Proposal:H.013240.6
Parish:Jefferson
Routes:LA 48
Description:LA 48: OAK AVE - BAILEY STREET
Type Construction:DRAINAGE STRUCTURES, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$231,397.00
| Rank | License | Bidder | Construction Bid |
| 1 | 44187 | Palmisano Construction LLC | $154,331.40 |
| 2 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $175,928.00 |
| 3 | 24901 | Hard Rock Construction LLC | $210,929.00 |
| 4 | 61575 | La Pequena Construction LLC | $244,893.80 |
| 5 | 64058 | McCoy Group, LLC | $267,332.70 |
| 6 | 36961 | Cycle Construction Co. L.L.C. | $285,750.80 |
| 7 | 00935 | Fleming Construction Co., LLC | $288,586.00 |
| 8 | 02179 | Boh Bros. Construction Co., LLC. | $297,975.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Palmisano Construction LLC | - 2 - BEVERLY CONSTRUCTION CO. LLC | - 3 - Hard Rock Construction LLC | - 4 - La Pequena Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions Removal and Reinstallation of Parking Curbs | 1 | LUMP | 1,250.00 | 1,250.00 | 5,100.00 | 5,100.00 | 8,500.00 | 8,500.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-00010 | Removal of Pipe T-Connection | 2 | EACH | 1.00 | 2.00 | 175.00 | 350.00 | 230.00 | 460.00 | 5,000.00 | 10,000.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 60.00 | 180.00 | 175.00 | 525.00 | 230.00 | 690.00 | 1,000.00 | 3,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 4 | SQYD | 60.00 | 240.00 | 25.00 | 100.00 | 15.00 | 60.00 | 57.00 | 228.00 | | 0005 | 202-02-26000 | Removal of Manholes | 2 | EACH | 250.00 | 500.00 | 175.00 | 350.00 | 230.00 | 460.00 | 1,000.00 | 2,000.00 | | 0006 | 202-02-32140 | Removal of Pipe (Storm Drain) <24" Storm Drain CMP | 453 | LNFT | 10.00 | 4,530.00 | 7.00 | 3,171.00 | 5.00 | 2,265.00 | 30.00 | 13,590.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 580 | CUYD | 20.00 | 11,600.00 | 50.00 | 29,000.00 | 1.00 | 580.00 | 15.00 | 8,700.00 | | 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 419 | SQYD | 55.00 | 23,045.00 | 40.00 | 16,760.00 | 75.00 | 31,425.00 | 103.00 | 43,157.00 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 32 | SQYD | 115.00 | 3,680.00 | 90.00 | 2,880.00 | 125.00 | 4,000.00 | 187.00 | 5,984.00 | | 0010 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 122 | LNFT | 65.00 | 7,930.00 | 80.00 | 9,760.00 | 135.00 | 16,470.00 | 153.00 | 18,666.00 | | 0011 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 213 | LNFT | 90.00 | 19,170.00 | 120.00 | 25,560.00 | 165.00 | 35,145.00 | 170.00 | 36,210.00 | | 0012 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 70.5 | LNFT | 125.00 | 8,812.50 | 160.00 | 11,280.00 | 250.00 | 17,625.00 | 200.00 | 14,100.00 | | 0013 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 24 | LNFT | 130.00 | 3,120.00 | 150.00 | 3,600.00 | 265.00 | 6,360.00 | 153.00 | 3,672.00 | | 0014 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 450 | LNFT | 0.01 | 4.50 | 12.00 | 5,400.00 | 1.00 | 450.00 | 33.00 | 14,850.00 | | 0015 | 702-02-00100 | Manholes (MH-06) | 4 | EACH | 3,500.00 | 14,000.00 | 4,100.00 | 16,400.00 | 5,100.00 | 20,400.00 | 3,000.00 | 12,000.00 | | 0016 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,000.00 | 9,000.00 | 2,800.00 | 8,400.00 | 3,700.00 | 11,100.00 | 4,000.00 | 12,000.00 | | 0017 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 3,750.00 | 7,500.00 | 3,100.00 | 6,200.00 | 4,500.00 | 9,000.00 | 4,500.00 | 9,000.00 | | 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 4.4 | SQYD | 195.00 | 858.00 | 100.00 | 440.00 | 125.00 | 550.00 | 97.00 | 426.80 | | 0019 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 10 | SQYD | 115.00 | 1,150.00 | 100.00 | 1,000.00 | 130.00 | 1,300.00 | 97.00 | 970.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | | 0021 | 717-01-00100 | Seeding | 1 | LB | 55.00 | 55.00 | 100.00 | 100.00 | 50.00 | 50.00 | 50.00 | 50.00 | | 0022 | 718-01-00100 | Fertilizer | 1 | LB | 55.00 | 55.00 | 100.00 | 100.00 | 50.00 | 50.00 | 100.00 | 100.00 | | 0023 | 726-01-00100 | Bedding Material | 109.8 | CUYD | 43.00 | 4,721.40 | 40.00 | 4,392.00 | 55.00 | 6,039.00 | 50.00 | 5,490.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 22,000.00 | 22,000.00 | 7,000.00 | 7,000.00 | | 0025 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) Parking Striping | 600 | LNFT | 1.63 | 978.00 | 1.10 | 660.00 | 3.25 | 1,950.00 | 1.50 | 900.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | 7,000.00 | 7,000.00 | | 0027 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 2 | EACH | 475.00 | 950.00 | 200.00 | 400.00 | 500.00 | 1,000.00 | 400.00 | 800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 154,331.40 | | 175,928.00 | | 210,929.00 | | 244,893.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - McCoy Group, LLC | - 6 - Cycle Construction Co. L.L.C. | - 7 - Fleming Construction Co., LLC | - 8 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions Removal and Reinstallation of Parking Curbs | 1 | LUMP | 5,817.64 | 5,817.64 | 2,400.00 | 2,400.00 | 2,000.00 | 2,000.00 | 12,750.00 | 12,750.00 | | 0002 | 202-02-00010 | Removal of Pipe T-Connection | 2 | EACH | 1,531.47 | 3,062.94 | 300.00 | 600.00 | 500.00 | 1,000.00 | 150.00 | 300.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 1,581.47 | 4,744.41 | 495.00 | 1,485.00 | 500.00 | 1,500.00 | 275.00 | 825.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 4 | SQYD | 9.94 | 39.76 | 46.00 | 184.00 | 30.00 | 120.00 | 75.00 | 300.00 | | 0005 | 202-02-26000 | Removal of Manholes | 2 | EACH | 1,628.32 | 3,256.64 | 495.00 | 990.00 | 500.00 | 1,000.00 | 275.00 | 550.00 | | 0006 | 202-02-32140 | Removal of Pipe (Storm Drain) <24" Storm Drain CMP | 453 | LNFT | 29.07 | 13,168.71 | 21.00 | 9,513.00 | 20.00 | 9,060.00 | 9.75 | 4,416.75 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 580 | CUYD | 4.31 | 2,499.80 | 69.00 | 40,020.00 | 50.00 | 29,000.00 | 25.00 | 14,500.00 | | 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 419 | SQYD | 119.94 | 50,254.86 | 60.00 | 25,140.00 | 110.00 | 46,090.00 | 100.00 | 41,900.00 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 32 | SQYD | 154.18 | 4,933.76 | 120.00 | 3,840.00 | 500.00 | 16,000.00 | 275.00 | 8,800.00 | | 0010 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 122 | LNFT | 118.05 | 14,402.10 | 107.00 | 13,054.00 | 150.00 | 18,300.00 | 175.00 | 21,350.00 | | 0011 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 213 | LNFT | 154.83 | 32,978.79 | 148.00 | 31,524.00 | 200.00 | 42,600.00 | 225.00 | 47,925.00 | | 0012 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 70.5 | LNFT | 225.04 | 15,865.32 | 200.00 | 14,100.00 | 220.00 | 15,510.00 | 275.00 | 19,387.50 | | 0013 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 24 | LNFT | 202.85 | 4,868.40 | 245.00 | 5,880.00 | 200.00 | 4,800.00 | 250.00 | 6,000.00 | | 0014 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 450 | LNFT | 1.73 | 778.50 | 14.00 | 6,300.00 | 5.00 | 2,250.00 | 8.50 | 3,825.00 | | 0015 | 702-02-00100 | Manholes (MH-06) | 4 | EACH | 2,838.14 | 11,352.56 | 6,100.00 | 24,400.00 | 4,000.00 | 16,000.00 | 6,750.00 | 27,000.00 | | 0016 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,184.00 | 9,552.00 | 5,600.00 | 16,800.00 | 4,000.00 | 12,000.00 | 5,750.00 | 17,250.00 | | 0017 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 3,792.52 | 7,585.04 | 7,600.00 | 15,200.00 | 4,200.00 | 8,400.00 | 7,850.00 | 15,700.00 | | 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 4.4 | SQYD | 333.55 | 1,467.62 | 165.00 | 726.00 | 250.00 | 1,100.00 | 250.00 | 1,100.00 | | 0019 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 10 | SQYD | 318.43 | 3,184.30 | 250.00 | 2,500.00 | 200.00 | 2,000.00 | 350.00 | 3,500.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,563.53 | 18,563.53 | 5,275.00 | 5,275.00 | 20,000.00 | 20,000.00 | 3,750.00 | 3,750.00 | | 0021 | 717-01-00100 | Seeding | 1 | LB | 46.38 | 46.38 | 250.00 | 250.00 | 20.00 | 20.00 | 150.00 | 150.00 | | 0022 | 718-01-00100 | Fertilizer | 1 | LB | 50.00 | 50.00 | 25.00 | 25.00 | 50.00 | 50.00 | 8.00 | 8.00 | | 0023 | 726-01-00100 | Bedding Material | 109.8 | CUYD | 106.55 | 11,699.19 | 76.00 | 8,344.80 | 70.00 | 7,686.00 | 60.00 | 6,588.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 26,752.98 | 26,752.98 | 47,500.00 | 47,500.00 | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 | | 0025 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) Parking Striping | 600 | LNFT | 2.73 | 1,638.00 | 3.50 | 2,100.00 | 3.00 | 1,800.00 | 4.50 | 2,700.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,690.63 | 18,690.63 | 5,600.00 | 5,600.00 | 2,000.00 | 2,000.00 | 12,000.00 | 12,000.00 | | 0027 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 2 | EACH | 39.42 | 78.84 | 1,000.00 | 2,000.00 | 150.00 | 300.00 | 200.00 | 400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 267,332.70 | | 285,750.80 | | 288,586.00 | | 297,975.25 |
|