Proposal:H.012287.6
Parish:Lafayette
Routes:I-49, LA 98
Description:I-49 NB EXIT RAMP AT LA 98
Type Construction:GRADING, LIME TREATMENT, SUBGRADE TREATMENT, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$432,910.79
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $570,129.47 |
| 2 | 52306 | Cecil Perry Improvements Llc | $610,866.33 |
| 3 | 58878 | Five S Group, Inc. | $626,307.15 |
| 4 | 30774 | Progressive Construction Co., LLC | $650,371.82 |
| 5 | 55505 | MERRICK, LLC | $654,542.90 |
| 6 | 33663 | Glenn Lege Construction Inc | $716,432.07 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Cecil Perry Improvements Llc | - 3 - Five S Group, Inc. | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 634.1 | SQYD | 15.00 | 9,511.50 | 10.50 | 6,658.05 | 25.00 | 15,852.50 | 8.00 | 5,072.80 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 983.9 | SQYD | 20.00 | 19,678.00 | 10.40 | 10,232.56 | 25.00 | 24,597.50 | 15.00 | 14,758.50 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 2-36" X 8' RCP | 16 | LNFT | 50.00 | 800.00 | 14.25 | 228.00 | 100.00 | 1,600.00 | 26.00 | 416.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 350 | SQYD | 20.00 | 7,000.00 | 12.00 | 4,200.00 | 20.00 | 7,000.00 | 11.00 | 3,850.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 6 | EACH | 510.00 | 3,060.00 | 460.00 | 2,760.00 | 1,000.00 | 6,000.00 | 118.00 | 708.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 1 | EACH | 57.00 | 57.00 | 51.00 | 51.00 | 250.00 | 250.00 | 59.00 | 59.00 | | 0007 | 202-02-38360 | Removal of Sign Faces | 13 | EACH | 200.00 | 2,600.00 | 180.00 | 2,340.00 | 250.00 | 3,250.00 | 59.00 | 767.00 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 2,050.00 | 2,050.00 | 1,835.00 | 1,835.00 | 10,000.00 | 10,000.00 | 2,118.00 | 2,118.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 35,550.00 | 35,550.00 | 25,000.00 | 25,000.00 | 33,500.00 | 33,500.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 12 | EACH | 21.00 | 252.00 | 22.50 | 270.00 | 16.00 | 192.00 | 18.00 | 216.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 89.00 | 267.00 | 177.00 | 531.00 | 150.00 | 450.00 | 171.00 | 513.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 700 | LNFT | 2.00 | 1,400.00 | 1.60 | 1,120.00 | 3.00 | 2,100.00 | 3.00 | 2,100.00 | | 0013 | 304-01-00100 | Lime | 4.59 | TON | 350.00 | 1,606.50 | 320.00 | 1,468.80 | 225.00 | 1,032.75 | 500.00 | 2,295.00 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 388 | SQYD | 25.00 | 9,700.00 | 3.50 | 1,358.00 | 12.00 | 4,656.00 | 19.00 | 7,372.00 | | 0015 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 1,553 | SQYD | 21.00 | 32,613.00 | 22.00 | 34,166.00 | 15.00 | 23,295.00 | 24.00 | 37,272.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 677.6 | TON | 135.00 | 91,476.00 | 148.00 | 100,284.80 | 140.00 | 94,864.00 | 153.00 | 103,672.80 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 864 | SQYD | 11.50 | 9,936.00 | 12.25 | 10,584.00 | 15.00 | 12,960.00 | 13.50 | 11,664.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -48 | CUYD | 0.01 | -0.48 | 0.01 | -0.48 | 1.00 | -48.00 | 0.01 | -0.48 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 38 | SQYD | 140.00 | 5,320.00 | 127.50 | 4,845.00 | 250.00 | 9,500.00 | 235.00 | 8,930.00 | | 0020 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 662.9 | SQYD | 90.50 | 59,992.45 | 103.00 | 68,278.70 | 75.00 | 49,717.50 | 93.50 | 61,981.15 | | 0021 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 160.7 | SQYD | 130.00 | 20,891.00 | 133.00 | 21,373.10 | 90.00 | 14,463.00 | 93.50 | 15,025.45 | | 0022 | 601-03-01100 | Portland Cement Concrete Shoulder (10" Thick) | 151.8 | SQYD | 130.00 | 19,734.00 | 123.50 | 18,747.30 | 85.00 | 12,903.00 | 93.50 | 14,193.30 | | 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 76 | LNFT | 104.00 | 7,904.00 | 150.00 | 11,400.00 | 125.00 | 9,500.00 | 175.00 | 13,300.00 | | 0024 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 354 | LNFT | 54.00 | 19,116.00 | 61.50 | 21,771.00 | 75.00 | 26,550.00 | 67.50 | 23,895.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 430 | LNFT | 6.00 | 2,580.00 | 0.01 | 4.30 | 2.00 | 860.00 | 5.00 | 2,150.00 | | 0026 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,077.00 | 5,077.00 | 7,705.00 | 7,705.00 | 4,000.00 | 4,000.00 | 7,400.00 | 7,400.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,175.00 | 9,525.00 | 3,475.00 | 10,425.00 | 4,000.00 | 12,000.00 | 3,600.00 | 10,800.00 | | 0028 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,600.00 | 2,600.00 | 2,675.00 | 2,675.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | | 0029 | 707-01-00300 | Concrete Curb (Mountable) | 60.2 | LNFT | 42.00 | 2,528.40 | 5.25 | 316.05 | 10.00 | 602.00 | 35.00 | 2,107.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 24,000.00 | 24,000.00 | 28,400.00 | 28,400.00 | 20,000.00 | 20,000.00 | 31,000.00 | 31,000.00 | | 0031 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.298 | MILE | 7,965.00 | 18,303.57 | 10,200.00 | 23,439.60 | 8,000.00 | 18,384.00 | 8,235.00 | 18,924.03 | | 0032 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 34.00 | 136.00 | 51.00 | 204.00 | 65.00 | 260.00 | 35.00 | 140.00 | | 0033 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 57.00 | 114.00 | 56.00 | 112.00 | 85.00 | 170.00 | 59.00 | 118.00 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 11,000.00 | 11,000.00 | 10,800.00 | 10,800.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | | 0035 | 726-01-00100 | Bedding Material | 91.7 | CUYD | 99.00 | 9,078.30 | 111.00 | 10,178.70 | 85.00 | 7,794.50 | 97.50 | 8,940.75 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 17,300.00 | 17,300.00 | 45,000.00 | 45,000.00 | 60,000.00 | 60,000.00 | 79,000.00 | 79,000.00 | | 0037 | 729-01-00100 | Sign (Type A) | 51.8 | SQFT | 51.00 | 2,641.80 | 46.00 | 2,382.80 | 50.00 | 2,590.00 | 36.00 | 1,864.80 | | 0038 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 36.9 | SQFT | 34.00 | 1,254.60 | 30.50 | 1,125.45 | 32.00 | 1,180.80 | 36.00 | 1,328.40 | | 0039 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 36 | SQFT | 39.00 | 1,404.00 | 36.00 | 1,296.00 | 36.00 | 1,296.00 | 47.00 | 1,692.00 | | 0040 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 2,162.00 | 4,324.00 | 1,940.00 | 3,880.00 | 2,000.00 | 4,000.00 | 1,765.00 | 3,530.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 74.00 | 148.00 | 66.25 | 132.50 | 70.00 | 140.00 | 94.00 | 188.00 | | 0042 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 1 | EACH | 176.00 | 176.00 | 158.00 | 158.00 | 175.00 | 175.00 | 4,112.00 | 4,112.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 352 | EACH | 5.75 | 2,024.00 | 8.15 | 2,868.80 | 6.00 | 2,112.00 | 6.00 | 2,112.00 | | 0044 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 934 | LNFT | 2.00 | 1,868.00 | 3.00 | 2,802.00 | 3.30 | 3,082.20 | 2.25 | 2,101.50 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 461 | LNFT | 7.00 | 3,227.00 | 11.20 | 5,163.20 | 8.50 | 3,918.50 | 7.00 | 3,227.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.18 | MILE | 3,286.00 | 3,877.48 | 4,080.00 | 4,814.40 | 2,200.00 | 2,596.00 | 3,398.00 | 4,009.64 | | 0047 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 0.189 | MILE | 1,644.00 | 310.72 | 2,550.00 | 481.95 | 3,600.00 | 680.40 | 1,700.00 | 321.30 | | 0048 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.182 | MILE | 5,943.00 | 1,081.63 | 3,060.00 | 556.92 | 5,500.00 | 1,001.00 | 6,150.00 | 1,119.30 | | 0049 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 200.00 | 400.00 | 357.00 | 714.00 | 400.00 | 800.00 | 206.00 | 412.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 170.00 | 680.00 | 306.00 | 1,224.00 | 250.00 | 1,000.00 | 176.50 | 706.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 170.00 | 340.00 | 306.00 | 612.00 | 250.00 | 500.00 | 176.50 | 353.00 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.478 | MILE | 6,000.00 | 2,868.00 | 6,117.00 | 2,923.93 | 6,500.00 | 3,107.00 | 6,212.00 | 2,969.34 | | 0053 | 736-01-00100 | Trenching and Backfilling | 85 | LNFT | 13.00 | 1,105.00 | 12.25 | 1,041.25 | 6.50 | 552.50 | 14.00 | 1,190.00 | | 0054 | 736-03-00100 | Jacking or Boring | 45 | LNFT | 24.00 | 1,080.00 | 21.45 | 965.25 | 25.00 | 1,125.00 | 25.00 | 1,125.00 | | 0055 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 1,593.00 | 1,593.00 | 1,425.00 | 1,425.00 | 4,500.00 | 4,500.00 | 1,647.00 | 1,647.00 | | 0056 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 4 | EACH | 1,240.00 | 4,960.00 | 1,111.00 | 4,444.00 | 1,300.00 | 5,200.00 | 1,282.00 | 5,128.00 | | 0057 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 1 | EACH | 1,240.00 | 1,240.00 | 1,111.00 | 1,111.00 | 1,300.00 | 1,300.00 | 1,282.00 | 1,282.00 | | 0058 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 1,565.00 | 1,565.00 | 1,401.00 | 1,401.00 | 1,500.00 | 1,500.00 | 36.00 | 36.00 | | 0059 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 1 | EACH | 1,565.00 | 1,565.00 | 1,401.00 | 1,401.00 | 1,500.00 | 1,500.00 | 1,618.00 | 1,618.00 | | 0060 | 736-05-45000 | Signal Heads (4 Section, 12 inch Led Lens, R, Y, G, RT. G) | 1 | EACH | 1,565.00 | 1,565.00 | 1,401.00 | 1,401.00 | 1,500.00 | 1,500.00 | 1,618.00 | 1,618.00 | | 0061 | 736-08-00100 | Signal Controller (980 ATC, Type 2)(Existing Cab)(Furnish & Install) | 1 | EACH | 7,772.00 | 7,772.00 | 6,965.00 | 6,965.00 | 6,800.00 | 6,800.00 | 8,035.00 | 8,035.00 | | 0062 | 736-09-00100 | Loop Detector | 230 | LNFT | 28.00 | 6,440.00 | 25.50 | 5,865.00 | 27.00 | 6,210.00 | 29.50 | 6,785.00 | | 0063 | 736-10-00300 | Underground Junction Box (Type F) | 1 | EACH | 800.00 | 800.00 | 715.00 | 715.00 | 700.00 | 700.00 | 823.50 | 823.50 | | 0064 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 30 | LNFT | 2.85 | 85.50 | 2.50 | 75.00 | 4.00 | 120.00 | 3.00 | 90.00 | | 0065 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 100 | LNFT | 9.00 | 900.00 | 8.15 | 815.00 | 5.00 | 500.00 | 9.50 | 950.00 | | 0066 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair, 19 strand) | 100 | LNFT | 2.25 | 225.00 | 2.05 | 205.00 | 6.00 | 600.00 | 2.50 | 250.00 | | 0067 | 736-12-02014 | Conductor (2c, #14 awg) | 80 | LNFT | 2.50 | 200.00 | 2.20 | 176.00 | 5.00 | 400.00 | 2.50 | 200.00 | | 0068 | 736-12-06014 | Conductor (6c, #14 awg) | 80 | LNFT | 4.25 | 340.00 | 4.00 | 320.00 | 9.00 | 720.00 | 4.50 | 360.00 | | 0069 | 736-12-10014 | Conductor (10c, #14 awg) | 273 | LNFT | 5.50 | 1,501.50 | 4.85 | 1,324.05 | 13.00 | 3,549.00 | 5.50 | 1,501.50 | | 0070 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 598.00 | 598.00 | 535.00 | 535.00 | 3,000.00 | 3,000.00 | 618.00 | 618.00 | | 0071 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 950.00 | 3,800.00 | 850.00 | 3,400.00 | 1,000.00 | 4,000.00 | 976.50 | 3,906.00 | | 0072 | 736-22-00000 | Pedestrian Push Button | 4 | EACH | 250.00 | 1,000.00 | 230.00 | 920.00 | 100.00 | 400.00 | 265.00 | 1,060.00 | | 0073 | 739-01-00100 | Hydro-Seeding | 0.82 | ACRE | 2,100.00 | 1,722.00 | 1,500.00 | 1,230.00 | 1,900.00 | 1,558.00 | 2,182.00 | 1,789.24 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 6,685.00 | 6,685.00 | 20,000.00 | 20,000.00 | 7,328.00 | 7,328.00 | | 0075 | 805-01-00900 | Class A1 Concrete Pipe Headwall | 9.93 | CUYD | 1,800.00 | 17,874.00 | 1,685.00 | 16,732.05 | 2,000.00 | 19,860.00 | 1,700.00 | 16,881.00 | | 0076 | 806-01-00100 | Deformed Reinforcing Steel | 602 | LB | 4.00 | 2,408.00 | 1.55 | 933.10 | 3.00 | 1,806.00 | 2.00 | 1,204.00 | | 0077 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,436 | INLF | 1.25 | 4,295.00 | 0.95 | 3,264.20 | 2.00 | 6,872.00 | 2.50 | 8,590.00 | | 0078 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 3 | EACH | 5,125.00 | 15,375.00 | 5,000.00 | 15,000.00 | 3,600.00 | 10,800.00 | 4,000.00 | 12,000.00 | | 0079 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad - Soil | 1 | EACH | 900.00 | 900.00 | 815.00 | 815.00 | 1,000.00 | 1,000.00 | 1,117.00 | 1,117.00 | | 0080 | NS-736-00132 | MMU for TS-2 Traffic Signal Cabinet | 1 | EACH | 1,389.00 | 1,389.00 | 1,255.00 | 1,255.00 | 2,800.00 | 2,800.00 | 1,435.00 | 1,435.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 570,129.47 | | 610,866.33 | | 626,307.15 | | 650,371.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - MERRICK, LLC | - 6 - Glenn Lege Construction Inc | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 634.1 | SQYD | 8.00 | 5,072.80 | 12.00 | 7,609.20 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 983.9 | SQYD | 10.00 | 9,839.00 | 18.50 | 18,202.15 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 2-36" X 8' RCP | 16 | LNFT | 75.00 | 1,200.00 | 43.30 | 692.80 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 350 | SQYD | 20.00 | 7,000.00 | 15.30 | 5,355.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 6 | EACH | 500.00 | 3,000.00 | 116.75 | 700.50 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 1 | EACH | 100.00 | 100.00 | 58.50 | 58.50 | | 0007 | 202-02-38360 | Removal of Sign Faces | 13 | EACH | 200.00 | 2,600.00 | 58.50 | 760.50 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 2,500.00 | 2,500.00 | 2,110.00 | 2,110.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 35,000.00 | 35,000.00 | 4,420.00 | 4,420.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 12 | EACH | 18.00 | 216.00 | 21.00 | 252.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 60.00 | 180.00 | 200.00 | 600.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 700 | LNFT | 2.00 | 1,400.00 | 3.25 | 2,275.00 | | 0013 | 304-01-00100 | Lime | 4.59 | TON | 500.00 | 2,295.00 | 425.00 | 1,950.75 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 388 | SQYD | 6.00 | 2,328.00 | 15.00 | 5,820.00 | | 0015 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 1,553 | SQYD | 20.00 | 31,060.00 | 9.40 | 14,598.20 | | 0016 | 502-01-00100 | Asphalt Concrete | 677.6 | TON | 180.00 | 121,968.00 | 144.00 | 97,574.40 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 864 | SQYD | 12.00 | 10,368.00 | 39.50 | 34,128.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -48 | CUYD | 0.01 | -0.48 | 0.10 | -4.80 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 38 | SQYD | 165.00 | 6,270.00 | 95.00 | 3,610.00 | | 0020 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 662.9 | SQYD | 110.00 | 72,919.00 | 157.00 | 104,075.30 | | 0021 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 160.7 | SQYD | 105.00 | 16,873.50 | 157.00 | 25,229.90 | | 0022 | 601-03-01100 | Portland Cement Concrete Shoulder (10" Thick) | 151.8 | SQYD | 105.00 | 15,939.00 | 157.00 | 23,832.60 | | 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 76 | LNFT | 140.00 | 10,640.00 | 178.00 | 13,528.00 | | 0024 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 354 | LNFT | 70.00 | 24,780.00 | 73.00 | 25,842.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 430 | LNFT | 10.00 | 4,300.00 | 66.00 | 28,380.00 | | 0026 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 4,500.00 | 4,500.00 | 10,300.00 | 10,300.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,750.00 | 11,250.00 | 3,360.00 | 10,080.00 | | 0028 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 300.00 | 300.00 | 2,535.00 | 2,535.00 | | 0029 | 707-01-00300 | Concrete Curb (Mountable) | 60.2 | LNFT | 10.00 | 602.00 | 32.00 | 1,926.40 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 66,115.00 | 66,115.00 | | 0031 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.298 | MILE | 7,000.00 | 16,086.00 | 11,675.00 | 26,829.15 | | 0032 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 30.00 | 120.00 | 60.00 | 240.00 | | 0033 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 50.00 | 100.00 | 65.00 | 130.00 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 4,000.00 | 4,000.00 | 12,200.00 | 12,200.00 | | 0035 | 726-01-00100 | Bedding Material | 91.7 | CUYD | 100.00 | 9,170.00 | 80.50 | 7,381.85 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 63,000.00 | 63,000.00 | 27,820.00 | 27,820.00 | | 0037 | 729-01-00100 | Sign (Type A) | 51.8 | SQFT | 52.00 | 2,693.60 | 35.00 | 1,813.00 | | 0038 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 36.9 | SQFT | 30.00 | 1,107.00 | 35.00 | 1,291.50 | | 0039 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 36 | SQFT | 40.00 | 1,440.00 | 47.00 | 1,692.00 | | 0040 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 2,000.00 | 4,000.00 | 1,750.00 | 3,500.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 95.00 | 190.00 | | 0042 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 1 | EACH | 250.00 | 250.00 | 410.00 | 410.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 352 | EACH | 6.00 | 2,112.00 | 9.50 | 3,344.00 | | 0044 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 934 | LNFT | 2.00 | 1,868.00 | 3.50 | 3,269.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 461 | LNFT | 7.00 | 3,227.00 | 13.00 | 5,993.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.18 | MILE | 2,900.00 | 3,422.00 | 4,670.00 | 5,510.60 | | 0047 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 0.189 | MILE | 1,400.00 | 264.60 | 2,920.00 | 551.88 | | 0048 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.182 | MILE | 5,100.00 | 928.20 | 3,500.00 | 637.00 | | 0049 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 175.00 | 350.00 | 410.00 | 820.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 150.00 | 600.00 | 350.00 | 1,400.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 150.00 | 300.00 | 350.00 | 700.00 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.478 | MILE | 5,200.00 | 2,485.60 | 7,005.00 | 3,348.39 | | 0053 | 736-01-00100 | Trenching and Backfilling | 85 | LNFT | 12.50 | 1,062.50 | 14.00 | 1,190.00 | | 0054 | 736-03-00100 | Jacking or Boring | 45 | LNFT | 22.00 | 990.00 | 25.00 | 1,125.00 | | 0055 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 1,500.00 | 1,500.00 | 1,635.00 | 1,635.00 | | 0056 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 4 | EACH | 1,100.00 | 4,400.00 | 1,275.00 | 5,100.00 | | 0057 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 1 | EACH | 1,100.00 | 1,100.00 | 1,275.00 | 1,275.00 | | 0058 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 1,400.00 | 1,400.00 | 1,605.00 | 1,605.00 | | 0059 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 1 | EACH | 1,400.00 | 1,400.00 | 1,605.00 | 1,605.00 | | 0060 | 736-05-45000 | Signal Heads (4 Section, 12 inch Led Lens, R, Y, G, RT. G) | 1 | EACH | 1,400.00 | 1,400.00 | 1,605.00 | 1,605.00 | | 0061 | 736-08-00100 | Signal Controller (980 ATC, Type 2)(Existing Cab)(Furnish & Install) | 1 | EACH | 6,500.00 | 6,500.00 | 7,975.00 | 7,975.00 | | 0062 | 736-09-00100 | Loop Detector | 230 | LNFT | 30.00 | 6,900.00 | 29.20 | 6,716.00 | | 0063 | 736-10-00300 | Underground Junction Box (Type F) | 1 | EACH | 1,000.00 | 1,000.00 | 820.00 | 820.00 | | 0064 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 30 | LNFT | 3.00 | 90.00 | 3.00 | 90.00 | | 0065 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 100 | LNFT | 9.00 | 900.00 | 9.35 | 935.00 | | 0066 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair, 19 strand) | 100 | LNFT | 3.00 | 300.00 | 2.35 | 235.00 | | 0067 | 736-12-02014 | Conductor (2c, #14 awg) | 80 | LNFT | 3.00 | 240.00 | 2.50 | 200.00 | | 0068 | 736-12-06014 | Conductor (6c, #14 awg) | 80 | LNFT | 4.00 | 320.00 | 4.50 | 360.00 | | 0069 | 736-12-10014 | Conductor (10c, #14 awg) | 273 | LNFT | 5.00 | 1,365.00 | 10.00 | 2,730.00 | | 0070 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 600.00 | 600.00 | 615.00 | 615.00 | | 0071 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 900.00 | 3,600.00 | 970.00 | 3,880.00 | | 0072 | 736-22-00000 | Pedestrian Push Button | 4 | EACH | 250.00 | 1,000.00 | 265.00 | 1,060.00 | | 0073 | 739-01-00100 | Hydro-Seeding | 0.82 | ACRE | 4,000.00 | 3,280.00 | 2,165.00 | 1,775.30 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 15,850.00 | 15,850.00 | | 0075 | 805-01-00900 | Class A1 Concrete Pipe Headwall | 9.93 | CUYD | 1,200.00 | 11,916.00 | 1,400.00 | 13,902.00 | | 0076 | 806-01-00100 | Deformed Reinforcing Steel | 602 | LB | 2.00 | 1,204.00 | 2.00 | 1,204.00 | | 0077 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,436 | INLF | 2.00 | 6,872.00 | 2.00 | 6,872.00 | | 0078 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 3 | EACH | 4,500.00 | 13,500.00 | 3,970.00 | 11,910.00 | | 0079 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad - Soil | 1 | EACH | 1,050.00 | 1,050.00 | 1,110.00 | 1,110.00 | | 0080 | NS-736-00132 | MMU for TS-2 Traffic Signal Cabinet | 1 | EACH | 1,479.58 | 1,479.58 | 1,425.00 | 1,425.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 654,542.90 | | 716,432.07 |
|