Proposal:H.011314.6
Parish:Ascension
Routes:LA 22, LA 70
Description:LA 22: NEAR I-10 GEOMETRIC IMPROV
Type Construction:CLEARING AND GRUBBING, SUBGRADE TREATMENT, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, CONCRETE WALKS AND DRIVES, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$6,124,025.90
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $5,633,333.69 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $5,929,933.11 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $6,661,011.14 |
| 4 | 00481 | COASTAL BRIDGE CO., L.L.C. | $7,473,041.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - KCR CONTRACTORS, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 20,000.00 | 20,000.00 | 209,800.00 | 209,800.00 | 34,000.00 | 34,000.00 | 69,000.00 | 69,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 24,000.00 | 24,000.00 | 30,000.00 | 30,000.00 | 69,000.00 | 69,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 232 | SQYD | 5.00 | 1,160.00 | 7.71 | 1,788.72 | 15.00 | 3,480.00 | 69.00 | 16,008.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 12,450.3 | SQYD | 5.00 | 62,251.50 | 0.08 | 996.02 | 5.00 | 62,251.50 | 49.69 | 618,655.41 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 12,450.3 | SQYD | 5.00 | 62,251.50 | 0.08 | 996.02 | 5.00 | 62,251.50 | 6.90 | 85,907.07 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,761 | SQYD | 15.00 | 26,415.00 | 7.50 | 13,207.50 | 17.00 | 29,937.00 | 69.00 | 121,509.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 2,143.8 | LNFT | 1.00 | 2,143.80 | 1.17 | 2,508.25 | 8.00 | 17,150.40 | 16.69 | 35,780.02 | | 0008 | 202-02-14500 | Removal of Guard Rail | 90 | LNFT | 15.00 | 1,350.00 | 10.51 | 945.90 | 12.00 | 1,080.00 | 69.00 | 6,210.00 | | 0009 | 202-02-26300 | Removal of Median / Island | 333 | SQYD | 5.00 | 1,665.00 | 7.50 | 2,497.50 | 25.00 | 8,325.00 | 69.00 | 22,977.00 | | 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,642 | SQYD | 5.00 | 8,210.00 | 6.69 | 10,984.98 | 17.00 | 27,914.00 | 69.00 | 113,298.00 | | 0011 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,000.00 | 3,000.00 | 3,850.00 | 3,850.00 | 4,000.00 | 4,000.00 | 6,900.00 | 6,900.00 | | 0012 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 1,000.00 | 1,000.00 | 1,215.50 | 1,215.50 | 2,000.00 | 2,000.00 | 6,900.00 | 6,900.00 | | 0013 | 203-01-00100 | General Excavation | 9,009 | CUYD | 12.00 | 108,108.00 | 7.04 | 63,423.36 | 14.00 | 126,126.00 | 6.69 | 60,270.21 | | 0014 | 203-03-00100 | Embankment | 21,234 | CUYD | 16.00 | 339,744.00 | 20.03 | 425,317.02 | 23.00 | 488,382.00 | 16.69 | 354,395.46 | | 0015 | 203-10-00100 | Cleaning Existing Ditches | 2,500 | LNFT | 5.00 | 12,500.00 | 1.15 | 2,875.00 | 7.50 | 18,750.00 | 6.69 | 16,725.00 | | 0016 | 204-02-00100 | Temporary Hay Bales | 126 | EACH | 25.00 | 3,150.00 | 25.00 | 3,150.00 | 15.00 | 1,890.00 | 16.69 | 2,102.94 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 21 | EACH | 125.00 | 2,625.00 | 125.00 | 2,625.00 | 135.00 | 2,835.00 | 169.69 | 3,563.49 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 11,291 | LNFT | 2.00 | 22,582.00 | 1.85 | 20,888.35 | 1.40 | 15,807.40 | 1.69 | 19,081.79 | | 0019 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 29,175.8 | SQYD | 6.00 | 175,054.80 | 15.36 | 448,140.29 | 20.00 | 583,516.00 | 13.69 | 399,416.70 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 33 | CUYD | 80.00 | 2,640.00 | 115.00 | 3,795.00 | 60.00 | 1,980.00 | 69.00 | 2,277.00 | | 0021 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 750 | CUYD | 25.00 | 18,750.00 | 61.60 | 46,200.00 | 55.00 | 41,250.00 | 69.00 | 51,750.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 23,957.4 | TON | 90.00 | 2,156,166.00 | 87.21 | 2,089,324.85 | 85.00 | 2,036,379.00 | 93.69 | 2,244,568.81 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 13.2 | TON | 180.00 | 2,376.00 | 87.21 | 1,151.17 | 275.00 | 3,630.00 | 469.00 | 6,190.80 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 14,323 | SQYD | 3.00 | 42,969.00 | 3.94 | 56,432.62 | 3.50 | 50,130.50 | 3.69 | 52,851.87 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -680 | CUYD | 25.00 | -17,000.00 | 0.10 | -68.00 | 0.00 | 0.00 | 16.69 | -11,349.20 | | 0026 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,276 | SQYD | 100.00 | 127,600.00 | 74.90 | 95,572.40 | 90.00 | 114,840.00 | 96.69 | 123,376.44 | | 0027 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 2,990.4 | SQYD | 75.00 | 224,280.00 | 55.92 | 167,223.17 | 90.00 | 269,136.00 | 69.00 | 206,337.60 | | 0028 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (10" Thick) | 630.4 | SQYD | 120.00 | 75,648.00 | 154.66 | 97,497.66 | 155.00 | 97,712.00 | 106.69 | 67,257.38 | | 0029 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (5" Thick) | 4,932.4 | SQYD | 80.00 | 394,592.00 | 93.39 | 460,636.84 | 90.00 | 443,916.00 | 42.69 | 210,564.16 | | 0030 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 10 | EACH | 100.00 | 1,000.00 | 262.50 | 2,625.00 | 300.00 | 3,000.00 | 1,500.00 | 15,000.00 | | 0031 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 213 | LNFT | 60.00 | 12,780.00 | 72.75 | 15,495.75 | 55.00 | 11,715.00 | 62.00 | 13,206.00 | | 0032 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 402 | LNFT | 80.00 | 32,160.00 | 82.57 | 33,193.14 | 75.00 | 30,150.00 | 80.00 | 32,160.00 | | 0033 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 55 | LNFT | 120.00 | 6,600.00 | 114.76 | 6,311.80 | 95.00 | 5,225.00 | 127.00 | 6,985.00 | | 0034 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 267 | LNFT | 130.00 | 34,710.00 | 118.00 | 31,506.00 | 115.00 | 30,705.00 | 138.00 | 36,846.00 | | 0035 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 147 | LNFT | 200.00 | 29,400.00 | 123.70 | 18,183.90 | 200.00 | 29,400.00 | 148.00 | 21,756.00 | | 0036 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 308 | LNFT | 80.00 | 24,640.00 | 82.57 | 25,431.56 | 80.00 | 24,640.00 | 62.00 | 19,096.00 | | 0037 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 52 | LNFT | 130.00 | 6,760.00 | 117.99 | 6,135.48 | 140.00 | 7,280.00 | 130.00 | 6,760.00 | | 0038 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 52 | LNFT | 130.00 | 6,760.00 | 128.25 | 6,669.00 | 150.00 | 7,800.00 | 205.00 | 10,660.00 | | 0039 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,000.00 | 4,000.00 | 575.00 | 1,150.00 | 1,750.00 | 3,500.00 | 1,300.00 | 2,600.00 | | 0040 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 658 | LNFT | 0.01 | 6.58 | 9.20 | 6,053.60 | 4.00 | 2,632.00 | 18.00 | 11,844.00 | | 0041 | 702-03-00100 | Catch Basins (CB-01) | 10 | EACH | 3,000.00 | 30,000.00 | 3,262.64 | 32,626.40 | 4,000.00 | 40,000.00 | 3,500.00 | 35,000.00 | | 0042 | 702-03-00500 | Catch Basins (CB-06) | 3 | EACH | 6,000.00 | 18,000.00 | 3,411.67 | 10,235.01 | 5,000.00 | 15,000.00 | 4,900.00 | 14,700.00 | | 0043 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 93.75 | LNFT | 25.00 | 2,343.75 | 24.76 | 2,321.25 | 24.00 | 2,250.00 | 22.00 | 2,062.50 | | 0044 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | 962.5 | LNFT | 32.00 | 30,800.00 | 31.69 | 30,501.63 | 32.00 | 30,800.00 | 29.00 | 27,912.50 | | 0045 | 704-05-00300 | Guard Rail Anchor Sections – 31”, (Trailing End) | 9.896 | LNFT | 110.00 | 1,088.56 | 289.19 | 2,861.82 | 115.00 | 1,138.04 | 104.94 | 1,038.49 | | 0046 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,000.00 | 3,000.00 | 2,574.77 | 2,574.77 | 2,900.00 | 2,900.00 | 2,700.00 | 2,700.00 | | 0047 | 704-10-00300 | Guard Rail End Treatment (Bi-Directional) | 2 | EACH | 6,000.00 | 12,000.00 | 7,960.87 | 15,921.74 | 6,200.00 | 12,400.00 | 5,800.00 | 11,600.00 | | 0048 | 706-02-00200 | Concrete Drive (6" Thick) | 1,393.6 | SQYD | 70.00 | 97,552.00 | 62.15 | 86,612.24 | 80.00 | 111,488.00 | 69.69 | 97,119.98 | | 0049 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 268.9 | SQYD | 70.00 | 18,823.00 | 50.60 | 13,606.34 | 85.00 | 22,856.50 | 69.69 | 18,739.64 | | 0050 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 900.00 | 8,100.00 | 920.00 | 8,280.00 | 1,800.00 | 16,200.00 | 1,669.69 | 15,027.21 | | 0051 | 707-01-00200 | Concrete Curb (Barrier) | 216.8 | LNFT | 9.00 | 1,951.20 | 4.57 | 990.78 | 20.00 | 4,336.00 | 69.69 | 15,108.79 | | 0052 | 707-01-00300 | Concrete Curb (Mountable) | 8,865.2 | LNFT | 9.00 | 79,786.80 | 4.22 | 37,411.14 | 18.00 | 159,573.60 | 26.69 | 236,612.19 | | 0053 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,446.9 | LNFT | 40.00 | 57,876.00 | 25.88 | 37,445.77 | 26.00 | 37,619.40 | 31.69 | 45,852.26 | | 0054 | 708-01-00100 | Right-of-Way Monument | 18 | EACH | 100.00 | 1,800.00 | 198.61 | 3,574.98 | 100.00 | 1,800.00 | 500.00 | 9,000.00 | | 0055 | 708-02-00100 | Right-of-Way Monument Witness Post | 18 | EACH | 100.00 | 1,800.00 | 91.67 | 1,650.06 | 100.00 | 1,800.00 | 1,200.00 | 21,600.00 | | 0056 | 710-01-00100 | Flowable Fill | 14 | CUYD | 250.00 | 3,500.00 | 201.25 | 2,817.50 | 300.00 | 4,200.00 | 222.00 | 3,108.00 | | 0057 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 44,500.50 | 44,500.50 | 115,000.00 | 115,000.00 | 169,000.00 | 169,000.00 | | 0058 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 65 | LNFT | 0.50 | 32.50 | 1.10 | 71.50 | 1.00 | 65.00 | 1.00 | 65.00 | | 0059 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.805 | MILE | 1,000.00 | 805.00 | 1,100.00 | 885.50 | 600.00 | 483.00 | 993.79 | 800.00 | | 0060 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.762 | MILE | 600.00 | 3,457.20 | 1,650.00 | 9,507.30 | 600.00 | 3,457.20 | 1,499.48 | 8,640.00 | | 0061 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 3 | EACH | 0.25 | 0.75 | 55.00 | 165.00 | 250.00 | 750.00 | 50.00 | 150.00 | | 0062 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 1 | EACH | 0.25 | 0.25 | 60.50 | 60.50 | 500.00 | 500.00 | 55.00 | 55.00 | | 0063 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 10,000.00 | 20,000.00 | 11,500.00 | 23,000.00 | 10,000.00 | 20,000.00 | 10,690.00 | 21,380.00 | | 0064 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 11,700.00 | 11,700.00 | 15,000.00 | 15,000.00 | 69,000.00 | 69,000.00 | | 0065 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.611 | MILE | 600.00 | 366.60 | 9,001.64 | 5,500.00 | 700.00 | 427.70 | 599.02 | 366.00 | | 0066 | 725-01-00100 | Temporary Detour Roads | 1,474.1 | SQYD | 60.00 | 88,446.00 | 87.18 | 128,512.04 | 65.00 | 95,816.50 | 113.69 | 167,590.43 | | 0067 | 726-01-00100 | Bedding Material | 135.4 | CUYD | 60.00 | 8,124.00 | 92.00 | 12,456.80 | 90.00 | 12,186.00 | 96.00 | 12,998.40 | | 0068 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 344,467.04 | 344,467.04 | 600,000.00 | 600,000.00 | 669,000.00 | 669,000.00 | | 0069 | 729-01-00100 | Sign (Type A) | 398.6 | SQFT | 25.00 | 9,965.00 | 24.25 | 9,666.05 | 27.00 | 10,762.20 | 16.00 | 6,377.60 | | 0070 | 729-01-00103 | Sign (Type A)(Relocate) | 51 | SQFT | 20.00 | 1,020.00 | 24.75 | 1,262.25 | 16.00 | 816.00 | 21.50 | 1,096.50 | | 0071 | 729-02-00100 | Sign (Type B) | 49.2 | SQFT | 28.00 | 1,377.60 | 29.70 | 1,461.24 | 28.00 | 1,377.60 | 26.00 | 1,279.20 | | 0072 | 729-04-00100 | Sign (Type D) | 26.25 | SQFT | 32.00 | 840.00 | 40.70 | 1,068.38 | 32.00 | 840.00 | 35.00 | 918.75 | | 0073 | 729-08-00200 | Mounting (3 1/2" Size Post) | 5 | EACH | 1,600.00 | 8,000.00 | 209.00 | 1,045.00 | 1,650.00 | 8,250.00 | 850.00 | 4,250.00 | | 0074 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 1 | EACH | 2,000.00 | 2,000.00 | 1,650.00 | 1,650.00 | 2,000.00 | 2,000.00 | 1,400.00 | 1,400.00 | | 0075 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 18 | EACH | 100.00 | 1,800.00 | 110.00 | 1,980.00 | 94.00 | 1,692.00 | 90.00 | 1,620.00 | | 0076 | 731-02-00100 | Reflectorized Raised Pavement Markers | 402 | EACH | 6.00 | 2,412.00 | 11.00 | 4,422.00 | 5.50 | 2,211.00 | 10.00 | 4,020.00 | | 0077 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.762 | MILE | 3,200.00 | 15,238.40 | 4,950.00 | 23,571.90 | 3,300.00 | 15,714.60 | 4,500.00 | 21,429.00 | | 0078 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.327 | MILE | 10,000.00 | 3,270.00 | 16,500.00 | 5,395.50 | 10,000.00 | 3,270.00 | 14,000.00 | 4,578.00 | | 0079 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.12 | MILE | 15,000.00 | 1,800.00 | 22,000.00 | 2,640.00 | 16,000.00 | 1,920.00 | 20,000.00 | 2,400.00 | | 0080 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.045 | MILE | 40,000.00 | 1,800.00 | 38,500.00 | 1,732.50 | 34,000.00 | 1,530.00 | 31,111.11 | 1,400.00 | | 0081 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.305 | MILE | 1,200.00 | 1,566.00 | 1,650.00 | 2,153.25 | 1,300.00 | 1,696.50 | 1,494.25 | 1,950.00 | | 0082 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.166 | MILE | 4,000.00 | 664.00 | 4,400.00 | 730.40 | 4,200.00 | 697.20 | 3,855.42 | 640.00 | | 0083 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.248 | MILE | 6,000.00 | 1,488.00 | 6,600.00 | 1,636.80 | 5,000.00 | 1,240.00 | 5,806.45 | 1,440.00 | | 0084 | 732-03-02060 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 90 mil) | 0.037 | MILE | 12,000.00 | 444.00 | 27,500.00 | 1,017.50 | 8,000.00 | 296.00 | 20,270.27 | 750.00 | | 0085 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 300.00 | 600.00 | 275.00 | 550.00 | 275.00 | 550.00 | 250.00 | 500.00 | | 0086 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 290.00 | 1,160.00 | 330.00 | 1,320.00 | 300.00 | 1,200.00 | 300.00 | 1,200.00 | | 0087 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 300.00 | 300.00 | 269.50 | 269.50 | 275.00 | 275.00 | 245.00 | 245.00 | | 0088 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 269.50 | 539.00 | 275.00 | 550.00 | 245.00 | 490.00 | | 0089 | 732-04-01130 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTRC) | 2 | EACH | 800.00 | 1,600.00 | 825.00 | 1,650.00 | 850.00 | 1,700.00 | 750.00 | 1,500.00 | | 0090 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 2 | EACH | 800.00 | 1,600.00 | 825.00 | 1,650.00 | 850.00 | 1,700.00 | 750.00 | 1,500.00 | | 0091 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 2 | EACH | 800.00 | 1,600.00 | 825.00 | 1,650.00 | 850.00 | 1,700.00 | 750.00 | 1,500.00 | | 0092 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 2 | EACH | 800.00 | 1,600.00 | 825.00 | 1,650.00 | 850.00 | 1,700.00 | 750.00 | 1,500.00 | | 0093 | 736-01-00100 | Trenching and Backfilling | 1,050 | LNFT | 8.00 | 8,400.00 | 7.28 | 7,644.00 | 7.00 | 7,350.00 | 7.80 | 8,190.00 | | 0094 | 736-03-00100 | Jacking or Boring | 440 | LNFT | 12.00 | 5,280.00 | 13.26 | 5,834.40 | 13.00 | 5,720.00 | 33.80 | 14,872.00 | | 0095 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 2,000.00 | 2,000.00 | 2,018.50 | 2,018.50 | 2,000.00 | 2,000.00 | 2,735.63 | 2,735.63 | | 0096 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 13,000.00 | 13,000.00 | 14,030.50 | 14,030.50 | 13,000.00 | 13,000.00 | 13,128.13 | 13,128.13 | | 0097 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 1 | EACH | 14,000.00 | 14,000.00 | 14,822.50 | 14,822.50 | 14,000.00 | 14,000.00 | 13,619.38 | 13,619.38 | | 0098 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 2 | EACH | 16,000.00 | 32,000.00 | 16,582.50 | 33,165.00 | 16,000.00 | 32,000.00 | 15,080.63 | 30,161.26 | | 0099 | 736-04-24540 | Signal Pole (Dual Mast Arm, 45ft-Arm 1, 40ft-Arm 2) | 2 | EACH | 21,000.00 | 42,000.00 | 22,542.30 | 45,084.60 | 21,000.00 | 42,000.00 | 20,900.00 | 41,800.00 | | 0100 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 16 | EACH | 1,000.00 | 16,000.00 | 1,050.50 | 16,808.00 | 1,100.00 | 17,600.00 | 1,051.80 | 16,828.80 | | 0101 | 736-05-31000 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 3 | EACH | 1,000.00 | 3,000.00 | 1,050.50 | 3,151.50 | 1,100.00 | 3,300.00 | 1,090.44 | 3,271.32 | | 0102 | 736-05-51000 | Signal Heads (5 Section, 12 inch Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,400.00 | 2,800.00 | 1,454.20 | 2,908.40 | 1,500.00 | 3,000.00 | 1,634.23 | 3,268.46 | | 0103 | 736-06-00100 | Signal Service | 2 | EACH | 1,800.00 | 3,600.00 | 1,945.90 | 3,891.80 | 2,000.00 | 4,000.00 | 2,054.03 | 4,108.06 | | 0104 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 2,300.00 | 4,600.00 | 2,420.00 | 4,840.00 | 2,500.00 | 5,000.00 | 2,785.21 | 5,570.42 | | 0105 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 7,000.00 | 14,000.00 | 7,073.00 | 14,146.00 | 7,000.00 | 14,000.00 | 7,131.88 | 14,263.76 | | 0106 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 500.00 | 1,000.00 | 544.50 | 1,089.00 | 550.00 | 1,100.00 | 551.94 | 1,103.88 | | 0107 | 736-10-00300 | Underground Junction Box (Type F) | 11 | EACH | 700.00 | 7,700.00 | 706.20 | 7,768.20 | 650.00 | 7,150.00 | 632.84 | 6,961.24 | | 0108 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 1,100.00 | 2,200.00 | 1,105.50 | 2,211.00 | 1,100.00 | 2,200.00 | 1,125.71 | 2,251.42 | | 0109 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 190 | LNFT | 5.00 | 950.00 | 4.40 | 836.00 | 4.20 | 798.00 | 2.55 | 484.50 | | 0110 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,500 | LNFT | 10.00 | 15,000.00 | 9.19 | 13,785.00 | 9.00 | 13,500.00 | 4.61 | 6,915.00 | | 0111 | 736-11-00400 | Conduit (4" HDPE, Schedule 80) | 190 | LNFT | 12.00 | 2,280.00 | 12.59 | 2,392.10 | 12.00 | 2,280.00 | 6.24 | 1,185.60 | | 0112 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 70 | LNFT | 4.00 | 280.00 | 4.08 | 285.60 | 4.00 | 280.00 | 4.05 | 283.50 | | 0113 | 736-12-06014 | Conductor (6c, #14 awg) | 1,545 | LNFT | 3.00 | 4,635.00 | 2.99 | 4,619.55 | 2.70 | 4,171.50 | 2.49 | 3,847.05 | | 0114 | 736-12-10014 | Conductor (10c, #14 awg) | 4,035 | LNFT | 3.00 | 12,105.00 | 3.39 | 13,678.65 | 3.10 | 12,508.50 | 2.23 | 8,998.05 | | 0115 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 600.00 | 600.00 | 588.50 | 588.50 | 550.00 | 550.00 | 1,618.65 | 1,618.65 | | 0116 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 6 | EACH | 2,000.00 | 12,000.00 | 2,180.20 | 13,081.20 | 2,000.00 | 12,000.00 | 4,369.00 | 26,214.00 | | 0117 | 737-04-00001 | Painted Curbs and Islands | 5,792 | SQYD | 0.50 | 2,896.00 | 5.50 | 31,856.00 | 2.30 | 13,321.60 | 5.00 | 28,960.00 | | 0118 | 739-01-00100 | Hydro-Seeding | 8.076 | ACRE | 1,900.00 | 15,344.40 | 2,089.95 | 16,878.44 | 1,000.00 | 8,076.00 | 1,469.00 | 11,863.64 | | 0119 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 65,000.00 | 65,000.00 | 85,000.00 | 85,000.00 | 69,000.00 | 69,000.00 | | 0120 | 822-01-00100 | Trenching and Backfilling | 70 | LNFT | 8.00 | 560.00 | 5.50 | 385.00 | 6.00 | 420.00 | 7.80 | 546.00 | | 0121 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (3#4, 1#8 GND) (SCH 80) | 70 | LNFT | 10.00 | 700.00 | 9.99 | 699.30 | 10.00 | 700.00 | 70.30 | 4,921.00 | | 0122 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 68,275 | INLF | 0.30 | 20,482.50 | 0.72 | 49,158.00 | 0.20 | 13,655.00 | 0.80 | 54,620.00 | | 0123 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,374 | INLF | 1.00 | 12,374.00 | 1.21 | 14,972.54 | 0.80 | 9,899.20 | 2.50 | 30,935.00 | | 0124 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad - Soil | 20 | EACH | 800.00 | 16,000.00 | 550.00 | 11,000.00 | 800.00 | 16,000.00 | 450.00 | 9,000.00 | | 0125 | NS-729-00031 | Breakaway Square Tubing Sign Support - Hard Concrete | 8 | EACH | 200.00 | 1,600.00 | 385.00 | 3,080.00 | 160.00 | 1,280.00 | 300.00 | 2,400.00 | | 0126 | NS-736-00001 | GPS | 2 | EACH | 1,000.00 | 2,000.00 | 1,094.50 | 2,189.00 | 1,100.00 | 2,200.00 | 1,085.69 | 2,171.38 | | 0127 | NS-736-00019 | Wireless Magnetometer Vehicle Detection System (WMVDS) (Stop Bar with Volume Density) | 2 | LUMP | 40,000.00 | 80,000.00 | 40,716.50 | 81,433.00 | 38,000.00 | 76,000.00 | 20,987.50 | 41,975.00 | | 0128 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 20,000.00 | 40,000.00 | 17,113.80 | 34,227.60 | 18,000.00 | 36,000.00 | 20,660.50 | 41,321.00 | | 0129 | NS-MSC-00120 | Drainage Structure paved gutter drain | 15 | EACH | 3,300.00 | 49,500.00 | 2,645.00 | 39,675.00 | 3,500.00 | 52,500.00 | 3,000.00 | 45,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,633,333.69 | | 5,929,933.11 | | 6,661,011.14 | | 7,473,041.52 |
|