Proposal:H.010395.6
Parish:Richland
Routes:US 425
Description:US 425: JCT I-20 TO JCT US 80
Type Construction:CLEARING AND GRUBBING (SELECTIVE), MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, HANDICAPPED CURB RAMPS, AND RELATED WORK.
Estimated Construction Cost:$1,639,229.59
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,395,393.65 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $1,776,488.65 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,637,788.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.927 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 557 | SQYD | 35.00 | 19,495.00 | 5.00 | 2,785.00 | 70.00 | 38,990.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 1,059 | LNFT | 25.00 | 26,475.00 | 6.00 | 6,354.00 | 30.00 | 31,770.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 6 | CUYD | 35.00 | 210.00 | 75.00 | 450.00 | 200.00 | 1,200.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 70 | CUYD | 30.00 | 2,100.00 | 120.00 | 8,400.00 | 90.00 | 6,300.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 4,268.6 | TON | 101.00 | 431,128.60 | 115.00 | 490,889.00 | 150.00 | 640,290.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 380.5 | TON | 185.00 | 70,392.50 | 190.00 | 72,295.00 | 300.00 | 114,150.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 36,625 | SQYD | 2.25 | 82,406.25 | 3.50 | 128,187.50 | 5.00 | 183,125.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,586 | CUYD | 0.10 | -158.60 | 1.00 | -1,586.00 | 1.00 | -1,586.00 | | 0010 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 3,956 | SQYD | 94.00 | 371,864.00 | 130.00 | 514,280.00 | 100.00 | 395,600.00 | | 0011 | 702-04-00100 | Adjusting Manholes | 32 | EACH | 1,250.00 | 40,000.00 | 1,400.00 | 44,800.00 | 3,500.00 | 112,000.00 | | 0012 | 702-04-00200 | Adjusting Catch Basins | 4 | EACH | 3,300.00 | 13,200.00 | 2,400.00 | 9,600.00 | 7,500.00 | 30,000.00 | | 0013 | 706-02-00200 | Concrete Drive (6" Thick) | 207.7 | SQYD | 75.00 | 15,577.50 | 80.00 | 16,616.00 | 100.00 | 20,770.00 | | 0014 | 706-04-00100 | Handicapped Curb Ramps | 69 | EACH | 1,200.00 | 82,800.00 | 3,100.00 | 213,900.00 | 3,500.00 | 241,500.00 | | 0015 | 707-01-00100 | Concrete Curb | 604 | LNFT | 44.00 | 26,576.00 | 16.00 | 9,664.00 | 65.00 | 39,260.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 46,000.00 | 46,000.00 | 250,000.00 | 250,000.00 | | 0017 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,758 | LNFT | 0.25 | 439.50 | 0.15 | 263.70 | 0.25 | 439.50 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 219 | LNFT | 1.00 | 219.00 | 0.50 | 109.50 | 2.00 | 438.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.421 | MILE | 165.00 | 894.47 | 200.00 | 1,084.20 | 250.00 | 1,355.25 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.421 | MILE | 525.00 | 2,846.03 | 400.00 | 2,168.40 | 600.00 | 3,252.60 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.842 | MILE | 650.00 | 7,047.30 | 500.00 | 5,421.00 | 800.00 | 8,673.60 | | 0022 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 85.00 | 510.00 | 25.00 | 150.00 | 100.00 | 600.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 5,000.00 | 2,500.00 | 5,500.00 | 2,750.00 | 3,000.00 | 1,500.00 | | 0024 | 717-01-00100 | Seeding | 16 | LB | 120.00 | 1,920.00 | 125.00 | 2,000.00 | 25.00 | 400.00 | | 0025 | 718-01-00100 | Fertilizer | 270 | LB | 2.75 | 742.50 | 3.00 | 810.00 | 2.00 | 540.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 53,000.00 | 53,000.00 | 90,000.00 | 90,000.00 | 250,000.00 | 250,000.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 252 | EACH | 7.00 | 1,764.00 | 6.00 | 1,512.00 | 10.00 | 2,520.00 | | 0028 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 586 | LNFT | 1.05 | 615.30 | 2.00 | 1,172.00 | 2.00 | 1,172.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 73 | LNFT | 9.75 | 711.75 | 12.00 | 876.00 | 12.00 | 876.00 | | 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.782 | MILE | 3,300.00 | 12,480.60 | 3,600.00 | 13,615.20 | 4,000.00 | 15,128.00 | | 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.891 | MILE | 1,050.00 | 1,985.55 | 1,000.00 | 1,891.00 | 1,300.00 | 2,458.30 | | 0032 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 325.00 | 650.00 | 400.00 | 800.00 | 400.00 | 800.00 | | 0033 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 525.00 | 1,050.00 | 700.00 | 1,400.00 | 650.00 | 1,300.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,250.00 | 5,250.00 | 12,000.00 | 12,000.00 | 65,000.00 | 65,000.00 | | 0035 | 741-11-00200 | Adjusting Water Valve and Meter Box | 16 | EACH | 850.00 | 13,600.00 | 500.00 | 8,000.00 | 2,500.00 | 40,000.00 | | 0036 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 3,321 | LNFT | 1.50 | 4,981.50 | 1.75 | 5,811.75 | 3.00 | 9,963.00 | | 0037 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 15,116 | LNFT | 1.20 | 18,139.20 | 1.25 | 18,895.00 | 3.00 | 45,348.00 | | 0038 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 18,437 | LNFT | 1.10 | 20,280.70 | 1.20 | 22,124.40 | 1.50 | 27,655.50 | | 0039 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 2 | EACH | 850.00 | 1,700.00 | 500.00 | 1,000.00 | 2,500.00 | 5,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,395,393.65 | | 1,776,488.65 | | 2,637,788.75 |
|