check Dams (Hay) 12     EACH20.00240.00150.001,800.00125.001,500.00156.251,875.00
0013204-06-00100Temporary Silt Fencing 3,872     LNFT0.0138.721.003,872.001.505,808.001.887,279.36
0014302-02-12060Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) 1,908.4   SQYD45.0085,878.0035.0066,794.0030.0057,252.0035.5667,862.70
0015304-01-00100Lime 27.07  TON1.0027.07150.004,060.50215.005,820.05250.766,788.07
0016304-05-00100Lime Treatment (Type E) 1,909     SQYD0.0119.095.009,545.006.0011,454.003.687,025.12
0017402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 200     CUYD0.012.00125.0025,000.0060.0012,000.0071.1214,224.00
0018502-01-00100Asphalt Concrete 1,512.9   TON100.00151,290.00105.00158,854.50113.00170,957.7098.96149,716.58
0019502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 372.8   TON150.0055,920.00150.0055,920.00125.0046,600.00118.0844,020.22
0020509-01-00100Milling Asphalt Pavement 4,458     SQYD1.004,458.002.5011,145.006.0026,748.003.5815,959.64
0021509-02-00100Contractor Retained Reclaimed Asphalt Pavement -186     CUYD50.00-9,300.0015.00-2,790.000.01-1.860.01-1.86
0022701-03-01040Storm Drain Pipe (24" RCP/PP) 6     LNFT200.001,200.00120.00720.00200.001,200.0095.21571.26
0023701-04-01020Storm Drain Pipe Arch (18" Equiv. RCPA) 738     LNFT110.0081,180.0055.0040,590.0065.0047,970.00107.9679,674.48
0024701-04-01040Storm Drain Pipe Arch (24" Equiv. RCPA) 421     LNFT125.0052,625.0065.0027,365.0085.0035,785.00121.0350,953.63
0025701-06-01020Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) 152     LNFT110.0016,720.0060.009,120.0080.0012,160.00101.1115,368.72
0026701-10-01040Reinforced Concrete Pipe (Extension) (18") 4     LNFT200.00800.00150.00600.00750.003,000.00162.50650.00
0027701-10-01060Reinforced Concrete Pipe (Extension) (24") 31     LNFT220.006,820.00160.004,960.00125.003,875.00162.505,037.50
0028701-15-00100Concrete Collar 4     EACH1,000.004,000.001,150.004,600.002,000.008,000.00750.003,000.00
0029701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 606     LNFT0.016.060.000.0030.0018,180.000.83502.98
0030702-02-00200Manholes (R-CB-11) 1     EACH5,000.005,000.005,000.005,000.004,500.004,500.004,380.314,380.31
0031702-03-00100Catch Basins (CB-01) 15     EACH5,000.0075,000.002,500.0037,500.003,200.0048,000.002,512.2537,683.75
0032702-04-00100Adjusting Manholes 1     EACH2,000.002,000.001,751.001,751.002,000.002,000.001,187.501,187.50
0033702-08-00100Side Drain Safety End (Type 1) 21     EACH500.0010,500.002,000.0042,000.002,700.0056,700.002,837.9359,596.53
0034706-02-00200Concrete Drive (6" Thick) 564.3   SQYD75.0042,322.5065.0036,679.5065.0036,679.5081.2545,849.38
0035706-02-00400Concrete Drive (10" Thick) 214.5   SQYD100.0021,450.0090.0019,305.0075.0016,087.5093.7520,109.38
0036713-01-00100Temporary Signs and Barricades 1     LUMP5,000.005,000.0050,000.0050,000.0017,500.0017,500.0020,375.0020,375.00
0037713-02-00300Temporary Pavement Markings (8" Width) 250     LNFT0.3587.500.2562.500.3587.500.44110.00
0038713-02-00500Temporary Pavement Markings (24" Width) 91.5   LNFT1.0091.501.0091.501.0091.501.25114.38
0039713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 1.65  MILE850.001,402.50900.001,485.00625.001,031.25781.251,289.06
0040713-05-00100Temporary Pavement Legends & Symbols (Arrow) 3     EACH50.00150.0028.0084.0050.00150.0062.50187.50
0041717-01-00100Seeding 55     LB20.001,100.0020.001,100.0018.00990.0022.501,237.50
0042718-01-00100Fertilizer 1,841     LB1.001,841.001.001,841.000.751,380.750.941,730.54
0043726-01-00100Bedding Material 266.1   CUYD25.006,652.5065.0017,296.5080.0021,288.0074.3819,792.52
0044727-01-00100Mobilization 1     LUMP70,000.0070,000.0080,000.0080,000.0055,000.0055,000.0049,665.0049,665.00
0045731-02-00100Reflectorized Raised Pavement Markers 301     EACH5.001,505.005.001,505.006.501,956.5010.003,010.00
0046732-01-02040Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 250     LNFT1.25312.501.50375.001.85462.502.50625.00
0047732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 92     LNFT6.50598.007.00644.007.00644.0011.251,035.00
0048732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.65  MILE2,750.004,537.503,000.004,950.002,950.004,867.505,000.008,250.00
0049732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.111 MILE2,400.00266.402,250.00249.754,000.00444.005,405.41600.00
0050732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 3     EACH150.00450.00175.00525.00245.00735.00312.50937.50
0051735-01-00100Mailboxes 12     EACH40.00480.0011.00132.008.0096.0018.75225.00
0052735-02-00100Mailbox Supports (Single) 12     EACH100.001,200.00250.003,000.00225.002,700.00143.751,725.00
0053740-01-00100Construction Layout 1     LUMP10,000.0010,000.0020,000.0020,000.004,500.004,500.005,625.005,625.00
0054NS-500-00340Saw Cutting Asphalt Concrete Pavement 9,938     INLF1.009,938.001.009,938.000.504,969.000.888,745.44
0055NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,512     INLF1.001,512.000.25378.001.502,268.001.251,890.00
             
  CONTRACTOR TOTAL   794,004.34 838,338.00 884,816.89 891,360.62



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Brown Industrial Construction, LLC
- 6 -
Barber Bros. Contracting Co., L.L.C
- 7 -
KORT's CONSTRUCTION SERVICES, INC.
- 8 -
Industrial Enterprises, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP40,000.0040,000.007,500.007,500.0020,000.0020,000.003,600.003,600.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP8,800.008,800.007,500.007,500.0020,000.0020,000.006,000.006,000.00
0003202-02-02000Removal of Asphalt Drives 237     SQYD14.003,318.0016.003,792.005.001,185.006.001,422.00
0004202-02-02020Removal of Asphalt Pavement 451     SQYD13.005,863.0016.007,216.005.002,255.0012.005,412.00
0005202-02-06100Removal of Concrete Walks and Drives 1,011     SQYD12.0012,132.0016.0016,176.005.005,055.0012.0012,132.00
0006202-02-06140Removal of Curbs (Concrete) 138.5   LNFT8.001,108.0016.002,216.005.00692.506.00831.00
0009203-01-00100General Excavation 1,440     CUYD17.0024,480.0020.0028,800.0028.0040,320.0040.0057,600.00
0010203-03-00100Embankment 806     CUYD44.0035,464.0026.0020,956.0045.0036,270.0024.0019,344.00
0011204-02-00100Temporary Hay Bales 52     EACH12.50650.0015.00780.0012.75663.0015.00780.00
0012204-05-00100Temporary Sediment Check Dams (Hay) 12     EACH125.001,500.00125.001,500.00130.001,560.00150.001,800.00
0013204-06-00100Temporary Silt Fencing 3,872     LNFT1.505,808.001.204,646.401.556,001.601.806,969.60
0014302-02-12060Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) 1,908.4   SQYD31.0059,160.4038.0072,519.2085.00162,214.0049.3394,141.37
0015304-01-00100Lime 27.07  TON190.005,143.30300.008,121.00100.002,707.00300.008,121.00
0016304-05-00100Lime Treatment (Type E) 1,909     SQYD7.0013,363.007.5014,317.501.001,909.009.6018,326.40
0017402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 200     CUYD108.0021,600.0055.0011,000.0085.0017,000.0072.0014,400.00
0018502-01-00100Asphalt Concrete 1,512.9   TON118.50179,278.65124.00187,599.60110.00166,419.00150.00226,935.00
0019502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 372.8   TON119.0044,363.20124.0046,227.20163.0060,766.40180.0067,104.00
0020509-01-00100Milling Asphalt Pavement 4,458     SQYD3.6016,048.803.5015,603.003.0013,374.003.6016,048.80
0021509-02-00100Contractor Retained Reclaimed Asphalt Pavement -186     CUYD0.01-1.860.000.0015.00-2,790.000.12-22.32
0022701-03-01040Storm Drain Pipe (24" RCP/PP) 6     LNFT239.001,434.00100.00600.0095.00570.00107.81646.86
0023701-04-01020Storm Drain Pipe Arch (18" Equiv. RCPA) 738     LNFT97.0071,586.0090.0066,420.0085.0062,730.0067.1449,549.32
0024701-04-01040Storm Drain Pipe Arch (24" Equiv. RCPA) 421     LNFT112.0047,152.0095.0039,995.00100.0042,100.0078.7833,166.38
0025701-06-01020Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) 152     LNFT116.0017,632.00100.0015,200.0085.0012,920.0068.2010,366.40
0026701-10-01040Reinforced Concrete Pipe (Extension) (18") 4     LNFT335.001,340.00195.00780.0080.00320.0094.92379.68
0027701-10-01060Reinforced Concrete Pipe (Extension) (24") 31     LNFT140.004,340.00200.006,200.0095.002,945.0081.902,538.90
0028701-15-00100Concrete Collar 4     EACH800.003,200.001,800.007,200.002,000.008,000.00600.002,400.00
0029701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 606     LNFT5.003,030.003.001,818.008.004,848.0030.0018,180.00
0030702-02-00200Manholes (R-CB-11) 1     EACH4,000.004,000.006,500.006,500.002,800.002,800.003,600.003,600.00
0031702-03-00100Catch Basins (CB-01) 15     EACH3,000.0045,000.003,500.0052,500.002,500.0037,500.003,000.0045,000.00
0032702-04-00100Adjusting Manholes 1     EACH1,550.001,550.001,500.001,500.001,100.001,100.00900.00900.00
0033702-08-00100Side Drain Safety End (Type 1) 21     EACH2,000.0042,000.002,500.0052,500.002,300.0048,300.002,151.6045,183.60
0034706-02-00200Concrete Drive (6" Thick) 564.3   SQYD68.0038,372.4080.0045,144.0060.0033,858.0090.0050,787.00
0035706-02-00400Concrete Drive (10" Thick) 214.5   SQYD99.0021,235.50100.0021,450.00110.0023,595.00120.0025,740.00
0036713-01-00100Temporary Signs and Barricades 1     LUMP20,000.0020,000.0045,000.0045,000.0045,000.0045,000.0052,900.0652,900.06
0037713-02-00300Temporary Pavement Markings (8" Width) 250     LNFT0.3587.500.40100.000.3792.500.42105.00
0038713-02-00500Temporary Pavement Markings (24" Width) 91.5   LNFT1.10100.651.10100.651.15105.231.20109.80
0039713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 1.65  MILE800.001,320.00700.001,155.00840.001,386.00750.001,237.50
0040713-05-00100Temporary Pavement Legends & Symbols (Arrow) 3     EACH25.0075.0050.00150.0026.2578.7560.00180.00
0041717-01-00100Seeding 55     LB18.00990.0020.001,100.0019.001,045.0021.601,188.00
0042718-01-00100Fertilizer 1,841     LB0.751,380.751.001,841.001.001,841.000.901,656.90
0043726-01-00100Bedding Material 266.1   CUYD105.0027,940.5072.0019,159.2065.0017,296.5096.0025,545.60
0044727-01-00100Mobilization 1     LUMP95,000.0095,000.0095,000.0095,000.0040,000.0040,000.0034,500.0034,500.00
0045731-02-00100Reflectorized Raised Pavement Markers 301     EACH5.001,505.009.002,709.005.251,580.259.602,889.60
0046732-01-02040Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 250     LNFT1.20300.002.20550.001.25312.502.40600.00
0047732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 92     LNFT6.00552.0010.00920.006.30579.6010.80993.60
0048732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 1.65  MILE2,777.004,582.054,500.007,425.002,915.004,809.754,800.007,920.00
0049732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.111 MILE2,222.00246.644,500.00499.502,330.00258.634,800.00532.80
0050732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 3     EACH150.00450.00275.00825.00158.00474.00300.00900.00
0051735-01-00100Mailboxes 12     EACH15.00180.0015.00180.0020.00240.009.60115.20
0052735-02-00100Mailbox Supports (Single) 12     EACH125.001,500.00120.001,440.00150.001,800.00270.003,240.00
0053740-01-00100Construction Layout 1     LUMP8,000.008,000.0015,000.0015,000.0020,000.0020,000.0012,000.0012,000.00
0054NS-500-00340Saw Cutting Asphalt Concrete Pavement 9,938     INLF1.5014,907.000.757,453.501.009,938.001.0810,733.04
0055NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,512     INLF1.502,268.001.001,512.001.251,890.001.201,814.40
             
  CONTRACTOR TOTAL   961,335.48 976,396.75 985,915.21 1,008,544.49