Proposal:H.007603.6
Parish:Terrebonne
Routes:LA 24
Description:LA 24 SIDEWALKS
Type Construction:GRADING, DRAINAGE STRUCTURES, INCIDENTAL CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$266,897.65
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $198,622.98 |
| 2 | 34263 | La Contracting Enterprise LLC | $274,899.00 |
| 3 | 48896 | Command Construction Industries LLC | $291,084.00 |
| 4 | 40312 | GRAY CONSTRUCTION CORP. | $298,421.28 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - La Contracting Enterprise LLC | - 3 - Command Construction Industries LLC | - 4 - GRAY CONSTRUCTION CORP. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 13 | SQYD | 15.00 | 195.00 | 30.00 | 390.00 | 10.00 | 130.00 | 47.00 | 611.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 301 | SQYD | 15.00 | 4,515.00 | 16.00 | 4,816.00 | 10.00 | 3,010.00 | 12.50 | 3,762.50 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 8 | LNFT | 4.00 | 32.00 | 27.00 | 216.00 | 10.00 | 80.00 | 26.25 | 210.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (15" CMP) | 20 | LNFT | 12.00 | 240.00 | 16.00 | 320.00 | 10.00 | 200.00 | 5.00 | 100.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) (15" RCP) | 106 | LNFT | 12.00 | 1,272.00 | 16.00 | 1,696.00 | 10.00 | 1,060.00 | 5.00 | 530.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | 142 | LNFT | 12.00 | 1,704.00 | 19.00 | 2,698.00 | 10.00 | 1,420.00 | 5.00 | 710.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (24" CMP) | 24 | LNFT | 12.00 | 288.00 | 20.00 | 480.00 | 10.00 | 240.00 | 3.50 | 84.00 | | 0008 | 202-03-38000 | Relocation of Sign (Traffic Signs) | 8 | EACH | 85.00 | 680.00 | 100.00 | 800.00 | 50.00 | 400.00 | 300.00 | 2,400.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 1,500.00 | 1,500.00 | 23,000.00 | 23,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 670 | CUYD | 20.00 | 13,400.00 | 21.00 | 14,070.00 | 1.00 | 670.00 | 15.20 | 10,184.00 | | 0011 | 203-10-00100 | Cleaning Existing Ditches | 114 | LNFT | 6.00 | 684.00 | 11.00 | 1,254.00 | 5.00 | 570.00 | 23.00 | 2,622.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 36 | EACH | 18.00 | 648.00 | 17.00 | 612.00 | 5.00 | 180.00 | 15.00 | 540.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 3,266 | LNFT | 2.00 | 6,532.00 | 2.00 | 6,532.00 | 3.00 | 9,798.00 | 1.62 | 5,290.92 | | 0014 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 108.00 | 10,800.00 | 84.00 | 8,400.00 | 80.00 | 8,000.00 | 88.00 | 8,800.00 | | 0015 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 309 | LNFT | 48.00 | 14,832.00 | 60.00 | 18,540.00 | 100.00 | 30,900.00 | 60.00 | 18,540.00 | | 0016 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 120 | LNFT | 62.25 | 7,470.00 | 83.00 | 9,960.00 | 110.00 | 13,200.00 | 85.20 | 10,224.00 | | 0017 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 67 | LNFT | 40.00 | 2,680.00 | 64.00 | 4,288.00 | 90.00 | 6,030.00 | 66.00 | 4,422.00 | | 0018 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 62 | LNFT | 48.00 | 2,976.00 | 77.00 | 4,774.00 | 100.00 | 6,200.00 | 80.20 | 4,972.40 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 2,500.00 | 17,500.00 | 3,200.00 | 22,400.00 | 4,000.00 | 28,000.00 | 3,200.00 | 22,400.00 | | 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 1,440.8 | SQYD | 40.50 | 58,352.40 | 48.00 | 69,158.40 | 60.00 | 86,448.00 | 62.20 | 89,617.76 | | 0021 | 706-01-00300 | Concrete Walk (6" Thick) | 34.4 | SQYD | 49.70 | 1,709.68 | 74.00 | 2,545.60 | 60.00 | 2,064.00 | 56.00 | 1,926.40 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 397.3 | SQYD | 55.00 | 21,851.50 | 60.00 | 23,838.00 | 60.00 | 23,838.00 | 55.00 | 21,851.50 | | 0023 | 706-04-00100 | Handicapped Curb Ramps (PED-01) (Type 4) | 1 | EACH | 500.00 | 500.00 | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 | 685.00 | 685.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,200.00 | 4,200.00 | 7,000.00 | 7,000.00 | 1,000.00 | 1,000.00 | 3,400.00 | 3,400.00 | | 0025 | 717-01-00100 | Seeding (Hulled Bermuda) | 45 | LB | 20.00 | 900.00 | 20.00 | 900.00 | 35.00 | 1,575.00 | 16.00 | 720.00 | | 0026 | 718-01-00100 | Fertilizer (8-8-8) | 1,500 | LB | 1.00 | 1,500.00 | 1.00 | 1,500.00 | 1.50 | 2,250.00 | 0.75 | 1,125.00 | | 0027 | 726-01-00100 | Bedding Material | 61.2 | CUYD | 95.00 | 5,814.00 | 125.00 | 7,650.00 | 60.00 | 3,672.00 | 151.00 | 9,241.20 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 6,000.00 | 6,000.00 | 19,000.00 | 19,000.00 | 25,000.00 | 25,000.00 | 19,000.00 | 19,000.00 | | 0029 | 729-01-00100 | Sign (Type A) | 63 | SQFT | 16.50 | 1,039.50 | 20.00 | 1,260.00 | 35.00 | 2,205.00 | 45.00 | 2,835.00 | | 0030 | 729-21-00100 | U-Channel Post | 7 | EACH | 82.50 | 577.50 | 100.00 | 700.00 | 100.00 | 700.00 | 100.00 | 700.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | 1,600.00 | 1,600.00 | | 0032 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,548 | INLF | 1.30 | 2,012.40 | 1.75 | 2,709.00 | 1.00 | 1,548.00 | 1.40 | 2,167.20 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement (6" Thick) | 696 | INLF | 1.75 | 1,218.00 | 2.00 | 1,392.00 | 1.00 | 696.00 | 1.40 | 974.40 | | 0034 | NS-ENH-01040 | Adjusting Utility Boxes (Adjust Cover to Match Sidewalk Elevation) | 5 | EACH | 500.00 | 2,500.00 | 1,000.00 | 5,000.00 | 500.00 | 2,500.00 | 235.00 | 1,175.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 198,622.98 | | 274,899.00 | | 291,084.00 | | 298,421.28 |
|