Proposal:H.010223.6
Parish:Evangeline
Routes:LA 106
Description:LA 106: LA 13 - US 167
Type Construction:IN-PLACE CEMENT STABILIZED BASE COURSE, SUBGRADE TREATMENT, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,059,752.38
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,046,365.58 |
| 2 | 34356 | Prairie Contractors LLC | $3,329,787.66 |
| 3 | 08815 | W. E. MCDONALD & SON, LLC. | $3,536,897.65 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $3,637,729.52 |
| 5 | 00481 | COASTAL BRIDGE CO., L.L.C. | $4,489,853.34 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Prairie Contractors LLC | - 3 - W. E. MCDONALD & SON, LLC. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 114 | SQYD | 20.00 | 2,280.00 | 22.00 | 2,508.00 | 15.00 | 1,710.00 | 30.00 | 3,420.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 121 | SQYD | 19.25 | 2,329.25 | 22.00 | 2,662.00 | 14.00 | 1,694.00 | 30.00 | 3,630.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 427.6 | LNFT | 13.25 | 5,665.70 | 15.00 | 6,414.00 | 13.00 | 5,558.80 | 14.00 | 5,986.40 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" - 36" RCP | 48 | LNFT | 20.00 | 960.00 | 45.00 | 2,160.00 | 36.00 | 1,728.00 | 35.00 | 1,680.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 200 | CUYD | 19.00 | 3,800.00 | 12.00 | 2,400.00 | 20.00 | 4,000.00 | 13.00 | 2,600.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 48 | EACH | 43.00 | 2,064.00 | 160.00 | 7,680.00 | 27.00 | 1,296.00 | 150.00 | 7,200.00 | | 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 72,019 | SQYD | 4.75 | 342,090.25 | 5.30 | 381,700.70 | 5.51 | 396,824.69 | 6.00 | 432,114.00 | | 0008 | 303-02-00100 | Removal of Existing Patches | 750 | SQYD | 1.00 | 750.00 | 5.00 | 3,750.00 | 5.00 | 3,750.00 | 6.25 | 4,687.50 | | 0009 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 70,824 | SQYD | 5.55 | 393,073.20 | 7.25 | 513,474.00 | 7.50 | 531,180.00 | 7.50 | 531,180.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,940 | CUYD | 29.00 | 85,260.00 | 16.00 | 47,040.00 | 15.00 | 44,100.00 | 31.00 | 91,140.00 | | 0011 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 20 | CUYD | 115.00 | 2,300.00 | 25.00 | 500.00 | 1.00 | 20.00 | 50.00 | 1,000.00 | | 0012 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 90 | CUYD | 62.00 | 5,580.00 | 25.00 | 2,250.00 | 1.00 | 90.00 | 50.00 | 4,500.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 21,150.2 | TON | 67.00 | 1,417,063.40 | 73.50 | 1,554,539.70 | 77.00 | 1,628,565.40 | 77.00 | 1,628,565.40 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,387.6 | TON | 130.00 | 180,388.00 | 45.00 | 62,442.00 | 50.00 | 69,380.00 | 77.00 | 106,845.20 | | 0015 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 46,376 | GAL | 2.75 | 127,534.00 | 2.75 | 127,534.00 | 2.25 | 104,346.00 | 3.00 | 139,128.00 | | 0016 | 507-02-00200 | Aggregate (S2) | 68,200 | SQYD | 1.00 | 68,200.00 | 1.05 | 71,610.00 | 1.25 | 85,250.00 | 1.10 | 75,020.00 | | 0017 | 507-02-00300 | Aggregate (S3) | 68,200 | SQYD | 0.85 | 57,970.00 | 0.85 | 57,970.00 | 1.05 | 71,610.00 | 0.90 | 61,380.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 54,437 | SQYD | 1.40 | 76,211.80 | 2.40 | 130,648.80 | 2.70 | 146,979.90 | 2.50 | 136,092.50 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,557 | CUYD | 1.00 | -5,557.00 | 0.01 | -55.57 | 0.01 | -55.57 | 1.00 | -5,557.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 58 | SQYD | 205.00 | 11,890.00 | 150.00 | 8,700.00 | 215.00 | 12,470.00 | 200.00 | 11,600.00 | | 0021 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 4 | LNFT | 1,100.00 | 4,400.00 | 275.00 | 1,100.00 | 500.00 | 2,000.00 | 350.00 | 1,400.00 | | 0022 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 36 | LNFT | 275.00 | 9,900.00 | 200.00 | 7,200.00 | 500.00 | 18,000.00 | 350.00 | 12,600.00 | | 0023 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 8 | LNFT | 550.00 | 4,400.00 | 300.00 | 2,400.00 | 500.00 | 4,000.00 | 350.00 | 2,800.00 | | 0024 | 701-15-00100 | Concrete Collar | 10 | EACH | 1,225.00 | 12,250.00 | 900.00 | 9,000.00 | 1,000.00 | 10,000.00 | 1,300.00 | 13,000.00 | | 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 162.5 | LNFT | 35.00 | 5,687.50 | 40.00 | 6,500.00 | 38.00 | 6,175.00 | 37.00 | 6,012.50 | | 0026 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 225 | LNFT | 23.00 | 5,175.00 | 25.00 | 5,625.00 | 24.00 | 5,400.00 | 24.00 | 5,400.00 | | 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 69.00 | 6,900.00 | 70.00 | 7,000.00 | 70.00 | 7,000.00 | 78.00 | 7,800.00 | | 0028 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,525.00 | 10,100.00 | 2,600.00 | 10,400.00 | 2,700.00 | 10,800.00 | 2,700.00 | 10,800.00 | | 0029 | 706-02-00200 | Concrete Drive (6" Thick) | 121 | SQYD | 125.00 | 15,125.00 | 150.00 | 18,150.00 | 40.00 | 4,840.00 | 65.00 | 7,865.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 21,000.00 | 21,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.482 | MILE | 154.00 | 2,076.23 | 1.00 | 13.48 | 2.00 | 26.96 | 210.00 | 2,831.22 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.222 | MILE | 350.00 | 777.70 | 2,600.00 | 5,777.20 | 540.00 | 1,199.88 | 350.00 | 777.70 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.838 | MILE | 600.00 | 7,702.80 | 5,300.00 | 68,041.40 | 675.00 | 8,665.65 | 600.00 | 7,702.80 | | 0034 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,374 | EACH | 2.00 | 4,748.00 | 2.10 | 4,985.40 | 3.85 | 9,139.90 | 2.25 | 5,341.50 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,500.00 | 3,500.00 | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 4.5 | MILE | 610.00 | 2,745.00 | 950.00 | 4,275.00 | 290.00 | 1,305.00 | 500.00 | 2,250.00 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9 | MILE | 450.00 | 4,050.00 | 950.00 | 8,550.00 | 290.00 | 2,610.00 | 500.00 | 4,500.00 | | 0038 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 3,600.00 | 3,600.00 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | 3,100.00 | 3,100.00 | | 0039 | 726-01-00100 | Bedding Material | 5.5 | CUYD | 165.00 | 907.50 | 150.00 | 825.00 | 325.00 | 1,787.50 | 140.00 | 770.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 67,250.00 | 67,250.00 | 56,000.00 | 56,000.00 | 237,000.00 | 237,000.00 | 200,000.00 | 200,000.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 38 | EACH | 82.00 | 3,116.00 | 85.00 | 3,230.00 | 86.00 | 3,268.00 | 80.00 | 3,040.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 90.00 | 540.00 | 95.00 | 570.00 | 97.00 | 582.00 | 90.00 | 540.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 735 | EACH | 5.00 | 3,675.00 | 6.00 | 4,410.00 | 8.00 | 5,880.00 | 5.00 | 3,675.00 | | 0044 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 68 | LNFT | 3.00 | 204.00 | 4.00 | 272.00 | 3.50 | 238.00 | 3.00 | 204.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 10.00 | 240.00 | 12.00 | 288.00 | 9.75 | 234.00 | 10.00 | 240.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.838 | MILE | 3,125.00 | 40,118.75 | 6,000.00 | 77,028.00 | 3,655.00 | 46,922.89 | 3,100.00 | 39,797.80 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.222 | MILE | 1,000.00 | 2,222.00 | 3,025.00 | 6,721.55 | 1,075.00 | 2,388.65 | 1,000.00 | 2,222.00 | | 0048 | 735-01-00100 | Mailboxes | 46 | EACH | 1.00 | 46.00 | 10.00 | 460.00 | 30.00 | 1,380.00 | 1.00 | 46.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 46 | EACH | 120.00 | 5,520.00 | 125.00 | 5,750.00 | 165.00 | 7,590.00 | 120.00 | 5,520.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 17,200.00 | 17,200.00 | 100.00 | 100.00 | 7,500.00 | 7,500.00 | 7,500.00 | 7,500.00 | | 0051 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 594 | INLF | 2.25 | 1,336.50 | 2.00 | 1,188.00 | 5.50 | 3,267.00 | 3.00 | 1,782.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,046,365.58 | | 3,329,787.66 | | 3,536,897.65 | | 3,637,729.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 114 | SQYD | 30.00 | 3,420.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 121 | SQYD | 50.00 | 6,050.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 427.6 | LNFT | 12.00 | 5,131.20 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" - 36" RCP | 48 | LNFT | 75.00 | 3,600.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 200 | CUYD | 30.00 | 6,000.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 48 | EACH | 100.00 | 4,800.00 | | 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 72,019 | SQYD | 6.75 | 486,128.25 | | 0008 | 303-02-00100 | Removal of Existing Patches | 750 | SQYD | 20.00 | 15,000.00 | | 0009 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 70,824 | SQYD | 8.80 | 623,251.20 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,940 | CUYD | 45.00 | 132,300.00 | | 0011 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 20 | CUYD | 35.00 | 700.00 | | 0012 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 90 | CUYD | 30.00 | 2,700.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 21,150.2 | TON | 92.00 | 1,945,818.40 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,387.6 | TON | 160.00 | 222,016.00 | | 0015 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 46,376 | GAL | 2.69 | 124,751.44 | | 0016 | 507-02-00200 | Aggregate (S2) | 68,200 | SQYD | 1.00 | 68,200.00 | | 0017 | 507-02-00300 | Aggregate (S3) | 68,200 | SQYD | 0.85 | 57,970.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 54,437 | SQYD | 4.00 | 217,748.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,557 | CUYD | 0.01 | -55.57 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 58 | SQYD | 125.00 | 7,250.00 | | 0021 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 4 | LNFT | 1,000.00 | 4,000.00 | | 0022 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 36 | LNFT | 150.00 | 5,400.00 | | 0023 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 8 | LNFT | 325.00 | 2,600.00 | | 0024 | 701-15-00100 | Concrete Collar | 10 | EACH | 1,650.00 | 16,500.00 | | 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 162.5 | LNFT | 38.00 | 6,175.00 | | 0026 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 225 | LNFT | 30.00 | 6,750.00 | | 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 80.00 | 8,000.00 | | 0028 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,850.00 | 11,400.00 | | 0029 | 706-02-00200 | Concrete Drive (6" Thick) | 121 | SQYD | 68.00 | 8,228.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.482 | MILE | 185.00 | 2,494.17 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.222 | MILE | 500.00 | 1,111.00 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.838 | MILE | 625.00 | 8,023.75 | | 0034 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,374 | EACH | 2.00 | 4,748.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,550.00 | 2,550.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 4.5 | MILE | 270.00 | 1,215.00 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9 | MILE | 270.00 | 2,430.00 | | 0038 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 2,000.00 | 2,000.00 | | 0039 | 726-01-00100 | Bedding Material | 5.5 | CUYD | 200.00 | 1,100.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 38 | EACH | 50.00 | 1,900.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 100.00 | 600.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 735 | EACH | 6.50 | 4,777.50 | | 0044 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 68 | LNFT | 3.00 | 204.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 9.00 | 216.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.838 | MILE | 3,000.00 | 38,514.00 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.222 | MILE | 1,000.00 | 2,222.00 | | 0048 | 735-01-00100 | Mailboxes | 46 | EACH | 18.00 | 828.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 46 | EACH | 150.00 | 6,900.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | | 0051 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 594 | INLF | 2.00 | 1,188.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,489,853.34 |
|